Overview
What is the OKI TIP?
OKI’s TIP lists committed transportation improvements in the eight-county OKI region. A new TIP is produced every two years, with each one spanning four years. The TIP is fiscally constrained, meaning total costs must not exceed expected funds available.
Inclusion in the TIP is a requirement for receiving federal transportation funds. The TIP provides a list by county of all federally funded or regionally significant highway and transit projects sponsored by municipal, county, or state governments or transit agencies. The TIP provides an overview of the transportation planning process and how projects are selected through the state DOTs or OKI.
The TIP includes a list of multi-modal transportation projects, such as:
- Improving highways that have recommendations for improving bus service
- Advanced technologies to move traffic more efficiently
- Projects that reduce drive-alone commuting, including ridesharing
- Bicycle and pedestrian projects
- Upgrading highway operating efficiency and projects that improve freight operations
Tip Projects & Amendments
TIP 2026-2029
as amended on September 10, 2026
original as adopted on April 10, 2025
Draft TIP Amendment #10A & #10B are scheduled for adoption by the OKI Executive Committee on September 10, 2026. OKI is accepting comments from the public until 4 p.m EDT/ 3 p.m. CT on September 9, 2026. Submit comments to Regina Fields.
FY26-29 TIP Amendment
TIP Roadway Projects
| PID | ID | State | Locale(s) | List Type | Sponsoring Agency | Project Name | Project Termini | Project Description | Primary Work Category | Air Quality Status | S/TIP Year (SFY) | Phase | Phase Sort | STIP Fund Type | S/TIP Year Estimate | Total Project Estimate |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 100650 | 35.847 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 73 7.20 | WAR SR 73: SLM 7.20-20.05 | Resurfacing a portion of SR 73 in Warren County and adding left turn lane on SB SR-73 at Old SR-73 intersection. | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Preservation | $3,096,494.41 | $5,077,870.00 |
| 100650 | 35.848 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 73 7.20 | WAR SR 73: SLM 7.20-20.05 | Resurfacing a portion of SR 73 in Warren County and adding left turn lane on SB SR-73 at Old SR-73 intersection. | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Safety | $766,756.80 | $5,077,870.00 |
| 100650 | 35.849 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 73 7.20 | WAR SR 73: SLM 7.20-20.05 | Resurfacing a portion of SR 73 in Warren County and adding left turn lane on SB SR-73 at Old SR-73 intersection. | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | State | $859,318.80 | $5,077,870.00 |
| 100650 | 35.850 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 73 7.20 | WAR SR 73: SLM 7.20-20.05 | Resurfacing a portion of SR 73 in Warren County and adding left turn lane on SB SR-73 at Old SR-73 intersection. | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Labor | $188,899.99 | $5,077,870.00 |
| 101313 | 35.851 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 0.00 | HAM IR 275: SLM 0 - 3.97 | Resurfacing portions of IR 275 in Hamilton County. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Preservation | $5,148,990.00 | $5,949,944.00 |
| 101313 | 35.852 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 0.00 | HAM IR 275: SLM 0 - 3.97 | Resurfacing portions of IR 275 in Hamilton County. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | State | $572,110.00 | $5,949,944.00 |
| 101313 | 35.853 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 0.00 | HAM IR 275: SLM 0 - 3.97 | Resurfacing portions of IR 275 in Hamilton County. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Labor | $228,844.00 | $5,949,944.00 |
| 101403 | 35.854 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 4B 2.77 | BUT SR 4B: SLM 2.772-5.975 | Resurfacing on a portion of SR 4 By-Pass in Butler County | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Preservation | $2,387,264.00 | $3,412,323.00 |
| 101403 | 35.855 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 4B 2.77 | BUT SR 4B: SLM 2.772-5.975 | Resurfacing on a portion of SR 4 By-Pass in Butler County | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | State | $893,816.00 | $3,412,323.00 |
| 101403 | 35.856 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 4B 2.77 | BUT SR 4B: SLM 2.772-5.975 | Resurfacing on a portion of SR 4 By-Pass in Butler County | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Labor | $131,243.00 | $3,412,323.00 |
| 102551 | 35.857 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 123 9.66 | WAR-123: SLM 9.66-14.78 | Chip sealing a portion of SR 123 in Warren County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Preservation | $399,295.45 | $610,393.00 |
| 102551 | 35.858 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 123 9.66 | WAR-123: SLM 9.66-14.78 | Chip sealing a portion of SR 123 in Warren County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | State | $99,823.86 | $610,393.00 |
| 102551 | 35.859 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 123 9.66 | WAR-123: SLM 9.66-14.78 | Chip sealing a portion of SR 123 in Warren County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Labor | $34,940.69 | $610,393.00 |
| 102749 | 35.860 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 127 11.88 | HAM US 127 11.88 - SFN 3111431 | Rehabilitate Bridge Size Culvert HAM-127-1188 over Tributary to West Fork Mill Creek by patching, Tuck-pointing, epoxy injection, and reconstructing deteriorated portions of the structure including adjoining drainage | Bridge Preservation | Exempt | 2026 | CO | 0 | Preservation | $615,645.76 | $909,146.00 |
| 102749 | 35.861 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 127 11.88 | HAM US 127 11.88 - SFN 3111431 | Rehabilitate Bridge Size Culvert HAM-127-1188 over Tributary to West Fork Mill Creek by patching, Tuck-pointing, epoxy injection, and reconstructing deteriorated portions of the structure including adjoining drainage | Bridge Preservation | Exempt | 2026 | CO | 0 | State | $153,911.44 | $909,146.00 |
| 102749 | 35.862 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 127 11.88 | HAM US 127 11.88 - SFN 3111431 | Rehabilitate Bridge Size Culvert HAM-127-1188 over Tributary to West Fork Mill Creek by patching, Tuck-pointing, epoxy injection, and reconstructing deteriorated portions of the structure including adjoining drainage | Bridge Preservation | Exempt | 2026 | CO | 0 | Labor | $76,952.80 | $909,146.00 |
| 102771 | 35.863 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 48/132 6.62/17.76 | CLE SR 48/132 6.62/17.76 SFNs 1300709 & 1302981 | Rehabilitate Bridge CLE-48-6.62 which carries SR 48 over O'Bannon Creek by installing a concrete overlay and installing polymer modified ashpalt expansion joints. Rehabiltate bridge CLE-132-1776 which carries SR 132 over Stonelick Creek by installing an o | Bridge Preservation | Exempt | 2026 | CO | 0 | Preservation | $915,031.56 | $1,390,260.00 |
| 102771 | 35.864 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 48/132 6.62/17.76 | CLE SR 48/132 6.62/17.76 SFNs 1300709 & 1302981 | Rehabilitate Bridge CLE-48-6.62 which carries SR 48 over O'Bannon Creek by installing a concrete overlay and installing polymer modified ashpalt expansion joints. Rehabiltate bridge CLE-132-1776 which carries SR 132 over Stonelick Creek by installing an o | Bridge Preservation | Exempt | 2026 | CO | 0 | State | $228,757.89 | $1,390,260.00 |
| 102771 | 35.865 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 48/132 6.62/17.76 | CLE SR 48/132 6.62/17.76 SFNs 1300709 & 1302981 | Rehabilitate Bridge CLE-48-6.62 which carries SR 48 over O'Bannon Creek by installing a concrete overlay and installing polymer modified ashpalt expansion joints. Rehabiltate bridge CLE-132-1776 which carries SR 132 over Stonelick Creek by installing an o | Bridge Preservation | Exempt | 2026 | CO | 0 | Labor | $80,070.55 | $1,390,260.00 |
| 105158 | 35.866 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE CHIP FY2026 | CLE US 52: SLM 16.64 - 25.49 | Chip sealing a portion of US 52 in Clermont County. Includes patching of bridge wearing surface CLE-52-2346. | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Preservation | $499,526.78 | $691,446.00 |
| 105158 | 35.867 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE CHIP FY2026 | CLE US 52: SLM 16.64 - 25.49 | Chip sealing a portion of US 52 in Clermont County. Includes patching of bridge wearing surface CLE-52-2346. | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | State | $124,881.70 | $691,446.00 |
| 105158 | 35.868 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE CHIP FY2026 | CLE US 52: SLM 16.64 - 25.49 | Chip sealing a portion of US 52 in Clermont County. Includes patching of bridge wearing surface CLE-52-2346. | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Labor | $43,711.52 | $691,446.00 |
| 105206 | 35.869 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 73 9.90 | BUT SR 73 SLM 9.90 to 14.66 | Resurfacing portions of SR 73 in Butler County. | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Preservation | $2,218,062.40 | $2,906,673.00 |
| 105206 | 35.870 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 73 9.90 | BUT SR 73 SLM 9.90 to 14.66 | Resurfacing portions of SR 73 in Butler County. | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | State | $554,515.60 | $2,906,673.00 |
| 105206 | 35.871 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 73 9.90 | BUT SR 73 SLM 9.90 to 14.66 | Resurfacing portions of SR 73 in Butler County. | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Labor | $110,902.00 | $2,906,673.00 |
| 105208 | 35.872 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 125 8.95 | CLE-125: SLM 8.95-14.01 | Resurfacing a portion of SR 125 in Clermont County. | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Preservation | $2,256,343.09 | $3,075,368.00 |
| 105208 | 35.873 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 125 8.95 | CLE-125: SLM 8.95-14.01 | Resurfacing a portion of SR 125 in Clermont County. | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | State | $564,085.77 | $3,075,368.00 |
| 105208 | 35.874 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 125 8.95 | CLE-125: SLM 8.95-14.01 | Resurfacing a portion of SR 125 in Clermont County. | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Labor | $197,431.14 | $3,075,368.00 |
| 105216 | 35.875 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 4/SR 747 6.13/0.00 | HAM SR 4 SLM 6.13-8.33 and HAM SR 747 SLM 0-0.88 | Resurfacing on a section of SR 4 and SR 747 in Hamilton County. | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Preservation | $1,971,846.13 | $2,577,923.00 |
| 105216 | 35.876 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 4/SR 747 6.13/0.00 | HAM SR 4 SLM 6.13-8.33 and HAM SR 747 SLM 0-0.88 | Resurfacing on a section of SR 4 and SR 747 in Hamilton County. | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | State | $492,961.53 | $2,577,923.00 |
| 105216 | 35.877 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 4/SR 747 6.13/0.00 | HAM SR 4 SLM 6.13-8.33 and HAM SR 747 SLM 0-0.88 | Resurfacing on a section of SR 4 and SR 747 in Hamilton County. | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Labor | $98,592.34 | $2,577,923.00 |
| 105220 | 35.878 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 5.05 | HAM IR 71 5.05 - SFN 3114600 | Minor Rehabilitation of the bridge the HAM-71-0505 Bridge that carries Woodburn Ave over I-71. The rehabilitation will include painting the structural steel, patching the substructure, sealing the deck, fence repair, and other minor repairs. | Bridge Preservation | Exempt | 2026 | CO | 0 | Preservation | $1,424,079.90 | $1,854,353.00 |
| 105220 | 35.879 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 5.05 | HAM IR 71 5.05 - SFN 3114600 | Minor Rehabilitation of the bridge the HAM-71-0505 Bridge that carries Woodburn Ave over I-71. The rehabilitation will include painting the structural steel, patching the substructure, sealing the deck, fence repair, and other minor repairs. | Bridge Preservation | Exempt | 2026 | CO | 0 | State | $158,231.10 | $1,854,353.00 |
| 105220 | 35.880 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 5.05 | HAM IR 71 5.05 - SFN 3114600 | Minor Rehabilitation of the bridge the HAM-71-0505 Bridge that carries Woodburn Ave over I-71. The rehabilitation will include painting the structural steel, patching the substructure, sealing the deck, fence repair, and other minor repairs. | Bridge Preservation | Exempt | 2026 | CO | 0 | Labor | $110,762.00 | $1,854,353.00 |
| 105221 | 35.881 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 129 9.09/9.20 | BUT SR 129 9.09/9.20 - SFNs 0900302 - 0900337 | Replace the concrete overlays for the two bridges BUT-129-0908/0920 over Beals Run and a Tributary to Indian Creek including other related rehab work. | Bridge Preservation | Exempt | ENV | 0 | State | $904,345.00 | ||
| 105221 | 35.882 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 129 9.09/9.20 | BUT SR 129 9.09/9.20 - SFNs 0900302 - 0900337 | Replace the concrete overlays for the two bridges BUT-129-0908/0920 over Beals Run and a Tributary to Indian Creek including other related rehab work. | Bridge Preservation | Exempt | 2026 | ENV | 0 | Labor | $141,440.00 | $904,345.00 |
| 105221 | 35.883 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 129 9.09/9.20 | BUT SR 129 9.09/9.20 - SFNs 0900302 - 0900337 | Replace the concrete overlays for the two bridges BUT-129-0908/0920 over Beals Run and a Tributary to Indian Creek including other related rehab work. | Bridge Preservation | Exempt | DD | 0 | State | $904,345.00 | ||
| 105221 | 35.884 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 129 9.09/9.20 | BUT SR 129 9.09/9.20 - SFNs 0900302 - 0900337 | Replace the concrete overlays for the two bridges BUT-129-0908/0920 over Beals Run and a Tributary to Indian Creek including other related rehab work. | Bridge Preservation | Exempt | 2026 | DD | 0 | Labor | $24,960.00 | $904,345.00 |
| 105221 | 35.885 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 129 9.09/9.20 | BUT SR 129 9.09/9.20 - SFNs 0900302 - 0900337 | Replace the concrete overlays for the two bridges BUT-129-0908/0920 over Beals Run and a Tributary to Indian Creek including other related rehab work. | Bridge Preservation | Exempt | 2027 | CO | 0 | Preservation | $448,320.00 | $904,345.00 |
| 105221 | 35.886 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 129 9.09/9.20 | BUT SR 129 9.09/9.20 - SFNs 0900302 - 0900337 | Replace the concrete overlays for the two bridges BUT-129-0908/0920 over Beals Run and a Tributary to Indian Creek including other related rehab work. | Bridge Preservation | Exempt | 2027 | CO | 0 | State | $112,080.00 | $904,345.00 |
| 105221 | 35.887 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 129 9.09/9.20 | BUT SR 129 9.09/9.20 - SFNs 0900302 - 0900337 | Replace the concrete overlays for the two bridges BUT-129-0908/0920 over Beals Run and a Tributary to Indian Creek including other related rehab work. | Bridge Preservation | Exempt | 2027 | CO | 0 | Labor | $56,040.00 | $904,345.00 |
| 105283 | 35.888 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 32 4.47 | CLE SR 32: SLM 4.47-6.50 | Resurfacing on a portion of SR 32 in Clermont County | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Preservation | $2,925,120.00 | $3,802,656.00 |
| 105283 | 35.889 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 32 4.47 | CLE SR 32: SLM 4.47-6.50 | Resurfacing on a portion of SR 32 in Clermont County | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | State | $731,280.00 | $3,802,656.00 |
| 105283 | 35.890 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 32 4.47 | CLE SR 32: SLM 4.47-6.50 | Resurfacing on a portion of SR 32 in Clermont County | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Labor | $146,256.00 | $3,802,656.00 |
| 105284 | 35.891 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 28 1.06 | CLE SR 28: SLM 1.058-12.231 | Resurfacing on portions of SR 28 in Clermont County. Project includes the repair of an over-height bridge impact to the bridge that carries Third Street over SR 28 (Bridge CLE-28-0227). | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Preservation | $2,924,240.00 | $3,801,512.00 |
| 105284 | 35.892 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 28 1.06 | CLE SR 28: SLM 1.058-12.231 | Resurfacing on portions of SR 28 in Clermont County. Project includes the repair of an over-height bridge impact to the bridge that carries Third Street over SR 28 (Bridge CLE-28-0227). | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | State | $731,060.00 | $3,801,512.00 |
| 105284 | 35.893 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 28 1.06 | CLE SR 28: SLM 1.058-12.231 | Resurfacing on portions of SR 28 in Clermont County. Project includes the repair of an over-height bridge impact to the bridge that carries Third Street over SR 28 (Bridge CLE-28-0227). | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Labor | $146,212.00 | $3,801,512.00 |
| 105349 | 39.727 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along W McMillan St on east side) | Western Hills Viaduct (WHV) construction phase: Construction of the new Western Hills Viaduct including construction of tower piers, approach bridge substructure, large span and approach span superstructures and decks, and remaining approach roadway. Proj | Bridge Expansion | Exempt | 2026 | DD | 1 | Discretionary / Earmark | $6,000,000.00 | $792,711,375.64 |
| 105349 | 39.728 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along W McMillan St on east side) | Western Hills Viaduct (WHV) construction phase: Construction of the new Western Hills Viaduct including construction of tower piers, approach bridge substructure, large span and approach span superstructures and decks, and remaining approach roadway. Proj | Bridge Expansion | Exempt | 2026 | DD | 2 | Local Programs | $5,102,624.00 | $792,711,375.64 |
| 105349 | 39.729 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along W McMillan St on east side) | Western Hills Viaduct (WHV) construction phase: Construction of the new Western Hills Viaduct including construction of tower piers, approach bridge substructure, large span and approach span superstructures and decks, and remaining approach roadway. Proj | Bridge Expansion | Exempt | 2026 | DD | 3 | Local | $2,163,296.00 | $792,711,375.64 |
| 105349 | 39.730 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along W McMillan St on east side) | Western Hills Viaduct (WHV) construction phase: Construction of the new Western Hills Viaduct including construction of tower piers, approach bridge substructure, large span and approach span superstructures and decks, and remaining approach roadway. Proj | Bridge Expansion | Exempt | 2026 | RW | 4 | Discretionary / Earmark | $1,140,000.00 | $792,711,375.64 |
| 105349 | 39.731 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along W McMillan St on east side) | Western Hills Viaduct (WHV) construction phase: Construction of the new Western Hills Viaduct including construction of tower piers, approach bridge substructure, large span and approach span superstructures and decks, and remaining approach roadway. Proj | Bridge Expansion | Exempt | 2026 | RW | 5 | Local Programs | $380,000.00 | $792,711,375.64 |
| 105349 | 39.732 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along W McMillan St on east side) | Western Hills Viaduct (WHV) construction phase: Construction of the new Western Hills Viaduct including construction of tower piers, approach bridge substructure, large span and approach span superstructures and decks, and remaining approach roadway. Proj | Bridge Expansion | Exempt | 2026 | RW | 6 | MPO STBG | $41,039.75 | $792,711,375.64 |
| 105349 | 39.733 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along W McMillan St on east side) | Western Hills Viaduct (WHV) construction phase: Construction of the new Western Hills Viaduct including construction of tower piers, approach bridge substructure, large span and approach span superstructures and decks, and remaining approach roadway. Proj | Bridge Expansion | Exempt | 2026 | RW | 7 | Local | $315,259.94 | $792,711,375.64 |
| 105349 | 39.734 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along W McMillan St on east side) | Western Hills Viaduct (WHV) construction phase: Construction of the new Western Hills Viaduct including construction of tower piers, approach bridge substructure, large span and approach span superstructures and decks, and remaining approach roadway. Proj | Bridge Expansion | Exempt | 2026 | CO | 8 | Discretionary / Earmark | $101,975,954.00 | $792,711,375.64 |
| 105349 | 39.735 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along W McMillan St on east side) | Western Hills Viaduct (WHV) construction phase: Construction of the new Western Hills Viaduct including construction of tower piers, approach bridge substructure, large span and approach span superstructures and decks, and remaining approach roadway. Proj | Bridge Expansion | Exempt | 2026 | CO | 9 | Local Programs | $5,000,000.00 | $792,711,375.64 |
| 105349 | 39.736 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along W McMillan St on east side) | Western Hills Viaduct (WHV) construction phase: Construction of the new Western Hills Viaduct including construction of tower piers, approach bridge substructure, large span and approach span superstructures and decks, and remaining approach roadway. Proj | Bridge Expansion | Exempt | 2026 | CO | 10 | Major Programs | $25,000,000.00 | $792,711,375.64 |
| 105349 | 39.737 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along W McMillan St on east side) | Western Hills Viaduct (WHV) construction phase: Construction of the new Western Hills Viaduct including construction of tower piers, approach bridge substructure, large span and approach span superstructures and decks, and remaining approach roadway. Proj | Bridge Expansion | Exempt | 2028 | CO | 11 | MPO STBG | $6,000,000.00 | $792,711,375.64 |
| 105349 | 39.738 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along W McMillan St on east side) | Western Hills Viaduct (WHV) construction phase: Construction of the new Western Hills Viaduct including construction of tower piers, approach bridge substructure, large span and approach span superstructures and decks, and remaining approach roadway. Proj | Bridge Expansion | Exempt | 2026 | CO | 12 | Local | $58,408,355.00 | $792,711,375.64 |
| 105349 | 39.739 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along W McMillan St on east side) | Western Hills Viaduct (WHV) construction phase: Construction of the new Western Hills Viaduct including construction of tower piers, approach bridge substructure, large span and approach span superstructures and decks, and remaining approach roadway. Proj | Bridge Expansion | Exempt | 2027 | CO | 12 | Local | $517,286,012.95 | $792,711,375.64 |
| 105349 | 39.740 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM WHV New Viaduct Construction | Western Hills Viaduct and approaches (near Moellering Ave on west side to east of Central Pkwy along W McMillan St on east side) | Western Hills Viaduct (WHV) construction phase: Construction of the new Western Hills Viaduct including construction of tower piers, approach bridge substructure, large span and approach span superstructures and decks, and remaining approach roadway. Proj | Bridge Expansion | Exempt | 2028 | CO | 12 | Local | $1,500,000.00 | $792,711,375.64 |
| 105473 | 35.894 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Tunnel Insp FY25/26 | Lytle Tunnel (structure HAM-71-0134) | Project to Inspect and maintain the Lytle Tunnel (Structure HAM-71-0134) that passes I-71 under Lytle Park in downtown Cincinnati. Includes NTIS inspection, routine excercising of ventilation, standpipe, air quality sensors, fire detection systems, draina | Asset Inventory / Inspection | Exempt | 2026 | OTH | 0 | State | $409,513.00 | $602,435.00 |
| 105502 | 35.895 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM LG FY2029 | Various locations in Hamilton County | Lighting replacements on Interstates inside the City of Cincinnati on IR-71 from the Ohio River to MLK. | Lighting (Safety) | Exempt | 2027 | DD | 0 | State | $625,000.00 | $5,265,000.00 |
| 105502 | 35.896 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM LG FY2029 | Various locations in Hamilton County | Lighting replacements on Interstates inside the City of Cincinnati on IR-71 from the Ohio River to MLK. | Lighting (Safety) | Exempt | 2029 | CO | 0 | State | $4,500,000.00 | $5,265,000.00 |
| 105502 | 35.897 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM LG FY2029 | Various locations in Hamilton County | Lighting replacements on Interstates inside the City of Cincinnati on IR-71 from the Ohio River to MLK. | Lighting (Safety) | Exempt | 2029 | CO | 0 | Labor | $140,000.00 | $5,265,000.00 |
| 107602 | 35.898 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 747 0.00 | BUT SR 747: SLM 0 - 3.11 | Resurfacing a portion of SR 747 in Butler County | Roadway Minor Rehab | Exempt | 2026 | ENV | 0 | State | $712.37 | $4,094,153.89 |
| 107602 | 35.899 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 747 0.00 | BUT SR 747: SLM 0 - 3.11 | Resurfacing a portion of SR 747 in Butler County | Roadway Minor Rehab | Exempt | ENV | 0 | Labor | $4,094,153.89 | ||
| 107602 | 35.900 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 747 0.00 | BUT SR 747: SLM 0 - 3.11 | Resurfacing a portion of SR 747 in Butler County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Preservation | $2,955,372.66 | $4,094,153.89 |
| 107602 | 35.901 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 747 0.00 | BUT SR 747: SLM 0 - 3.11 | Resurfacing a portion of SR 747 in Butler County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | State | $738,843.16 | $4,094,153.89 |
| 107602 | 35.902 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 747 0.00 | BUT SR 747: SLM 0 - 3.11 | Resurfacing a portion of SR 747 in Butler County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Labor | $367,111.18 | $4,094,153.89 |
| 109654 | 35.903 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 177 2.11 | BUT SR 177 SLM 2.11 to 13.41 | Resurfacing a portion of SR 177 in Butler County | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Preservation | $1,908,720.00 | $2,481,336.00 |
| 109654 | 35.904 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 177 2.11 | BUT SR 177 SLM 2.11 to 13.41 | Resurfacing a portion of SR 177 in Butler County | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | State | $477,180.00 | $2,481,336.00 |
| 109654 | 35.905 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 177 2.11 | BUT SR 177 SLM 2.11 to 13.41 | Resurfacing a portion of SR 177 in Butler County | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Labor | $95,436.00 | $2,481,336.00 |
| 109736 | 35.906 | Ohio | CLE | Group | ODOT Sponsoring Agency | HAM/CLE SR 32 4.61/0.00 | CLE SR 32: SLM 0 - 2.57 and HAM SR 32: SLM 4.611-6.522 | Resurfacing a portion of SR 32 in Hamilton and Clermont Counties | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Preservation | $5,578,320.00 | $7,251,816.00 |
| 109736 | 35.907 | Ohio | CLE | Group | ODOT Sponsoring Agency | HAM/CLE SR 32 4.61/0.00 | CLE SR 32: SLM 0 - 2.57 and HAM SR 32: SLM 4.611-6.522 | Resurfacing a portion of SR 32 in Hamilton and Clermont Counties | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | State | $1,394,580.00 | $7,251,816.00 |
| 109736 | 35.908 | Ohio | CLE | Group | ODOT Sponsoring Agency | HAM/CLE SR 32 4.61/0.00 | CLE SR 32: SLM 0 - 2.57 and HAM SR 32: SLM 4.611-6.522 | Resurfacing a portion of SR 32 in Hamilton and Clermont Counties | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Labor | $278,916.00 | $7,251,816.00 |
| 110008 | 35.909 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 6.86 | HAM SR 126: SLM 6.86 - 11.38 | Resurfacing a portion of SR 126 in Hamilton County | Roadway Minor Rehab | Exempt | 2026 | ENV | 0 | Labor | $14,300.00 | $4,711,933.00 |
| 110008 | 35.910 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 6.86 | HAM SR 126: SLM 6.86 - 11.38 | Resurfacing a portion of SR 126 in Hamilton County | Roadway Minor Rehab | Exempt | 2026 | DD | 0 | Labor | $2,523.00 | $4,711,933.00 |
| 110008 | 35.911 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 6.86 | HAM SR 126: SLM 6.86 - 11.38 | Resurfacing a portion of SR 126 in Hamilton County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Preservation | $3,572,099.21 | $4,711,933.00 |
| 110008 | 35.912 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 6.86 | HAM SR 126: SLM 6.86 - 11.38 | Resurfacing a portion of SR 126 in Hamilton County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Safety | $44,463.59 | $4,711,933.00 |
| 110008 | 35.913 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 6.86 | HAM SR 126: SLM 6.86 - 11.38 | Resurfacing a portion of SR 126 in Hamilton County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | State | $897,965.20 | $4,711,933.00 |
| 110008 | 35.914 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 6.86 | HAM SR 126: SLM 6.86 - 11.38 | Resurfacing a portion of SR 126 in Hamilton County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Labor | $180,582.00 | $4,711,933.00 |
| 110013 | 35.915 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 123 14.78 | WAR SR 123: SLM 14.78-17.20 and SLM 20.62-27.47 | Resurfacing a portion of SR 123 in Warren County | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Preservation | $1,400,960.00 | $1,821,248.00 |
| 110013 | 35.916 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 123 14.78 | WAR SR 123: SLM 14.78-17.20 and SLM 20.62-27.47 | Resurfacing a portion of SR 123 in Warren County | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | State | $350,240.00 | $1,821,248.00 |
| 110013 | 35.917 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 123 14.78 | WAR SR 123: SLM 14.78-17.20 and SLM 20.62-27.47 | Resurfacing a portion of SR 123 in Warren County | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Labor | $70,048.00 | $1,821,248.00 |
| 110110 | 35.918 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 2.26/2.94/3.44 | HAM-71-3.34 - SFN 3114325 | Rehabilitate bridges HAM-71-0226 that carries Elsinore Place over I-71 by painting, replace the drainage and vandal protection fencing and reconstructing the beam seat. Rehabilitate HAM-71-0294 that carries McGregor over I-71 by replacing the joints, Va | Bridge Preservation | Exempt | 2026 | CO | 0 | State | $3,210,460.00 | $3,761,354.00 |
| 110110 | 35.919 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 2.26/2.94/3.44 | HAM-71-3.34 - SFN 3114325 | Rehabilitate bridges HAM-71-0226 that carries Elsinore Place over I-71 by painting, replace the drainage and vandal protection fencing and reconstructing the beam seat. Rehabilitate HAM-71-0294 that carries McGregor over I-71 by replacing the joints, Va | Bridge Preservation | Exempt | 2026 | CO | 0 | Labor | $224,732.00 | $3,761,354.00 |
| 110451 | 35.920 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 74 0.00 | HAM IR 74: SLM 0 - 3.54 | Resurfacing a portion of I-74 in Hamilton County | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Preservation | $4,583,700.00 | $5,296,720.00 |
| 110451 | 35.921 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 74 0.00 | HAM IR 74: SLM 0 - 3.54 | Resurfacing a portion of I-74 in Hamilton County | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | State | $509,300.00 | $5,296,720.00 |
| 110451 | 35.922 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 74 0.00 | HAM IR 74: SLM 0 - 3.54 | Resurfacing a portion of I-74 in Hamilton County | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Labor | $203,720.00 | $5,296,720.00 |
| 110539 | 35.923 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 74 7.05 | HAM-74 SLM 7.05 to 11.16 | Resurfacing a portion of I-74 in Hamilton County, including minor bridge work such as deck sealing, expansion joint repairs, and drilling of fatigue cracks. | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Preservation | $6,832,800.00 | $8,062,080.00 |
| 110539 | 35.924 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 74 7.05 | HAM-74 SLM 7.05 to 11.16 | Resurfacing a portion of I-74 in Hamilton County, including minor bridge work such as deck sealing, expansion joint repairs, and drilling of fatigue cracks. | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | State | $759,200.00 | $8,062,080.00 |
| 110539 | 35.925 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 74 7.05 | HAM-74 SLM 7.05 to 11.16 | Resurfacing a portion of I-74 in Hamilton County, including minor bridge work such as deck sealing, expansion joint repairs, and drilling of fatigue cracks. | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Labor | $303,680.00 | $8,062,080.00 |
| 110543 | 35.926 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 744 5.35 | BUT-744 SLM 5.35 - 9.83 | Resurfacing a portion of SR 744 in Butler County | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | Preservation | $1,804,368.00 | $2,345,678.00 |
| 110543 | 35.927 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 744 5.35 | BUT-744 SLM 5.35 - 9.83 | Resurfacing a portion of SR 744 in Butler County | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | State | $451,092.00 | $2,345,678.00 |
| 110543 | 35.928 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 744 5.35 | BUT-744 SLM 5.35 - 9.83 | Resurfacing a portion of SR 744 in Butler County | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | Labor | $90,218.00 | $2,345,678.00 |
| 110566 | 35.929 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 128 0.29 | BUT-128-0029 | Rehabilitate bridge over Dry Run to replace superstructure pier caps, abutment seats, and to protect pier piles. | Bridge Preservation | Exempt | 2028 | CO | 0 | Preservation | $1,356,207.08 | $1,880,514.97 |
| 110566 | 35.930 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 128 0.29 | BUT-128-0029 | Rehabilitate bridge over Dry Run to replace superstructure pier caps, abutment seats, and to protect pier piles. | Bridge Preservation | Exempt | 2028 | CO | 0 | State | $339,051.77 | $1,880,514.97 |
| 110566 | 35.931 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 128 0.29 | BUT-128-0029 | Rehabilitate bridge over Dry Run to replace superstructure pier caps, abutment seats, and to protect pier piles. | Bridge Preservation | Exempt | 2028 | CO | 0 | Labor | $118,668.12 | $1,880,514.97 |
| 110682 | 35.932 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 133 8.05 | CLE-133-0805 - SFN 1303155 | Rehabilitate Structure CLE-133-0805, a two span pipe arch that carries SR 133 over a tributary of Indian Creek, by lining the pipes and replacing the outlet headwall. | Bridge Preservation | Exempt | 2026 | CO | 0 | Preservation | $503,739.44 | $732,640.00 |
| 110682 | 35.933 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 133 8.05 | CLE-133-0805 - SFN 1303155 | Rehabilitate Structure CLE-133-0805, a two span pipe arch that carries SR 133 over a tributary of Indian Creek, by lining the pipes and replacing the outlet headwall. | Bridge Preservation | Exempt | 2026 | CO | 0 | State | $125,934.86 | $732,640.00 |
| 110682 | 35.934 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 133 8.05 | CLE-133-0805 - SFN 1303155 | Rehabilitate Structure CLE-133-0805, a two span pipe arch that carries SR 133 over a tributary of Indian Creek, by lining the pipes and replacing the outlet headwall. | Bridge Preservation | Exempt | 2026 | CO | 0 | Labor | $62,965.70 | $732,640.00 |
| 112397 | 35.935 | Ohio | D07, D08 | Group | ODOT Sponsoring Agency | D07/D08 ES Task Order FY24/25 | District 7 & 8 Environmetal Services Task Order | District 7 & 8 Environmental Services Task Order for FY2024 & FY2025 | Environmental Services | Exempt | 2026 | ENV | 0 | State | $27,944.00 | $27,944.00 |
| 112398 | 35.936 | Ohio | D07, D08 | Group | ODOT Sponsoring Agency | D07/D08 ES Task Order FY26/27 | District 7 & 8 Environmetal Services Task Order | District 7 & 8 Environmental Services Task Order for FY2026 & FY2027 | Environmental Services | Exempt | 2026 | ENV | 0 | State | $80,821.00 | $646,967.00 |
| 112398 | 35.937 | Ohio | D07, D08 | Group | ODOT Sponsoring Agency | D07/D08 ES Task Order FY26/27 | District 7 & 8 Environmetal Services Task Order | District 7 & 8 Environmental Services Task Order for FY2026 & FY2027 | Environmental Services | Exempt | 2027 | ENV | 0 | State | $566,146.00 | $646,967.00 |
| 112399 | 35.938 | Ohio | D08, D07 | Group | ODOT Sponsoring Agency | D08/D07 Geotech FY2022/2023 | District 7 and 8 Wide Task Order | District Wide Geotechnical Task Order for FY2022/2023 in both District 7 and District 8. | Geotechnical Services | Exempt | 2027 | ENV | 0 | State | $6,130.00 | $6,130.00 |
| 112400 | 35.939 | Ohio | D08, D07 | Group | ODOT Sponsoring Agency | D08/D07 Geotech FY2024/2025 | District 7 and 8 Wide Task Order | District Wide Geotechnical Task Order for FY2024/2025 in both District 7 and District 8. | Geotechnical Services | Exempt | 2027 | ENV | 0 | State | $16,162.00 | $33,803.00 |
| 112401 | 35.940 | Ohio | D08, D07 | Group | ODOT Sponsoring Agency | D08 Geotech FY2026/2027 | District 7 and 8 Wide Task Order | District Wide Geotechnical Task Order for FY2026/2027 in District 8. | Geotechnical Services | Exempt | 2026 | ENV | 0 | State | $750,000.00 | $1,500,000.00 |
| 112401 | 35.941 | Ohio | D08, D07 | Group | ODOT Sponsoring Agency | D08 Geotech FY2026/2027 | District 7 and 8 Wide Task Order | District Wide Geotechnical Task Order for FY2026/2027 in District 8. | Geotechnical Services | Exempt | 2027 | ENV | 0 | State | $750,000.00 | $1,500,000.00 |
| 112413 | 35.942 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR IR 71 0.00 | WAR IR 71: SLM 0.0 - 8.40 | Resurfacing a portion of IR 71 in Warren County. Add median cable barrier on I-71 between Socialville Foster Rd and SR-48. | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | Preservation | $5,941,800.00 | $8,412,230.00 |
| 112413 | 35.943 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR IR 71 0.00 | WAR IR 71: SLM 0.0 - 8.40 | Resurfacing a portion of IR 71 in Warren County. Add median cable barrier on I-71 between Socialville Foster Rd and SR-48. | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | Safety | $1,445,000.00 | $8,412,230.00 |
| 112413 | 35.944 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR IR 71 0.00 | WAR IR 71: SLM 0.0 - 8.40 | Resurfacing a portion of IR 71 in Warren County. Add median cable barrier on I-71 between Socialville Foster Rd and SR-48. | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | State | $660,200.00 | $8,412,230.00 |
| 112413 | 35.945 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR IR 71 0.00 | WAR IR 71: SLM 0.0 - 8.40 | Resurfacing a portion of IR 71 in Warren County. Add median cable barrier on I-71 between Socialville Foster Rd and SR-48. | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | Labor | $365,230.00 | $8,412,230.00 |
| 112554 | 35.946 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 122 0.00 | BUT SR 122: SLM 0-6.06 | Resurfacing a portion of SR 122 in Butler County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Preservation | $2,071,998.41 | $2,733,529.00 |
| 112554 | 35.947 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 122 0.00 | BUT SR 122: SLM 0-6.06 | Resurfacing a portion of SR 122 in Butler County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | State | $517,999.59 | $2,733,529.00 |
| 112554 | 35.948 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 122 0.00 | BUT SR 122: SLM 0-6.06 | Resurfacing a portion of SR 122 in Butler County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Labor | $103,602.00 | $2,733,529.00 |
| 112556 | 35.949 | Ohio | CLE | Group | ODOT Sponsoring Agency | HAM US 50 19.09 | HAM US 50: SLM 19.09-20.13 | Resurfacing a portion of W 6th St, US 50, in Hamilton County | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Preservation | $1,606,880.00 | $2,088,944.00 |
| 112556 | 35.950 | Ohio | CLE | Group | ODOT Sponsoring Agency | HAM US 50 19.09 | HAM US 50: SLM 19.09-20.13 | Resurfacing a portion of W 6th St, US 50, in Hamilton County | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | State | $401,720.00 | $2,088,944.00 |
| 112556 | 35.951 | Ohio | CLE | Group | ODOT Sponsoring Agency | HAM US 50 19.09 | HAM US 50: SLM 19.09-20.13 | Resurfacing a portion of W 6th St, US 50, in Hamilton County | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Labor | $80,344.00 | $2,088,944.00 |
| 112574 | 35.952 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Noise Walls FY2026 | HAM-126, HAM-71, HAM-275, GRE-675, BUT-129 | Replace and rehabilitate noise wall panels which have been damaged throughout District 8. Perform minor bridge rehab on bridges HAM-126-13.17L (SFN 3105172), HAM-126-13.31R (SFN 3118479), HAM-126-13.31L (SFN 3118460) and HAM-126-13.73N (SFN 3104915) whi | Noise Wall | Exempt | 2026 | ENV | 0 | State | $23,000.00 | $3,644,085.00 |
| 112574 | 35.953 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Noise Walls FY2026 | HAM-126, HAM-71, HAM-275, GRE-675, BUT-129 | Replace and rehabilitate noise wall panels which have been damaged throughout District 8. Perform minor bridge rehab on bridges HAM-126-13.17L (SFN 3105172), HAM-126-13.31R (SFN 3118479), HAM-126-13.31L (SFN 3118460) and HAM-126-13.73N (SFN 3104915) whi | Noise Wall | Exempt | ENV | 0 | Labor | $3,644,085.00 | ||
| 112574 | 35.954 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Noise Walls FY2026 | HAM-126, HAM-71, HAM-275, GRE-675, BUT-129 | Replace and rehabilitate noise wall panels which have been damaged throughout District 8. Perform minor bridge rehab on bridges HAM-126-13.17L (SFN 3105172), HAM-126-13.31R (SFN 3118479), HAM-126-13.31L (SFN 3118460) and HAM-126-13.73N (SFN 3104915) whi | Noise Wall | Exempt | 2026 | CO | 0 | Other | $2,133,000.00 | $3,644,085.00 |
| 112574 | 35.955 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Noise Walls FY2026 | HAM-126, HAM-71, HAM-275, GRE-675, BUT-129 | Replace and rehabilitate noise wall panels which have been damaged throughout District 8. Perform minor bridge rehab on bridges HAM-126-13.17L (SFN 3105172), HAM-126-13.31R (SFN 3118479), HAM-126-13.31L (SFN 3118460) and HAM-126-13.73N (SFN 3104915) whi | Noise Wall | Exempt | 2026 | CO | 0 | Preservation | $674,316.00 | $3,644,085.00 |
| 112574 | 35.956 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Noise Walls FY2026 | HAM-126, HAM-71, HAM-275, GRE-675, BUT-129 | Replace and rehabilitate noise wall panels which have been damaged throughout District 8. Perform minor bridge rehab on bridges HAM-126-13.17L (SFN 3105172), HAM-126-13.31R (SFN 3118479), HAM-126-13.31L (SFN 3118460) and HAM-126-13.73N (SFN 3104915) whi | Noise Wall | Exempt | 2026 | CO | 0 | State | $523,579.00 | $3,644,085.00 |
| 112574 | 35.957 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Noise Walls FY2026 | HAM-126, HAM-71, HAM-275, GRE-675, BUT-129 | Replace and rehabilitate noise wall panels which have been damaged throughout District 8. Perform minor bridge rehab on bridges HAM-126-13.17L (SFN 3105172), HAM-126-13.31R (SFN 3118479), HAM-126-13.31L (SFN 3118460) and HAM-126-13.73N (SFN 3104915) whi | Noise Wall | Exempt | 2026 | CO | 0 | Labor | $222,670.00 | $3,644,085.00 |
| 112587 | 35.958 | Ohio | BUT, HAM | Group | ODOT Sponsoring Agency | BUT/HAM CS FY2026 | BUT-75: SLM 0-5.2 and HAM-71: 16.69-19.90 | District wide crack sealing in FY2026 on a portion of IR 75 in Butler County and IR 71 in Hamilton County | Pavement Maintenance | Exempt | 2026 | CO | 0 | Preservation | $427,312.66 | $529,530.00 |
| 112587 | 35.959 | Ohio | BUT, HAM | Group | ODOT Sponsoring Agency | BUT/HAM CS FY2026 | BUT-75: SLM 0-5.2 and HAM-71: 16.69-19.90 | District wide crack sealing in FY2026 on a portion of IR 75 in Butler County and IR 71 in Hamilton County | Pavement Maintenance | Exempt | 2026 | CO | 0 | State | $47,479.18 | $529,530.00 |
| 112587 | 35.960 | Ohio | BUT, HAM | Group | ODOT Sponsoring Agency | BUT/HAM CS FY2026 | BUT-75: SLM 0-5.2 and HAM-71: 16.69-19.90 | District wide crack sealing in FY2026 on a portion of IR 75 in Butler County and IR 71 in Hamilton County | Pavement Maintenance | Exempt | 2026 | CO | 0 | Labor | $33,238.16 | $529,530.00 |
| 112770 | 35.961 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-PM/RPM-FY2026 | Various locations in D8 | District wide pavement marking and RPM contract for FY2026 in D8. Locations to be determined. | Traffic Control (Safety) | Exempt | 2026 | CO | 0 | State | $4,065,600.00 | $4,390,992.00 |
| 112770 | 35.962 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-PM/RPM-FY2026 | Various locations in D8 | District wide pavement marking and RPM contract for FY2026 in D8. Locations to be determined. | Traffic Control (Safety) | Exempt | 2026 | CO | 0 | Labor | $284,592.00 | $4,390,992.00 |
| 112771 | 35.963 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-LG-FY2026/2027 | Various locations in D8 | 2 Year Lighting Maintenance Contract in District 8 | Lighting (Safety) | Exempt | 2026 | CO | 0 | State | $2,591,576.43 | $2,772,990.00 |
| 112771 | 35.964 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-LG-FY2026/2027 | Various locations in D8 | 2 Year Lighting Maintenance Contract in District 8 | Lighting (Safety) | Exempt | 2026 | CO | 0 | Labor | $181,413.57 | $2,772,990.00 |
| 112773 | 35.965 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-TSG SIGNALS W R/W | Various locations in D8 | FY2027 District Wide Signal Replacement requiring R/W project. 5 locations: HAM-IR 74 EB Ramps at SR 128, HAM-IR 275 WB at Mosteller Rd, HAM-US22/SR3 @ Finley Ln/Moeller High School, HAM-SR 128 @ New Haven Rd, and BUT-US 27 @ Stillwell Beckett Rd. | Traffic Control (Safety) | Exempt | 2026 | DD | 0 | Preservation | $56,832.00 | $3,328,185.00 |
| 112773 | 35.966 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-TSG SIGNALS W R/W | Various locations in D8 | FY2027 District Wide Signal Replacement requiring R/W project. 5 locations: HAM-IR 74 EB Ramps at SR 128, HAM-IR 275 WB at Mosteller Rd, HAM-US22/SR3 @ Finley Ln/Moeller High School, HAM-SR 128 @ New Haven Rd, and BUT-US 27 @ Stillwell Beckett Rd. | Traffic Control (Safety) | Exempt | 2026 | RW | 0 | Preservation | $500,000.00 | $3,328,185.00 |
| 112773 | 35.967 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-TSG SIGNALS W R/W | Various locations in D8 | FY2027 District Wide Signal Replacement requiring R/W project. 5 locations: HAM-IR 74 EB Ramps at SR 128, HAM-IR 275 WB at Mosteller Rd, HAM-US22/SR3 @ Finley Ln/Moeller High School, HAM-SR 128 @ New Haven Rd, and BUT-US 27 @ Stillwell Beckett Rd. | Traffic Control (Safety) | Exempt | 2026 | RW | 0 | State | $85,000.00 | $3,328,185.00 |
| 112773 | 35.968 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-TSG SIGNALS W R/W | Various locations in D8 | FY2027 District Wide Signal Replacement requiring R/W project. 5 locations: HAM-IR 74 EB Ramps at SR 128, HAM-IR 275 WB at Mosteller Rd, HAM-US22/SR3 @ Finley Ln/Moeller High School, HAM-SR 128 @ New Haven Rd, and BUT-US 27 @ Stillwell Beckett Rd. | Traffic Control (Safety) | Exempt | 2027 | CO | 0 | Preservation | $2,126,000.00 | $3,328,185.00 |
| 112773 | 35.969 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-TSG SIGNALS W R/W | Various locations in D8 | FY2027 District Wide Signal Replacement requiring R/W project. 5 locations: HAM-IR 74 EB Ramps at SR 128, HAM-IR 275 WB at Mosteller Rd, HAM-US22/SR3 @ Finley Ln/Moeller High School, HAM-SR 128 @ New Haven Rd, and BUT-US 27 @ Stillwell Beckett Rd. | Traffic Control (Safety) | Exempt | 2027 | CO | 0 | Labor | $148,820.00 | $3,328,185.00 |
| 112977 | 35.970 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 122 6.50R | BUT-122-0650R | Rehabilitate bridge size triple culverts BUT-122-0650R over the Hydraulic Canal in Middletown. | Bridge Preservation | Exempt | 2026 | CO | 0 | Preservation | $874,715.20 | $1,341,600.00 |
| 112977 | 36.023 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 122 6.50R | BUT-122-0650R | Rehabilitate bridge size triple culverts BUT-122-0650R over the Hydraulic Canal in Middletown. | Bridge Preservation | Exempt | 2026 | CO | 0 | State | $218,678.80 | $1,341,600.00 |
| 112977 | 36.024 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 122 6.50R | BUT-122-0650R | Rehabilitate bridge size triple culverts BUT-122-0650R over the Hydraulic Canal in Middletown. | Bridge Preservation | Exempt | 2026 | CO | 0 | Labor | $76,536.00 | $1,341,600.00 |
| 112985 | 36.025 | Ohio | CLE, HAM | Group | ODOT Sponsoring Agency | CLE US 52 1.59/4.98 - Pt 1 | HAM US 52 SLM: 35.55 to 40.07; CLE US 52 SLM: 0 to 13.34 | Rehabilitate the CLE-52-0159L/R bridges over Tenmile Creek by replacing the decks, converting to semi-integral, and painting the superstructures. Rehabilitate CLE-52-0498L/R that carries US 52 over Twelvemile Creek by converting it to semi-integral. | Bridge Preservation | Exempt | 2027 | CO | 0 | Preservation | $19,895,592.00 | $26,629,165.00 |
| 112985 | 36.026 | Ohio | CLE, HAM | Group | ODOT Sponsoring Agency | CLE US 52 1.59/4.98 - Pt 1 | HAM US 52 SLM: 35.55 to 40.07; CLE US 52 SLM: 0 to 13.34 | Rehabilitate the CLE-52-0159L/R bridges over Tenmile Creek by replacing the decks, converting to semi-integral, and painting the superstructures. Rehabilitate CLE-52-0498L/R that carries US 52 over Twelvemile Creek by converting it to semi-integral. | Bridge Preservation | Exempt | 2027 | CO | 0 | State | $4,973,898.00 | $26,629,165.00 |
| 112985 | 36.027 | Ohio | CLE, HAM | Group | ODOT Sponsoring Agency | CLE US 52 1.59/4.98 - Pt 1 | HAM US 52 SLM: 35.55 to 40.07; CLE US 52 SLM: 0 to 13.34 | Rehabilitate the CLE-52-0159L/R bridges over Tenmile Creek by replacing the decks, converting to semi-integral, and painting the superstructures. Rehabilitate CLE-52-0498L/R that carries US 52 over Twelvemile Creek by converting it to semi-integral. | Bridge Preservation | Exempt | 2027 | CO | 0 | Labor | $1,144,922.00 | $26,629,165.00 |
| 112988 | 36.028 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 5.51/6.03/6.75 | HAM IR 71 5.51/6.03/6.75 | Rehabilitate the HAM-71-0551 bridge which carries Trimble Ave over I-71, HAM-71-0603 which carries Dana Ave over I-71, and HAM-71-0675 which carries Smith Edwards over I-71 by replacing the joints, Vandal Fence, painting the structural steel and other min | Bridge Preservation | Exempt | 2026 | ENV | 0 | Labor | $141,440.00 | $9,413,767.00 |
| 112988 | 36.029 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 5.51/6.03/6.75 | HAM IR 71 5.51/6.03/6.75 | Rehabilitate the HAM-71-0551 bridge which carries Trimble Ave over I-71, HAM-71-0603 which carries Dana Ave over I-71, and HAM-71-0675 which carries Smith Edwards over I-71 by replacing the joints, Vandal Fence, painting the structural steel and other min | Bridge Preservation | Exempt | DD | 0 | State | $9,413,767.00 | ||
| 112988 | 36.030 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 5.51/6.03/6.75 | HAM IR 71 5.51/6.03/6.75 | Rehabilitate the HAM-71-0551 bridge which carries Trimble Ave over I-71, HAM-71-0603 which carries Dana Ave over I-71, and HAM-71-0675 which carries Smith Edwards over I-71 by replacing the joints, Vandal Fence, painting the structural steel and other min | Bridge Preservation | Exempt | 2026 | DD | 0 | Labor | $24,960.00 | $9,413,767.00 |
| 112988 | 36.031 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 5.51/6.03/6.75 | HAM IR 71 5.51/6.03/6.75 | Rehabilitate the HAM-71-0551 bridge which carries Trimble Ave over I-71, HAM-71-0603 which carries Dana Ave over I-71, and HAM-71-0675 which carries Smith Edwards over I-71 by replacing the joints, Vandal Fence, painting the structural steel and other min | Bridge Preservation | Exempt | 2028 | CO | 0 | Preservation | $7,629,782.40 | $9,413,767.00 |
| 112988 | 36.032 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 5.51/6.03/6.75 | HAM IR 71 5.51/6.03/6.75 | Rehabilitate the HAM-71-0551 bridge which carries Trimble Ave over I-71, HAM-71-0603 which carries Dana Ave over I-71, and HAM-71-0675 which carries Smith Edwards over I-71 by replacing the joints, Vandal Fence, painting the structural steel and other min | Bridge Preservation | Exempt | 2028 | CO | 0 | State | $847,753.60 | $9,413,767.00 |
| 112988 | 36.033 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 5.51/6.03/6.75 | HAM IR 71 5.51/6.03/6.75 | Rehabilitate the HAM-71-0551 bridge which carries Trimble Ave over I-71, HAM-71-0603 which carries Dana Ave over I-71, and HAM-71-0675 which carries Smith Edwards over I-71 by replacing the joints, Vandal Fence, painting the structural steel and other min | Bridge Preservation | Exempt | 2028 | CO | 0 | Labor | $593,428.00 | $9,413,767.00 |
| 112991 | 36.034 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 VAR | HAM IR 126 | Paint or Zone Paint several bridges on SR 126 in Cincinnati, Reading and Blue Ash. | Bridge / Culvert Maintenance | Exempt | 2026 | CO | 0 | Preservation | $4,947,802.02 | $6,728,290.00 |
| 112991 | 36.035 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 VAR | HAM IR 126 | Paint or Zone Paint several bridges on SR 126 in Cincinnati, Reading and Blue Ash. | Bridge / Culvert Maintenance | Exempt | 2026 | CO | 0 | State | $1,236,950.50 | $6,728,290.00 |
| 112991 | 36.036 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 VAR | HAM IR 126 | Paint or Zone Paint several bridges on SR 126 in Cincinnati, Reading and Blue Ash. | Bridge / Culvert Maintenance | Exempt | 2026 | CO | 0 | Labor | $432,937.48 | $6,728,290.00 |
| 113002 | 36.037 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE Culverts FY26 | varies | Pave invert CLE-132-1521. Replace culvert CLE-222-1312 | Culvert Preservation | Exempt | 2026 | CO | 0 | Preservation | $235,005.96 | $351,032.00 |
| 113002 | 36.038 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE Culverts FY26 | varies | Pave invert CLE-132-1521. Replace culvert CLE-222-1312 | Culvert Preservation | Exempt | 2026 | CO | 0 | State | $58,751.49 | $351,032.00 |
| 113002 | 36.039 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE Culverts FY26 | varies | Pave invert CLE-132-1521. Replace culvert CLE-222-1312 | Culvert Preservation | Exempt | 2026 | CO | 0 | Labor | $29,382.55 | $351,032.00 |
| 113005 | 36.040 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 132 12.64 | CLE SR 132 12.64 | Rehabilitate bridge CLE SR 132 12.64 which carries SR 132 over Backbone Creek by replacing the expansion joints, painting the structural steel, overlaying the superstructure, and performing other related rehabilitation items. | Bridge Preservation | Exempt | 2026 | CO | 0 | Preservation | $455,002.80 | $718,263.00 |
| 113005 | 36.041 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 132 12.64 | CLE SR 132 12.64 | Rehabilitate bridge CLE SR 132 12.64 which carries SR 132 over Backbone Creek by replacing the expansion joints, painting the structural steel, overlaying the superstructure, and performing other related rehabilitation items. | Bridge Preservation | Exempt | 2026 | CO | 0 | State | $113,750.70 | $718,263.00 |
| 113005 | 36.042 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 132 12.64 | CLE SR 132 12.64 | Rehabilitate bridge CLE SR 132 12.64 which carries SR 132 over Backbone Creek by replacing the expansion joints, painting the structural steel, overlaying the superstructure, and performing other related rehabilitation items. | Bridge Preservation | Exempt | 2026 | CO | 0 | Labor | $56,876.50 | $718,263.00 |
| 113006 | 36.043 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Bridge Maintenance FY2026 | Various locations in D8 | Bridge Maintenance Project to perform minor maintenance bridge repairs. | Bridge / Culvert Maintenance | Exempt | 2026 | CO | 0 | Preservation | $2,245,850.65 | $3,243,733.00 |
| 113006 | 36.044 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Bridge Maintenance FY2026 | Various locations in D8 | Bridge Maintenance Project to perform minor maintenance bridge repairs. | Bridge / Culvert Maintenance | Exempt | 2026 | CO | 0 | State | $539,297.40 | $3,243,733.00 |
| 113006 | 36.045 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Bridge Maintenance FY2026 | Various locations in D8 | Bridge Maintenance Project to perform minor maintenance bridge repairs. | Bridge / Culvert Maintenance | Exempt | 2026 | CO | 0 | Labor | $194,951.95 | $3,243,733.00 |
| 113361 | 39.741 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 1.05 | HAM-75 between Linn - Findlay | PID 113361 Work includes construction work on mainline 75 work from Linn to north of Ezzard Charles, Ezzard Charles reconstruction (with "caps"), Freeman overpass. Work on local streets include improvements on Western Avenue, Gest Street, and Winchell Av | Add Through Lane(s) | Exempt | 2026 | RW | 3 | State | $830,275.00 | $439,133,584.00 |
| 113361 | 39.742 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 1.05 | HAM-75 between Linn - Findlay | PID 113361 Work includes construction work on mainline 75 work from Linn to north of Ezzard Charles, Ezzard Charles reconstruction (with "caps"), Freeman overpass. Work on local streets include improvements on Western Avenue, Gest Street, and Winchell Av | Add Through Lane(s) | Exempt | 2027 | RW | 3 | State | $3,469,725.00 | $439,133,584.00 |
| 113361 | 39.743 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 1.05 | HAM-75 between Linn - Findlay | PID 113361 Work includes construction work on mainline 75 work from Linn to north of Ezzard Charles, Ezzard Charles reconstruction (with "caps"), Freeman overpass. Work on local streets include improvements on Western Avenue, Gest Street, and Winchell Av | Add Through Lane(s) | Exempt | CO | 4 | Major Programs | $439,133,584.00 | ||
| 113361 | 39.744 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 1.05 | HAM-75 between Linn - Findlay | PID 113361 Work includes construction work on mainline 75 work from Linn to north of Ezzard Charles, Ezzard Charles reconstruction (with "caps"), Freeman overpass. Work on local streets include improvements on Western Avenue, Gest Street, and Winchell Av | Add Through Lane(s) | Exempt | CO | 5 | MPO STBG | $439,133,584.00 | ||
| 113361 | 39.745 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 1.05 | HAM-75 between Linn - Findlay | PID 113361 Work includes construction work on mainline 75 work from Linn to north of Ezzard Charles, Ezzard Charles reconstruction (with "caps"), Freeman overpass. Work on local streets include improvements on Western Avenue, Gest Street, and Winchell Av | Add Through Lane(s) | Exempt | CO | 6 | National Highway Freight | $439,133,584.00 | ||
| 113361 | 39.746 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 1.05 | HAM-75 between Linn - Findlay | PID 113361 Work includes construction work on mainline 75 work from Linn to north of Ezzard Charles, Ezzard Charles reconstruction (with "caps"), Freeman overpass. Work on local streets include improvements on Western Avenue, Gest Street, and Winchell Av | Add Through Lane(s) | Exempt | 2026 | CO | 7 | State | $123,265,896.00 | $439,133,584.00 |
| 113361 | 39.747 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 1.05 | HAM-75 between Linn - Findlay | PID 113361 Work includes construction work on mainline 75 work from Linn to north of Ezzard Charles, Ezzard Charles reconstruction (with "caps"), Freeman overpass. Work on local streets include improvements on Western Avenue, Gest Street, and Winchell Av | Add Through Lane(s) | Exempt | 2027 | CO | 7 | State | $29,234,104.00 | $439,133,584.00 |
| 113361 | 39.748 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 1.05 | HAM-75 between Linn - Findlay | PID 113361 Work includes construction work on mainline 75 work from Linn to north of Ezzard Charles, Ezzard Charles reconstruction (with "caps"), Freeman overpass. Work on local streets include improvements on Western Avenue, Gest Street, and Winchell Av | Add Through Lane(s) | Exempt | CO | 8 | Labor | $439,133,584.00 | ||
| 113361 | 39.749 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 1.05 | HAM-75 between Linn - Findlay | PID 113361 Work includes construction work on mainline 75 work from Linn to north of Ezzard Charles, Ezzard Charles reconstruction (with "caps"), Freeman overpass. Work on local streets include improvements on Western Avenue, Gest Street, and Winchell Av | Add Through Lane(s) | Exempt | CO | 9 | Local | $439,133,584.00 | ||
| 113361 | 39.750 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 1.05 | HAM-75 between Linn - Findlay | PID 113361 Work includes construction work on mainline 75 work from Linn to north of Ezzard Charles, Ezzard Charles reconstruction (with "caps"), Freeman overpass. Work on local streets include improvements on Western Avenue, Gest Street, and Winchell Av | Add Through Lane(s) | Exempt | CO | 10 | N/A | $439,133,584.00 | ||
| 113464 | 36.046 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 74 11.25 | HAM IR 74 11.25 | Repair the north bank of the Taylor Creek channel opposite the westbound ramps of the Harrison Avenue/Rybolt Rd interchange. Repair of the bank may require reconstruction of the slope, construction of a wall or regrading of the channel. | Geologic Maintenance / Slide Repair | Exempt | 2026 | CO | 0 | Preservation | $386,139.50 | $1,540,166.91 |
| 113464 | 36.047 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 74 11.25 | HAM IR 74 11.25 | Repair the north bank of the Taylor Creek channel opposite the westbound ramps of the Harrison Avenue/Rybolt Rd interchange. Repair of the bank may require reconstruction of the slope, construction of a wall or regrading of the channel. | Geologic Maintenance / Slide Repair | Exempt | 2026 | CO | 0 | State | $42,904.39 | $1,540,166.91 |
| 113464 | 36.048 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 74 11.25 | HAM IR 74 11.25 | Repair the north bank of the Taylor Creek channel opposite the westbound ramps of the Harrison Avenue/Rybolt Rd interchange. Repair of the bank may require reconstruction of the slope, construction of a wall or regrading of the channel. | Geologic Maintenance / Slide Repair | Exempt | 2026 | CO | 0 | Labor | $42,906.11 | $1,540,166.91 |
| 113601 | 39.751 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM CR 461 1.63 | Intersection of Wooster Road with Beechmont Circle | Construct intersection improvement at Wooster Road and Beechmont Circle intersection. | Intersection Improvement (Safety) | Exempt | 2027 | ENV | 1 | Major Programs | $200,000.00 | $3,225,000.00 |
| 113601 | 39.752 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM CR 461 1.63 | Intersection of Wooster Road with Beechmont Circle | Construct intersection improvement at Wooster Road and Beechmont Circle intersection. | Intersection Improvement (Safety) | Exempt | 2027 | ENV | 2 | State | $50,000.00 | $3,225,000.00 |
| 113601 | 39.753 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM CR 461 1.63 | Intersection of Wooster Road with Beechmont Circle | Construct intersection improvement at Wooster Road and Beechmont Circle intersection. | Intersection Improvement (Safety) | Exempt | 2027 | DD | 3 | Major Programs | $80,000.00 | $3,225,000.00 |
| 113601 | 39.754 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM CR 461 1.63 | Intersection of Wooster Road with Beechmont Circle | Construct intersection improvement at Wooster Road and Beechmont Circle intersection. | Intersection Improvement (Safety) | Exempt | 2027 | DD | 4 | State | $20,000.00 | $3,225,000.00 |
| 113603 | 39.755 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM Wasson Way to Otto Armleder | Intersection of Red Bank & Colbank in the Village of Fairfax | Connect Wasson Way to Little Miami Scenic Trail via Otto Armleder (Alternative E7) | Pedestrian Facilities | Exempt | 2027 | DD | 1 | Major Programs | $275,301.60 | $12,728,161.00 |
| 113603 | 39.756 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM Wasson Way to Otto Armleder | Intersection of Red Bank & Colbank in the Village of Fairfax | Connect Wasson Way to Little Miami Scenic Trail via Otto Armleder (Alternative E7) | Pedestrian Facilities | Exempt | 2027 | DD | 2 | State | $68,825.40 | $12,728,161.00 |
| 113647 | 39.757 | Ohio | Butler | Individual | Butler Co. TID | BUT IR 75 8.50 | I-75 in the vicinity of Millikin Road | Butler County: Evaluate and implement transportation improvements (new full interchange) in the area of I-75 & Millikin Road in Liberty Township. | Interchange Expansion | Non-Exempt (Analyzed) | 2026 | DD | 2 | State | $135,213.00 | $85,198,713.00 |
| 113647 | 39.758 | Ohio | Butler | Individual | Butler Co. TID | BUT IR 75 8.50 | I-75 in the vicinity of Millikin Road | Butler County: Evaluate and implement transportation improvements (new full interchange) in the area of I-75 & Millikin Road in Liberty Township. FFY2026 HIP Earmark "Millikin Road at Interstate 75, Future Exit 26 @ I-75" Must be obligated by 09/30/20 | Interchange Expansion | Non-Exempt (Analyzed) | 2026 | DD | 3 | Local | $2,000,000.00 | $85,198,713.00 |
| 113647 | 39.993 | Ohio | Butler | Individual | Butler Co. TID | BUT IR 75 8.50 | I-75 in the vicinity of Millikin Road | Butler County: Evaluate and implement transportation improvements (new full interchange) in the area of I-75 & Millikin Road in Liberty Township. FFY2026 HIP Earmark "Millikin Road at Interstate 75, Future Exit 26 @ I-75" Must be obligated by 09/30/20 | Interchange Expansion | Non-Exempt (Analyzed) | 2026 | RW | 4 | Major Programs | $6,973,820.00 | $85,198,713.00 |
| 113647 | 39.994 | Ohio | Butler | Individual | Butler Co. TID | BUT IR 75 8.50 | I-75 in the vicinity of Millikin Road | Butler County: Evaluate and implement transportation improvements (new full interchange) in the area of I-75 & Millikin Road in Liberty Township. FFY2026 HIP Earmark "Millikin Road at Interstate 75, Future Exit 26 @ I-75" Must be obligated by 09/30/20 | Interchange Expansion | Non-Exempt (Analyzed) | 2026 | RW | 5 | State | $2,243,455.00 | $85,198,713.00 |
| 113647 | 39.995 | Ohio | Butler | Individual | Butler Co. TID | BUT IR 75 8.50 | I-75 in the vicinity of Millikin Road | Butler County: Evaluate and implement transportation improvements (new full interchange) in the area of I-75 & Millikin Road in Liberty Township. FFY2026 HIP Earmark "Millikin Road at Interstate 75, Future Exit 26 @ I-75" Must be obligated by 09/30/20 | Interchange Expansion | Non-Exempt (Analyzed) | 2026 | RW | 6 | Local | $15,000,000.00 | $85,198,713.00 |
| 113647 | 39.996 | Ohio | Butler | Individual | Butler Co. TID | BUT IR 75 8.50 | I-75 in the vicinity of Millikin Road | Butler County: Evaluate and implement transportation improvements (new full interchange) in the area of I-75 & Millikin Road in Liberty Township. FFY2026 HIP Earmark "Millikin Road at Interstate 75, Future Exit 26 @ I-75" Must be obligated by 09/30/20 | Interchange Expansion | Non-Exempt (Analyzed) | 2028 | CO | 7 | Major Programs | $27,000,000.00 | $85,198,713.00 |
| 113647 | 39.997 | Ohio | Butler | Individual | Butler Co. TID | BUT IR 75 8.50 | I-75 in the vicinity of Millikin Road | Butler County: Evaluate and implement transportation improvements (new full interchange) in the area of I-75 & Millikin Road in Liberty Township. FFY2026 HIP Earmark "Millikin Road at Interstate 75, Future Exit 26 @ I-75" Must be obligated by 09/30/20 | Interchange Expansion | Non-Exempt (Analyzed) | 2028 | CO | 8 | Local | $28,426,000.00 | $85,198,713.00 |
| 113841 | 36.049 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE IR 275 1.48, Ramp C | CLE IR 275 1.46 to 1.53 | Repair of landslide approximately 400 long on the downslope of Ramp C at Wards Corner. Slide has caused damage to guardrail and lighting in the project area. | Other Studies/ Tasks | Exempt | 2026 | DD | 0 | State | $162,742.00 | $2,269,305.00 |
| 113841 | 36.050 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE IR 275 1.48, Ramp C | CLE IR 275 1.46 to 1.53 | Repair of landslide approximately 400 long on the downslope of Ramp C at Wards Corner. Slide has caused damage to guardrail and lighting in the project area. | Other Studies/ Tasks | Exempt | 2028 | CO | 0 | PROTECT | $1,771,875.00 | $2,269,305.00 |
| 113841 | 36.051 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE IR 275 1.48, Ramp C | CLE IR 275 1.46 to 1.53 | Repair of landslide approximately 400 long on the downslope of Ramp C at Wards Corner. Slide has caused damage to guardrail and lighting in the project area. | Other Studies/ Tasks | Exempt | 2028 | CO | 0 | State | $196,875.00 | $2,269,305.00 |
| 113841 | 36.052 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE IR 275 1.48, Ramp C | CLE IR 275 1.46 to 1.53 | Repair of landslide approximately 400 long on the downslope of Ramp C at Wards Corner. Slide has caused damage to guardrail and lighting in the project area. | Other Studies/ Tasks | Exempt | 2028 | CO | 0 | Labor | $137,813.00 | $2,269,305.00 |
| 114042 | 39.759 | Ohio | Clermont | Individual | New Richmond, Village of | CLE US 52 4.67 New Richmond | US 52 from Front Street to just east of the Village of New Richmond corporation limit. | Convert the existing four lane divided section of US 52 to one lane of traffic in each direction using existing northbound lanes of US 52, and convert the existing southbound lanes to a shared use path. Convert four existing intersections (Front, Sycamore | Bike Facility | Non-Exempt (Analyzed) | 2026 | RW | 4 | Local | $413,000.00 | $16,766,105.00 |
| 114042 | 39.760 | Ohio | Clermont | Individual | New Richmond, Village of | CLE US 52 4.67 New Richmond | US 52 from Front Street to just east of the Village of New Richmond corporation limit. | Convert the existing four lane divided section of US 52 to one lane of traffic in each direction using existing northbound lanes of US 52, and convert the existing southbound lanes to a shared use path. Convert four existing intersections (Front, Sycamore | Bike Facility | Non-Exempt (Analyzed) | 2028 | CO | 6 | MPO CMAQ | $4,348,000.00 | $16,766,105.00 |
| 114042 | 39.761 | Ohio | Clermont | Individual | New Richmond, Village of | CLE US 52 4.67 New Richmond | US 52 from Front Street to just east of the Village of New Richmond corporation limit. | Convert the existing four lane divided section of US 52 to one lane of traffic in each direction using existing northbound lanes of US 52, and convert the existing southbound lanes to a shared use path. Convert four existing intersections (Front, Sycamore | Bike Facility | Non-Exempt (Analyzed) | 2028 | CO | 7 | Labor | $851,105.00 | $16,766,105.00 |
| 114042 | 39.762 | Ohio | Clermont | Individual | New Richmond, Village of | CLE US 52 4.67 New Richmond | US 52 from Front Street to just east of the Village of New Richmond corporation limit. | Convert the existing four lane divided section of US 52 to one lane of traffic in each direction using existing northbound lanes of US 52, and convert the existing southbound lanes to a shared use path. Convert four existing intersections (Front, Sycamore | Bike Facility | Non-Exempt (Analyzed) | 2028 | CO | 8 | Local | $7,810,636.00 | $16,766,105.00 |
| 114042 | 39.998 | Ohio | Clermont | Individual | New Richmond, Village of | CLE US 52 4.67 New Richmond | US 52 from Front Street to just east of the Village of New Richmond corporation limit. | Convert the existing four lane divided section of US 52 to one lane of traffic in each direction using existing northbound lanes of US 52, and convert the existing southbound lanes to a shared use path. Convert four existing intersections (Front, Sycamore | Bike Facility | Non-Exempt (Analyzed) | 2026 | DD | 2 | Local | $209,597.00 | $16,766,105.00 |
| 114042 | 39.999 | Ohio | Clermont | Individual | New Richmond, Village of | CLE US 52 4.67 New Richmond | US 52 from Front Street to just east of the Village of New Richmond corporation limit. | Convert the existing four lane divided section of US 52 to one lane of traffic in each direction using existing northbound lanes of US 52, and convert the existing southbound lanes to a shared use path. Convert four existing intersections (Front, Sycamore | Bike Facility | Non-Exempt (Analyzed) | 2026 | RW | 3 | MPO CMAQ | $1,652,000.00 | $16,766,105.00 |
| 114275 | 36.053 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Mowing FY2026 (A) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Butler, Clermont, and Hamilton Counties. | Vegetative Maintenance | Exempt | 2026 | CO | 0 | State | $805,540.00 | $951,190.00 |
| 114275 | 36.054 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Mowing FY2026 (A) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Butler, Clermont, and Hamilton Counties. | Vegetative Maintenance | Exempt | 2026 | CO | 0 | Labor | $80,550.00 | $951,190.00 |
| 114276 | 36.055 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Mowing FY2027 (A) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Butler, Clermont, and Hamilton Counties. | Vegetative Maintenance | Exempt | 2027 | CO | 0 | State | $821,300.00 | $903,430.00 |
| 114276 | 36.056 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Mowing FY2027 (A) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Butler, Clermont, and Hamilton Counties. | Vegetative Maintenance | Exempt | 2027 | CO | 0 | Labor | $82,130.00 | $903,430.00 |
| 114277 | 36.057 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Mowing FY2028 (A) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Butler, Clermont, and Hamilton Counties. | Vegetative Maintenance | Exempt | 2028 | CO | 0 | State | $923,740.00 | $1,058,840.00 |
| 114277 | 36.058 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Mowing FY2028 (A) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Butler, Clermont, and Hamilton Counties. | Vegetative Maintenance | Exempt | 2028 | CO | 0 | Labor | $70,000.00 | $1,058,840.00 |
| 114285 | 36.059 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08/D07 Mowing FY2026 (B) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Clinton, Greene and Warren Counties. District 7 mowing on MOT IR 675 SLM 0.00 to 7.44 & MOT IR 75 SLM 0.00 to 9.31 | Vegetative Maintenance | Exempt | 2026 | CO | 0 | State | $650,387.00 | $780,520.00 |
| 114285 | 36.060 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08/D07 Mowing FY2026 (B) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Clinton, Greene and Warren Counties. District 7 mowing on MOT IR 675 SLM 0.00 to 7.44 & MOT IR 75 SLM 0.00 to 9.31 | Vegetative Maintenance | Exempt | 2026 | CO | 0 | Labor | $65,033.00 | $780,520.00 |
| 114286 | 36.061 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08/D07 Mowing FY2027 (B) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Clinton, Greene and Warren Counties. District 7 mowing on MOT IR 675 SLM 0.00 to 7.44 & MOT IR 75 SLM 0.00 to 9.31 | Vegetative Maintenance | Exempt | 2027 | CO | 0 | State | $1,024,950.00 | $1,104,950.00 |
| 114286 | 36.062 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08/D07 Mowing FY2027 (B) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Clinton, Greene and Warren Counties. District 7 mowing on MOT IR 675 SLM 0.00 to 7.44 & MOT IR 75 SLM 0.00 to 9.31 | Vegetative Maintenance | Exempt | 2027 | CO | 0 | Labor | $80,000.00 | $1,104,950.00 |
| 114287 | 36.063 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08/D07 Mowing FY2028 (B) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Clinton, Greene and Warren Counties. District 7 mowing on MOT IR 675 SLM 0.00 to 7.44 & MOT IR 75 SLM 0.00 to 9.31 | Vegetative Maintenance | Exempt | 2028 | CO | 0 | State | $1,055,710.00 | $1,200,810.00 |
| 114287 | 36.064 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08/D07 Mowing FY2028 (B) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Clinton, Greene and Warren Counties. District 7 mowing on MOT IR 675 SLM 0.00 to 7.44 & MOT IR 75 SLM 0.00 to 9.31 | Vegetative Maintenance | Exempt | 2028 | CO | 0 | Labor | $80,000.00 | $1,200,810.00 |
| 114293 | 36.065 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 GR FY2026 | District 8 | District 8 counties guardrail repair and upgrading contract. | Roadside / Median Improvement (Safety) | Exempt | 2026 | CO | 0 | State | $1,494,395.00 | $1,602,100.00 |
| 114293 | 36.066 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 GR FY2026 | District 8 | District 8 counties guardrail repair and upgrading contract. | Roadside / Median Improvement (Safety) | Exempt | 2026 | CO | 0 | Labor | $104,605.00 | $1,602,100.00 |
| 114294 | 36.067 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 GR FY2027 | District 8 | District 8 counties guardrail repair and upgrading contract. | Roadside / Median Improvement (Safety) | Exempt | 2027 | CO | 0 | State | $1,822,760.00 | $1,950,353.00 |
| 114294 | 36.068 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 GR FY2027 | District 8 | District 8 counties guardrail repair and upgrading contract. | Roadside / Median Improvement (Safety) | Exempt | 2027 | CO | 0 | Labor | $127,593.00 | $1,950,353.00 |
| 114295 | 36.069 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 GR FY2028 | District 8 | District 8 counties guardrail repair and upgrading contract. | Roadside / Median Improvement (Safety) | Exempt | 2028 | CO | 0 | State | $1,638,520.00 | $1,753,216.00 |
| 114295 | 36.070 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 GR FY2028 | District 8 | District 8 counties guardrail repair and upgrading contract. | Roadside / Median Improvement (Safety) | Exempt | 2028 | CO | 0 | Labor | $114,696.00 | $1,753,216.00 |
| 114356 | 36.071 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 38.82 | HAM IR 275: SLM 38.87-39.02 | Slope stabilization of embankment beneath a portion of IR 275 in Hamilton County. Reconstructing the travel lanes of IR 275 that have settled, constructing drilled shafts to stabilize the slope, and armoring the creek to prevent continued erosion. | Geotechnical Services | Exempt | 2026 | RW | 0 | State | $20,000.00 | $4,612,584.00 |
| 114438 | 36.072 | Ohio | D08 | Group | District 8 Engineering | D08 BI FY2027/2028 (A) | Various Truss Bridges in D8 | D8 Consultant Bridge Inspection Contract for various truss bridges in the District for calendar year 2027 and 2028. | Asset Inventory / Inspection | Exempt | 2027 | OTH | 0 | Preservation | $360,000.00 | $450,000.00 |
| 114438 | 36.073 | Ohio | D08 | Group | District 8 Engineering | D08 BI FY2027/2028 (A) | Various Truss Bridges in D8 | D8 Consultant Bridge Inspection Contract for various truss bridges in the District for calendar year 2027 and 2028. | Asset Inventory / Inspection | Exempt | 2027 | OTH | 0 | State | $90,000.00 | $450,000.00 |
| 114439 | 36.074 | Ohio | D08 | Group | District 8 Engineering | D08 BI FY2027/2028 (B) | Various | D8 Consultant Bridge Inspection Contract for calendar year 2027 and 2028. Includes various fracture critical steel pier caps. | Asset Inventory / Inspection | Exempt | 2027 | OTH | 0 | Preservation | $320,000.00 | $400,000.00 |
| 114439 | 36.075 | Ohio | D08 | Group | District 8 Engineering | D08 BI FY2027/2028 (B) | Various | D8 Consultant Bridge Inspection Contract for calendar year 2027 and 2028. Includes various fracture critical steel pier caps. | Asset Inventory / Inspection | Exempt | 2027 | OTH | 0 | State | $80,000.00 | $400,000.00 |
| 114496 | 39.763 | Ohio | Hamilton | Individual | Hamilton County Park District | HAM Columbia Connector | Intersection of US-50 & Spring Hill to the western terminus of the Little Miami Scenic Trail located east of Walton Creek | Construct a shared use path beginning near the intersection of US-50 & Pocahontas and ending at the current west terminus of the Little Miami Scenic Trail, east of the Walton Creek, similar to Concept F7 in the 2019 Eastern Corridor, Segment II/III Concep | Shared Use Path | Exempt | 2026 | RW | 3 | MPO CMAQ | $121,245.89 | $2,890,815.80 |
| 114496 | 39.764 | Ohio | Hamilton | Individual | Hamilton County Park District | HAM Columbia Connector | Intersection of US-50 & Spring Hill to the western terminus of the Little Miami Scenic Trail located east of Walton Creek | Construct a shared use path beginning near the intersection of US-50 & Pocahontas and ending at the current west terminus of the Little Miami Scenic Trail, east of the Walton Creek, similar to Concept F7 in the 2019 Eastern Corridor, Segment II/III Concep | Shared Use Path | Exempt | RW | 4 | State | $2,890,815.80 | ||
| 114496 | 40.000 | Ohio | Hamilton | Individual | Hamilton County Park District | HAM Columbia Connector | Intersection of US-50 & Spring Hill to the western terminus of the Little Miami Scenic Trail located east of Walton Creek | Construct a shared use path beginning near the intersection of US-50 & Pocahontas and ending at the current west terminus of the Little Miami Scenic Trail, east of the Walton Creek, similar to Concept F7 in the 2019 Eastern Corridor, Segment II/III Concep | Shared Use Path | Exempt | 2026 | RW | 5 | Local | $32,229.91 | $2,890,815.80 |
| 114496 | 40.001 | Ohio | Hamilton | Individual | Hamilton County Park District | HAM Columbia Connector | Intersection of US-50 & Spring Hill to the western terminus of the Little Miami Scenic Trail located east of Walton Creek | Construct a shared use path beginning near the intersection of US-50 & Pocahontas and ending at the current west terminus of the Little Miami Scenic Trail, east of the Walton Creek, similar to Concept F7 in the 2019 Eastern Corridor, Segment II/III Concep | Shared Use Path | Exempt | 2026 | CO | 6 | MPO CMAQ | $449,650.00 | $2,890,815.80 |
| 114496 | 40.002 | Ohio | Hamilton | Individual | Hamilton County Park District | HAM Columbia Connector | Intersection of US-50 & Spring Hill to the western terminus of the Little Miami Scenic Trail located east of Walton Creek | Construct a shared use path beginning near the intersection of US-50 & Pocahontas and ending at the current west terminus of the Little Miami Scenic Trail, east of the Walton Creek, similar to Concept F7 in the 2019 Eastern Corridor, Segment II/III Concep | Shared Use Path | Exempt | 2026 | CO | 7 | MPO TA | $1,000,000.00 | $2,890,815.80 |
| 114496 | 40.003 | Ohio | Hamilton | Individual | Hamilton County Park District | HAM Columbia Connector | Intersection of US-50 & Spring Hill to the western terminus of the Little Miami Scenic Trail located east of Walton Creek | Construct a shared use path beginning near the intersection of US-50 & Pocahontas and ending at the current west terminus of the Little Miami Scenic Trail, east of the Walton Creek, similar to Concept F7 in the 2019 Eastern Corridor, Segment II/III Concep | Shared Use Path | Exempt | 2026 | CO | 8 | Labor | $128,450.00 | $2,890,815.80 |
| 114496 | 40.004 | Ohio | Hamilton | Individual | Hamilton County Park District | HAM Columbia Connector | Intersection of US-50 & Spring Hill to the western terminus of the Little Miami Scenic Trail located east of Walton Creek | Construct a shared use path beginning near the intersection of US-50 & Pocahontas and ending at the current west terminus of the Little Miami Scenic Trail, east of the Walton Creek, similar to Concept F7 in the 2019 Eastern Corridor, Segment II/III Concep | Shared Use Path | Exempt | 2026 | CO | 9 | Local | $385,350.00 | $2,890,815.80 |
| 114505 | 36.076 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR/CLI SR 28 0.00/0.00 | WAR-28 SLM 0.00-5.22 and CLI-28 SLM 0-1.96 | Resurfacing on a portion of SR 28 in Warren and Clinton Counties | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Preservation | $2,369,840.00 | $3,080,792.00 |
| 114505 | 36.077 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR/CLI SR 28 0.00/0.00 | WAR-28 SLM 0.00-5.22 and CLI-28 SLM 0-1.96 | Resurfacing on a portion of SR 28 in Warren and Clinton Counties | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | State | $592,460.00 | $3,080,792.00 |
| 114505 | 36.078 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR/CLI SR 28 0.00/0.00 | WAR-28 SLM 0.00-5.22 and CLI-28 SLM 0-1.96 | Resurfacing on a portion of SR 28 in Warren and Clinton Counties | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Labor | $118,492.00 | $3,080,792.00 |
| 114507 | 36.079 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 13.83 | HAM-275 SLM 13.827-21.677 | Resurfacing on a portion of IR 275 in Hamilton County | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Preservation | $14,264,910.00 | $16,483,896.00 |
| 114507 | 36.080 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 13.83 | HAM-275 SLM 13.827-21.677 | Resurfacing on a portion of IR 275 in Hamilton County | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | State | $1,584,990.00 | $16,483,896.00 |
| 114507 | 36.081 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 13.83 | HAM-275 SLM 13.827-21.677 | Resurfacing on a portion of IR 275 in Hamilton County | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Labor | $633,996.00 | $16,483,896.00 |
| 114511 | 36.082 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 1.78 | HAM-71 SLM 1.78 to 5.01 | Resurfacing a portion of IR 71 in Hamilton County | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | Preservation | $3,313,674.00 | $3,829,134.00 |
| 114511 | 36.083 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 1.78 | HAM-71 SLM 1.78 to 5.01 | Resurfacing a portion of IR 71 in Hamilton County | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | State | $368,186.00 | $3,829,134.00 |
| 114511 | 36.084 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 1.78 | HAM-71 SLM 1.78 to 5.01 | Resurfacing a portion of IR 71 in Hamilton County | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | Labor | $147,274.00 | $3,829,134.00 |
| 114512 | 36.085 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 36.66 | HAM-275 SLM 36.66 - 39.40 | Placing an asphalt overlay on a portion of the existing rigid pavement of IR 275 in Hamilton County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Preservation | $8,863,417.12 | $10,345,504.00 |
| 114512 | 36.086 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 36.66 | HAM-275 SLM 36.66 - 39.40 | Placing an asphalt overlay on a portion of the existing rigid pavement of IR 275 in Hamilton County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | State | $984,824.12 | $10,345,504.00 |
| 114512 | 36.087 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 36.66 | HAM-275 SLM 36.66 - 39.40 | Placing an asphalt overlay on a portion of the existing rigid pavement of IR 275 in Hamilton County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Labor | $393,928.76 | $10,345,504.00 |
| 114514 | 36.088 | Ohio | WAR, GRE | Group | ODOT Sponsoring Agency | WAR/GRE US 42 18.01/0.00 | WAR-42 SLM 18.01 to 24.80 - GRE-42 SLM 0.00 to 3.709 | Resurfacing a portion of US 42 in Warren and Greene Counties | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Preservation | $4,642,000.00 | $6,034,600.00 |
| 114514 | 36.089 | Ohio | WAR, GRE | Group | ODOT Sponsoring Agency | WAR/GRE US 42 18.01/0.00 | WAR-42 SLM 18.01 to 24.80 - GRE-42 SLM 0.00 to 3.709 | Resurfacing a portion of US 42 in Warren and Greene Counties | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | State | $1,160,500.00 | $6,034,600.00 |
| 114514 | 36.090 | Ohio | WAR, GRE | Group | ODOT Sponsoring Agency | WAR/GRE US 42 18.01/0.00 | WAR-42 SLM 18.01 to 24.80 - GRE-42 SLM 0.00 to 3.709 | Resurfacing a portion of US 42 in Warren and Greene Counties | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Labor | $232,100.00 | $6,034,600.00 |
| 114515 | 36.091 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 3.76/19.03 | HAM-50-1903L - HAM-50-0376L | Paint Bridge HAM-50-0376L that carries WB US 50 over the Great Miami River and HAM-50-1903L that carries WB US 50 over the Mill Creek and a railroad. Zone paint the HAM-50-0376R bridge that carries EB US 50 over the great Miami River. Other minor rehab wo | Bridge / Culvert Maintenance | Exempt | 2026 | ENV | 0 | State | $5,008.95 | $8,452,558.95 |
| 114515 | 36.092 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 3.76/19.03 | HAM-50-1903L - HAM-50-0376L | Paint Bridge HAM-50-0376L that carries WB US 50 over the Great Miami River and HAM-50-1903L that carries WB US 50 over the Mill Creek and a railroad. Zone paint the HAM-50-0376R bridge that carries EB US 50 over the great Miami River. Other minor rehab wo | Bridge / Culvert Maintenance | Exempt | 2026 | CO | 0 | Major Programs | $5,758,548.98 | $8,452,558.95 |
| 114515 | 36.093 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 3.76/19.03 | HAM-50-1903L - HAM-50-0376L | Paint Bridge HAM-50-0376L that carries WB US 50 over the Great Miami River and HAM-50-1903L that carries WB US 50 over the Mill Creek and a railroad. Zone paint the HAM-50-0376R bridge that carries EB US 50 over the great Miami River. Other minor rehab wo | Bridge / Culvert Maintenance | Exempt | 2026 | CO | 0 | Preservation | $555,729.75 | $8,452,558.95 |
| 114515 | 36.094 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 3.76/19.03 | HAM-50-1903L - HAM-50-0376L | Paint Bridge HAM-50-0376L that carries WB US 50 over the Great Miami River and HAM-50-1903L that carries WB US 50 over the Mill Creek and a railroad. Zone paint the HAM-50-0376R bridge that carries EB US 50 over the great Miami River. Other minor rehab wo | Bridge / Culvert Maintenance | Exempt | 2026 | CO | 0 | State | $1,578,569.69 | $8,452,558.95 |
| 114515 | 36.095 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 3.76/19.03 | HAM-50-1903L - HAM-50-0376L | Paint Bridge HAM-50-0376L that carries WB US 50 over the Great Miami River and HAM-50-1903L that carries WB US 50 over the Mill Creek and a railroad. Zone paint the HAM-50-0376R bridge that carries EB US 50 over the great Miami River. Other minor rehab wo | Bridge / Culvert Maintenance | Exempt | 2026 | CO | 0 | Labor | $549,701.58 | $8,452,558.95 |
| 114602 | 39.765 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Wasson Way Phase 7 | Beginning on MLK at a point between Reading Rd (US-42) and IR-71 and ending at Blair Court | Construction of a shared use trail from Martin Luther King Drive to Blair Court. (Phase 7 of the Wasson Way) | Shared Use Path | Exempt | 2026 | ENV | 2 | Local | $36,000.00 | $7,559,770.00 |
| 114602 | 39.766 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Wasson Way Phase 7 | Beginning on MLK at a point between Reading Rd (US-42) and IR-71 and ending at Blair Court | Construction of a shared use trail from Martin Luther King Drive to Blair Court. (Phase 7 of the Wasson Way) | Shared Use Path | Exempt | 2027 | CO | 6 | MPO STBG | $3,202,200.00 | $7,559,770.00 |
| 114602 | 39.767 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Wasson Way Phase 7 | Beginning on MLK at a point between Reading Rd (US-42) and IR-71 and ending at Blair Court | Construction of a shared use trail from Martin Luther King Drive to Blair Court. (Phase 7 of the Wasson Way) | Shared Use Path | Exempt | 2027 | CO | 7 | Local | $3,007,570.00 | $7,559,770.00 |
| 114602 | 40.005 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Wasson Way Phase 7 | Beginning on MLK at a point between Reading Rd (US-42) and IR-71 and ending at Blair Court | Construction of a shared use trail from Martin Luther King Drive to Blair Court. (Phase 7 of the Wasson Way) | Shared Use Path | Exempt | 2026 | ENV | 1 | MPO CRP | $144,000.00 | $7,559,770.00 |
| 114651 | 36.096 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 562 2.27 | HAM SR 562 2.27 | Project to replace and raise bridge HAM-562-0227 that carries Wesley Rd over SR562. | Bridge Preservation | Exempt | 2027 | DD | 0 | Preservation | $45,179.20 | $8,494,162.00 |
| 114651 | 36.097 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 562 2.27 | HAM SR 562 2.27 | Project to replace and raise bridge HAM-562-0227 that carries Wesley Rd over SR562. | Bridge Preservation | Exempt | 2027 | DD | 0 | State | $11,294.80 | $8,494,162.00 |
| 114651 | 36.098 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 562 2.27 | HAM SR 562 2.27 | Project to replace and raise bridge HAM-562-0227 that carries Wesley Rd over SR562. | Bridge Preservation | Exempt | 2027 | RW | 0 | State | $40,000.00 | $8,494,162.00 |
| 114652 | 36.099 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 19.50 | HAM SR 126 19.50 | Project to replace and raise the pedestrian bridge over SR126 near Sycamore Middle School. | Pedestrian Facilities | Exempt | 2026 | DD | 0 | Preservation | $60,684.00 | $7,617,761.00 |
| 114652 | 36.100 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 19.50 | HAM SR 126 19.50 | Project to replace and raise the pedestrian bridge over SR126 near Sycamore Middle School. | Pedestrian Facilities | Exempt | 2026 | DD | 0 | State | $15,171.00 | $7,617,761.00 |
| 114652 | 36.101 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 19.50 | HAM SR 126 19.50 | Project to replace and raise the pedestrian bridge over SR126 near Sycamore Middle School. | Pedestrian Facilities | Exempt | DD | 0 | Labor | $7,617,761.00 | ||
| 114652 | 36.102 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 19.50 | HAM SR 126 19.50 | Project to replace and raise the pedestrian bridge over SR126 near Sycamore Middle School. | Pedestrian Facilities | Exempt | 2026 | RW | 0 | State | $8,468.00 | $7,617,761.00 |
| 114652 | 36.103 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 19.50 | HAM SR 126 19.50 | Project to replace and raise the pedestrian bridge over SR126 near Sycamore Middle School. | Pedestrian Facilities | Exempt | 2027 | CO | 0 | Preservation | $4,828,360.00 | $7,617,761.00 |
| 114652 | 36.104 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 19.50 | HAM SR 126 19.50 | Project to replace and raise the pedestrian bridge over SR126 near Sycamore Middle School. | Pedestrian Facilities | Exempt | 2027 | CO | 0 | State | $1,207,090.00 | $7,617,761.00 |
| 114652 | 36.105 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 19.50 | HAM SR 126 19.50 | Project to replace and raise the pedestrian bridge over SR126 near Sycamore Middle School. | Pedestrian Facilities | Exempt | 2027 | CO | 0 | Labor | $422,482.00 | $7,617,761.00 |
| 114653 | 36.106 | Ohio | BUT, PRE | Group | ODOT Sponsoring Agency | BUT/PRE Inverts FY2027 | Various culverts in PRE county | Project to Pave inverts of bridge size culverts in Butler/Preble County and perform other related repairs. Project includes bridge size culverts BUT-27-1264, BUT-4B-0044, BUT-122-1115, PRE-503-1271, PRE-725-1433, and PRE 732-1310. | Culvert Preservation | Exempt | 2026 | ENV | 0 | State | $46,658.00 | $1,289,858.00 |
| 114653 | 36.107 | Ohio | BUT, PRE | Group | ODOT Sponsoring Agency | BUT/PRE Inverts FY2027 | Various culverts in PRE county | Project to Pave inverts of bridge size culverts in Butler/Preble County and perform other related repairs. Project includes bridge size culverts BUT-27-1264, BUT-4B-0044, BUT-122-1115, PRE-503-1271, PRE-725-1433, and PRE 732-1310. | Culvert Preservation | Exempt | ENV | 0 | Labor | $1,289,858.00 | ||
| 114653 | 36.108 | Ohio | BUT, PRE | Group | ODOT Sponsoring Agency | BUT/PRE Inverts FY2027 | Various culverts in PRE county | Project to Pave inverts of bridge size culverts in Butler/Preble County and perform other related repairs. Project includes bridge size culverts BUT-27-1264, BUT-4B-0044, BUT-122-1115, PRE-503-1271, PRE-725-1433, and PRE 732-1310. | Culvert Preservation | Exempt | 2026 | RW | 0 | State | $12,000.00 | $1,289,858.00 |
| 114653 | 36.109 | Ohio | BUT, PRE | Group | ODOT Sponsoring Agency | BUT/PRE Inverts FY2027 | Various culverts in PRE county | Project to Pave inverts of bridge size culverts in Butler/Preble County and perform other related repairs. Project includes bridge size culverts BUT-27-1264, BUT-4B-0044, BUT-122-1115, PRE-503-1271, PRE-725-1433, and PRE 732-1310. | Culvert Preservation | Exempt | 2027 | CO | 0 | Preservation | $774,400.00 | $1,289,858.00 |
| 114653 | 36.110 | Ohio | BUT, PRE | Group | ODOT Sponsoring Agency | BUT/PRE Inverts FY2027 | Various culverts in PRE county | Project to Pave inverts of bridge size culverts in Butler/Preble County and perform other related repairs. Project includes bridge size culverts BUT-27-1264, BUT-4B-0044, BUT-122-1115, PRE-503-1271, PRE-725-1433, and PRE 732-1310. | Culvert Preservation | Exempt | 2027 | CO | 0 | State | $193,600.00 | $1,289,858.00 |
| 114653 | 36.111 | Ohio | BUT, PRE | Group | ODOT Sponsoring Agency | BUT/PRE Inverts FY2027 | Various culverts in PRE county | Project to Pave inverts of bridge size culverts in Butler/Preble County and perform other related repairs. Project includes bridge size culverts BUT-27-1264, BUT-4B-0044, BUT-122-1115, PRE-503-1271, PRE-725-1433, and PRE 732-1310. | Culvert Preservation | Exempt | 2027 | CO | 0 | Labor | $96,800.00 | $1,289,858.00 |
| 114659 | 36.112 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 0.34/3.12 | HAM IR 275 0.34/3.12/3.84 | Project to repair bridges HAM-275-0034 over US 50 and railroad and HAM-275-0312L/R over Whitewater River. The HAM-275-0034 bridges will also be painted. | Bridge Preservation | Exempt | 2026 | ENV | 0 | State | $20,000.00 | $2,713,502.00 |
| 114659 | 36.113 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 0.34/3.12 | HAM IR 275 0.34/3.12/3.84 | Project to repair bridges HAM-275-0034 over US 50 and railroad and HAM-275-0312L/R over Whitewater River. The HAM-275-0034 bridges will also be painted. | Bridge Preservation | Exempt | ENV | 0 | Labor | $2,713,502.00 | ||
| 114659 | 36.114 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 0.34/3.12 | HAM IR 275 0.34/3.12/3.84 | Project to repair bridges HAM-275-0034 over US 50 and railroad and HAM-275-0312L/R over Whitewater River. The HAM-275-0034 bridges will also be painted. | Bridge Preservation | Exempt | 2027 | CO | 0 | Preservation | $2,131,488.00 | $2,713,502.00 |
| 114659 | 36.115 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 0.34/3.12 | HAM IR 275 0.34/3.12/3.84 | Project to repair bridges HAM-275-0034 over US 50 and railroad and HAM-275-0312L/R over Whitewater River. The HAM-275-0034 bridges will also be painted. | Bridge Preservation | Exempt | 2027 | CO | 0 | State | $236,832.00 | $2,713,502.00 |
| 114659 | 36.116 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 0.34/3.12 | HAM IR 275 0.34/3.12/3.84 | Project to repair bridges HAM-275-0034 over US 50 and railroad and HAM-275-0312L/R over Whitewater River. The HAM-275-0034 bridges will also be painted. | Bridge Preservation | Exempt | 2027 | CO | 0 | Labor | $158,782.00 | $2,713,502.00 |
| 114660 | 36.117 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Inverts FY2027 | HAM-747-0195 | Project to Pave inverts of bridge size culverts and perform other related repairs Including HAM-747-0195, HAM-126-1700, HAM-74-1681, & HAM-275-2448 | Culvert Preservation | Exempt | 2027 | CO | 0 | Preservation | $955,000.00 | $1,349,820.00 |
| 114660 | 36.118 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Inverts FY2027 | HAM-747-0195 | Project to Pave inverts of bridge size culverts and perform other related repairs Including HAM-747-0195, HAM-126-1700, HAM-74-1681, & HAM-275-2448 | Culvert Preservation | Exempt | 2027 | CO | 0 | State | $151,000.00 | $1,349,820.00 |
| 114660 | 36.119 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Inverts FY2027 | HAM-747-0195 | Project to Pave inverts of bridge size culverts and perform other related repairs Including HAM-747-0195, HAM-126-1700, HAM-74-1681, & HAM-275-2448 | Culvert Preservation | Exempt | 2027 | CO | 0 | Labor | $77,420.00 | $1,349,820.00 |
| 114662 | 36.120 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 2.08/11.16 | HAM US 50 2.08/11.16 | Project to repair bridge HAM-50-0208 that carries US 50 over the Whitewater River by repairing a deep scour hole in the river in front of the abutment. Also repair bridge HAM-50-1116 that carries SU 50 over Rapid Run by repairing the vertical legs of seve | Bridge Preservation | Exempt | 2026 | ENV | 0 | State | $30,896.00 | $1,233,652.00 |
| 114662 | 36.121 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 2.08/11.16 | HAM US 50 2.08/11.16 | Project to repair bridge HAM-50-0208 that carries US 50 over the Whitewater River by repairing a deep scour hole in the river in front of the abutment. Also repair bridge HAM-50-1116 that carries SU 50 over Rapid Run by repairing the vertical legs of seve | Bridge Preservation | Exempt | ENV | 0 | Labor | $1,233,652.00 | ||
| 114662 | 36.122 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 2.08/11.16 | HAM US 50 2.08/11.16 | Project to repair bridge HAM-50-0208 that carries US 50 over the Whitewater River by repairing a deep scour hole in the river in front of the abutment. Also repair bridge HAM-50-1116 that carries SU 50 over Rapid Run by repairing the vertical legs of seve | Bridge Preservation | Exempt | 2027 | CO | 0 | Preservation | $122,440.00 | $1,233,652.00 |
| 114662 | 36.123 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 2.08/11.16 | HAM US 50 2.08/11.16 | Project to repair bridge HAM-50-0208 that carries US 50 over the Whitewater River by repairing a deep scour hole in the river in front of the abutment. Also repair bridge HAM-50-1116 that carries SU 50 over Rapid Run by repairing the vertical legs of seve | Bridge Preservation | Exempt | 2027 | CO | 0 | PROTECT | $688,640.00 | $1,233,652.00 |
| 114662 | 36.124 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 2.08/11.16 | HAM US 50 2.08/11.16 | Project to repair bridge HAM-50-0208 that carries US 50 over the Whitewater River by repairing a deep scour hole in the river in front of the abutment. Also repair bridge HAM-50-1116 that carries SU 50 over Rapid Run by repairing the vertical legs of seve | Bridge Preservation | Exempt | 2027 | CO | 0 | State | $202,770.00 | $1,233,652.00 |
| 114662 | 36.125 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 2.08/11.16 | HAM US 50 2.08/11.16 | Project to repair bridge HAM-50-0208 that carries US 50 over the Whitewater River by repairing a deep scour hole in the river in front of the abutment. Also repair bridge HAM-50-1116 that carries SU 50 over Rapid Run by repairing the vertical legs of seve | Bridge Preservation | Exempt | 2027 | CO | 0 | Labor | $70,970.00 | $1,233,652.00 |
| 114663 | 36.126 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 22.18/23.16 | HAM US 50 23.16 | Project to repair two bridges on US 50 below the Mt Adams area in Cincinnati. Repair bridge HAM-50-2218 that carries a widened portion of Eastbound US 50 extending from a retaining wall and roadway. Work includes patching of concrete walls and concrete be | Bridge Preservation | Exempt | 2027 | ENV | 0 | Preservation | $60,000.00 | $2,215,000.00 |
| 114663 | 36.127 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 22.18/23.16 | HAM US 50 23.16 | Project to repair two bridges on US 50 below the Mt Adams area in Cincinnati. Repair bridge HAM-50-2218 that carries a widened portion of Eastbound US 50 extending from a retaining wall and roadway. Work includes patching of concrete walls and concrete be | Bridge Preservation | Exempt | 2027 | ENV | 0 | State | $15,000.00 | $2,215,000.00 |
| 114666 | 36.128 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 13.54S | HAM IR 275 13.54S | Project to repair bridge HAM-275-1354S that carries Sprindale Rd over the ramps to Ronald Reagan Highway by replacing the deck and raising the structure approximately 1 foot. | Bridge Preservation | Exempt | 2026 | RW | 0 | Preservation | $36,000.00 | $5,225,481.00 |
| 114666 | 36.129 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 13.54S | HAM IR 275 13.54S | Project to repair bridge HAM-275-1354S that carries Sprindale Rd over the ramps to Ronald Reagan Highway by replacing the deck and raising the structure approximately 1 foot. | Bridge Preservation | Exempt | 2026 | RW | 0 | State | $29,000.00 | $5,225,481.00 |
| 114666 | 36.130 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 13.54S | HAM IR 275 13.54S | Project to repair bridge HAM-275-1354S that carries Sprindale Rd over the ramps to Ronald Reagan Highway by replacing the deck and raising the structure approximately 1 foot. | Bridge Preservation | Exempt | 2028 | CO | 0 | Preservation | $3,852,531.00 | $5,225,481.00 |
| 114666 | 36.131 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 13.54S | HAM IR 275 13.54S | Project to repair bridge HAM-275-1354S that carries Sprindale Rd over the ramps to Ronald Reagan Highway by replacing the deck and raising the structure approximately 1 foot. | Bridge Preservation | Exempt | 2028 | CO | 0 | State | $428,059.00 | $5,225,481.00 |
| 114666 | 36.132 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 13.54S | HAM IR 275 13.54S | Project to repair bridge HAM-275-1354S that carries Sprindale Rd over the ramps to Ronald Reagan Highway by replacing the deck and raising the structure approximately 1 foot. | Bridge Preservation | Exempt | 2028 | CO | 0 | Labor | $299,641.00 | $5,225,481.00 |
| 114667 | 36.133 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT CULVERTS FY29 | varies | project entails replace small culvert BUT-73-0776 (1815613) and replace BUT-129-1767 (1985994). pave or EIPI culvert BUT-75-0291 (1821287) | Culvert Preservation | Exempt | 2029 | RW | 0 | Labor | $30,000.00 | $1,658,000.00 |
| 114667 | 36.134 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT CULVERTS FY29 | varies | project entails replace small culvert BUT-73-0776 (1815613) and replace BUT-129-1767 (1985994). pave or EIPI culvert BUT-75-0291 (1821287) | Culvert Preservation | Exempt | 2029 | CO | 0 | Preservation | $1,284,000.00 | $1,658,000.00 |
| 114667 | 36.135 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT CULVERTS FY29 | varies | project entails replace small culvert BUT-73-0776 (1815613) and replace BUT-129-1767 (1985994). pave or EIPI culvert BUT-75-0291 (1821287) | Culvert Preservation | Exempt | 2029 | CO | 0 | State | $196,000.00 | $1,658,000.00 |
| 114667 | 36.136 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT CULVERTS FY29 | varies | project entails replace small culvert BUT-73-0776 (1815613) and replace BUT-129-1767 (1985994). pave or EIPI culvert BUT-75-0291 (1821287) | Culvert Preservation | Exempt | 2029 | CO | 0 | Labor | $148,000.00 | $1,658,000.00 |
| 114670 | 36.137 | Ohio | D08 | Group | ODOT Sponsoring Agency | PRE State Contract FY28 | varies | Sockline drainage pipes connecting into bridges PRE-35-1897 and PRE-35-1790. | Culvert Preservation | Exempt | 2028 | CO | 0 | State | $40,000.00 | $40,000.00 |
| 114672 | 36.138 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE Culverts FY29 | varies | Project entails pave small culvert CLE-222-1753 (1883314). Replace small culvert CLE-133-0475 (1883296) | Culvert Preservation | Exempt | 2027 | RW | 0 | State | $30,000.00 | $272,000.00 |
| 114672 | 36.139 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE Culverts FY29 | varies | Project entails pave small culvert CLE-222-1753 (1883314). Replace small culvert CLE-133-0475 (1883296) | Culvert Preservation | Exempt | 2029 | CO | 0 | Preservation | $176,000.00 | $272,000.00 |
| 114672 | 36.140 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE Culverts FY29 | varies | Project entails pave small culvert CLE-222-1753 (1883314). Replace small culvert CLE-133-0475 (1883296) | Culvert Preservation | Exempt | 2029 | CO | 0 | State | $44,000.00 | $272,000.00 |
| 114672 | 36.141 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE Culverts FY29 | varies | Project entails pave small culvert CLE-222-1753 (1883314). Replace small culvert CLE-133-0475 (1883296) | Culvert Preservation | Exempt | 2029 | CO | 0 | Labor | $22,000.00 | $272,000.00 |
| 114673 | 35.971 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Culverts FY27 | varies | Project entails pave invert for small culverts: HAM-74-1548 (1835935), HAM-74-1591 (1880384), and HAM-126-2231 (1879828). Sockline HAM-275-3781 (1984407); Repair headwall HAM-52-3663 (1879455). | Culvert Preservation | Exempt | 2027 | CO | 0 | Preservation | $583,500.00 | $774,065.00 |
| 114673 | 35.972 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Culverts FY27 | varies | Project entails pave invert for small culverts: HAM-74-1548 (1835935), HAM-74-1591 (1880384), and HAM-126-2231 (1879828). Sockline HAM-275-3781 (1984407); Repair headwall HAM-52-3663 (1879455). | Culvert Preservation | Exempt | 2027 | CO | 0 | State | $89,500.00 | $774,065.00 |
| 114673 | 35.973 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Culverts FY27 | varies | Project entails pave invert for small culverts: HAM-74-1548 (1835935), HAM-74-1591 (1880384), and HAM-126-2231 (1879828). Sockline HAM-275-3781 (1984407); Repair headwall HAM-52-3663 (1879455). | Culvert Preservation | Exempt | 2027 | CO | 0 | Labor | $67,300.00 | $774,065.00 |
| 114673 | 36.142 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Culverts FY27 | varies | Project entails pave invert for small culverts: HAM-74-1548 (1835935), HAM-74-1591 (1880384), and HAM-126-2231 (1879828). Sockline HAM-275-3781 (1984407); Repair headwall HAM-52-3663 (1879455). | Culvert Preservation | Exempt | 2026 | ENV | 0 | State | $33,765.00 | $774,065.00 |
| 114676 | 35.974 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR Inverts FY2029 | WAR-71-0908, WAR-741-1172 | Project to Pave inverts and/or other repairs to bridge size culverts including WAR-741-1172, WAR-123-1296, WAR-123-1328, WAR-75-0415E, and WAR-75-0810. (Note: WAR-71-0980 moved to PID 126016) | Culvert Preservation | Exempt | 2029 | CO | 0 | Preservation | $1,279,700.00 | $1,758,560.00 |
| 114676 | 35.975 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR Inverts FY2029 | WAR-71-0908, WAR-741-1172 | Project to Pave inverts and/or other repairs to bridge size culverts including WAR-741-1172, WAR-123-1296, WAR-123-1328, WAR-75-0415E, and WAR-75-0810. (Note: WAR-71-0980 moved to PID 126016) | Culvert Preservation | Exempt | 2029 | CO | 0 | State | $208,300.00 | $1,758,560.00 |
| 114676 | 35.976 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR Inverts FY2029 | WAR-71-0908, WAR-741-1172 | Project to Pave inverts and/or other repairs to bridge size culverts including WAR-741-1172, WAR-123-1296, WAR-123-1328, WAR-75-0415E, and WAR-75-0810. (Note: WAR-71-0980 moved to PID 126016) | Culvert Preservation | Exempt | 2029 | CO | 0 | Labor | $104,160.00 | $1,758,560.00 |
| 114678 | 35.977 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE US 50 15.89 | CLE US 50 15.89 | Replace the box beam superstructure of the Bridge CLE-50-15.89 that carries US 50 over Pleasant Run including approach roadway work. | Bridge Preservation | Exempt | 2026 | ENV | 0 | Preservation | $120,000.00 | $932,550.00 |
| 114678 | 35.978 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE US 50 15.89 | CLE US 50 15.89 | Replace the box beam superstructure of the Bridge CLE-50-15.89 that carries US 50 over Pleasant Run including approach roadway work. | Bridge Preservation | Exempt | 2026 | ENV | 0 | State | $30,000.00 | $932,550.00 |
| 114678 | 35.979 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE US 50 15.89 | CLE US 50 15.89 | Replace the box beam superstructure of the Bridge CLE-50-15.89 that carries US 50 over Pleasant Run including approach roadway work. | Bridge Preservation | Exempt | 2029 | CO | 0 | Preservation | $571,200.00 | $932,550.00 |
| 114678 | 35.980 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE US 50 15.89 | CLE US 50 15.89 | Replace the box beam superstructure of the Bridge CLE-50-15.89 that carries US 50 over Pleasant Run including approach roadway work. | Bridge Preservation | Exempt | 2029 | CO | 0 | State | $142,800.00 | $932,550.00 |
| 114678 | 36.143 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE US 50 15.89 | CLE US 50 15.89 | Replace the box beam superstructure of the Bridge CLE-50-15.89 that carries US 50 over Pleasant Run including approach roadway work. | Bridge Preservation | Exempt | 2029 | CO | 0 | Labor | $49,980.00 | $932,550.00 |
| 114679 | 36.144 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 133 13.24/34.79 | CLE SR 133 34.79 | Repair bridge size precast box culvert that carries SR 133 over Town Run in Bethel. Replace Bridge size Culvert that carries SR 133 over Locust Creek | Bridge Preservation | Exempt | 2026 | ENV | 0 | Preservation | $120,000.00 | $1,096,250.00 |
| 114679 | 36.145 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 133 13.24/34.79 | CLE SR 133 34.79 | Repair bridge size precast box culvert that carries SR 133 over Town Run in Bethel. Replace Bridge size Culvert that carries SR 133 over Locust Creek | Bridge Preservation | Exempt | 2026 | ENV | 0 | State | $30,000.00 | $1,096,250.00 |
| 114679 | 36.146 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 133 13.24/34.79 | CLE SR 133 34.79 | Repair bridge size precast box culvert that carries SR 133 over Town Run in Bethel. Replace Bridge size Culvert that carries SR 133 over Locust Creek | Bridge Preservation | Exempt | 2027 | RW | 0 | State | $10,000.00 | $1,096,250.00 |
| 114679 | 36.147 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 133 13.24/34.79 | CLE SR 133 34.79 | Repair bridge size precast box culvert that carries SR 133 over Town Run in Bethel. Replace Bridge size Culvert that carries SR 133 over Locust Creek | Bridge Preservation | Exempt | 2029 | CO | 0 | Preservation | $700,000.00 | $1,096,250.00 |
| 114679 | 36.148 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 133 13.24/34.79 | CLE SR 133 34.79 | Repair bridge size precast box culvert that carries SR 133 over Town Run in Bethel. Replace Bridge size Culvert that carries SR 133 over Locust Creek | Bridge Preservation | Exempt | 2029 | CO | 0 | State | $175,000.00 | $1,096,250.00 |
| 114679 | 36.149 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 133 13.24/34.79 | CLE SR 133 34.79 | Repair bridge size precast box culvert that carries SR 133 over Town Run in Bethel. Replace Bridge size Culvert that carries SR 133 over Locust Creek | Bridge Preservation | Exempt | 2029 | CO | 0 | Labor | $61,250.00 | $1,096,250.00 |
| 114690 | 36.150 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-LG-FY2028/2029 | Various locations in D8 | Lighting replacements on Interstates in D8 for FY2028-2029 | Lighting (Safety) | Exempt | 2028 | CO | 0 | State | $2,750,000.00 | $2,942,500.00 |
| 114690 | 36.151 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-LG-FY2028/2029 | Various locations in D8 | Lighting replacements on Interstates in D8 for FY2028-2029 | Lighting (Safety) | Exempt | 2028 | CO | 0 | Labor | $192,500.00 | $2,942,500.00 |
| 114691 | 36.152 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-PM/RPM-FY2027 | Various locations in D8 | District wide pavement marking and RPM contract in D8. Locations to be determined. | Traffic Control (Safety) | Exempt | 2027 | CO | 0 | State | $5,218,000.00 | $5,583,260.00 |
| 114691 | 36.153 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-PM/RPM-FY2027 | Various locations in D8 | District wide pavement marking and RPM contract in D8. Locations to be determined. | Traffic Control (Safety) | Exempt | 2027 | CO | 0 | Labor | $365,260.00 | $5,583,260.00 |
| 114692 | 36.154 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-PM/RPM-FY2028 | Various locations in D8 | District wide pavement marking and RPM contract in D8. Locations to be determined. | Traffic Control (Safety) | Exempt | 2028 | CO | 0 | State | $4,900,000.00 | $5,243,000.00 |
| 114692 | 36.155 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-PM/RPM-FY2028 | Various locations in D8 | District wide pavement marking and RPM contract in D8. Locations to be determined. | Traffic Control (Safety) | Exempt | 2028 | CO | 0 | Labor | $343,000.00 | $5,243,000.00 |
| 114693 | 36.156 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-TSG-FY2027/FY2028 | Various locations in D8 | Install by contract traffic signals at various locations in D8. Will include LED replacement for entire district. | Traffic Control (Safety) | Exempt | 2026 | DD | 0 | State | $152,966.00 | $2,892,166.00 |
| 114693 | 36.157 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-TSG-FY2027/FY2028 | Various locations in D8 | Install by contract traffic signals at various locations in D8. Will include LED replacement for entire district. | Traffic Control (Safety) | Exempt | 2027 | CO | 0 | Preservation | $2,560,000.00 | $2,892,166.00 |
| 114693 | 36.158 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-TSG-FY2027/FY2028 | Various locations in D8 | Install by contract traffic signals at various locations in D8. Will include LED replacement for entire district. | Traffic Control (Safety) | Exempt | 2027 | CO | 0 | Labor | $179,200.00 | $2,892,166.00 |
| 114695 | 36.159 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Tunnel Insp FY27/28 | Lytle Tunnel (structure HAM-71-0134) | Project to Inspect and maintain the Lytle Tunnel (Structure HAM-71-0134) that passes I-71 under Lytle Park in downtown Cincinnati. Includes NTIS inspection, routine excercising of ventilation, standpipe, air quality sensors, fire detection systems, draina | Asset Inventory / Inspection | Exempt | 2027 | OTH | 0 | State | $200,000.00 | $350,000.00 |
| 114695 | 36.160 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Tunnel Insp FY27/28 | Lytle Tunnel (structure HAM-71-0134) | Project to Inspect and maintain the Lytle Tunnel (Structure HAM-71-0134) that passes I-71 under Lytle Park in downtown Cincinnati. Includes NTIS inspection, routine excercising of ventilation, standpipe, air quality sensors, fire detection systems, draina | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | State | $150,000.00 | $350,000.00 |
| 114776 | 36.161 | Ohio | D08 | Group | ODOT Sponsoring Agency | HAM Culverts FY28 | varies | Sockline following culverts. HAM-128-0546 (1982911), HAM-128-0544(1982495), HAM-128-0544 (1982496), HAM-128-0561 (1972631), HAM-128-0553 (1982494), and HAM-126-1050 (1808180) via purchase order state contract 313-26. | Culvert Preservation | Exempt | 2026 | CO | 0 | State | $408,790.00 | $408,790.00 |
| 114780 | 36.162 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 1.34/3.32 | HAM IR 71 3.32 | Project to rehabilitate Bridge HAM-71-0332 which carries William Howard Taft Street over I-71 in Cincinnati. Rehabilitation will include replacing the expansion joints, overlay, bearings, approach slabs, slope protection, drainage, repairing the fence, pa | Bridge Preservation | Exempt | 2026 | ENV | 0 | Preservation | $135,000.00 | $4,080,660.00 |
| 114780 | 36.163 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 1.34/3.32 | HAM IR 71 3.32 | Project to rehabilitate Bridge HAM-71-0332 which carries William Howard Taft Street over I-71 in Cincinnati. Rehabilitation will include replacing the expansion joints, overlay, bearings, approach slabs, slope protection, drainage, repairing the fence, pa | Bridge Preservation | Exempt | 2026 | ENV | 0 | State | $15,000.00 | $4,080,660.00 |
| 114780 | 36.164 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 1.34/3.32 | HAM IR 71 3.32 | Project to rehabilitate Bridge HAM-71-0332 which carries William Howard Taft Street over I-71 in Cincinnati. Rehabilitation will include replacing the expansion joints, overlay, bearings, approach slabs, slope protection, drainage, repairing the fence, pa | Bridge Preservation | Exempt | 2027 | ENV | 0 | Labor | $141,440.00 | $4,080,660.00 |
| 114780 | 36.165 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 1.34/3.32 | HAM IR 71 3.32 | Project to rehabilitate Bridge HAM-71-0332 which carries William Howard Taft Street over I-71 in Cincinnati. Rehabilitation will include replacing the expansion joints, overlay, bearings, approach slabs, slope protection, drainage, repairing the fence, pa | Bridge Preservation | Exempt | 2027 | DD | 0 | Labor | $24,960.00 | $4,080,660.00 |
| 114780 | 36.166 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 1.34/3.32 | HAM IR 71 3.32 | Project to rehabilitate Bridge HAM-71-0332 which carries William Howard Taft Street over I-71 in Cincinnati. Rehabilitation will include replacing the expansion joints, overlay, bearings, approach slabs, slope protection, drainage, repairing the fence, pa | Bridge Preservation | Exempt | 2029 | CO | 0 | Preservation | $3,166,200.00 | $4,080,660.00 |
| 114780 | 36.167 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 1.34/3.32 | HAM IR 71 3.32 | Project to rehabilitate Bridge HAM-71-0332 which carries William Howard Taft Street over I-71 in Cincinnati. Rehabilitation will include replacing the expansion joints, overlay, bearings, approach slabs, slope protection, drainage, repairing the fence, pa | Bridge Preservation | Exempt | 2029 | CO | 0 | State | $351,800.00 | $4,080,660.00 |
| 114780 | 36.168 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 1.34/3.32 | HAM IR 71 3.32 | Project to rehabilitate Bridge HAM-71-0332 which carries William Howard Taft Street over I-71 in Cincinnati. Rehabilitation will include replacing the expansion joints, overlay, bearings, approach slabs, slope protection, drainage, repairing the fence, pa | Bridge Preservation | Exempt | 2029 | CO | 0 | Labor | $246,260.00 | $4,080,660.00 |
| 114781 | 36.169 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Bridge Maintenance FY2027 | Various locations in D8, primarily in Butler County | Project to perform minor maintenance bridge repairs, primarily in Butler County. Locations will be added as they are found. | Bridge / Culvert Maintenance | Exempt | 2026 | RW | 0 | State | $107,200.00 | $3,264,302.00 |
| 114781 | 36.170 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Bridge Maintenance FY2027 | Various locations in D8, primarily in Butler County | Project to perform minor maintenance bridge repairs, primarily in Butler County. Locations will be added as they are found. | Bridge / Culvert Maintenance | Exempt | 2027 | CO | 0 | Preservation | $2,192,607.00 | $3,264,302.00 |
| 114781 | 36.171 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Bridge Maintenance FY2027 | Various locations in D8, primarily in Butler County | Project to perform minor maintenance bridge repairs, primarily in Butler County. Locations will be added as they are found. | Bridge / Culvert Maintenance | Exempt | 2027 | CO | 0 | State | $619,133.00 | $3,264,302.00 |
| 114781 | 36.172 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Bridge Maintenance FY2027 | Various locations in D8, primarily in Butler County | Project to perform minor maintenance bridge repairs, primarily in Butler County. Locations will be added as they are found. | Bridge / Culvert Maintenance | Exempt | 2027 | CO | 0 | Labor | $194,862.00 | $3,264,302.00 |
| 114787 | 36.173 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR BS 2027 | mainline bridges on I-71 and I-75 in Warren County | Seal mainline bridges on I-71 and I-75 in Warren County | Bridge / Culvert Maintenance | Exempt | 2027 | CO | 0 | Preservation | $1,013,985.00 | $1,205,516.00 |
| 114787 | 36.174 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR BS 2027 | mainline bridges on I-71 and I-75 in Warren County | Seal mainline bridges on I-71 and I-75 in Warren County | Bridge / Culvert Maintenance | Exempt | 2027 | CO | 0 | State | $112,665.00 | $1,205,516.00 |
| 114787 | 36.175 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR BS 2027 | mainline bridges on I-71 and I-75 in Warren County | Seal mainline bridges on I-71 and I-75 in Warren County | Bridge / Culvert Maintenance | Exempt | 2027 | CO | 0 | Labor | $78,866.00 | $1,205,516.00 |
| 114859 | 36.176 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Mt. Adams Inspection FY24-26 | Mt. Adams Slope Stability System | Inspection, monitoring, and maintenance of the Mt. Adams Slope Stability System. | Asset Inventory / Inspection | Exempt | 2026 | OTH | 0 | State | $245,402.00 | $880,132.00 |
| 115291 | 39.768 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM SR 125 1.80 LMST Ext | SR-125 from Elstun to Ranchvale | Construct shared use path from Elstun road along SR-125 to the intersection of Ranchvale. The Feasibility Study for this project is being completed under PID 113602, and this project was originally recommended in the 2019 Eastern Corridor II/III Study (Al | Pedestrian Facilities | Exempt | 2026 | RW | 3 | MPO TA | $63,283.00 | $1,311,638.90 |
| 115291 | 39.769 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM SR 125 1.80 LMST Ext | SR-125 from Elstun to Ranchvale | Construct shared use path from Elstun road along SR-125 to the intersection of Ranchvale. The Feasibility Study for this project is being completed under PID 113602, and this project was originally recommended in the 2019 Eastern Corridor II/III Study (Al | Pedestrian Facilities | Exempt | 2026 | RW | 4 | Local | $15,820.75 | $1,311,638.90 |
| 115291 | 39.770 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM SR 125 1.80 LMST Ext | SR-125 from Elstun to Ranchvale | Construct shared use path from Elstun road along SR-125 to the intersection of Ranchvale. The Feasibility Study for this project is being completed under PID 113602, and this project was originally recommended in the 2019 Eastern Corridor II/III Study (Al | Pedestrian Facilities | Exempt | 2026 | CO | 5 | MPO TA | $587,632.00 | $1,311,638.90 |
| 115291 | 39.771 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM SR 125 1.80 LMST Ext | SR-125 from Elstun to Ranchvale | Construct shared use path from Elstun road along SR-125 to the intersection of Ranchvale. The Feasibility Study for this project is being completed under PID 113602, and this project was originally recommended in the 2019 Eastern Corridor II/III Study (Al | Pedestrian Facilities | Exempt | 2026 | CO | 6 | Local | $402,098.15 | $1,311,638.90 |
| 115417 | 40.006 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM/CLE IR 275 30.98/0.00 Part 1 | HAM IR 275 from IR 71 to the Clermont County Line; CLE IR 275 from Hamilton County line to SR-28 | Implement Smart Lane by installing dynamic message signs and variable speed limit signs on eastbound I-275 from IR-71 interchange to SR-28 and westbound I-275 from SR-28 to Loveland-Madeira. This matches the Smart lane constructed in the previous project | Roadway Minor Rehab | Exempt | 2026 | DD | 1 | Major Programs | $1,217,592.80 | $101,629,677.00 |
| 115417 | 40.007 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM/CLE IR 275 30.98/0.00 Part 1 | HAM IR 275 from IR 71 to the Clermont County Line; CLE IR 275 from Hamilton County line to SR-28 | Implement Smart Lane by installing dynamic message signs and variable speed limit signs on eastbound I-275 from IR-71 interchange to SR-28 and westbound I-275 from SR-28 to Loveland-Madeira. This matches the Smart lane constructed in the previous project | Roadway Minor Rehab | Exempt | 2026 | DD | 2 | State | $304,398.20 | $101,629,677.00 |
| 115417 | 40.008 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM/CLE IR 275 30.98/0.00 Part 1 | HAM IR 275 from IR 71 to the Clermont County Line; CLE IR 275 from Hamilton County line to SR-28 | Implement Smart Lane by installing dynamic message signs and variable speed limit signs on eastbound I-275 from IR-71 interchange to SR-28 and westbound I-275 from SR-28 to Loveland-Madeira. This matches the Smart lane constructed in the previous project | Roadway Minor Rehab | Exempt | 2026 | RW | 3 | Major Programs | $128,163.20 | $101,629,677.00 |
| 115417 | 40.009 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM/CLE IR 275 30.98/0.00 Part 1 | HAM IR 275 from IR 71 to the Clermont County Line; CLE IR 275 from Hamilton County line to SR-28 | Implement Smart Lane by installing dynamic message signs and variable speed limit signs on eastbound I-275 from IR-71 interchange to SR-28 and westbound I-275 from SR-28 to Loveland-Madeira. This matches the Smart lane constructed in the previous project | Roadway Minor Rehab | Exempt | 2026 | RW | 4 | State | $32,040.80 | $101,629,677.00 |
| 115417 | 40.010 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM/CLE IR 275 30.98/0.00 Part 1 | HAM IR 275 from IR 71 to the Clermont County Line; CLE IR 275 from Hamilton County line to SR-28 | Implement Smart Lane by installing dynamic message signs and variable speed limit signs on eastbound I-275 from IR-71 interchange to SR-28 and westbound I-275 from SR-28 to Loveland-Madeira. This matches the Smart lane constructed in the previous project | Roadway Minor Rehab | Exempt | 2028 | CO | 5 | Major Programs | $62,938,266.20 | $101,629,677.00 |
| 115417 | 40.011 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM/CLE IR 275 30.98/0.00 Part 1 | HAM IR 275 from IR 71 to the Clermont County Line; CLE IR 275 from Hamilton County line to SR-28 | Implement Smart Lane by installing dynamic message signs and variable speed limit signs on eastbound I-275 from IR-71 interchange to SR-28 and westbound I-275 from SR-28 to Loveland-Madeira. This matches the Smart lane constructed in the previous project | Roadway Minor Rehab | Exempt | 2029 | CO | 5 | Major Programs | $1,440,841.60 | $101,629,677.00 |
| 115417 | 40.012 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM/CLE IR 275 30.98/0.00 Part 1 | HAM IR 275 from IR 71 to the Clermont County Line; CLE IR 275 from Hamilton County line to SR-28 | Implement Smart Lane by installing dynamic message signs and variable speed limit signs on eastbound I-275 from IR-71 interchange to SR-28 and westbound I-275 from SR-28 to Loveland-Madeira. This matches the Smart lane constructed in the previous project | Roadway Minor Rehab | Exempt | 2028 | CO | 6 | Preservation | $517,638.60 | $101,629,677.00 |
| 115417 | 40.013 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM/CLE IR 275 30.98/0.00 Part 1 | HAM IR 275 from IR 71 to the Clermont County Line; CLE IR 275 from Hamilton County line to SR-28 | Implement Smart Lane by installing dynamic message signs and variable speed limit signs on eastbound I-275 from IR-71 interchange to SR-28 and westbound I-275 from SR-28 to Loveland-Madeira. This matches the Smart lane constructed in the previous project | Roadway Minor Rehab | Exempt | 2028 | CO | 7 | State | $15,791,249.20 | $101,629,677.00 |
| 115417 | 40.014 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM/CLE IR 275 30.98/0.00 Part 1 | HAM IR 275 from IR 71 to the Clermont County Line; CLE IR 275 from Hamilton County line to SR-28 | Implement Smart Lane by installing dynamic message signs and variable speed limit signs on eastbound I-275 from IR-71 interchange to SR-28 and westbound I-275 from SR-28 to Loveland-Madeira. This matches the Smart lane constructed in the previous project | Roadway Minor Rehab | Exempt | 2029 | CO | 7 | State | $359,158.40 | $101,629,677.00 |
| 115417 | 40.015 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM/CLE IR 275 30.98/0.00 Part 1 | HAM IR 275 from IR 71 to the Clermont County Line; CLE IR 275 from Hamilton County line to SR-28 | Implement Smart Lane by installing dynamic message signs and variable speed limit signs on eastbound I-275 from IR-71 interchange to SR-28 and westbound I-275 from SR-28 to Loveland-Madeira. This matches the Smart lane constructed in the previous project | Roadway Minor Rehab | Exempt | 2028 | CO | 8 | Labor | $5,412,551.00 | $101,629,677.00 |
| 115555 | 36.177 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 75 11.96 | HAM-75: SLM 11.96 | Acquisition of land from the Village of Lockland for corridor preservation | Real Estate Services | Exempt | 2026 | RW | 0 | State | $306,790.00 | $350,000.00 |
| 115754 | 36.178 | Ohio | BUT | Group | Trenton, City of | BUT SR 73 16.05 | BUT-73: SLM 16.05-16.76 (First St - eastern corp) | FY26 Urban Paving project in the City of Trenton on a portion of SR 73 (State St) | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Preservation | $406,850.82 | $1,038,484.00 |
| 115754 | 36.179 | Ohio | BUT | Group | Trenton, City of | BUT SR 73 16.05 | BUT-73: SLM 16.05-16.76 (First St - eastern corp) | FY26 Urban Paving project in the City of Trenton on a portion of SR 73 (State St) | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Labor | $70,275.55 | $1,038,484.00 |
| 115754 | 36.180 | Ohio | BUT | Group | Trenton, City of | BUT SR 73 16.05 | BUT-73: SLM 16.05-16.76 (First St - eastern corp) | FY26 Urban Paving project in the City of Trenton on a portion of SR 73 (State St) | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Local | $540,498.63 | $1,038,484.00 |
| 115757 | 36.181 | Ohio | HAM | Group | Montgomery, City of | HAM US 22 15.22 | HAM-22: SLM 15.22-15.87 (between Pfeiffer Rd - Weller Rd) | FY26 Urban Paving project in the City of Montgomery on a portion of US 22 (Montgomery Rd) | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Preservation | $492,837.01 | $1,016,202.00 |
| 115757 | 36.182 | Ohio | HAM | Group | Montgomery, City of | HAM US 22 15.22 | HAM-22: SLM 15.22-15.87 (between Pfeiffer Rd - Weller Rd) | FY26 Urban Paving project in the City of Montgomery on a portion of US 22 (Montgomery Rd) | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Local | $488,418.99 | $1,016,202.00 |
| 115961 | 36.183 | Ohio | BUT | Group | ODOT Sponsoring Agency | D08 PO FY2026 (Butler Co.) | Butler County | District 8 PO for Butler Co. issues in FY 2026. | Maintenance Contracts (Non-Let.) | Exempt | 2026 | OTH | 0 | State | $24,000.00 | $24,000.00 |
| 115962 | 36.184 | Ohio | BUT | Group | ODOT Sponsoring Agency | D08 PO FY2027 (Butler Co.) | Butler County | District 8 PO for Butler Co. issues in FY 2027. | Maintenance Contracts (Non-Let.) | Exempt | 2027 | OTH | 0 | State | $24,000.00 | $24,000.00 |
| 115963 | 36.185 | Ohio | BUT | Group | ODOT Sponsoring Agency | D08 PO FY2028 (Butler Co.) | Butler County | District 8 PO for Butler Co. issues in FY 2028. | Maintenance Contracts (Non-Let.) | Exempt | 2028 | OTH | 0 | State | $24,000.00 | $24,000.00 |
| 115965 | 36.186 | Ohio | HAM | Group | ODOT Sponsoring Agency | D08 PO FY2026 (Hamilton Co.) | Hamilton County | District 8 PO for Hamilton County issues in FY 2026. | Maintenance Contracts (Non-Let.) | Exempt | 2026 | OTH | 0 | State | $89,000.00 | $89,000.00 |
| 115966 | 36.187 | Ohio | HAM | Group | ODOT Sponsoring Agency | D08 PO FY2027 (Hamilton Co.) | Hamilton County | District 8 PO for Hamilton County issues in FY 2027. | Maintenance Contracts (Non-Let.) | Exempt | 2027 | OTH | 0 | State | $169,000.00 | $169,000.00 |
| 115967 | 36.188 | Ohio | HAM | Group | ODOT Sponsoring Agency | D08 PO FY2028 (Hamilton Co.) | Hamilton County | District 8 PO for Hamilton County issues in FY 2028. | Maintenance Contracts (Non-Let.) | Exempt | 2028 | OTH | 0 | State | $169,000.00 | $169,000.00 |
| 115976 | 40.019 | Ohio | Hamilton | Individual | Newtown, Village of | HAM SR 32 4.34 | From west of Round Bottom Road to the eastern Newtown corp. limit | Improve the intersection of SR-32 & Round Bottom Road by creating two southbound left turn lanes and widening eastbound SR-32 to provide two receiving lanes with the added lane ending as a right turn lane at Little Dry Run Road. Construct a two way left t | Roadway Improvement (Safety) | Non-Exempt (Analyzed) | 2027 | ENV | 1 | Major Programs | $1,046,960.00 | $14,739,208.00 |
| 115976 | 40.020 | Ohio | Hamilton | Individual | Newtown, Village of | HAM SR 32 4.34 | From west of Round Bottom Road to the eastern Newtown corp. limit | Improve the intersection of SR-32 & Round Bottom Road by creating two southbound left turn lanes and widening eastbound SR-32 to provide two receiving lanes with the added lane ending as a right turn lane at Little Dry Run Road. Construct a two way left t | Roadway Improvement (Safety) | Non-Exempt (Analyzed) | 2027 | ENV | 2 | State | $261,740.00 | $14,739,208.00 |
| 115976 | 40.021 | Ohio | Hamilton | Individual | Newtown, Village of | HAM SR 32 4.34 | From west of Round Bottom Road to the eastern Newtown corp. limit | Improve the intersection of SR-32 & Round Bottom Road by creating two southbound left turn lanes and widening eastbound SR-32 to provide two receiving lanes with the added lane ending as a right turn lane at Little Dry Run Road. Construct a two way left t | Roadway Improvement (Safety) | Non-Exempt (Analyzed) | 2027 | DD | 3 | Major Programs | $761,606.40 | $14,739,208.00 |
| 115976 | 40.022 | Ohio | Hamilton | Individual | Newtown, Village of | HAM SR 32 4.34 | From west of Round Bottom Road to the eastern Newtown corp. limit | Improve the intersection of SR-32 & Round Bottom Road by creating two southbound left turn lanes and widening eastbound SR-32 to provide two receiving lanes with the added lane ending as a right turn lane at Little Dry Run Road. Construct a two way left t | Roadway Improvement (Safety) | Non-Exempt (Analyzed) | 2027 | DD | 4 | State | $190,401.60 | $14,739,208.00 |
| 116203 | 36.189 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 74 7.67 | HAM IR 74 7.56 to 7.78 | Slope stabilization of the shoulder on IR 74 along the existing soldier pile wall on the ramp to SR 128 in Hamilton County | Other Studies/ Tasks | Exempt | 2026 | ENV | 0 | State | $143,551.00 | $1,748,551.00 |
| 116203 | 36.190 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 74 7.67 | HAM IR 74 7.56 to 7.78 | Slope stabilization of the shoulder on IR 74 along the existing soldier pile wall on the ramp to SR 128 in Hamilton County | Other Studies/ Tasks | Exempt | 2027 | CO | 0 | PROTECT | $1,200,000.00 | $1,748,551.00 |
| 116203 | 36.191 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 74 7.67 | HAM IR 74 7.56 to 7.78 | Slope stabilization of the shoulder on IR 74 along the existing soldier pile wall on the ramp to SR 128 in Hamilton County | Other Studies/ Tasks | Exempt | 2027 | CO | 0 | State | $300,000.00 | $1,748,551.00 |
| 116203 | 36.192 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 74 7.67 | HAM IR 74 7.56 to 7.78 | Slope stabilization of the shoulder on IR 74 along the existing soldier pile wall on the ramp to SR 128 in Hamilton County | Other Studies/ Tasks | Exempt | 2027 | CO | 0 | Labor | $105,000.00 | $1,748,551.00 |
| 116259 | 36.193 | Ohio | HAM | Group | Kentucky, Commonwealth of | Roebling Stone II & Sidewalk | HAM-CR600-0.01 | Roebling Bridge - KYTC lead bridge project to improve the sidewalk along with some stone work. | Bridge Preservation | Exempt | 2026 | DD | 0 | State | $800,000.00 | $17,000,000.00 |
| 116259 | 36.194 | Ohio | HAM | Group | Kentucky, Commonwealth of | Roebling Stone II & Sidewalk | HAM-CR600-0.01 | Roebling Bridge - KYTC lead bridge project to improve the sidewalk along with some stone work. | Bridge Preservation | Exempt | 2026 | DD | 0 | Local | $1,200,000.00 | $17,000,000.00 |
| 116259 | 36.195 | Ohio | HAM | Group | Kentucky, Commonwealth of | Roebling Stone II & Sidewalk | HAM-CR600-0.01 | Roebling Bridge - KYTC lead bridge project to improve the sidewalk along with some stone work. | Bridge Preservation | Exempt | 2027 | CO | 0 | Major Programs | $4,800,000.00 | $17,000,000.00 |
| 116259 | 36.196 | Ohio | HAM | Group | Kentucky, Commonwealth of | Roebling Stone II & Sidewalk | HAM-CR600-0.01 | Roebling Bridge - KYTC lead bridge project to improve the sidewalk along with some stone work. | Bridge Preservation | Exempt | 2027 | CO | 0 | State | $1,200,000.00 | $17,000,000.00 |
| 116259 | 36.197 | Ohio | HAM | Group | Kentucky, Commonwealth of | Roebling Stone II & Sidewalk | HAM-CR600-0.01 | Roebling Bridge - KYTC lead bridge project to improve the sidewalk along with some stone work. | Bridge Preservation | Exempt | 2027 | CO | 0 | Local | $9,000,000.00 | $17,000,000.00 |
| 116289 | 36.198 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08/D07 GES Task Order FY27/28 | District 8 Design Task Order for FY2027-28 | District 8 and District 7 Design Task Order for FY2027-2028 | General Engineering | Exempt | 2027 | ENV | 0 | State | $750,000.00 | $1,500,000.00 |
| 116289 | 36.199 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08/D07 GES Task Order FY27/28 | District 8 Design Task Order for FY2027-28 | District 8 and District 7 Design Task Order for FY2027-2028 | General Engineering | Exempt | 2028 | ENV | 0 | State | $750,000.00 | $1,500,000.00 |
| 116290 | 36.200 | Ohio | D07, D08 | Group | ODOT Sponsoring Agency | D7/D8-GES-FY28/29 | District 7 & District 8 Design Task Order for FY28-29 | District 7 and District 8 Design Task Order for FY2028-2029 | General Engineering | Exempt | 2028 | ENV | 0 | State | $750,000.00 | $1,500,000.00 |
| 116290 | 36.201 | Ohio | D07, D08 | Group | ODOT Sponsoring Agency | D7/D8-GES-FY28/29 | District 7 & District 8 Design Task Order for FY28-29 | District 7 and District 8 Design Task Order for FY2028-2029 | General Engineering | Exempt | 2029 | ENV | 0 | State | $750,000.00 | $1,500,000.00 |
| 116333 | 36.202 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 128 0.00 | HAM SR 128: SLM 0-5.62 | Resurfacing a portion of SR 128 in Hamilton County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Preservation | $2,201,328.63 | $2,903,674.00 |
| 116333 | 36.203 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 128 0.00 | HAM SR 128: SLM 0-5.62 | Resurfacing a portion of SR 128 in Hamilton County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | State | $550,332.16 | $2,903,674.00 |
| 116333 | 36.204 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 128 0.00 | HAM SR 128: SLM 0-5.62 | Resurfacing a portion of SR 128 in Hamilton County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Labor | $110,069.21 | $2,903,674.00 |
| 116337 | 36.205 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR US 22 0.00 | WAR-22: SLM 0 to 4.89 | Resurfacing a portion of US 22 in Warren County. Widen US-22 between Old Mill Rd and Old 3C Highway. | Roadway Minor Rehab | Exempt | 2026 | ENV | 0 | State | $106,751.00 | $9,014,055.00 |
| 116337 | 36.206 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR US 22 0.00 | WAR-22: SLM 0 to 4.89 | Resurfacing a portion of US 22 in Warren County. Widen US-22 between Old Mill Rd and Old 3C Highway. | Roadway Minor Rehab | Exempt | 2027 | RW | 0 | Preservation | $240,000.00 | $9,014,055.00 |
| 116337 | 36.207 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR US 22 0.00 | WAR-22: SLM 0 to 4.89 | Resurfacing a portion of US 22 in Warren County. Widen US-22 between Old Mill Rd and Old 3C Highway. | Roadway Minor Rehab | Exempt | 2027 | RW | 0 | State | $60,000.00 | $9,014,055.00 |
| 116337 | 36.208 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR US 22 0.00 | WAR-22: SLM 0 to 4.89 | Resurfacing a portion of US 22 in Warren County. Widen US-22 between Old Mill Rd and Old 3C Highway. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Preservation | $3,551,360.00 | $9,014,055.00 |
| 116337 | 36.209 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR US 22 0.00 | WAR-22: SLM 0 to 4.89 | Resurfacing a portion of US 22 in Warren County. Widen US-22 between Old Mill Rd and Old 3C Highway. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | State | $4,596,840.00 | $9,014,055.00 |
| 116337 | 36.210 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR US 22 0.00 | WAR-22: SLM 0 to 4.89 | Resurfacing a portion of US 22 in Warren County. Widen US-22 between Old Mill Rd and Old 3C Highway. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Labor | $459,104.00 | $9,014,055.00 |
| 116341 | 36.211 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 732 0.00 | BUT-732: SLM 0-7.34 + 9.87-13.76 | Chip sealing portions of SR 732 in Butler County | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Preservation | $888,800.00 | $1,155,440.00 |
| 116341 | 36.212 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 732 0.00 | BUT-732: SLM 0-7.34 + 9.87-13.76 | Chip sealing portions of SR 732 in Butler County | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | State | $222,200.00 | $1,155,440.00 |
| 116341 | 36.213 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 732 0.00 | BUT-732: SLM 0-7.34 + 9.87-13.76 | Chip sealing portions of SR 732 in Butler County | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Labor | $44,440.00 | $1,155,440.00 |
| 116344 | 36.214 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE Culverts FY28 | various culverts CLE county | to repair abutments small culvert CLE-50-0326 (1812424), sockline small pipe connecting into bridge size culvert CLE-275-0468, and pave inverts for small culverts CLE-727-0476 (1864282) and CLE-32-0591 (1844526). | Culvert Preservation | Exempt | 2028 | CO | 0 | Preservation | $710,000.00 | $973,500.00 |
| 116344 | 36.215 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE Culverts FY28 | various culverts CLE county | to repair abutments small culvert CLE-50-0326 (1812424), sockline small pipe connecting into bridge size culvert CLE-275-0468, and pave inverts for small culverts CLE-727-0476 (1864282) and CLE-32-0591 (1844526). | Culvert Preservation | Exempt | 2028 | CO | 0 | State | $175,000.00 | $973,500.00 |
| 116344 | 36.216 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE Culverts FY28 | various culverts CLE county | to repair abutments small culvert CLE-50-0326 (1812424), sockline small pipe connecting into bridge size culvert CLE-275-0468, and pave inverts for small culverts CLE-727-0476 (1864282) and CLE-32-0591 (1844526). | Culvert Preservation | Exempt | 2028 | CO | 0 | Labor | $88,500.00 | $973,500.00 |
| 116350 | 36.217 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Interstate Culverts FY26 | various culverts hamilton county | Hardline small culvert HAM-275-1362 (1886716) via purchase order. Sockline HAM-71-0391 (1973707), and HAM-71-0395 (1973706) via purchase order. | Culvert Preservation | Exempt | 2026 | CO | 0 | State | $504,684.00 | $504,684.00 |
| 116465 | 39.772 | Ohio | Hamilton | Individual | Forest Park, City of | HAM VAR Forest Park Signals | CR 266 (Kemper); CR 239 (Winton); CR 614 (Northland Blvd) | Upgrade traffic signals at 14 intersections in Forest Park including new controllers, new detection, and connection to a centrally based system. | Traffic Control (Safety) | Exempt | 2026 | CO | 6 | MPO STBG | $213,043.60 | $799,079.50 |
| 116465 | 39.773 | Ohio | Hamilton | Individual | Forest Park, City of | HAM VAR Forest Park Signals | CR 266 (Kemper); CR 239 (Winton); CR 614 (Northland Blvd) | Upgrade traffic signals at 14 intersections in Forest Park including new controllers, new detection, and connection to a centrally based system. | Traffic Control (Safety) | Exempt | 2026 | CO | 7 | Local | $583,086.90 | $799,079.50 |
| 116547 | 39.774 | Ohio | Hamilton | Individual | Green Township (Hamilton County) | HAM CR 128/161 Roundabout | Intersection of Hutchinson and Ebenezer Roads | Construction of a roundabout at the intersection of Hutchinson and Ebenezer Roads. | Intersection Improvement (Safety) | Exempt | 2026 | ENV | 8 | Labor | $120,246.00 | $2,526,208.92 |
| 116547 | 39.775 | Ohio | Hamilton | Individual | Green Township (Hamilton County) | HAM CR 128/161 Roundabout | Intersection of Hutchinson and Ebenezer Roads | Construction of a roundabout at the intersection of Hutchinson and Ebenezer Roads. | Intersection Improvement (Safety) | Exempt | 2026 | DD | 3 | Labor | $21,220.00 | $2,526,208.92 |
| 116547 | 39.776 | Ohio | Hamilton | Individual | Green Township (Hamilton County) | HAM CR 128/161 Roundabout | Intersection of Hutchinson and Ebenezer Roads | Construction of a roundabout at the intersection of Hutchinson and Ebenezer Roads. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 6 | MPO STBG | $827,258.00 | $2,526,208.92 |
| 116547 | 39.777 | Ohio | Hamilton | Individual | Green Township (Hamilton County) | HAM CR 128/161 Roundabout | Intersection of Hutchinson and Ebenezer Roads | Construction of a roundabout at the intersection of Hutchinson and Ebenezer Roads. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 7 | Labor | $144,235.12 | $2,526,208.92 |
| 116547 | 39.778 | Ohio | Hamilton | Individual | Green Township (Hamilton County) | HAM CR 128/161 Roundabout | Intersection of Hutchinson and Ebenezer Roads | Construction of a roundabout at the intersection of Hutchinson and Ebenezer Roads. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 8 | Local | $1,233,243.80 | $2,526,208.92 |
| 116548 | 39.779 | Ohio | Hamilton | Individual | Green Township (Hamilton County) | HAM CR 158/460 2.04/0.54 | Intersection of Westbourne and Werk Roads | Addition of right turn lanes on 3 legs, and replacement of the traffic signal at the intersection of Westbourne and Werk Roads. | Intersection Improvement (Safety) | Exempt | 2026 | ENV | 1 | Labor | $102,807.00 | $2,546,846.25 |
| 116548 | 39.780 | Ohio | Hamilton | Individual | Green Township (Hamilton County) | HAM CR 158/460 2.04/0.54 | Intersection of Westbourne and Werk Roads | Addition of right turn lanes on 3 legs, and replacement of the traffic signal at the intersection of Westbourne and Werk Roads. | Intersection Improvement (Safety) | Exempt | 2026 | DD | 3 | Labor | $18,142.00 | $2,546,846.25 |
| 116548 | 39.781 | Ohio | Hamilton | Individual | Green Township (Hamilton County) | HAM CR 158/460 2.04/0.54 | Intersection of Westbourne and Werk Roads | Addition of right turn lanes on 3 legs, and replacement of the traffic signal at the intersection of Westbourne and Werk Roads. | Intersection Improvement (Safety) | Exempt | 2026 | RW | 5 | Labor | $60,000.00 | $2,546,846.25 |
| 116548 | 39.782 | Ohio | Hamilton | Individual | Green Township (Hamilton County) | HAM CR 158/460 2.04/0.54 | Intersection of Westbourne and Werk Roads | Addition of right turn lanes on 3 legs, and replacement of the traffic signal at the intersection of Westbourne and Werk Roads. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 6 | MPO STBG | $923,451.00 | $2,546,846.25 |
| 116548 | 39.783 | Ohio | Hamilton | Individual | Green Township (Hamilton County) | HAM CR 158/460 2.04/0.54 | Intersection of Westbourne and Werk Roads | Addition of right turn lanes on 3 legs, and replacement of the traffic signal at the intersection of Westbourne and Werk Roads. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 7 | Labor | $147,337.75 | $2,546,846.25 |
| 116548 | 39.784 | Ohio | Hamilton | Individual | Green Township (Hamilton County) | HAM CR 158/460 2.04/0.54 | Intersection of Westbourne and Werk Roads | Addition of right turn lanes on 3 legs, and replacement of the traffic signal at the intersection of Westbourne and Werk Roads. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 8 | Local | $1,295,108.50 | $2,546,846.25 |
| 116550 | 39.785 | Ohio | Hamilton | Individual | Silverton, Village of | HAM US 22/CR 273 Intersec Improv | Plainfield Rd: from St. James Ave to the northern corp. limit; Montgomery Rd: from Parkview Ave to Plainfield Rd | Reconstruction of Plainfield Road from St. James Ave. to the Silverton northern corp. line. Includes intersection improvements and signal replacement. Resurfacing of Montgomery Road between Parkview and Plainfield Road. | Roadway Major Rehab | Exempt | 2026 | RW | 3 | MPO STBG | $20,000.00 | $6,312,378.71 |
| 116550 | 39.786 | Ohio | Hamilton | Individual | Silverton, Village of | HAM US 22/CR 273 Intersec Improv | Plainfield Rd: from St. James Ave to the northern corp. limit; Montgomery Rd: from Parkview Ave to Plainfield Rd | Reconstruction of Plainfield Road from St. James Ave. to the Silverton northern corp. line. Includes intersection improvements and signal replacement. Resurfacing of Montgomery Road between Parkview and Plainfield Road. | Roadway Major Rehab | Exempt | 2026 | RW | 4 | Local | $5,000.00 | $6,312,378.71 |
| 116550 | 39.787 | Ohio | Hamilton | Individual | Silverton, Village of | HAM US 22/CR 273 Intersec Improv | Plainfield Rd: from St. James Ave to the northern corp. limit; Montgomery Rd: from Parkview Ave to Plainfield Rd | Reconstruction of Plainfield Road from St. James Ave. to the Silverton northern corp. line. Includes intersection improvements and signal replacement. Resurfacing of Montgomery Road between Parkview and Plainfield Road. | Roadway Major Rehab | Exempt | 2026 | CO | 6 | MPO STBG | $4,296,046.24 | $6,312,378.71 |
| 116550 | 39.788 | Ohio | Hamilton | Individual | Silverton, Village of | HAM US 22/CR 273 Intersec Improv | Plainfield Rd: from St. James Ave to the northern corp. limit; Montgomery Rd: from Parkview Ave to Plainfield Rd | Reconstruction of Plainfield Road from St. James Ave. to the Silverton northern corp. line. Includes intersection improvements and signal replacement. Resurfacing of Montgomery Road between Parkview and Plainfield Road. | Roadway Major Rehab | Exempt | 2026 | CO | 7 | State | $150,000.00 | $6,312,378.71 |
| 116550 | 39.789 | Ohio | Hamilton | Individual | Silverton, Village of | HAM US 22/CR 273 Intersec Improv | Plainfield Rd: from St. James Ave to the northern corp. limit; Montgomery Rd: from Parkview Ave to Plainfield Rd | Reconstruction of Plainfield Road from St. James Ave. to the Silverton northern corp. line. Includes intersection improvements and signal replacement. Resurfacing of Montgomery Road between Parkview and Plainfield Road. | Roadway Major Rehab | Exempt | 2026 | CO | 8 | Labor | $386,911.91 | $6,312,378.71 |
| 116550 | 39.790 | Ohio | Hamilton | Individual | Silverton, Village of | HAM US 22/CR 273 Intersec Improv | Plainfield Rd: from St. James Ave to the northern corp. limit; Montgomery Rd: from Parkview Ave to Plainfield Rd | Reconstruction of Plainfield Road from St. James Ave. to the Silverton northern corp. line. Includes intersection improvements and signal replacement. Resurfacing of Montgomery Road between Parkview and Plainfield Road. | Roadway Major Rehab | Exempt | 2026 | CO | 9 | Local | $1,288,020.56 | $6,312,378.71 |
| 116560 | 36.218 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 12.77 | HAM IR 71: SLM 12.77 | Project to replace the concrete wearing surface, paint, repair sound wall, and perform other rehabilitation items of Bridge HAM-71-1277L/R that carries I-71 over Galbraith Rd. | Bridge Preservation | Exempt | 2026 | ENV | 0 | Labor | $141,440.00 | $4,342,610.00 |
| 116560 | 36.219 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 12.77 | HAM IR 71: SLM 12.77 | Project to replace the concrete wearing surface, paint, repair sound wall, and perform other rehabilitation items of Bridge HAM-71-1277L/R that carries I-71 over Galbraith Rd. | Bridge Preservation | Exempt | 2026 | DD | 0 | Labor | $24,960.00 | $4,342,610.00 |
| 116560 | 36.220 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 12.77 | HAM IR 71: SLM 12.77 | Project to replace the concrete wearing surface, paint, repair sound wall, and perform other rehabilitation items of Bridge HAM-71-1277L/R that carries I-71 over Galbraith Rd. | Bridge Preservation | Exempt | 2028 | CO | 0 | Preservation | $3,512,700.00 | $4,342,610.00 |
| 116560 | 36.221 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 12.77 | HAM IR 71: SLM 12.77 | Project to replace the concrete wearing surface, paint, repair sound wall, and perform other rehabilitation items of Bridge HAM-71-1277L/R that carries I-71 over Galbraith Rd. | Bridge Preservation | Exempt | 2028 | CO | 0 | State | $390,300.00 | $4,342,610.00 |
| 116560 | 36.222 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 12.77 | HAM IR 71: SLM 12.77 | Project to replace the concrete wearing surface, paint, repair sound wall, and perform other rehabilitation items of Bridge HAM-71-1277L/R that carries I-71 over Galbraith Rd. | Bridge Preservation | Exempt | 2028 | CO | 0 | Labor | $273,210.00 | $4,342,610.00 |
| 116562 | 36.223 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM BS FY2028 | Multiple locations in HAM CO | Project to seal mainline and ramp bridges on I-75 and I-74 in Hamilton County in FY2028. | Bridge Preservation | Exempt | 2026 | ENV | 0 | Labor | $134,138.00 | $2,288,477.00 |
| 116562 | 36.224 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM BS FY2028 | Multiple locations in HAM CO | Project to seal mainline and ramp bridges on I-75 and I-74 in Hamilton County in FY2028. | Bridge Preservation | Exempt | 2026 | DD | 0 | Labor | $23,671.00 | $2,288,477.00 |
| 116562 | 36.225 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM BS FY2028 | Multiple locations in HAM CO | Project to seal mainline and ramp bridges on I-75 and I-74 in Hamilton County in FY2028. | Bridge Preservation | Exempt | 2028 | CO | 0 | Major Programs | $653,137.20 | $2,288,477.00 |
| 116562 | 36.226 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM BS FY2028 | Multiple locations in HAM CO | Project to seal mainline and ramp bridges on I-75 and I-74 in Hamilton County in FY2028. | Bridge Preservation | Exempt | 2028 | CO | 0 | Preservation | $1,186,974.00 | $2,288,477.00 |
| 116562 | 36.227 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM BS FY2028 | Multiple locations in HAM CO | Project to seal mainline and ramp bridges on I-75 and I-74 in Hamilton County in FY2028. | Bridge Preservation | Exempt | 2028 | CO | 0 | State | $204,456.80 | $2,288,477.00 |
| 116562 | 36.228 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM BS FY2028 | Multiple locations in HAM CO | Project to seal mainline and ramp bridges on I-75 and I-74 in Hamilton County in FY2028. | Bridge Preservation | Exempt | 2028 | CO | 0 | Labor | $86,100.00 | $2,288,477.00 |
| 116563 | 36.229 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT US 127 8.46 | BUT US 127: SLM 8.46 | Project to repair Pier scour at BUT-127-0846 bridge that carries US 127 over the Great Miami River. | Bridge Preservation | Exempt | 2026 | ENV | 0 | State | $42,824.00 | $129,475.00 |
| 116563 | 36.230 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT US 127 8.46 | BUT US 127: SLM 8.46 | Project to repair Pier scour at BUT-127-0846 bridge that carries US 127 over the Great Miami River. | Bridge Preservation | Exempt | ENV | 0 | Labor | $129,475.00 | ||
| 116563 | 36.231 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT US 127 8.46 | BUT US 127: SLM 8.46 | Project to repair Pier scour at BUT-127-0846 bridge that carries US 127 over the Great Miami River. | Bridge Preservation | Exempt | 2027 | OTH | 0 | State | $22,500.00 | $129,475.00 |
| 116566 | 36.232 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 27 0.46 | HAM US 27: SLM 0.46 | Rehabilitate bridge HAM-27-0046 which carries US 27 over Broadway St by replacing the rigid wearing surface and performing other minor repairs | Bridge Preservation | Exempt | 2029 | CO | 0 | Preservation | $548,800.00 | $734,020.00 |
| 116566 | 36.233 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 27 0.46 | HAM US 27: SLM 0.46 | Rehabilitate bridge HAM-27-0046 which carries US 27 over Broadway St by replacing the rigid wearing surface and performing other minor repairs | Bridge Preservation | Exempt | 2029 | CO | 0 | State | $137,200.00 | $734,020.00 |
| 116566 | 36.234 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 27 0.46 | HAM US 27: SLM 0.46 | Rehabilitate bridge HAM-27-0046 which carries US 27 over Broadway St by replacing the rigid wearing surface and performing other minor repairs | Bridge Preservation | Exempt | 2029 | CO | 0 | Labor | $48,020.00 | $734,020.00 |
| 116567 | 36.235 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 4 6.41 | HAM SR 4: SLM 6.41 | Replace bridge HAM-4-0641, (SFN 3100669) that carries SR 4 over West Fork Mill Creek. | Bridge Preservation | Exempt | 2026 | ENV | 0 | Preservation | $290,021.60 | $5,361,197.00 |
| 116567 | 36.236 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 4 6.41 | HAM SR 4: SLM 6.41 | Replace bridge HAM-4-0641, (SFN 3100669) that carries SR 4 over West Fork Mill Creek. | Bridge Preservation | Exempt | 2027 | ENV | 0 | Preservation | $240,000.00 | $5,361,197.00 |
| 116567 | 36.237 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 4 6.41 | HAM SR 4: SLM 6.41 | Replace bridge HAM-4-0641, (SFN 3100669) that carries SR 4 over West Fork Mill Creek. | Bridge Preservation | Exempt | 2026 | ENV | 0 | State | $72,505.40 | $5,361,197.00 |
| 116567 | 36.238 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 4 6.41 | HAM SR 4: SLM 6.41 | Replace bridge HAM-4-0641, (SFN 3100669) that carries SR 4 over West Fork Mill Creek. | Bridge Preservation | Exempt | 2027 | ENV | 0 | State | $60,000.00 | $5,361,197.00 |
| 116567 | 36.239 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 4 6.41 | HAM SR 4: SLM 6.41 | Replace bridge HAM-4-0641, (SFN 3100669) that carries SR 4 over West Fork Mill Creek. | Bridge Preservation | Exempt | 2027 | DD | 0 | Preservation | $120,000.00 | $5,361,197.00 |
| 116567 | 36.240 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 4 6.41 | HAM SR 4: SLM 6.41 | Replace bridge HAM-4-0641, (SFN 3100669) that carries SR 4 over West Fork Mill Creek. | Bridge Preservation | Exempt | 2027 | DD | 0 | State | $30,000.00 | $5,361,197.00 |
| 116567 | 36.241 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 4 6.41 | HAM SR 4: SLM 6.41 | Replace bridge HAM-4-0641, (SFN 3100669) that carries SR 4 over West Fork Mill Creek. | Bridge Preservation | Exempt | 2028 | RW | 0 | State | $75,000.00 | $5,361,197.00 |
| 116569 | 36.242 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 32 12.14 | CLE SR 32: SLM 12.14 | Rehabilitate Bridge No. CLE-32-1214 (SFN 1300431) which carries Half Acre Rd over SR 32 by replacing the deck, raising, painting, and performing other related rehabilitation items. | Bridge Preservation | Exempt | 2027 | DD | 0 | Preservation | $32,182.40 | $5,928,770.00 |
| 116569 | 36.243 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 32 12.14 | CLE SR 32: SLM 12.14 | Rehabilitate Bridge No. CLE-32-1214 (SFN 1300431) which carries Half Acre Rd over SR 32 by replacing the deck, raising, painting, and performing other related rehabilitation items. | Bridge Preservation | Exempt | 2027 | DD | 0 | State | $8,045.60 | $5,928,770.00 |
| 116642 | 36.244 | Ohio | D07, D08 | Group | ODOT Sponsoring Agency | D07/D08 ES Task Order FY28/29 | District 7 & 8 Environmetal Services Task Order | District 7 & 8 Environmental Services Task Order for FY2028 & FY2029 | Environmental Services | Exempt | 2028 | ENV | 0 | State | $450,000.00 | $1,125,000.00 |
| 116642 | 36.245 | Ohio | D07, D08 | Group | ODOT Sponsoring Agency | D07/D08 ES Task Order FY28/29 | District 7 & 8 Environmetal Services Task Order | District 7 & 8 Environmental Services Task Order for FY2028 & FY2029 | Environmental Services | Exempt | 2029 | ENV | 0 | State | $675,000.00 | $1,125,000.00 |
| 116644 | 36.246 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Geotech FY2028/2029 | District 8 Wide Task Order | District Wide Geotechnical Task Order for FY2028/2029 in District 8. | Geotechnical Services | Exempt | 2028 | ENV | 0 | State | $250,000.00 | $500,000.00 |
| 116644 | 36.247 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Geotech FY2028/2029 | District 8 Wide Task Order | District Wide Geotechnical Task Order for FY2028/2029 in District 8. | Geotechnical Services | Exempt | 2029 | ENV | 0 | State | $250,000.00 | $500,000.00 |
| 116645 | 36.248 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Mt. Adams Inspection FY27-29 | Mt. Adams Slope Stability System | Inspection, monitoring, and maintenance of the Mt. Adams Slope Stability System. | Asset Inventory / Inspection | Exempt | 2027 | OTH | 0 | State | $300,000.00 | $900,000.00 |
| 116645 | 36.249 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Mt. Adams Inspection FY27-29 | Mt. Adams Slope Stability System | Inspection, monitoring, and maintenance of the Mt. Adams Slope Stability System. | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | State | $300,000.00 | $900,000.00 |
| 116645 | 36.250 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Mt. Adams Inspection FY27-29 | Mt. Adams Slope Stability System | Inspection, monitoring, and maintenance of the Mt. Adams Slope Stability System. | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | State | $300,000.00 | $900,000.00 |
| 116649 | 39.791 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | Brent Spence Bridge Corridor | South of Dixie Highway interchange in Kentucky north to Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Projectincluding the companion bridgefrom just south of Dixie Highway interchange in Kentucky north to Linn St. in Ohio. Project will be delivered via a progressive design-build procurement led by OD | Bridge Expansion | Non-Exempt (Analyzed) | 2026 | RW | 3 | Discretionary / Earmark | $32,560,000.00 | $3,298,654,904.67 |
| 116649 | 39.792 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | Brent Spence Bridge Corridor | South of Dixie Highway interchange in Kentucky north to Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Projectincluding the companion bridgefrom just south of Dixie Highway interchange in Kentucky north to Linn St. in Ohio. Project will be delivered via a progressive design-build procurement led by OD | Bridge Expansion | Non-Exempt (Analyzed) | RW | 4 | Major Programs | $3,298,654,904.67 | ||
| 116649 | 39.793 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | Brent Spence Bridge Corridor | South of Dixie Highway interchange in Kentucky north to Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Projectincluding the companion bridgefrom just south of Dixie Highway interchange in Kentucky north to Linn St. in Ohio. Project will be delivered via a progressive design-build procurement led by OD | Bridge Expansion | Non-Exempt (Analyzed) | RW | 5 | State | $3,298,654,904.67 | ||
| 116649 | 39.794 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | Brent Spence Bridge Corridor | South of Dixie Highway interchange in Kentucky north to Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Projectincluding the companion bridgefrom just south of Dixie Highway interchange in Kentucky north to Linn St. in Ohio. Project will be delivered via a progressive design-build procurement led by OD | Bridge Expansion | Non-Exempt (Analyzed) | 2026 | RW | 6 | Local | $8,140,000.00 | $3,298,654,904.67 |
| 116649 | 39.795 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | Brent Spence Bridge Corridor | South of Dixie Highway interchange in Kentucky north to Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Projectincluding the companion bridgefrom just south of Dixie Highway interchange in Kentucky north to Linn St. in Ohio. Project will be delivered via a progressive design-build procurement led by OD | Bridge Expansion | Non-Exempt (Analyzed) | 2026 | CO | 7 | Discretionary / Earmark | $1,218,904,090.00 | $3,298,654,904.67 |
| 116649 | 39.796 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | Brent Spence Bridge Corridor | South of Dixie Highway interchange in Kentucky north to Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Projectincluding the companion bridgefrom just south of Dixie Highway interchange in Kentucky north to Linn St. in Ohio. Project will be delivered via a progressive design-build procurement led by OD | Bridge Expansion | Non-Exempt (Analyzed) | 2026 | CO | 8 | State | $430,032,390.00 | $3,298,654,904.67 |
| 116649 | 39.797 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | Brent Spence Bridge Corridor | South of Dixie Highway interchange in Kentucky north to Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Projectincluding the companion bridgefrom just south of Dixie Highway interchange in Kentucky north to Linn St. in Ohio. Project will be delivered via a progressive design-build procurement led by OD | Bridge Expansion | Non-Exempt (Analyzed) | 2026 | CO | 9 | Labor | $5,000,000.00 | $3,298,654,904.67 |
| 116649 | 39.798 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | Brent Spence Bridge Corridor | South of Dixie Highway interchange in Kentucky north to Linn St. in Ohio | The construction of the Brent Spence Bridge Corridor Projectincluding the companion bridgefrom just south of Dixie Highway interchange in Kentucky north to Linn St. in Ohio. Project will be delivered via a progressive design-build procurement led by OD | Bridge Expansion | Non-Exempt (Analyzed) | 2026 | CO | 10 | Local | $635,290,658.00 | $3,298,654,904.67 |
| 116663 | 36.251 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 5.25 | HAM IR 275 near SLM 22.92 | Embankment slide repair along shoulder of HAM-275 near Kilby Road | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | Preservation | $900,000.00 | $1,219,050.00 |
| 116663 | 36.252 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 5.25 | HAM IR 275 near SLM 22.92 | Embankment slide repair along shoulder of HAM-275 near Kilby Road | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | State | $100,000.00 | $1,219,050.00 |
| 116663 | 36.253 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 5.25 | HAM IR 275 near SLM 22.92 | Embankment slide repair along shoulder of HAM-275 near Kilby Road | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | Labor | $100,000.00 | $1,219,050.00 |
| 116664 | 36.254 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 350 8.30 Pt1 | WAR SR 350 near SLM 8.30 | Part 1: Erosion & drainage repair to the existing retaining wall along a portion of SR 350 in Warren County. | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | Preservation | $887,456.00 | $1,436,706.00 |
| 116664 | 36.255 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 350 8.30 Pt1 | WAR SR 350 near SLM 8.30 | Part 1: Erosion & drainage repair to the existing retaining wall along a portion of SR 350 in Warren County. | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | State | $221,864.00 | $1,436,706.00 |
| 116664 | 36.256 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 350 8.30 Pt1 | WAR SR 350 near SLM 8.30 | Part 1: Erosion & drainage repair to the existing retaining wall along a portion of SR 350 in Warren County. | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | Labor | $110,932.00 | $1,436,706.00 |
| 116988 | 36.257 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Tunnel Maint FY25-26 | HAM-71: Lytle Tunnel | Routine Maintenance on the Lytle Tunnel in FY2025 + FY2026 | Bridge / Culvert Maintenance | Exempt | 2026 | OTH | 0 | State | $400,000.00 | $700,000.00 |
| 116989 | 36.258 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Tunnel Maint FY27-28 | HAM-71: Lytle Tunnel | Routine Maintenance on the Lytle Tunnel in FY2027 + FY2028 | Bridge / Culvert Maintenance | Exempt | 2027 | OTH | 0 | State | $300,000.00 | $600,000.00 |
| 116989 | 36.259 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Tunnel Maint FY27-28 | HAM-71: Lytle Tunnel | Routine Maintenance on the Lytle Tunnel in FY2027 + FY2028 | Bridge / Culvert Maintenance | Exempt | 2028 | OTH | 0 | State | $300,000.00 | $600,000.00 |
| 116992 | 36.260 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 CS FY2028 | TBD | District wide crack sealing in FY2028 | Pavement Maintenance | Exempt | 2028 | CO | 0 | Preservation | $640,000.00 | $856,000.00 |
| 116992 | 36.261 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 CS FY2028 | TBD | District wide crack sealing in FY2028 | Pavement Maintenance | Exempt | 2028 | CO | 0 | State | $160,000.00 | $856,000.00 |
| 116992 | 36.262 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 CS FY2028 | TBD | District wide crack sealing in FY2028 | Pavement Maintenance | Exempt | 2028 | CO | 0 | Labor | $56,000.00 | $856,000.00 |
| 117167 | 39.799 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 10.40 | Galbraith Road to Shepherd Lane, southbound only (phase 5) | Add a fourth lane, construct C-D for Galbraith/Anthony Wayne and southbound IR75 to westbound SR126 ramp, and unify both directions of I-75 onto the existing southbound alignment. This PID is the next step following the approval of the PID 113687 AER and | Add Through Lane(s) | Non-Exempt (Analyzed) | 2027 | DD | 1 | Major Programs | $1,760,000.00 | $210,157,318.00 |
| 117167 | 39.800 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 10.40 | Galbraith Road to Shepherd Lane, southbound only (phase 5) | Add a fourth lane, construct C-D for Galbraith/Anthony Wayne and southbound IR75 to westbound SR126 ramp, and unify both directions of I-75 onto the existing southbound alignment. This PID is the next step following the approval of the PID 113687 AER and | Add Through Lane(s) | Non-Exempt (Analyzed) | 2027 | DD | 2 | State | $440,000.00 | $210,157,318.00 |
| 117208 | 39.801 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM CR 674 0.53 Victory Parkway | Eden Park Drive/Victory Parkway: from Martin Drive to William Howard Taft Road | Reconstruction of Victory Parkway including rehabilitation of the bridge over Kemper Lane. Restriping to add bike lanes. Replacement of street lighting to LED technology. | Roadway Minor Rehab | Exempt | 2026 | CO | 5 | MPO STBG | $6,000,000.00 | $17,187,446.00 |
| 117208 | 39.802 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM CR 674 0.53 Victory Parkway | Eden Park Drive/Victory Parkway: from Martin Drive to William Howard Taft Road | Reconstruction of Victory Parkway including rehabilitation of the bridge over Kemper Lane. Restriping to add bike lanes. Replacement of street lighting to LED technology. | Roadway Minor Rehab | Exempt | 2026 | CO | 6 | Local | $11,120,000.00 | $17,187,446.00 |
| 117275 | 36.263 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT IR 75/VAR 5.22/VAR | BUT IR 75; SLM 5.22, BUT US 27; SLM 10.38, BUT SR 4; SLM 23.90 | Lowering the pavement beneath 3 bridges in Butler County. | Roadway Major Rehab | Exempt | 2026 | DD | 0 | Preservation | $79,667.20 | $10,252,151.00 |
| 117275 | 36.264 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT IR 75/VAR 5.22/VAR | BUT IR 75; SLM 5.22, BUT US 27; SLM 10.38, BUT SR 4; SLM 23.90 | Lowering the pavement beneath 3 bridges in Butler County. | Roadway Major Rehab | Exempt | 2026 | DD | 0 | State | $19,916.80 | $10,252,151.00 |
| 117275 | 36.265 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT IR 75/VAR 5.22/VAR | BUT IR 75; SLM 5.22, BUT US 27; SLM 10.38, BUT SR 4; SLM 23.90 | Lowering the pavement beneath 3 bridges in Butler County. | Roadway Major Rehab | Exempt | 2027 | RW | 0 | Preservation | $220,000.00 | $10,252,151.00 |
| 117275 | 36.266 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT IR 75/VAR 5.22/VAR | BUT IR 75; SLM 5.22, BUT US 27; SLM 10.38, BUT SR 4; SLM 23.90 | Lowering the pavement beneath 3 bridges in Butler County. | Roadway Major Rehab | Exempt | 2027 | RW | 0 | State | $125,000.00 | $10,252,151.00 |
| 117275 | 36.267 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT IR 75/VAR 5.22/VAR | BUT IR 75; SLM 5.22, BUT US 27; SLM 10.38, BUT SR 4; SLM 23.90 | Lowering the pavement beneath 3 bridges in Butler County. | Roadway Major Rehab | Exempt | 2028 | CO | 0 | Major Programs | $6,521,696.20 | $10,252,151.00 |
| 117275 | 36.268 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT IR 75/VAR 5.22/VAR | BUT IR 75; SLM 5.22, BUT US 27; SLM 10.38, BUT SR 4; SLM 23.90 | Lowering the pavement beneath 3 bridges in Butler County. | Roadway Major Rehab | Exempt | 2028 | CO | 0 | Preservation | $559,381.60 | $10,252,151.00 |
| 117275 | 36.269 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT IR 75/VAR 5.22/VAR | BUT IR 75; SLM 5.22, BUT US 27; SLM 10.38, BUT SR 4; SLM 23.90 | Lowering the pavement beneath 3 bridges in Butler County. | Roadway Major Rehab | Exempt | 2028 | CO | 0 | State | $1,459,987.20 | $10,252,151.00 |
| 117275 | 36.270 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT IR 75/VAR 5.22/VAR | BUT IR 75; SLM 5.22, BUT US 27; SLM 10.38, BUT SR 4; SLM 23.90 | Lowering the pavement beneath 3 bridges in Butler County. | Roadway Major Rehab | Exempt | 2028 | CO | 0 | Labor | $597,875.00 | $10,252,151.00 |
| 117339 | 36.271 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 127 5.14 | HAM-127-0514: Bridge that carries US 127 over I-75, a Railroad, and Mill Creek | Rehabilitate the HAM-127-0514 (SFN 3111385) bridge that carries US 127 over I-75, two Railroads, and Mill Creek by replacing the wearing surface, replacing the abutment joints, patching the barrier, and cleaning the drainage system. | Bridge Preservation | Exempt | 2026 | DD | 0 | Labor | $24,960.00 | $6,022,767.00 |
| 117339 | 36.272 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 127 5.14 | HAM-127-0514: Bridge that carries US 127 over I-75, a Railroad, and Mill Creek | Rehabilitate the HAM-127-0514 (SFN 3111385) bridge that carries US 127 over I-75, two Railroads, and Mill Creek by replacing the wearing surface, replacing the abutment joints, patching the barrier, and cleaning the drainage system. | Bridge Preservation | Exempt | 2028 | CO | 0 | Major Programs | $4,925,916.00 | $6,022,767.00 |
| 117339 | 36.273 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 127 5.14 | HAM-127-0514: Bridge that carries US 127 over I-75, a Railroad, and Mill Creek | Rehabilitate the HAM-127-0514 (SFN 3111385) bridge that carries US 127 over I-75, two Railroads, and Mill Creek by replacing the wearing surface, replacing the abutment joints, patching the barrier, and cleaning the drainage system. | Bridge Preservation | Exempt | 2028 | CO | 0 | State | $547,324.00 | $6,022,767.00 |
| 117339 | 36.274 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 127 5.14 | HAM-127-0514: Bridge that carries US 127 over I-75, a Railroad, and Mill Creek | Rehabilitate the HAM-127-0514 (SFN 3111385) bridge that carries US 127 over I-75, two Railroads, and Mill Creek by replacing the wearing surface, replacing the abutment joints, patching the barrier, and cleaning the drainage system. | Bridge Preservation | Exempt | 2028 | CO | 0 | Labor | $383,127.00 | $6,022,767.00 |
| 117392 | 36.275 | Ohio | HAM | Group | Hamilton County TID | HAM TID Dry Fork Rd Corridor | Harrison Township: northeast of the I-74 interchange with Dry Fork | Project will perform detailed design for the improvements to the operation of the interchange of I-74 and Dry Fork Rd, including turn lanes, extension of existing turn lanes, ramp widening, and ramp meters. | Other Studies/ Tasks | Exempt | 2026 | DD | 0 | State | $500,000.00 | $1,000,000.00 |
| 117392 | 36.276 | Ohio | HAM | Group | Hamilton County TID | HAM TID Dry Fork Rd Corridor | Harrison Township: northeast of the I-74 interchange with Dry Fork | Project will perform detailed design for the improvements to the operation of the interchange of I-74 and Dry Fork Rd, including turn lanes, extension of existing turn lanes, ramp widening, and ramp meters. | Other Studies/ Tasks | Exempt | DD | 0 | Local | $1,000,000.00 | ||
| 117525 | 39.803 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 8.91 | Begin near Regina Grater Way and at the SR126 interchange, 8.91 to 10.30 | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange and tie into the existing SR 126 interchange southern | Add Through Lane(s) | Non-Exempt (Analyzed) | CO | 5 | Garvee / SIB | $84,241,161.15 | ||
| 117525 | 39.804 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 8.91 | Begin near Regina Grater Way and at the SR126 interchange, 8.91 to 10.30 | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange and tie into the existing SR 126 interchange southern | Add Through Lane(s) | Non-Exempt (Analyzed) | CO | 6 | Major Programs | $84,241,161.15 | ||
| 117525 | 39.805 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 8.91 | Begin near Regina Grater Way and at the SR126 interchange, 8.91 to 10.30 | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange and tie into the existing SR 126 interchange southern | Add Through Lane(s) | Non-Exempt (Analyzed) | 2026 | CO | 7 | Preservation | $800,000.00 | $84,241,161.15 |
| 117525 | 39.806 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 8.91 | Begin near Regina Grater Way and at the SR126 interchange, 8.91 to 10.30 | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange and tie into the existing SR 126 interchange southern | Add Through Lane(s) | Non-Exempt (Analyzed) | 2027 | CO | 7 | Preservation | $800,000.00 | $84,241,161.15 |
| 117525 | 39.807 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 8.91 | Begin near Regina Grater Way and at the SR126 interchange, 8.91 to 10.30 | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange and tie into the existing SR 126 interchange southern | Add Through Lane(s) | Non-Exempt (Analyzed) | 2028 | CO | 7 | Preservation | $120,000.00 | $84,241,161.15 |
| 117525 | 39.808 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 8.91 | Begin near Regina Grater Way and at the SR126 interchange, 8.91 to 10.30 | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange and tie into the existing SR 126 interchange southern | Add Through Lane(s) | Non-Exempt (Analyzed) | CO | 8 | Bonds | $84,241,161.15 | ||
| 117525 | 39.809 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 8.91 | Begin near Regina Grater Way and at the SR126 interchange, 8.91 to 10.30 | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange and tie into the existing SR 126 interchange southern | Add Through Lane(s) | Non-Exempt (Analyzed) | 2026 | CO | 9 | State | $200,000.00 | $84,241,161.15 |
| 117525 | 39.810 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 8.91 | Begin near Regina Grater Way and at the SR126 interchange, 8.91 to 10.30 | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange and tie into the existing SR 126 interchange southern | Add Through Lane(s) | Non-Exempt (Analyzed) | 2027 | CO | 9 | State | $200,000.00 | $84,241,161.15 |
| 117525 | 40.023 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 8.91 | Begin near Regina Grater Way and at the SR126 interchange, 8.91 to 10.30 | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange and tie into the existing SR 126 interchange southern | Add Through Lane(s) | Non-Exempt (Analyzed) | 2028 | CO | 9 | State | $30,000.00 | $84,241,161.15 |
| 117525 | 40.024 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 8.91 | Begin near Regina Grater Way and at the SR126 interchange, 8.91 to 10.30 | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange and tie into the existing SR 126 interchange southern | Add Through Lane(s) | Non-Exempt (Analyzed) | CO | 10 | Labor | $84,241,161.15 | ||
| 117525 | 40.025 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 8.91 | Begin near Regina Grater Way and at the SR126 interchange, 8.91 to 10.30 | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange and tie into the existing SR 126 interchange southern | Add Through Lane(s) | Non-Exempt (Analyzed) | 2026 | DBT | 11 | Garvee / SIB Repayments | $2,564,245.00 | $84,241,161.15 |
| 117525 | 40.026 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 8.91 | Begin near Regina Grater Way and at the SR126 interchange, 8.91 to 10.30 | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange and tie into the existing SR 126 interchange southern | Add Through Lane(s) | Non-Exempt (Analyzed) | 2027 | DBT | 11 | Garvee / SIB Repayments | $2,564,245.00 | $84,241,161.15 |
| 117525 | 40.027 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 8.91 | Begin near Regina Grater Way and at the SR126 interchange, 8.91 to 10.30 | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange and tie into the existing SR 126 interchange southern | Add Through Lane(s) | Non-Exempt (Analyzed) | 2028 | DBT | 11 | Garvee / SIB Repayments | $2,564,245.00 | $84,241,161.15 |
| 117525 | 40.028 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 8.91 | Begin near Regina Grater Way and at the SR126 interchange, 8.91 to 10.30 | Phase 8C of the Mill Creek Expressway Project. Project will widen for additional through lanes, rehabilitate existing pavement and bridges. Complete minor improvements to the Paddock Road interchange and tie into the existing SR 126 interchange southern | Add Through Lane(s) | Non-Exempt (Analyzed) | 2029 | DBT | 11 | Garvee / SIB Repayments | $2,564,245.00 | $84,241,161.15 |
| 117567 | 40.029 | Ohio | Warren | Individual | Warren County TID | WAR SR 48 7.50 | WAR 48 7.50-9.10 | Widening of SR-48 to provide an additional thru lane in each direction between Ridgeview Ln and Mason Morrow Millgrove Rd, including a new major structure over the Little Miami River. Other improvements include a roundabout at SR-48 & Dwire Rd, and the ad | Add Through Lane(s) | Non-Exempt (Analyzed) | 2027 | ENV | 1 | Major Programs | $1,600,000.00 | $68,352,451.00 |
| 117567 | 40.030 | Ohio | Warren | Individual | Warren County TID | WAR SR 48 7.50 | WAR 48 7.50-9.10 | Widening of SR-48 to provide an additional thru lane in each direction between Ridgeview Ln and Mason Morrow Millgrove Rd, including a new major structure over the Little Miami River. Other improvements include a roundabout at SR-48 & Dwire Rd, and the ad | Add Through Lane(s) | Non-Exempt (Analyzed) | 2027 | ENV | 2 | State | $400,000.00 | $68,352,451.00 |
| 117567 | 40.031 | Ohio | Warren | Individual | Warren County TID | WAR SR 48 7.50 | WAR 48 7.50-9.10 | Widening of SR-48 to provide an additional thru lane in each direction between Ridgeview Ln and Mason Morrow Millgrove Rd, including a new major structure over the Little Miami River. Other improvements include a roundabout at SR-48 & Dwire Rd, and the ad | Add Through Lane(s) | Non-Exempt (Analyzed) | 2027 | ENV | 3 | Local | $2,009,666.00 | $68,352,451.00 |
| 117567 | 40.032 | Ohio | Warren | Individual | Warren County TID | WAR SR 48 7.50 | WAR 48 7.50-9.10 | Widening of SR-48 to provide an additional thru lane in each direction between Ridgeview Ln and Mason Morrow Millgrove Rd, including a new major structure over the Little Miami River. Other improvements include a roundabout at SR-48 & Dwire Rd, and the ad | Add Through Lane(s) | Non-Exempt (Analyzed) | 2028 | DD | 4 | Local | $302,974.00 | $68,352,451.00 |
| 117582 | 36.277 | Ohio | WAR | Group | ODNR | WAR Caesar Creek SP FY29 | Caesar Creek State Park | ODNR project to resurface various campgrounds within Caesar Creek State Park. | Parks | Exempt | 2028 | ENV | 0 | Labor | $43,860.00 | $1,395,600.00 |
| 117582 | 36.278 | Ohio | WAR | Group | ODNR | WAR Caesar Creek SP FY29 | Caesar Creek State Park | ODNR project to resurface various campgrounds within Caesar Creek State Park. | Parks | Exempt | 2028 | DD | 0 | Labor | $7,740.00 | $1,395,600.00 |
| 117582 | 36.279 | Ohio | WAR | Group | ODNR | WAR Caesar Creek SP FY29 | Caesar Creek State Park | ODNR project to resurface various campgrounds within Caesar Creek State Park. | Parks | Exempt | 2029 | CO | 0 | State | $1,200,000.00 | $1,395,600.00 |
| 117582 | 36.280 | Ohio | WAR | Group | ODNR | WAR Caesar Creek SP FY29 | Caesar Creek State Park | ODNR project to resurface various campgrounds within Caesar Creek State Park. | Parks | Exempt | 2029 | CO | 0 | Labor | $144,000.00 | $1,395,600.00 |
| 117584 | 36.281 | Ohio | HAM | Group | Kentucky, Commonwealth of | Brent Spence Brdg Insp FY23 | HAM-71-0.00 | Brent Spence Bridge Inspection - FY23 | Asset Inventory / Inspection | Exempt | 2026 | OTH | 0 | State | $7,307.36 | $226,450.16 |
| 117585 | 36.282 | Ohio | HAM | Group | Kentucky, Commonwealth of | Clay Wade Bailey Br Insp FY23 | HAM-42-0.00 | Clay Wade Bailey Bridge Inspection - FY 23 | Asset Inventory / Inspection | Exempt | 2026 | OTH | 0 | State | $39,733.35 | $143,737.11 |
| 117586 | 36.283 | Ohio | HAM | Group | Kentucky, Commonwealth of | John A Roebling Br Insp FY23+ | HAM-CR600-0.01 | Roebling Bridge FY23 Inspection - KYTC lead Ohio River Bridge Inspection. | Asset Inventory / Inspection | Exempt | 2026 | OTH | 0 | State | $5,634.81 | $138,497.73 |
| 117697 | 36.284 | Ohio | HAM | Group | Madeira, City of | HAM CR 270 2.96 Miami Ave | Miami Avenue: from Naomi Avenue to Euclid Avenue | Reconstruction of Miami Avenue. Reducing roadway from 4 lanes to 3 with on-street parking. Improvements to traffic signals and pedestrian infrastructure. Earmark: OH417 | Roadway Improvement (Safety) | Exempt | 2026 | ENV | 0 | Labor | $141,440.00 | $6,477,910.00 |
| 117697 | 36.285 | Ohio | HAM | Group | Madeira, City of | HAM CR 270 2.96 Miami Ave | Miami Avenue: from Naomi Avenue to Euclid Avenue | Reconstruction of Miami Avenue. Reducing roadway from 4 lanes to 3 with on-street parking. Improvements to traffic signals and pedestrian infrastructure. Earmark: OH417 | Roadway Improvement (Safety) | Exempt | 2026 | DD | 0 | Labor | $24,960.00 | $6,477,910.00 |
| 117697 | 36.286 | Ohio | HAM | Group | Madeira, City of | HAM CR 270 2.96 Miami Ave | Miami Avenue: from Naomi Avenue to Euclid Avenue | Reconstruction of Miami Avenue. Reducing roadway from 4 lanes to 3 with on-street parking. Improvements to traffic signals and pedestrian infrastructure. Earmark: OH417 | Roadway Improvement (Safety) | Exempt | 2026 | RW | 0 | Labor | $60,000.00 | $6,477,910.00 |
| 117697 | 36.287 | Ohio | HAM | Group | Madeira, City of | HAM CR 270 2.96 Miami Ave | Miami Avenue: from Naomi Avenue to Euclid Avenue | Reconstruction of Miami Avenue. Reducing roadway from 4 lanes to 3 with on-street parking. Improvements to traffic signals and pedestrian infrastructure. Earmark: OH417 | Roadway Improvement (Safety) | Exempt | 2026 | CO | 0 | Discretionary / Earmark | $3,397,799.00 | $6,477,910.00 |
| 117697 | 36.288 | Ohio | HAM | Group | Madeira, City of | HAM CR 270 2.96 Miami Ave | Miami Avenue: from Naomi Avenue to Euclid Avenue | Reconstruction of Miami Avenue. Reducing roadway from 4 lanes to 3 with on-street parking. Improvements to traffic signals and pedestrian infrastructure. Earmark: OH417 | Roadway Improvement (Safety) | Exempt | 2026 | CO | 0 | Rail | $561,670.00 | $6,477,910.00 |
| 117697 | 36.289 | Ohio | HAM | Group | Madeira, City of | HAM CR 270 2.96 Miami Ave | Miami Avenue: from Naomi Avenue to Euclid Avenue | Reconstruction of Miami Avenue. Reducing roadway from 4 lanes to 3 with on-street parking. Improvements to traffic signals and pedestrian infrastructure. Earmark: OH417 | Roadway Improvement (Safety) | Exempt | 2026 | CO | 0 | Labor | $370,026.76 | $6,477,910.00 |
| 117697 | 36.290 | Ohio | HAM | Group | Madeira, City of | HAM CR 270 2.96 Miami Ave | Miami Avenue: from Naomi Avenue to Euclid Avenue | Reconstruction of Miami Avenue. Reducing roadway from 4 lanes to 3 with on-street parking. Improvements to traffic signals and pedestrian infrastructure. Earmark: OH417 | Roadway Improvement (Safety) | Exempt | 2026 | CO | 0 | Local | $1,922,014.24 | $6,477,910.00 |
| 117818 | 39.811 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM State to Central: BBN | State Ave (River Rd to W. 8th St); W. 8th St (River Rd to Central Ave); Linn St (W. 6th St to Central Pkwy) | Safety improvements and addition of bicycle and pedestrian infrastructure on three corridors totaling 3.5 linear miles (Linn Street, W. 8th Street, and State Avenue) in Cincinnati. | Intersection Improvement (Safety) | Exempt | 2027 | CO | 6 | Local | $15,364,570.00 | $37,416,146.60 |
| 117818 | 40.033 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM State to Central: BBN | State Ave (River Rd to W. 8th St); W. 8th St (River Rd to Central Ave); Linn St (W. 6th St to Central Pkwy) | Safety improvements and addition of bicycle and pedestrian infrastructure on three corridors totaling 3.5 linear miles (Linn Street, W. 8th Street, and State Avenue) in Cincinnati. | Intersection Improvement (Safety) | Exempt | 2027 | DD | 1 | Discretionary / Earmark | $148,199.52 | $37,416,146.60 |
| 117818 | 40.034 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM State to Central: BBN | State Ave (River Rd to W. 8th St); W. 8th St (River Rd to Central Ave); Linn St (W. 6th St to Central Pkwy) | Safety improvements and addition of bicycle and pedestrian infrastructure on three corridors totaling 3.5 linear miles (Linn Street, W. 8th Street, and State Avenue) in Cincinnati. | Intersection Improvement (Safety) | Exempt | 2027 | DD | 2 | Local | $213,626.48 | $37,416,146.60 |
| 117818 | 40.035 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM State to Central: BBN | State Ave (River Rd to W. 8th St); W. 8th St (River Rd to Central Ave); Linn St (W. 6th St to Central Pkwy) | Safety improvements and addition of bicycle and pedestrian infrastructure on three corridors totaling 3.5 linear miles (Linn Street, W. 8th Street, and State Avenue) in Cincinnati. | Intersection Improvement (Safety) | Exempt | 2027 | CO | 5 | Discretionary / Earmark | $20,000,000.00 | $37,416,146.60 |
| 118400 | 36.291 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 732 6.35 | intersection of SR-732 and CR-38 (BUT SR 732 6.35) | Construct a single lane modern roundabout at the intersection of Oxford Reily Rd (SR-732) and Stillwell Beckett Rd (CR-38) in Butler County. | Intersection Improvement (Safety) | Exempt | 2026 | DD | 0 | Safety | $50,165.00 | $3,421,438.00 |
| 118400 | 36.292 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 732 6.35 | intersection of SR-732 and CR-38 (BUT SR 732 6.35) | Construct a single lane modern roundabout at the intersection of Oxford Reily Rd (SR-732) and Stillwell Beckett Rd (CR-38) in Butler County. | Intersection Improvement (Safety) | Exempt | 2026 | RW | 0 | Safety | $335,000.00 | $3,421,438.00 |
| 118400 | 36.293 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 732 6.35 | intersection of SR-732 and CR-38 (BUT SR 732 6.35) | Construct a single lane modern roundabout at the intersection of Oxford Reily Rd (SR-732) and Stillwell Beckett Rd (CR-38) in Butler County. | Intersection Improvement (Safety) | Exempt | RW | 0 | Labor | $3,421,438.00 | ||
| 118400 | 36.294 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 732 6.35 | intersection of SR-732 and CR-38 (BUT SR 732 6.35) | Construct a single lane modern roundabout at the intersection of Oxford Reily Rd (SR-732) and Stillwell Beckett Rd (CR-38) in Butler County. | Intersection Improvement (Safety) | Exempt | 2027 | CO | 0 | Safety | $2,201,433.00 | $3,421,438.00 |
| 118400 | 36.295 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 732 6.35 | intersection of SR-732 and CR-38 (BUT SR 732 6.35) | Construct a single lane modern roundabout at the intersection of Oxford Reily Rd (SR-732) and Stillwell Beckett Rd (CR-38) in Butler County. | Intersection Improvement (Safety) | Exempt | 2027 | CO | 0 | Labor | $172,238.00 | $3,421,438.00 |
| 118400 | 36.296 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 732 6.35 | intersection of SR-732 and CR-38 (BUT SR 732 6.35) | Construct a single lane modern roundabout at the intersection of Oxford Reily Rd (SR-732) and Stillwell Beckett Rd (CR-38) in Butler County. | Intersection Improvement (Safety) | Exempt | 2027 | CO | 0 | Local | $259,098.00 | $3,421,438.00 |
| 118429 | 36.297 | Ohio | BUT | Group | CO Facilities | FACD08 BUT RA IR 75 9.77 | Butler I75 NB/SB Rest Areas | Expanding the footprint of the rest area on BUT-75 & Renovation of Rest Area. | Building / Facility Improvement | Exempt | 2026 | DD | 0 | State | $28,200.00 | $16,610,729.05 |
| 118429 | 36.298 | Ohio | BUT | Group | CO Facilities | FACD08 BUT RA IR 75 9.77 | Butler I75 NB/SB Rest Areas | Expanding the footprint of the rest area on BUT-75 & Renovation of Rest Area. | Building / Facility Improvement | Exempt | 2026 | CO | 0 | State | $15,950.00 | $16,610,729.05 |
| 118472 | 39.812 | Ohio | Hamilton | Individual | Harrison, City of | HAM CR 14 3.49 Dry Fork Rd | I-74 interchange with Dry Fork Road | Widening the Dry Fork Road bridge over I-74 to add turn lanes to the I-74 on-ramps and provide sidewalk on the bridge. Widening the WB I-74 off-ramp. Traffic signals at ramps will be rebuilt. | Bridge Expansion | Exempt | 2026 | CO | 6 | Major Programs | $2,900,000.00 | $9,137,825.91 |
| 118472 | 39.813 | Ohio | Hamilton | Individual | Harrison, City of | HAM CR 14 3.49 Dry Fork Rd | I-74 interchange with Dry Fork Road | Widening the Dry Fork Road bridge over I-74 to add turn lanes to the I-74 on-ramps and provide sidewalk on the bridge. Widening the WB I-74 off-ramp. Traffic signals at ramps will be rebuilt. | Bridge Expansion | Exempt | 2026 | CO | 7 | MPO STBG | $2,348,426.10 | $9,137,825.91 |
| 118472 | 39.814 | Ohio | Hamilton | Individual | Harrison, City of | HAM CR 14 3.49 Dry Fork Rd | I-74 interchange with Dry Fork Road | Widening the Dry Fork Road bridge over I-74 to add turn lanes to the I-74 on-ramps and provide sidewalk on the bridge. Widening the WB I-74 off-ramp. Traffic signals at ramps will be rebuilt. | Bridge Expansion | Exempt | 2026 | CO | 8 | State | $845,466.68 | $9,137,825.91 |
| 118472 | 39.815 | Ohio | Hamilton | Individual | Harrison, City of | HAM CR 14 3.49 Dry Fork Rd | I-74 interchange with Dry Fork Road | Widening the Dry Fork Road bridge over I-74 to add turn lanes to the I-74 on-ramps and provide sidewalk on the bridge. Widening the WB I-74 off-ramp. Traffic signals at ramps will be rebuilt. | Bridge Expansion | Exempt | 2026 | CO | 9 | Labor | $586,915.72 | $9,137,825.91 |
| 118472 | 39.816 | Ohio | Hamilton | Individual | Harrison, City of | HAM CR 14 3.49 Dry Fork Rd | I-74 interchange with Dry Fork Road | Widening the Dry Fork Road bridge over I-74 to add turn lanes to the I-74 on-ramps and provide sidewalk on the bridge. Widening the WB I-74 off-ramp. Traffic signals at ramps will be rebuilt. | Bridge Expansion | Exempt | 2026 | CO | 10 | Local | $2,290,617.41 | $9,137,825.91 |
| 118484 | 39.817 | Ohio | Hamilton | Individual | Anderson Township (Hamilton County) | HAM CR 358 0.94 Clough & Newtown | Clough Pike: from Copperleaf Lane to east of Newtown Road | Widening of Clough Pike to provide EB and WB left turn lanes at the Newtown Road intersection. New sidewalk on the south side of Clough Pike between Copperleaf Lane and Newtown Road. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 6 | MPO STBG | $449,461.00 | $1,402,821.29 |
| 118484 | 40.036 | Ohio | Hamilton | Individual | Anderson Township (Hamilton County) | HAM CR 358 0.94 Clough & Newtown | Clough Pike: from Copperleaf Lane to east of Newtown Road | Widening of Clough Pike to provide EB and WB left turn lanes at the Newtown Road intersection. New sidewalk on the south side of Clough Pike between Copperleaf Lane and Newtown Road. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 7 | Labor | $99,553.75 | $1,402,821.29 |
| 118484 | 40.037 | Ohio | Hamilton | Individual | Anderson Township (Hamilton County) | HAM CR 358 0.94 Clough & Newtown | Clough Pike: from Copperleaf Lane to east of Newtown Road | Widening of Clough Pike to provide EB and WB left turn lanes at the Newtown Road intersection. New sidewalk on the south side of Clough Pike between Copperleaf Lane and Newtown Road. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 8 | Local | $615,174.54 | $1,402,821.29 |
| 118586 | 40.038 | Ohio | Butler | Individual | Oxford, City of | BUT Oxford Amtrak Station | W. Chestnut Street near S. Beech Street | Construction of a platform and covered shelters to provide access for Amtrack passenger rail service. Construction of a parking area and sidewalk connection to the adjacent BCRTA transit facility. | New Building/ Facility | Exempt | 2027 | CO | 6 | MPO STBG | $2,305,801.00 | $3,163,449.25 |
| 118586 | 40.039 | Ohio | Butler | Individual | Oxford, City of | BUT Oxford Amtrak Station | W. Chestnut Street near S. Beech Street | Construction of a platform and covered shelters to provide access for Amtrack passenger rail service. Construction of a parking area and sidewalk connection to the adjacent BCRTA transit facility. | New Building/ Facility | Exempt | 2027 | CO | 7 | Local | $778,208.25 | $3,163,449.25 |
| 118672 | 40.040 | Ohio | Hamilton | Individual | Hamilton County Engineer | HAM CR 4 1.43 Intersection Impr | Intersections of Fields Ertel Road with McCauly and Conrey Roads | Improvements to the intersections of Fields Ertel Road with McCauly and Conrey Roads. Addition of turn lanes and a traffic signal at McCauly and conversion of the intersection with Conrey to a roundabout. Sidewalk to be constructed along the north side of | Intersection Improvement (Safety) | Exempt | 2026 | CO | 6 | MPO STBG | $4,984,089.90 | $10,741,078.25 |
| 118672 | 40.041 | Ohio | Hamilton | Individual | Hamilton County Engineer | HAM CR 4 1.43 Intersection Impr | Intersections of Fields Ertel Road with McCauly and Conrey Roads | Improvements to the intersections of Fields Ertel Road with McCauly and Conrey Roads. Addition of turn lanes and a traffic signal at McCauly and conversion of the intersection with Conrey to a roundabout. Sidewalk to be constructed along the north side of | Intersection Improvement (Safety) | Exempt | 2026 | CO | 7 | Local | $3,461,681.22 | $10,741,078.25 |
| 118757 | 36.299 | Ohio | CLE | Group | Clermont County TID | CLE Half Acre & Afton Roundabout | Intersection of Half Acre and Afton Drive | This project entails the detailed design for a roundabout at the intersection of Half Acre Rd and Afton Dr in Williamsburg Township. | Roadway Improvement (Jobs & Commerce) | Exempt | 2026 | DD | 0 | State | $250,000.00 | $250,000.00 |
| 118818 | 36.300 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 25.45 | HAM-275 SLM 25.45 to 28.73 | Resurfacing on a portion of IR 275 in Hamilton County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Preservation | $8,061,458.62 | $9,481,860.00 |
| 118818 | 36.301 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 25.45 | HAM-275 SLM 25.45 to 28.73 | Resurfacing on a portion of IR 275 in Hamilton County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | State | $895,717.62 | $9,481,860.00 |
| 118818 | 36.302 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 25.45 | HAM-275 SLM 25.45 to 28.73 | Resurfacing on a portion of IR 275 in Hamilton County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Labor | $358,283.76 | $9,481,860.00 |
| 118922 | 36.303 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE Culverts FY29 | varies | pave culvert inverts of CLE-28-0191 and CLE-131-0107 | Culvert Preservation | Exempt | 2029 | CO | 0 | Preservation | $454,400.00 | $624,800.00 |
| 118922 | 36.304 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE Culverts FY29 | varies | pave culvert inverts of CLE-28-0191 and CLE-131-0107 | Culvert Preservation | Exempt | 2029 | CO | 0 | State | $113,600.00 | $624,800.00 |
| 118922 | 36.305 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE Culverts FY29 | varies | pave culvert inverts of CLE-28-0191 and CLE-131-0107 | Culvert Preservation | Exempt | 2029 | CO | 0 | Labor | $56,800.00 | $624,800.00 |
| 118923 | 36.306 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR Culverts FY29 | varies | sockline or replace culvert WAR-42-0949 | Culvert Preservation | Exempt | 2029 | CO | 0 | Preservation | $411,200.00 | $565,400.00 |
| 118923 | 36.307 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR Culverts FY29 | varies | sockline or replace culvert WAR-42-0949 | Culvert Preservation | Exempt | 2029 | CO | 0 | State | $102,800.00 | $565,400.00 |
| 118923 | 36.308 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR Culverts FY29 | varies | sockline or replace culvert WAR-42-0949 | Culvert Preservation | Exempt | 2029 | CO | 0 | Labor | $51,400.00 | $565,400.00 |
| 118924 | 36.309 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Culverts FY29 | varies | pave short section of HAM-71-0844 bridge (3115232); sockline or EIPI small culvert HAM-74-0698; sockline HAM-50-2967; replace broken back HAM-52-3817 | Culvert Preservation | Exempt | 2029 | CO | 0 | Preservation | $774,000.00 | $1,033,400.00 |
| 118924 | 36.310 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Culverts FY29 | varies | pave short section of HAM-71-0844 bridge (3115232); sockline or EIPI small culvert HAM-74-0698; sockline HAM-50-2967; replace broken back HAM-52-3817 | Culvert Preservation | Exempt | 2029 | CO | 0 | State | $170,000.00 | $1,033,400.00 |
| 118924 | 36.311 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Culverts FY29 | varies | pave short section of HAM-71-0844 bridge (3115232); sockline or EIPI small culvert HAM-74-0698; sockline HAM-50-2967; replace broken back HAM-52-3817 | Culvert Preservation | Exempt | 2029 | CO | 0 | Labor | $89,400.00 | $1,033,400.00 |
| 118927 | 40.042 | Ohio | Hamilton | Individual | OKI | HAM OKI 2026 Reg Plng - FIAM | 0 | OKI State Fiscal Year 2026 Fiscal Impact Analysis Model Project | Statewide / Regional Planning | Exempt | 2026 | OTH | 6 | MPO STBG | $72,266.00 | $72,266.00 |
| 118928 | 40.043 | Ohio | Hamilton | Individual | OKI | HAM OKI 2027 Reg Plng - FIAM | 0 | OKI State Fiscal Year 2027 Fiscal Impact Analysis Model Project | Statewide / Regional Planning | Exempt | 2027 | OTH | 6 | MPO STBG | $74,616.00 | $74,616.00 |
| 118932 | 40.044 | Ohio | Hamilton | Individual | OKI | HAM OKI 26 Reg Trans Plng - LU | 0 | SFY 2026 OKI Regional Transportation Planning - Land Use | Statewide / Regional Planning | Exempt | 2026 | OTH | 6 | MPO STBG | $769,658.00 | $769,658.00 |
| 118934 | 40.045 | Ohio | Hamilton | Individual | OKI | HAM OKI 27 Reg Trans Plng - LU | 0 | SFY 2027 OKI Regional Transportation Planning - Land Use | Statewide / Regional Planning | Exempt | 2027 | OTH | 6 | MPO STBG | $796,096.00 | $796,096.00 |
| 118936 | 40.046 | Ohio | Hamilton | Individual | OKI | HAM OKI FY 2026 Clean Air Progra | 0 | HAM OKI SFY 2026 Air Quality Planning Funds | Statewide / Regional Planning | Exempt | 2026 | OTH | 6 | MPO CMAQ | $202,109.00 | $202,109.00 |
| 118937 | 40.047 | Ohio | Hamilton | Individual | OKI | HAM OKI FY 2027 Clean Air Progra | 0 | HAM OKI SFY 2027 Air Quality Planning Funds | Statewide / Regional Planning | Exempt | 2027 | OTH | 6 | MPO CMAQ | $203,519.00 | $203,519.00 |
| 118938 | 40.048 | Ohio | Hamilton | Individual | OKI | HAM OKI FY2026 Rideshare | 0 | SFY 2026 Rideshare funding | Statewide / Regional Planning | Exempt | 2026 | OTH | 6 | MPO CMAQ | $168,831.00 | $168,831.00 |
| 118939 | 40.049 | Ohio | Hamilton | Individual | OKI | HAM OKI FY 2027 Rideshare | 0 | SFY 2027 Rideshare funding | Statewide / Regional Planning | Exempt | 2027 | OTH | 6 | MPO CMAQ | $169,959.00 | $169,959.00 |
| 118969 | 36.312 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-R-W/R-FY26 | Various locations in D8 | Installation of Reflective/Wet Reflective (R-W/R) long line pavement markings to be installed Summer 2026. R-WR markings to be installed following completion of paving projects on various routes. | Traffic Control Maintenance | Exempt | 2026 | CO | 0 | State | $673,855.80 | $741,240.00 |
| 118969 | 36.313 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-R-W/R-FY26 | Various locations in D8 | Installation of Reflective/Wet Reflective (R-W/R) long line pavement markings to be installed Summer 2026. R-WR markings to be installed following completion of paving projects on various routes. | Traffic Control Maintenance | Exempt | 2026 | CO | 0 | Labor | $67,384.20 | $741,240.00 |
| 118975 | 36.314 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-PM/RPM-FY2029 | Various locations in D8 | District wide pavement marking and RPM contract in D8. Locations to be determined. | Traffic Control (Safety) | Exempt | 2029 | CO | 0 | State | $5,000,000.00 | $5,350,000.00 |
| 118975 | 36.315 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-PM/RPM-FY2029 | Various locations in D8 | District wide pavement marking and RPM contract in D8. Locations to be determined. | Traffic Control (Safety) | Exempt | 2029 | CO | 0 | Labor | $350,000.00 | $5,350,000.00 |
| 118978 | 36.316 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-TSG-FY2029/FY2030 | Various locations in D8 | Install by contract traffic signals at various locations in D8. Will include LED replacement for entire district. | Traffic Control (Safety) | Exempt | 2028 | DD | 0 | State | $200,000.00 | $3,061,000.00 |
| 118978 | 36.317 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-TSG-FY2029/FY2030 | Various locations in D8 | Install by contract traffic signals at various locations in D8. Will include LED replacement for entire district. | Traffic Control (Safety) | Exempt | 2029 | CO | 0 | Preservation | $2,700,000.00 | $3,061,000.00 |
| 118978 | 36.318 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08-TSG-FY2029/FY2030 | Various locations in D8 | Install by contract traffic signals at various locations in D8. Will include LED replacement for entire district. | Traffic Control (Safety) | Exempt | 2029 | CO | 0 | Labor | $161,000.00 | $3,061,000.00 |
| 119024 | 35.981 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE US 50 2.25 | CLE US 50 2.25 - SFN 1300830 | Improve the hydraulic channel at the CLE-50-0225 bridge to minimize flooding and roadway overtopping caused be sedimentation/aggradation within the channel and to protect the bridge and embankment from scour. Federal PROTECT funds are being utilized to im | Bridge Preservation | Exempt | RW | 0 | Labor | $1,345,655.00 | ||
| 119024 | 35.982 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE US 50 2.25 | CLE US 50 2.25 - SFN 1300830 | Improve the hydraulic channel at the CLE-50-0225 bridge to minimize flooding and roadway overtopping caused be sedimentation/aggradation within the channel and to protect the bridge and embankment from scour. Federal PROTECT funds are being utilized to im | Bridge Preservation | Exempt | 2026 | CO | 0 | PROTECT | $650,700.00 | $1,345,655.00 |
| 119024 | 35.983 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE US 50 2.25 | CLE US 50 2.25 - SFN 1300830 | Improve the hydraulic channel at the CLE-50-0225 bridge to minimize flooding and roadway overtopping caused be sedimentation/aggradation within the channel and to protect the bridge and embankment from scour. Federal PROTECT funds are being utilized to im | Bridge Preservation | Exempt | 2026 | CO | 0 | State | $137,500.00 | $1,345,655.00 |
| 119024 | 35.984 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE US 50 2.25 | CLE US 50 2.25 - SFN 1300830 | Improve the hydraulic channel at the CLE-50-0225 bridge to minimize flooding and roadway overtopping caused be sedimentation/aggradation within the channel and to protect the bridge and embankment from scour. Federal PROTECT funds are being utilized to im | Bridge Preservation | Exempt | 2026 | CO | 0 | Labor | $72,300.00 | $1,345,655.00 |
| 119024 | 36.319 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE US 50 2.25 | CLE US 50 2.25 - SFN 1300830 | Improve the hydraulic channel at the CLE-50-0225 bridge to minimize flooding and roadway overtopping caused be sedimentation/aggradation within the channel and to protect the bridge and embankment from scour. Federal PROTECT funds are being utilized to im | Bridge Preservation | Exempt | 2026 | RW | 0 | PROTECT | $42,332.00 | $1,345,655.00 |
| 119024 | 36.320 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE US 50 2.25 | CLE US 50 2.25 - SFN 1300830 | Improve the hydraulic channel at the CLE-50-0225 bridge to minimize flooding and roadway overtopping caused be sedimentation/aggradation within the channel and to protect the bridge and embankment from scour. Federal PROTECT funds are being utilized to im | Bridge Preservation | Exempt | 2026 | RW | 0 | State | $10,583.00 | $1,345,655.00 |
| 119038 | 35.985 | Ohio | D08 | Group | District 8 Engineering | D08 BI FY2029/2030 (A) | Various Truss Bridges in D8 | D8 Consultant Bridge Inspection Contract for various truss bridges in the District for calendar year 2029 and 2030. | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | Preservation | $560,000.00 | $700,000.00 |
| 119038 | 35.986 | Ohio | D08 | Group | District 8 Engineering | D08 BI FY2029/2030 (A) | Various Truss Bridges in D8 | D8 Consultant Bridge Inspection Contract for various truss bridges in the District for calendar year 2029 and 2030. | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | State | $140,000.00 | $700,000.00 |
| 119039 | 35.987 | Ohio | D08 | Group | District 8 Engineering | D08 BI FY2029/2030 (B) | Various | D8 Consultant Bridge Inspection Contract for calendar year 2029 and 2030. Includes various fracture critical steel pier caps. | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | Preservation | $400,000.00 | $500,000.00 |
| 119039 | 35.988 | Ohio | D08 | Group | District 8 Engineering | D08 BI FY2029/2030 (B) | Various | D8 Consultant Bridge Inspection Contract for calendar year 2029 and 2030. Includes various fracture critical steel pier caps. | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | State | $100,000.00 | $500,000.00 |
| 119041 | 35.989 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Bridge Maintenance FY2029 | TBD | Project to perform minor maintenance bridge repairs . Locations will be added as they are found. | Bridge Preservation | Exempt | 2029 | CO | 0 | Preservation | $1,600,000.00 | $2,140,000.00 |
| 119041 | 35.990 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Bridge Maintenance FY2029 | TBD | Project to perform minor maintenance bridge repairs . Locations will be added as they are found. | Bridge Preservation | Exempt | 2029 | CO | 0 | State | $400,000.00 | $2,140,000.00 |
| 119041 | 36.321 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Bridge Maintenance FY2029 | TBD | Project to perform minor maintenance bridge repairs . Locations will be added as they are found. | Bridge Preservation | Exempt | 2029 | CO | 0 | Labor | $140,000.00 | $2,140,000.00 |
| 119064 | 40.050 | Ohio | Butler | Individual | Metroparks of Butler County | BUT GMR Trail Middletown-Monroe | From the proposed terminus of the Monroe GMR Trail to the Middletown section at SR 73 | Construction of the Great Miami River Trail, to connect the Middletown and Monroe sections. | Shared Use Path | Exempt | 2028 | ENV | 1 | Labor | $8,897.00 | $1,342,147.62 |
| 119064 | 40.051 | Ohio | Butler | Individual | Metroparks of Butler County | BUT GMR Trail Middletown-Monroe | From the proposed terminus of the Monroe GMR Trail to the Middletown section at SR 73 | Construction of the Great Miami River Trail, to connect the Middletown and Monroe sections. | Shared Use Path | Exempt | 2028 | DD | 2 | Labor | $1,570.00 | $1,342,147.62 |
| 119064 | 40.052 | Ohio | Butler | Individual | Metroparks of Butler County | BUT GMR Trail Middletown-Monroe | From the proposed terminus of the Monroe GMR Trail to the Middletown section at SR 73 | Construction of the Great Miami River Trail, to connect the Middletown and Monroe sections. | Shared Use Path | Exempt | 2028 | RW | 3 | Labor | $60,000.00 | $1,342,147.62 |
| 119064 | 40.053 | Ohio | Butler | Individual | Metroparks of Butler County | BUT GMR Trail Middletown-Monroe | From the proposed terminus of the Monroe GMR Trail to the Middletown section at SR 73 | Construction of the Great Miami River Trail, to connect the Middletown and Monroe sections. | Shared Use Path | Exempt | 2028 | CO | 5 | MPO TA | $950,789.25 | $1,342,147.62 |
| 119064 | 40.054 | Ohio | Butler | Individual | Metroparks of Butler County | BUT GMR Trail Middletown-Monroe | From the proposed terminus of the Monroe GMR Trail to the Middletown section at SR 73 | Construction of the Great Miami River Trail, to connect the Middletown and Monroe sections. | Shared Use Path | Exempt | 2028 | CO | 6 | Labor | $83,194.06 | $1,342,147.62 |
| 119064 | 40.055 | Ohio | Butler | Individual | Metroparks of Butler County | BUT GMR Trail Middletown-Monroe | From the proposed terminus of the Monroe GMR Trail to the Middletown section at SR 73 | Construction of the Great Miami River Trail, to connect the Middletown and Monroe sections. | Shared Use Path | Exempt | 2028 | CO | 7 | Local | $237,697.31 | $1,342,147.62 |
| 119069 | 40.056 | Ohio | Hamilton | Individual | Deer Park | HAM CR 251 0.11 Blue Ash Rd Ph 2 | Blue Ash Road from Sibley Avenue to Duneden Avenue. | Reconstruction of Blue Ash Road from Sibley Avenue to Duneden Avenue. | Roadway Major Rehab | Exempt | 2027 | CO | 5 | MPO STBG | $4,176,276.00 | $6,120,769.15 |
| 119069 | 40.057 | Ohio | Hamilton | Individual | Deer Park | HAM CR 251 0.11 Blue Ash Rd Ph 2 | Blue Ash Road from Sibley Avenue to Duneden Avenue. | Reconstruction of Blue Ash Road from Sibley Avenue to Duneden Avenue. | Roadway Major Rehab | Exempt | 2027 | CO | 6 | MPO TA | $400,000.00 | $6,120,769.15 |
| 119069 | 40.058 | Ohio | Hamilton | Individual | Deer Park | HAM CR 251 0.11 Blue Ash Rd Ph 2 | Blue Ash Road from Sibley Avenue to Duneden Avenue. | Reconstruction of Blue Ash Road from Sibley Avenue to Duneden Avenue. | Roadway Major Rehab | Exempt | 2027 | CO | 7 | Labor | $400,424.15 | $6,120,769.15 |
| 119069 | 40.059 | Ohio | Hamilton | Individual | Deer Park | HAM CR 251 0.11 Blue Ash Rd Ph 2 | Blue Ash Road from Sibley Avenue to Duneden Avenue. | Reconstruction of Blue Ash Road from Sibley Avenue to Duneden Avenue. | Roadway Major Rehab | Exempt | 2027 | CO | 8 | Local | $1,144,069.00 | $6,120,769.15 |
| 119070 | 39.818 | Ohio | Hamilton | Individual | Delhi Township (Hamilton County) | HAM CR 196 1.89 Delhi Ave | Delhi Road from Delhi Towne Square to Klemme Drive. | Installation of new signals at Delhi Avenue and Klemme Drive and at Delhi Avenue and Delhi Towne Square. Widen approach of Klemme Dr South of intersection. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 8 | Labor | $138,451.08 | $2,282,723.58 |
| 119070 | 39.819 | Ohio | Hamilton | Individual | Delhi Township (Hamilton County) | HAM CR 196 1.89 Delhi Ave | Delhi Road from Delhi Towne Square to Klemme Drive. | Installation of new signals at Delhi Avenue and Klemme Drive and at Delhi Avenue and Delhi Towne Square. Widen approach of Klemme Dr South of intersection. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 7 | Local | $395,574.50 | $2,282,723.58 |
| 119070 | 40.060 | Ohio | Hamilton | Individual | Delhi Township (Hamilton County) | HAM CR 196 1.89 Delhi Ave | Delhi Road from Delhi Towne Square to Klemme Drive. | Installation of new signals at Delhi Avenue and Klemme Drive and at Delhi Avenue and Delhi Towne Square. Widen approach of Klemme Dr South of intersection. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 6 | MPO STBG | $1,582,298.00 | $2,282,723.58 |
| 119071 | 39.820 | Ohio | Hamilton | Individual | Madeira, City of | HAM Dawson Rd Shared Use Path | Dawson Road from McDonald Commons to Miami Avenue | Construction of a wide sidewalk along Dawson Road from Miami Avenue to McDonald Commons. | Shared Use Path | Exempt | 2028 | CO | 6 | MPO TA | $747,763.20 | $1,028,174.40 |
| 119071 | 39.821 | Ohio | Hamilton | Individual | Madeira, City of | HAM Dawson Rd Shared Use Path | Dawson Road from McDonald Commons to Miami Avenue | Construction of a wide sidewalk along Dawson Road from Miami Avenue to McDonald Commons. | Shared Use Path | Exempt | 2028 | CO | 7 | Local | $280,411.20 | $1,028,174.40 |
| 119072 | 39.822 | Ohio | Hamilton | Individual | Sharonville, City of | HAM US 42 0.030 Reading Rd | Reading Road from Cornell to Sharon Road | Road diet on Reading Road from Cornell Road to Sharon Road. Improvements to pedestrian infrastructure. | Roadway Improvement (Safety) | Exempt | 2027 | RW | 3 | MPO STBG | $1,120,000.00 | $6,506,803.59 |
| 119072 | 39.823 | Ohio | Hamilton | Individual | Sharonville, City of | HAM US 42 0.030 Reading Rd | Reading Road from Cornell to Sharon Road | Road diet on Reading Road from Cornell Road to Sharon Road. Improvements to pedestrian infrastructure. | Roadway Improvement (Safety) | Exempt | 2027 | RW | 4 | Local | $280,000.00 | $6,506,803.59 |
| 119072 | 39.824 | Ohio | Hamilton | Individual | Sharonville, City of | HAM US 42 0.030 Reading Rd | Reading Road from Cornell to Sharon Road | Road diet on Reading Road from Cornell Road to Sharon Road. Improvements to pedestrian infrastructure. | Roadway Improvement (Safety) | Exempt | 2027 | CO | 6 | MPO STBG | $2,039,011.54 | $6,506,803.59 |
| 119072 | 39.825 | Ohio | Hamilton | Individual | Sharonville, City of | HAM US 42 0.030 Reading Rd | Reading Road from Cornell to Sharon Road | Road diet on Reading Road from Cornell Road to Sharon Road. Improvements to pedestrian infrastructure. | Roadway Improvement (Safety) | Exempt | 2027 | CO | 7 | Labor | $380,386.93 | $6,506,803.59 |
| 119072 | 39.826 | Ohio | Hamilton | Individual | Sharonville, City of | HAM US 42 0.030 Reading Rd | Reading Road from Cornell to Sharon Road | Road diet on Reading Road from Cornell Road to Sharon Road. Improvements to pedestrian infrastructure. | Roadway Improvement (Safety) | Exempt | 2027 | CO | 8 | Local | $2,521,005.12 | $6,506,803.59 |
| 119074 | 39.827 | Ohio | Hamilton | Individual | Sycamore Township (Hamilton County) | HAM School & Solzman Sidewalk | School Rd from Sharonville to Solzman Road; Solzman Rd from School Rd to East Kemper Rd | Installation of sidewalk along School Road and Solzman Road in Sycamore Township. | Pedestrian Facilities | Exempt | 2026 | CO | 6 | MPO TA | $671,571.60 | $1,445,209.79 |
| 119074 | 39.828 | Ohio | Hamilton | Individual | Sycamore Township (Hamilton County) | HAM School & Solzman Sidewalk | School Rd from Sharonville to Solzman Road; Solzman Rd from School Rd to East Kemper Rd | Installation of sidewalk along School Road and Solzman Road in Sycamore Township. | Pedestrian Facilities | Exempt | 2026 | CO | 7 | Local | $772,908.98 | $1,445,209.79 |
| 119075 | 39.829 | Ohio | Warren | Individual | Mason, City of | WAR Tylersville & Mason Montgom | Intersection of Tylersville Road with Mason Montgomery Road | Improvements to the intersection of Tylersville Road and Mason Montgomery Road. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 6 | MPO CRP | $1,720,372.00 | $4,099,505.38 |
| 119075 | 39.830 | Ohio | Warren | Individual | Mason, City of | WAR Tylersville & Mason Montgom | Intersection of Tylersville Road with Mason Montgomery Road | Improvements to the intersection of Tylersville Road and Mason Montgomery Road. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 7 | Local | $2,207,753.38 | $4,099,505.38 |
| 119077 | 36.322 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 20.16 | HAM IR 275: SLM 20.16 | Project to rehabilitate bridge HAM-275-2016 which carries Mill Rd over I-275. Rehab will include raising structure 0.7 feet, replacing the deck and painting the bridge. | Bridge Preservation | Exempt | 2027 | ENV | 0 | Preservation | $90,000.00 | $4,701,095.00 |
| 119077 | 36.323 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 20.16 | HAM IR 275: SLM 20.16 | Project to rehabilitate bridge HAM-275-2016 which carries Mill Rd over I-275. Rehab will include raising structure 0.7 feet, replacing the deck and painting the bridge. | Bridge Preservation | Exempt | 2027 | ENV | 0 | State | $10,000.00 | $4,701,095.00 |
| 119077 | 36.324 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 20.16 | HAM IR 275: SLM 20.16 | Project to rehabilitate bridge HAM-275-2016 which carries Mill Rd over I-275. Rehab will include raising structure 0.7 feet, replacing the deck and painting the bridge. | Bridge Preservation | Exempt | 2028 | ENV | 0 | Labor | $23,728.00 | $4,701,095.00 |
| 119077 | 36.325 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 20.16 | HAM IR 275: SLM 20.16 | Project to rehabilitate bridge HAM-275-2016 which carries Mill Rd over I-275. Rehab will include raising structure 0.7 feet, replacing the deck and painting the bridge. | Bridge Preservation | Exempt | 2028 | DD | 0 | Labor | $4,187.00 | $4,701,095.00 |
| 119083 | 36.326 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 17.53 | HAM SR 126 17.53 - SFN 3101177 | Project to replace the superstructure and rehabilitate the substructure of the bridge that carries SR 126 over Eldora Drive. | Bridge Preservation | Exempt | 2026 | ENV | 0 | Preservation | $320,000.00 | $5,390,823.00 |
| 119083 | 36.327 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 17.53 | HAM SR 126 17.53 - SFN 3101177 | Project to replace the superstructure and rehabilitate the substructure of the bridge that carries SR 126 over Eldora Drive. | Bridge Preservation | Exempt | 2026 | ENV | 0 | State | $80,000.00 | $5,390,823.00 |
| 119083 | 36.328 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 17.53 | HAM SR 126 17.53 - SFN 3101177 | Project to replace the superstructure and rehabilitate the substructure of the bridge that carries SR 126 over Eldora Drive. | Bridge Preservation | Exempt | 2028 | ENV | 0 | Labor | $15,691.00 | $5,390,823.00 |
| 119083 | 36.329 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 17.53 | HAM SR 126 17.53 - SFN 3101177 | Project to replace the superstructure and rehabilitate the substructure of the bridge that carries SR 126 over Eldora Drive. | Bridge Preservation | Exempt | 2027 | DD | 0 | Preservation | $53,319.20 | $5,390,823.00 |
| 119083 | 36.330 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 17.53 | HAM SR 126 17.53 - SFN 3101177 | Project to replace the superstructure and rehabilitate the substructure of the bridge that carries SR 126 over Eldora Drive. | Bridge Preservation | Exempt | 2027 | DD | 0 | State | $13,329.80 | $5,390,823.00 |
| 119083 | 36.331 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 17.53 | HAM SR 126 17.53 - SFN 3101177 | Project to replace the superstructure and rehabilitate the substructure of the bridge that carries SR 126 over Eldora Drive. | Bridge Preservation | Exempt | 2028 | DD | 0 | Labor | $2,769.00 | $5,390,823.00 |
| 119083 | 36.332 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 17.53 | HAM SR 126 17.53 - SFN 3101177 | Project to replace the superstructure and rehabilitate the substructure of the bridge that carries SR 126 over Eldora Drive. | Bridge Preservation | Exempt | 2028 | RW | 0 | Preservation | $32,000.00 | $5,390,823.00 |
| 119083 | 36.333 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 17.53 | HAM SR 126 17.53 - SFN 3101177 | Project to replace the superstructure and rehabilitate the substructure of the bridge that carries SR 126 over Eldora Drive. | Bridge Preservation | Exempt | 2028 | RW | 0 | State | $8,000.00 | $5,390,823.00 |
| 119083 | 36.334 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 17.53 | HAM SR 126 17.53 - SFN 3101177 | Project to replace the superstructure and rehabilitate the substructure of the bridge that carries SR 126 over Eldora Drive. | Bridge Preservation | Exempt | 2028 | RW | 0 | Labor | $40,000.00 | $5,390,823.00 |
| 119083 | 36.335 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 17.53 | HAM SR 126 17.53 - SFN 3101177 | Project to replace the superstructure and rehabilitate the substructure of the bridge that carries SR 126 over Eldora Drive. | Bridge Preservation | Exempt | 2029 | CO | 0 | Preservation | $3,485,600.00 | $5,390,823.00 |
| 119083 | 36.336 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 17.53 | HAM SR 126 17.53 - SFN 3101177 | Project to replace the superstructure and rehabilitate the substructure of the bridge that carries SR 126 over Eldora Drive. | Bridge Preservation | Exempt | 2029 | CO | 0 | State | $871,400.00 | $5,390,823.00 |
| 119083 | 36.337 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 17.53 | HAM SR 126 17.53 - SFN 3101177 | Project to replace the superstructure and rehabilitate the substructure of the bridge that carries SR 126 over Eldora Drive. | Bridge Preservation | Exempt | 2029 | CO | 0 | Labor | $304,990.00 | $5,390,823.00 |
| 119221 | 36.338 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08/D07 Mowing FY2029 (B) | District 8 and District 7 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Clinton, Greene and Warren Counties. District 7 mowing on MOT IR 675 SLM 0.00 to 7.44 & MOT IR 75 SLM 0.00 to 9.31 | Vegetative Maintenance | Exempt | 2028 | ENV | 0 | Labor | $55,335.00 | $1,243,480.00 |
| 119221 | 36.339 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08/D07 Mowing FY2029 (B) | District 8 and District 7 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Clinton, Greene and Warren Counties. District 7 mowing on MOT IR 675 SLM 0.00 to 7.44 & MOT IR 75 SLM 0.00 to 9.31 | Vegetative Maintenance | Exempt | 2028 | DD | 0 | Labor | $9,765.00 | $1,243,480.00 |
| 119221 | 36.340 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08/D07 Mowing FY2029 (B) | District 8 and District 7 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Clinton, Greene and Warren Counties. District 7 mowing on MOT IR 675 SLM 0.00 to 7.44 & MOT IR 75 SLM 0.00 to 9.31 | Vegetative Maintenance | Exempt | 2029 | CO | 0 | State | $1,087,380.00 | $1,243,480.00 |
| 119221 | 36.341 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08/D07 Mowing FY2029 (B) | District 8 and District 7 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Clinton, Greene and Warren Counties. District 7 mowing on MOT IR 675 SLM 0.00 to 7.44 & MOT IR 75 SLM 0.00 to 9.31 | Vegetative Maintenance | Exempt | 2029 | CO | 0 | Labor | $91,000.00 | $1,243,480.00 |
| 119223 | 36.342 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Mowing FY2029 (A) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Butler, Clermont, and Hamilton Counties. | Vegetative Maintenance | Exempt | 2028 | ENV | 0 | Labor | $55,335.00 | $1,106,050.00 |
| 119223 | 36.343 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Mowing FY2029 (A) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Butler, Clermont, and Hamilton Counties. | Vegetative Maintenance | Exempt | 2028 | DD | 0 | Labor | $9,765.00 | $1,106,050.00 |
| 119223 | 36.344 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Mowing FY2029 (A) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Butler, Clermont, and Hamilton Counties. | Vegetative Maintenance | Exempt | 2029 | CO | 0 | State | $951,450.00 | $1,106,050.00 |
| 119223 | 36.345 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Mowing FY2029 (A) | District 8 | District 8 mowing contract. Includes mowing interstates and interstate look-alikes in Butler, Clermont, and Hamilton Counties. | Vegetative Maintenance | Exempt | 2029 | CO | 0 | Labor | $89,500.00 | $1,106,050.00 |
| 119232 | 36.346 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 GR FY2029 | District 8 | District 8 counties guardrail repair and upgrading contract. | Roadside / Median Improvement (Safety) | Exempt | 2029 | CO | 0 | State | $1,438,500.00 | $1,564,400.00 |
| 119232 | 36.347 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 GR FY2029 | District 8 | District 8 counties guardrail repair and upgrading contract. | Roadside / Median Improvement (Safety) | Exempt | 2029 | CO | 0 | Labor | $125,900.00 | $1,564,400.00 |
| 119238 | 36.348 | Ohio | HAM | Group | ODOT Sponsoring Agency | D08 PO FY2029 (Hamilton Co.) | Hamilton County | District 8 PO for Hamilton County issues in FY 2029. | Maintenance Contracts (Non-Let.) | Exempt | 2029 | OTH | 0 | State | $169,000.00 | $169,000.00 |
| 119245 | 36.349 | Ohio | BUT | Group | ODOT Sponsoring Agency | D08 PO FY2029 (Butler Co.) | Butler County | District 8 PO for Butler Co. issues in FY 2029. | Maintenance Contracts (Non-Let.) | Exempt | 2029 | OTH | 0 | State | $24,000.00 | $24,000.00 |
| 119356 | 36.350 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 133 22.12 | CLE SR 133 22.12 | Project to replace the deck, paint, and raise bridge CLE-133-2212 that carries SR 133 over US 32. | Bridge Preservation | Exempt | 2027 | ENV | 0 | Preservation | $200,000.00 | $6,069,900.00 |
| 119356 | 36.351 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 133 22.12 | CLE SR 133 22.12 | Project to replace the deck, paint, and raise bridge CLE-133-2212 that carries SR 133 over US 32. | Bridge Preservation | Exempt | 2027 | ENV | 0 | State | $50,000.00 | $6,069,900.00 |
| 119356 | 36.352 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 133 22.12 | CLE SR 133 22.12 | Project to replace the deck, paint, and raise bridge CLE-133-2212 that carries SR 133 over US 32. | Bridge Preservation | Exempt | 2028 | ENV | 0 | Labor | $141,440.00 | $6,069,900.00 |
| 119356 | 36.353 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 133 22.12 | CLE SR 133 22.12 | Project to replace the deck, paint, and raise bridge CLE-133-2212 that carries SR 133 over US 32. | Bridge Preservation | Exempt | 2028 | DD | 0 | Preservation | $200,000.00 | $6,069,900.00 |
| 119356 | 36.354 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 133 22.12 | CLE SR 133 22.12 | Project to replace the deck, paint, and raise bridge CLE-133-2212 that carries SR 133 over US 32. | Bridge Preservation | Exempt | 2028 | DD | 0 | State | $50,000.00 | $6,069,900.00 |
| 119356 | 36.355 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 133 22.12 | CLE SR 133 22.12 | Project to replace the deck, paint, and raise bridge CLE-133-2212 that carries SR 133 over US 32. | Bridge Preservation | Exempt | 2028 | DD | 0 | Labor | $24,960.00 | $6,069,900.00 |
| 119424 | 36.356 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM BS FY2029 | Multiple locations in HAM CO | Sealing of mainline SR 126 bridge decks in Hamilton County. Other bridge decks in the county may be added prior to scoping. | Bridge Preservation | Exempt | 2029 | CO | 0 | Preservation | $1,494,191.20 | $1,970,843.00 |
| 119424 | 36.357 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM BS FY2029 | Multiple locations in HAM CO | Sealing of mainline SR 126 bridge decks in Hamilton County. Other bridge decks in the county may be added prior to scoping. | Bridge Preservation | Exempt | 2029 | CO | 0 | State | $297,484.80 | $1,970,843.00 |
| 119424 | 36.358 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM BS FY2029 | Multiple locations in HAM CO | Sealing of mainline SR 126 bridge decks in Hamilton County. Other bridge decks in the county may be added prior to scoping. | Bridge Preservation | Exempt | 2029 | CO | 0 | Labor | $179,167.00 | $1,970,843.00 |
| 119592 | 39.831 | Ohio | Hamilton | Individual | Blue Ash | HAM Grooms Road Connector | New roadway connecting Reed Hartman Highway (north of Cornell) to Grooms Road (south of the Blue Ash Sports Center) | Construction of a new roadway to connect Grooms Road to Reed Hartman Highway. | New Roadway | Non-Exempt (Analyzed) | 2026 | CO | 6 | Discretionary / Earmark | $2,000,000.00 | $3,834,936.00 |
| 119592 | 39.832 | Ohio | Hamilton | Individual | Blue Ash | HAM Grooms Road Connector | New roadway connecting Reed Hartman Highway (north of Cornell) to Grooms Road (south of the Blue Ash Sports Center) | Construction of a new roadway to connect Grooms Road to Reed Hartman Highway. | New Roadway | Non-Exempt (Analyzed) | 2026 | CO | 7 | Local | $1,557,372.90 | $3,834,936.00 |
| 119603 | 36.359 | Ohio | CLE | Group | Clermont County T.I.D. | CLE CR 133/CR 40 Roundabout | 300' north and south of intersection along Deerfield Road, and 300' east and west of intersection along Woodville Pike | Construction of a roundabout at the intersection of Woodville Pike and Deerfield Road. | Intersection Improvement (Safety) | Exempt | 2028 | CO | 0 | Local Programs | $1,872,744.43 | $2,389,062.54 |
| 119603 | 36.360 | Ohio | CLE | Group | Clermont County T.I.D. | CLE CR 133/CR 40 Roundabout | 300' north and south of intersection along Deerfield Road, and 300' east and west of intersection along Woodville Pike | Construction of a roundabout at the intersection of Woodville Pike and Deerfield Road. | Intersection Improvement (Safety) | Exempt | 2028 | CO | 0 | Local | $468,186.11 | $2,389,062.54 |
| 119618 | 36.361 | Ohio | HAM | Group | Kentucky, Commonwealth of | Daniel Carter Beard Br Rpr FY24 | HAM-471-0.00 | Daniel Carter Beard NB & SB Bridge repairs. | Bridge Preservation | Exempt | 2026 | CO | 0 | State | $584,939.62 | $4,624,144.62 |
| 119618 | 36.362 | Ohio | HAM | Group | Kentucky, Commonwealth of | Daniel Carter Beard Br Rpr FY24 | HAM-471-0.00 | Daniel Carter Beard NB & SB Bridge repairs. | Bridge Preservation | Exempt | 2026 | CO | 0 | Local | $4,039,205.00 | $4,624,144.62 |
| 119619 | 36.363 | Ohio | HAM | Group | Kentucky, Commonwealth of | Clay Wade Bailey Br Repair FY24 | HAM-42-0.00 | FY24 Clay Wade Bailey Bridge Repair The associated Agreement is 39179-1 | Asset Inventory / Inspection | Exempt | 2026 | CO | 0 | State | $1,012,000.00 | $4,600,000.00 |
| 119619 | 36.364 | Ohio | HAM | Group | Kentucky, Commonwealth of | Clay Wade Bailey Br Repair FY24 | HAM-42-0.00 | FY24 Clay Wade Bailey Bridge Repair The associated Agreement is 39179-1 | Asset Inventory / Inspection | Exempt | 2026 | CO | 0 | Local | $3,588,000.00 | $4,600,000.00 |
| 119700 | 36.365 | Ohio | CLE | Group | Bethel, Village of | CLE SR 125 14.08 | SR-125 (W Plane St): from SLM 14.08 (Grant Career Center driveway) to SLM 14.56 (Harris Ave) | Construct sidewalk on the north side of W Plane St (SR-125) in the Village of Bethel. Project to include pedestrian curb ramps and crosswalks. | Pedestrian Facilities | Exempt | 2027 | CO | 0 | Local Programs | $910,045.78 | $1,436,073.98 |
| 119700 | 36.366 | Ohio | CLE | Group | Bethel, Village of | CLE SR 125 14.08 | SR-125 (W Plane St): from SLM 14.08 (Grant Career Center driveway) to SLM 14.56 (Harris Ave) | Construct sidewalk on the north side of W Plane St (SR-125) in the Village of Bethel. Project to include pedestrian curb ramps and crosswalks. | Pedestrian Facilities | Exempt | 2027 | CO | 0 | Labor | $100,259.00 | $1,436,073.98 |
| 119700 | 36.367 | Ohio | CLE | Group | Bethel, Village of | CLE SR 125 14.08 | SR-125 (W Plane St): from SLM 14.08 (Grant Career Center driveway) to SLM 14.56 (Harris Ave) | Construct sidewalk on the north side of W Plane St (SR-125) in the Village of Bethel. Project to include pedestrian curb ramps and crosswalks. | Pedestrian Facilities | Exempt | 2027 | CO | 0 | Local | $101,116.20 | $1,436,073.98 |
| 119734 | 36.368 | Ohio | BUT | Group | Hamilton, City of | BUT South G St Bridge Demolition | South G Street Bridge (SFN 0960306) in the City of Hamilton | Demolition of the South G Street bridge (SFN 0960306). | Bridge Preservation | Exempt | 2026 | CO | 0 | Local Programs | $923,414.00 | $1,778,158.82 |
| 119734 | 36.369 | Ohio | BUT | Group | Hamilton, City of | BUT South G St Bridge Demolition | South G Street Bridge (SFN 0960306) in the City of Hamilton | Demolition of the South G Street bridge (SFN 0960306). | Bridge Preservation | Exempt | 2026 | CO | 0 | Local | $758,179.82 | $1,778,158.82 |
| 119752 | 36.370 | Ohio | HAM | Group | Symmes Township (Hamilton County) | HAM CR 266 16.31 Kemper Rd | Mariners Cove to Pemmican Run | Installation of sidewalk on a portion of Kemper Rd in Symmes Township. Project also includes ADA compliant curb ramps and a mid-block crosswalk with Rectangular Rapid-Flashing Beacon(RRFB). | Pedestrian Facilities | Exempt | 2026 | DD | 0 | Safety | $19,812.60 | $1,282,581.31 |
| 119752 | 36.371 | Ohio | HAM | Group | Symmes Township (Hamilton County) | HAM CR 266 16.31 Kemper Rd | Mariners Cove to Pemmican Run | Installation of sidewalk on a portion of Kemper Rd in Symmes Township. Project also includes ADA compliant curb ramps and a mid-block crosswalk with Rectangular Rapid-Flashing Beacon(RRFB). | Pedestrian Facilities | Exempt | DD | 0 | Labor | $1,282,581.31 | ||
| 119752 | 36.372 | Ohio | HAM | Group | Symmes Township (Hamilton County) | HAM CR 266 16.31 Kemper Rd | Mariners Cove to Pemmican Run | Installation of sidewalk on a portion of Kemper Rd in Symmes Township. Project also includes ADA compliant curb ramps and a mid-block crosswalk with Rectangular Rapid-Flashing Beacon(RRFB). | Pedestrian Facilities | Exempt | 2026 | DD | 0 | Local | $2,201.40 | $1,282,581.31 |
| 119752 | 36.373 | Ohio | HAM | Group | Symmes Township (Hamilton County) | HAM CR 266 16.31 Kemper Rd | Mariners Cove to Pemmican Run | Installation of sidewalk on a portion of Kemper Rd in Symmes Township. Project also includes ADA compliant curb ramps and a mid-block crosswalk with Rectangular Rapid-Flashing Beacon(RRFB). | Pedestrian Facilities | Exempt | 2026 | RW | 0 | Safety | $216,992.70 | $1,282,581.31 |
| 119752 | 36.374 | Ohio | HAM | Group | Symmes Township (Hamilton County) | HAM CR 266 16.31 Kemper Rd | Mariners Cove to Pemmican Run | Installation of sidewalk on a portion of Kemper Rd in Symmes Township. Project also includes ADA compliant curb ramps and a mid-block crosswalk with Rectangular Rapid-Flashing Beacon(RRFB). | Pedestrian Facilities | Exempt | RW | 0 | Labor | $1,282,581.31 | ||
| 119752 | 36.375 | Ohio | HAM | Group | Symmes Township (Hamilton County) | HAM CR 266 16.31 Kemper Rd | Mariners Cove to Pemmican Run | Installation of sidewalk on a portion of Kemper Rd in Symmes Township. Project also includes ADA compliant curb ramps and a mid-block crosswalk with Rectangular Rapid-Flashing Beacon(RRFB). | Pedestrian Facilities | Exempt | 2026 | RW | 0 | Local | $24,110.30 | $1,282,581.31 |
| 119752 | 36.376 | Ohio | HAM | Group | Symmes Township (Hamilton County) | HAM CR 266 16.31 Kemper Rd | Mariners Cove to Pemmican Run | Installation of sidewalk on a portion of Kemper Rd in Symmes Township. Project also includes ADA compliant curb ramps and a mid-block crosswalk with Rectangular Rapid-Flashing Beacon(RRFB). | Pedestrian Facilities | Exempt | 2027 | CO | 0 | Safety | $510,867.28 | $1,282,581.31 |
| 119752 | 36.377 | Ohio | HAM | Group | Symmes Township (Hamilton County) | HAM CR 266 16.31 Kemper Rd | Mariners Cove to Pemmican Run | Installation of sidewalk on a portion of Kemper Rd in Symmes Township. Project also includes ADA compliant curb ramps and a mid-block crosswalk with Rectangular Rapid-Flashing Beacon(RRFB). | Pedestrian Facilities | Exempt | 2027 | CO | 0 | Labor | $56,764.00 | $1,282,581.31 |
| 119752 | 36.378 | Ohio | HAM | Group | Symmes Township (Hamilton County) | HAM CR 266 16.31 Kemper Rd | Mariners Cove to Pemmican Run | Installation of sidewalk on a portion of Kemper Rd in Symmes Township. Project also includes ADA compliant curb ramps and a mid-block crosswalk with Rectangular Rapid-Flashing Beacon(RRFB). | Pedestrian Facilities | Exempt | 2027 | CO | 0 | Local | $56,763.03 | $1,282,581.31 |
| 119753 | 36.379 | Ohio | HAM | Group | Cincinnati, City of | HAM US 42 9.25 | Reading & Summit intersection | Realignment of the intersection at Reading Rd (US42) & Summit Rd to remove slip lanes and shorten pedestrian crossings. Other associated work includes ADA curb ramps and a new traffic signal. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 0 | Safety | $1,007,979.75 | $1,128,879.50 |
| 119753 | 36.380 | Ohio | HAM | Group | Cincinnati, City of | HAM US 42 9.25 | Reading & Summit intersection | Realignment of the intersection at Reading Rd (US42) & Summit Rd to remove slip lanes and shorten pedestrian crossings. Other associated work includes ADA curb ramps and a new traffic signal. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 0 | Local | $111,997.75 | $1,128,879.50 |
| 119754 | 36.381 | Ohio | HAM | Group | Cincinnati, City of | HAM Cincinnati Ped FY25 | City of Cincinnati | Various pedestrian improvements at 6 locations across the City of Cincinnati including sidewalk, raised crosswalks, curb bump-outs, and ADA curb ramps. | Pedestrian Facilities | Exempt | 2026 | CO | 0 | Safety | $871,215.40 | $1,072,905.82 |
| 119754 | 36.382 | Ohio | HAM | Group | Cincinnati, City of | HAM Cincinnati Ped FY25 | City of Cincinnati | Various pedestrian improvements at 6 locations across the City of Cincinnati including sidewalk, raised crosswalks, curb bump-outs, and ADA curb ramps. | Pedestrian Facilities | Exempt | 2026 | CO | 0 | Local | $193,603.42 | $1,072,905.82 |
| 119757 | 36.383 | Ohio | HAM | Group | Loveland, City of | HAM CR 299 5.78 Loveland Madeira | SLM 5.78-6.50 | Installation of sidewalk along a portion of Loveland Madeira Rd within the City of Loveland. Project also includes a mid-block crossing with RRFB. | Pedestrian Facilities | Exempt | 2026 | CO | 0 | Safety | $1,464,769.80 | $2,776,063.74 |
| 119757 | 36.384 | Ohio | HAM | Group | Loveland, City of | HAM CR 299 5.78 Loveland Madeira | SLM 5.78-6.50 | Installation of sidewalk along a portion of Loveland Madeira Rd within the City of Loveland. Project also includes a mid-block crossing with RRFB. | Pedestrian Facilities | Exempt | 2026 | CO | 0 | Labor | $125,697.15 | $2,776,063.74 |
| 119757 | 36.385 | Ohio | HAM | Group | Loveland, City of | HAM CR 299 5.78 Loveland Madeira | SLM 5.78-6.50 | Installation of sidewalk along a portion of Loveland Madeira Rd within the City of Loveland. Project also includes a mid-block crossing with RRFB. | Pedestrian Facilities | Exempt | 2026 | CO | 0 | Local | $330,963.05 | $2,776,063.74 |
| 119765 | 36.386 | Ohio | BUT | Group | Monroe, City of | BUT Monroe Ped Project FY2026 | City of Monroe | Various pedestrian facility improvements throughout the City of Monroe, including new sidewalks, ADA curb ramps, and improved signage and pavement markings. | Pedestrian Facilities | Exempt | 2026 | CO | 0 | Safety | $495,334.80 | $827,978.00 |
| 119765 | 36.387 | Ohio | BUT | Group | Monroe, City of | BUT Monroe Ped Project FY2026 | City of Monroe | Various pedestrian facility improvements throughout the City of Monroe, including new sidewalks, ADA curb ramps, and improved signage and pavement markings. | Pedestrian Facilities | Exempt | 2026 | CO | 0 | Local | $109,051.20 | $827,978.00 |
| 119772 | 36.388 | Ohio | BUT | Group | Hamilton, City of | BUT MR 990 0.920 | Ross Ave from Urban St to C st | Constructing curb bump outs and other improvements along Ross Avenue. | Enhanced Crossing | Exempt | 2026 | CO | 0 | Safety | $915,094.80 | $1,325,417.33 |
| 119772 | 36.389 | Ohio | BUT | Group | Hamilton, City of | BUT MR 990 0.920 | Ross Ave from Urban St to C st | Constructing curb bump outs and other improvements along Ross Avenue. | Enhanced Crossing | Exempt | 2026 | CO | 0 | Local | $172,852.20 | $1,325,417.33 |
| 119776 | 36.390 | Ohio | BUT | Group | Butler County Engineer | BUT CR 81 0.00 Trenton Franklin | Trenton Franklin Rd (CR-81); 0.000 to 1.216 | Widen Trenton Franklin Rd (CR-81) in Butler County. Project to also include rumble stripes and removal of fixed objects within the clear zone. | Roadway Improvement (Safety) | Exempt | 2026 | CO | 0 | State | $3,502,896.02 | $4,336,764.43 |
| 119776 | 36.391 | Ohio | BUT | Group | Butler County Engineer | BUT CR 81 0.00 Trenton Franklin | Trenton Franklin Rd (CR-81); 0.000 to 1.216 | Widen Trenton Franklin Rd (CR-81) in Butler County. Project to also include rumble stripes and removal of fixed objects within the clear zone. | Roadway Improvement (Safety) | Exempt | 2026 | CO | 0 | Local | $737,276.41 | $4,336,764.43 |
| 120000 | 36.392 | Ohio | D08 | Group | District 8-Maintenance | D08 Conduit Cleanout FY2025(A) | District wide culvert cleanout project | A statewide project to clean out culvert pipes through state contract 313-26 using PROTECT funding. Each district to have their own PID for this project. | Bridge / Culvert Maintenance | Exempt | 2026 | OTH | 0 | PROTECT | $65,095.53 | $81,369.41 |
| 120000 | 36.393 | Ohio | D08 | Group | District 8-Maintenance | D08 Conduit Cleanout FY2025(A) | District wide culvert cleanout project | A statewide project to clean out culvert pipes through state contract 313-26 using PROTECT funding. Each district to have their own PID for this project. | Bridge / Culvert Maintenance | Exempt | 2026 | OTH | 0 | State | $16,273.88 | $81,369.41 |
| 120090 | 36.394 | Ohio | BUT | Group | Butler County Engineer | BUT TR 121 1.03 McCauley @ Dimm | Dimmick Rd and McCauly Rd | Construct a single-lane roundabout at Dimmick Road and McCauly Road. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 0 | Safety | $1,030,242.00 | $1,745,859.00 |
| 120090 | 36.395 | Ohio | BUT | Group | Butler County Engineer | BUT TR 121 1.03 McCauley @ Dimm | Dimmick Rd and McCauly Rd | Construct a single-lane roundabout at Dimmick Road and McCauly Road. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 0 | Local | $707,973.00 | $1,745,859.00 |
| 120144 | 39.833 | Ohio | Hamilton | Individual | Green Township (Harrison County) | HAM Green Twp EV Charging | Township Government complex and Veterans Park | Installation of electric vehicle charging infrastructure at the Green Township Government Complex and Veterans Park | Emission Reduction | Exempt | 2026 | CO | 6 | MPO CRP | $212,797.20 | $283,729.60 |
| 120144 | 39.834 | Ohio | Hamilton | Individual | Green Township (Harrison County) | HAM Green Twp EV Charging | Township Government complex and Veterans Park | Installation of electric vehicle charging infrastructure at the Green Township Government Complex and Veterans Park | Emission Reduction | Exempt | 2026 | CO | 7 | Local | $70,932.40 | $283,729.60 |
| 120254 | 36.396 | Ohio | BUT | Group | Hamilton, City of | BUT Crawford Woods SRTS 2023 | Hancock Ave (CR-20): from SLM 0.53 (Vista Dr) to SLM 0.99 (Bender Ave) | Construct sidewalk, ADA curb ramps, and pedestrian crossings on Hancock Ave (CR-20), Parrish Ave (MR-939), and Hensley Ave (MR-791) in the City of Hamilton to increase connectivity to Crawford Woods Elementary School. | Pedestrian Facilities | Exempt | 2026 | CO | 0 | Local Programs | $270,944.37 | $364,126.37 |
| 120254 | 36.397 | Ohio | BUT | Group | Hamilton, City of | BUT Crawford Woods SRTS 2023 | Hancock Ave (CR-20): from SLM 0.53 (Vista Dr) to SLM 0.99 (Bender Ave) | Construct sidewalk, ADA curb ramps, and pedestrian crossings on Hancock Ave (CR-20), Parrish Ave (MR-939), and Hensley Ave (MR-791) in the City of Hamilton to increase connectivity to Crawford Woods Elementary School. | Pedestrian Facilities | Exempt | 2026 | CO | 0 | Local | $27,095.00 | $364,126.37 |
| 120258 | 36.398 | Ohio | HAM | Group | Madeira, City of | HAM Madeira SRTS 2023 | Shewango Way (MR-3843): from SLM 0.00 (Hosbrook Rd) to SLM 0.38 (Miami Ave) | Construct sidewalk, ADA curb ramps, and pedestrian crossings along Shewango Way (MR-3843) in the City of Madeira. | Pedestrian Facilities | Exempt | 2026 | CO | 0 | Local Programs | $393,934.76 | $599,480.56 |
| 120258 | 36.399 | Ohio | HAM | Group | Madeira, City of | HAM Madeira SRTS 2023 | Shewango Way (MR-3843): from SLM 0.00 (Hosbrook Rd) to SLM 0.38 (Miami Ave) | Construct sidewalk, ADA curb ramps, and pedestrian crossings along Shewango Way (MR-3843) in the City of Madeira. | Pedestrian Facilities | Exempt | 2026 | CO | 0 | Labor | $39,395.24 | $599,480.56 |
| 120341 | 36.400 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 75 10.15 | HAM IR 75 - Lockland split area. SLM 10.15 - 12.67 | Rehabilitate Bridge HAM-75-1192R which carries Northbound I-75 over the Mill Creek, A railroad, Benson St. and Shepard Lane. Rehab will repair out-of-plane bending cracks occurring in the structural steel, zone paint under the expansion joints, and other | Bridge Preservation | Exempt | 2026 | ENV | 0 | State | $6,000.00 | $13,741,340.00 |
| 120341 | 36.401 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 75 10.15 | HAM IR 75 - Lockland split area. SLM 10.15 - 12.67 | Rehabilitate Bridge HAM-75-1192R which carries Northbound I-75 over the Mill Creek, A railroad, Benson St. and Shepard Lane. Rehab will repair out-of-plane bending cracks occurring in the structural steel, zone paint under the expansion joints, and other | Bridge Preservation | Exempt | ENV | 0 | Labor | $13,741,340.00 | ||
| 120341 | 36.402 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 75 10.15 | HAM IR 75 - Lockland split area. SLM 10.15 - 12.67 | Rehabilitate Bridge HAM-75-1192R which carries Northbound I-75 over the Mill Creek, A railroad, Benson St. and Shepard Lane. Rehab will repair out-of-plane bending cracks occurring in the structural steel, zone paint under the expansion joints, and other | Bridge Preservation | Exempt | 2026 | CO | 0 | Major Programs | $5,261,437.03 | $13,741,340.00 |
| 120341 | 36.403 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 75 10.15 | HAM IR 75 - Lockland split area. SLM 10.15 - 12.67 | Rehabilitate Bridge HAM-75-1192R which carries Northbound I-75 over the Mill Creek, A railroad, Benson St. and Shepard Lane. Rehab will repair out-of-plane bending cracks occurring in the structural steel, zone paint under the expansion joints, and other | Bridge Preservation | Exempt | 2026 | CO | 0 | Preservation | $6,139,047.48 | $13,741,340.00 |
| 120341 | 36.404 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 75 10.15 | HAM IR 75 - Lockland split area. SLM 10.15 - 12.67 | Rehabilitate Bridge HAM-75-1192R which carries Northbound I-75 over the Mill Creek, A railroad, Benson St. and Shepard Lane. Rehab will repair out-of-plane bending cracks occurring in the structural steel, zone paint under the expansion joints, and other | Bridge Preservation | Exempt | 2026 | CO | 0 | State | $1,306,720.50 | $13,741,340.00 |
| 120341 | 36.405 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 75 10.15 | HAM IR 75 - Lockland split area. SLM 10.15 - 12.67 | Rehabilitate Bridge HAM-75-1192R which carries Northbound I-75 over the Mill Creek, A railroad, Benson St. and Shepard Lane. Rehab will repair out-of-plane bending cracks occurring in the structural steel, zone paint under the expansion joints, and other | Bridge Preservation | Exempt | 2026 | CO | 0 | Labor | $886,694.99 | $13,741,340.00 |
| 120369 | 36.406 | Ohio | WAR | Group | Warren County Engineer | WAR TR 147 0.47 Grog Run Road | Grog Run Road: 100' either side of bridge (SFN 8333076) | Bridge rehabilitation (SFN 8333076) consisting of replacing the deteriorated superstructure. | Bridge Preservation | Exempt | 2026 | CO | 0 | Local Programs | $540,000.00 | $615,137.97 |
| 120369 | 36.407 | Ohio | WAR | Group | Warren County Engineer | WAR TR 147 0.47 Grog Run Road | Grog Run Road: 100' either side of bridge (SFN 8333076) | Bridge rehabilitation (SFN 8333076) consisting of replacing the deteriorated superstructure. | Bridge Preservation | Exempt | 2026 | CO | 0 | Local | $72,058.97 | $615,137.97 |
| 120545 | 35.991 | Ohio | HAM | Group | Hamilton County Engineer | HAM CR 239 8.28 Winton Rd | 150' north and south of the structure | Removal and replacement of Bridge (SFN 3137384) on Winton Road with a culvert. | Bridge Preservation | Exempt | 2026 | CO | 0 | Local Programs | $1,337,600.00 | $2,100,383.96 |
| 120545 | 35.992 | Ohio | HAM | Group | Hamilton County Engineer | HAM CR 239 8.28 Winton Rd | 150' north and south of the structure | Removal and replacement of Bridge (SFN 3137384) on Winton Road with a culvert. | Bridge Preservation | Exempt | 2026 | CO | 0 | Labor | $117,040.00 | $2,100,383.96 |
| 120545 | 35.993 | Ohio | HAM | Group | Hamilton County Engineer | HAM CR 239 8.28 Winton Rd | 150' north and south of the structure | Removal and replacement of Bridge (SFN 3137384) on Winton Road with a culvert. | Bridge Preservation | Exempt | 2026 | CO | 0 | Local | $334,400.00 | $2,100,383.96 |
| 120571 | 35.994 | Ohio | BUT | Group | Middletown, City of | BUT SR 122 9.64 | BUT SR 122: SLM 9.64 - 11.22 | FY2027 Urban Paving in the City of Middletown on a portion of US 122 | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | Preservation | $1,435,500.00 | $3,100,681.00 |
| 120571 | 35.995 | Ohio | BUT | Group | Middletown, City of | BUT SR 122 9.64 | BUT SR 122: SLM 9.64 - 11.22 | FY2027 Urban Paving in the City of Middletown on a portion of US 122 | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | Labor | $229,681.00 | $3,100,681.00 |
| 120571 | 35.996 | Ohio | BUT | Group | Middletown, City of | BUT SR 122 9.64 | BUT SR 122: SLM 9.64 - 11.22 | FY2027 Urban Paving in the City of Middletown on a portion of US 122 | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | Local | $1,435,500.00 | $3,100,681.00 |
| 120580 | 35.997 | Ohio | HAM | Group | Kentucky, Commonwealth of | Taylor Southgate Br Cable Rep | HAM-27-0.00 | Taylor Southgate Safety Cable Repairs - KYTC Lead Project | Bridge Preservation | Exempt | 2026 | CO | 0 | State | $82,500.00 | $330,000.00 |
| 120580 | 35.998 | Ohio | HAM | Group | Kentucky, Commonwealth of | Taylor Southgate Br Cable Rep | HAM-27-0.00 | Taylor Southgate Safety Cable Repairs - KYTC Lead Project | Bridge Preservation | Exempt | 2026 | CO | 0 | Local | $247,500.00 | $330,000.00 |
| 120664 | 35.999 | Ohio | HAM | Group | Kentucky, Commonwealth of | Combs-Hehl Brdg T1 Repair | HAM-275-41.6 | Combs-Hehl Bridge T1 Repairs. | Bridge Preservation | Exempt | 2026 | CO | 0 | State | $714,923.00 | $2,776,399.00 |
| 120664 | 36.000 | Ohio | HAM | Group | Kentucky, Commonwealth of | Combs-Hehl Brdg T1 Repair | HAM-275-41.6 | Combs-Hehl Bridge T1 Repairs. | Bridge Preservation | Exempt | 2026 | CO | 0 | Local | $2,061,476.00 | $2,776,399.00 |
| 120673 | 36.001 | Ohio | WAR | Group | Warren County Engineer | WAR CR 182 0.08 Bridge Rehab | Bridge WAR CR 182 0.08 (SFN 8333475) carrying Oregonia Road over Hawleys Run | Project will rehab bridge WAR CR 182 0.08 (SFN 8333475) carrying CR 182 (Oregonia Road) over Hawleys Run. | Bridge Preservation | Exempt | 2027 | CO | 0 | State | $2,455,967.00 | $2,585,228.42 |
| 120673 | 36.002 | Ohio | WAR | Group | Warren County Engineer | WAR CR 182 0.08 Bridge Rehab | Bridge WAR CR 182 0.08 (SFN 8333475) carrying Oregonia Road over Hawleys Run | Project will rehab bridge WAR CR 182 0.08 (SFN 8333475) carrying CR 182 (Oregonia Road) over Hawleys Run. | Bridge Preservation | Exempt | 2027 | CO | 0 | Local | $129,261.42 | $2,585,228.42 |
| 120680 | 36.003 | Ohio | BUT | Group | Butler County Engineer | BUT CR2821 7.25 Union Centre Bvd | Union Centre Boulevard from West Chester Road to Chappell Crossing Blvd. | Project involves superelevation improvements to horizontal curves, resurfacing, and application of pavement markings. | Roadway Improvement (Safety) | Exempt | 2028 | CO | 0 | Local Programs | $917,600.00 | $1,182,130.75 |
| 120680 | 36.004 | Ohio | BUT | Group | Butler County Engineer | BUT CR2821 7.25 Union Centre Bvd | Union Centre Boulevard from West Chester Road to Chappell Crossing Blvd. | Project involves superelevation improvements to horizontal curves, resurfacing, and application of pavement markings. | Roadway Improvement (Safety) | Exempt | 2028 | CO | 0 | Local | $229,400.00 | $1,182,130.75 |
| 120681 | 36.005 | Ohio | CLE | Group | Clermont County Engineer | CLE CR 45 2.45 Felicity Cedron | Bridge CLE CR 45 2.45 (SFN 1358502) | Project will rehabilitate Felicity Cedron Road bridge (SFN 1358502). Includes replacement of guardrail, expansion joints and resurface. Pier and abutments will be rehabilitated. | Bridge Preservation | Exempt | 2026 | CO | 0 | Local Programs | $885,409.70 | $973,950.67 |
| 120681 | 36.006 | Ohio | CLE | Group | Clermont County Engineer | CLE CR 45 2.45 Felicity Cedron | Bridge CLE CR 45 2.45 (SFN 1358502) | Project will rehabilitate Felicity Cedron Road bridge (SFN 1358502). Includes replacement of guardrail, expansion joints and resurface. Pier and abutments will be rehabilitated. | Bridge Preservation | Exempt | 2026 | CO | 0 | Local | $88,540.97 | $973,950.67 |
| 120723 | 39.835 | Ohio | Hamilton | Individual | Springdale, City of | HAM CR 266 8.40 Kemper Northland | Kemper Rd from Lawnview Ave to SR 747. Northland Blvd from the Kemper Rd intersection to approximately 0.1 miles south. | Realignment of the intersection of Kemper Rd and Northland Blvd. Construction of a shared used path on Kemper Rd from Lawnview Ave to Princeton Pike (SR 747) and connecting to the Northland Blvd SUP to the south of the intersection. | Shared Use Path | Exempt | 2028 | CO | 6 | MPO STBG | $4,078,825.00 | $5,455,428.44 |
| 120723 | 39.836 | Ohio | Hamilton | Individual | Springdale, City of | HAM CR 266 8.40 Kemper Northland | Kemper Rd from Lawnview Ave to SR 747. Northland Blvd from the Kemper Rd intersection to approximately 0.1 miles south. | Realignment of the intersection of Kemper Rd and Northland Blvd. Construction of a shared used path on Kemper Rd from Lawnview Ave to Princeton Pike (SR 747) and connecting to the Northland Blvd SUP to the south of the intersection. | Shared Use Path | Exempt | 2028 | CO | 7 | Local | $1,376,603.44 | $5,455,428.44 |
| 120726 | 39.837 | Ohio | Butler | Individual | Metroparks of Butler County | BUT GMRT Timberhill to Rockdale | GMRT from Timberhill to Rockdale Rd | Construction of 1.1 miles of new trail in Butler County to connect the Great Miami River Trail between Timberhill and Rockdale Road. | Shared Use Path | Exempt | 2026 | RW | 3 | MPO CMAQ | $96,000.00 | $2,331,447.11 |
| 120726 | 39.838 | Ohio | Butler | Individual | Metroparks of Butler County | BUT GMRT Timberhill to Rockdale | GMRT from Timberhill to Rockdale Rd | Construction of 1.1 miles of new trail in Butler County to connect the Great Miami River Trail between Timberhill and Rockdale Road. | Shared Use Path | Exempt | 2026 | RW | 4 | Local | $24,000.00 | $2,331,447.11 |
| 120726 | 39.839 | Ohio | Butler | Individual | Metroparks of Butler County | BUT GMRT Timberhill to Rockdale | GMRT from Timberhill to Rockdale Rd | Construction of 1.1 miles of new trail in Butler County to connect the Great Miami River Trail between Timberhill and Rockdale Road. | Shared Use Path | Exempt | 2028 | CO | 5 | MPO CMAQ | $1,653,418.40 | $2,331,447.11 |
| 120726 | 39.840 | Ohio | Butler | Individual | Metroparks of Butler County | BUT GMRT Timberhill to Rockdale | GMRT from Timberhill to Rockdale Rd | Construction of 1.1 miles of new trail in Butler County to connect the Great Miami River Trail between Timberhill and Rockdale Road. | Shared Use Path | Exempt | 2028 | CO | 6 | Local | $558,028.71 | $2,331,447.11 |
| 120730 | 39.841 | Ohio | Warren | Individual | Mason, City of | WAR Mason VAR Signals | Various routes in the city of Mason | Detection upgrades to several signals within the city of Mason. Also the addition of flashing yellow arrow signals and upgrades to pushbuttons. | Traffic Control (Safety) | Exempt | 2026 | CO | 5 | MPO STBG | $749,177.84 | $1,013,294.85 |
| 120730 | 39.842 | Ohio | Warren | Individual | Mason, City of | WAR Mason VAR Signals | Various routes in the city of Mason | Detection upgrades to several signals within the city of Mason. Also the addition of flashing yellow arrow signals and upgrades to pushbuttons. | Traffic Control (Safety) | Exempt | 2026 | CO | 6 | Local | $264,117.01 | $1,013,294.85 |
| 120732 | 39.843 | Ohio | Hamilton | Individual | Loveland, City of | HAM CR 299 6.81 Loveland Madeira | Loveland Madeira Rd (CR 299) from West Loveland Ave to just past the intersection with Valley View Ln. | Reconstruct Loveland Madeira Rd (CR 299) from West Loveland Ave to Valley View Ln by improving access management, adding sidewalk on the southeast side and a multi-use path on the northwest, and improving the intersection of Loveland Madeira Rd and Valley | Intersection Improvement (Safety) | Exempt | 2026 | RW | 3 | MPO CMAQ | $654,120.00 | $6,222,335.45 |
| 120732 | 39.844 | Ohio | Hamilton | Individual | Loveland, City of | HAM CR 299 6.81 Loveland Madeira | Loveland Madeira Rd (CR 299) from West Loveland Ave to just past the intersection with Valley View Ln. | Reconstruct Loveland Madeira Rd (CR 299) from West Loveland Ave to Valley View Ln by improving access management, adding sidewalk on the southeast side and a multi-use path on the northwest, and improving the intersection of Loveland Madeira Rd and Valley | Intersection Improvement (Safety) | Exempt | 2026 | RW | 4 | Local | $173,880.00 | $6,222,335.45 |
| 120732 | 39.845 | Ohio | Hamilton | Individual | Loveland, City of | HAM CR 299 6.81 Loveland Madeira | Loveland Madeira Rd (CR 299) from West Loveland Ave to just past the intersection with Valley View Ln. | Reconstruct Loveland Madeira Rd (CR 299) from West Loveland Ave to Valley View Ln by improving access management, adding sidewalk on the southeast side and a multi-use path on the northwest, and improving the intersection of Loveland Madeira Rd and Valley | Intersection Improvement (Safety) | Exempt | 2028 | CO | 5 | MPO CMAQ | $3,982,733.65 | $6,222,335.45 |
| 120732 | 39.846 | Ohio | Hamilton | Individual | Loveland, City of | HAM CR 299 6.81 Loveland Madeira | Loveland Madeira Rd (CR 299) from West Loveland Ave to just past the intersection with Valley View Ln. | Reconstruct Loveland Madeira Rd (CR 299) from West Loveland Ave to Valley View Ln by improving access management, adding sidewalk on the southeast side and a multi-use path on the northwest, and improving the intersection of Loveland Madeira Rd and Valley | Intersection Improvement (Safety) | Exempt | 2028 | CO | 6 | Labor | $352,900.45 | $6,222,335.45 |
| 120732 | 39.847 | Ohio | Hamilton | Individual | Loveland, City of | HAM CR 299 6.81 Loveland Madeira | Loveland Madeira Rd (CR 299) from West Loveland Ave to just past the intersection with Valley View Ln. | Reconstruct Loveland Madeira Rd (CR 299) from West Loveland Ave to Valley View Ln by improving access management, adding sidewalk on the southeast side and a multi-use path on the northwest, and improving the intersection of Loveland Madeira Rd and Valley | Intersection Improvement (Safety) | Exempt | 2028 | CO | 7 | Local | $1,058,701.35 | $6,222,335.45 |
| 120734 | 39.848 | Ohio | Warren | Individual | Lebanon, City of | WAR SR 63 5.36 | SR 63 from the western Lebanon city limits to just west of Neil Armstrong Way. | The project consists of widening SR 63 to three lanes from east of McClure to west of Neil Armstrong Way . Includes Curb and Gutter, storm sewers, shared use path on the north side and bridge replacement (SFN 8301565) and roundabout at Markey and SR 63. | Roadway Improvement (Safety) | Exempt | 2027 | CO | 5 | MPO STBG | $5,721,104.00 | $9,329,293.07 |
| 120734 | 39.849 | Ohio | Warren | Individual | Lebanon, City of | WAR SR 63 5.36 | SR 63 from the western Lebanon city limits to just west of Neil Armstrong Way. | The project consists of widening SR 63 to three lanes from east of McClure to west of Neil Armstrong Way . Includes Curb and Gutter, storm sewers, shared use path on the north side and bridge replacement (SFN 8301565) and roundabout at Markey and SR 63. | Roadway Improvement (Safety) | Exempt | 2027 | CO | 6 | Labor | $610,327.58 | $9,329,293.07 |
| 120734 | 39.850 | Ohio | Warren | Individual | Lebanon, City of | WAR SR 63 5.36 | SR 63 from the western Lebanon city limits to just west of Neil Armstrong Way. | The project consists of widening SR 63 to three lanes from east of McClure to west of Neil Armstrong Way . Includes Curb and Gutter, storm sewers, shared use path on the north side and bridge replacement (SFN 8301565) and roundabout at Markey and SR 63. | Roadway Improvement (Safety) | Exempt | 2027 | CO | 7 | Local | $2,997,861.49 | $9,329,293.07 |
| 120771 | 39.851 | Ohio | Butler | Individual | Butler County TID | BUT NW Washington/W. Elkton/N. B | 1000' south of W Elkton Street and NW Washington Blvd., 600' west of NW Washington and W Elkton, 600' north of Woodrow | Convert two intersections to roundabouts along West Elkton Road between NW Washington Street and West B street, and add sidewalk and multi-use path. | Roadway Minor Rehab | Exempt | 2026 | DD | 1 | Discretionary / Earmark | $1,880.80 | $7,131,365.32 |
| 120771 | 39.852 | Ohio | Butler | Individual | Butler County TID | BUT NW Washington/W. Elkton/N. B | 1000' south of W Elkton Street and NW Washington Blvd., 600' west of NW Washington and W Elkton, 600' north of Woodrow | Convert two intersections to roundabouts along West Elkton Road between NW Washington Street and West B street, and add sidewalk and multi-use path. | Roadway Minor Rehab | Exempt | 2026 | DD | 2 | Local | $83,827.20 | $7,131,365.32 |
| 120771 | 39.853 | Ohio | Butler | Individual | Butler County TID | BUT NW Washington/W. Elkton/N. B | 1000' south of W Elkton Street and NW Washington Blvd., 600' west of NW Washington and W Elkton, 600' north of Woodrow | Convert two intersections to roundabouts along West Elkton Road between NW Washington Street and West B street, and add sidewalk and multi-use path. | Roadway Minor Rehab | Exempt | 2026 | RW | 3 | MPO STBG | $35,550.00 | $7,131,365.32 |
| 120771 | 40.061 | Ohio | Butler | Individual | Butler County TID | BUT NW Washington/W. Elkton/N. B | 1000' south of W Elkton Street and NW Washington Blvd., 600' west of NW Washington and W Elkton, 600' north of Woodrow | Convert two intersections to roundabouts along West Elkton Road between NW Washington Street and West B street, and add sidewalk and multi-use path. | Roadway Minor Rehab | Exempt | 2026 | RW | 4 | Local | $9,450.00 | $7,131,365.32 |
| 120771 | 40.062 | Ohio | Butler | Individual | Butler County TID | BUT NW Washington/W. Elkton/N. B | 1000' south of W Elkton Street and NW Washington Blvd., 600' west of NW Washington and W Elkton, 600' north of Woodrow | Convert two intersections to roundabouts along West Elkton Road between NW Washington Street and West B street, and add sidewalk and multi-use path. | Roadway Minor Rehab | Exempt | 2027 | CO | 5 | MPO STBG | $4,669,175.17 | $7,131,365.32 |
| 120771 | 40.063 | Ohio | Butler | Individual | Butler County TID | BUT NW Washington/W. Elkton/N. B | 1000' south of W Elkton Street and NW Washington Blvd., 600' west of NW Washington and W Elkton, 600' north of Woodrow | Convert two intersections to roundabouts along West Elkton Road between NW Washington Street and West B street, and add sidewalk and multi-use path. | Roadway Minor Rehab | Exempt | 2027 | CO | 6 | Local | $1,241,173.15 | $7,131,365.32 |
| 120782 | 36.007 | Ohio | HAM | Group | Cincinnati, City of | HAM CR 163 1.87 WNB Corridor | Westwood Northern Boulevard: from Beekman Street to Boudinot Avenue (City corp. line) | Development of the Westwood Northern Boulevard Corridor Plan, a comprehensive corridor study including planning, environmental, engineering and design, public engagement, and preconstruction activities. Focused on improvements to address safety for traffi | Safety Related Studies | Exempt | 2026 | ENV | 0 | Discretionary / Earmark | $2,275,000.00 | $2,275,000.00 |
| 120802 | 36.008 | Ohio | HAM | Group | District 8 Engineering | HAM IR 74 0.00 Cable | I-74 from Indiana state line to I-275 | Install median cable barrier on I-74 from the Indiana State Line to I-275. | Roadside / Median Improvement (Safety) | Exempt | 2026 | CO | 0 | Safety | $1,292,596.32 | $1,588,600.00 |
| 120802 | 36.009 | Ohio | HAM | Group | District 8 Engineering | HAM IR 74 0.00 Cable | I-74 from Indiana state line to I-275 | Install median cable barrier on I-74 from the Indiana State Line to I-275. | Roadside / Median Improvement (Safety) | Exempt | 2026 | CO | 0 | State | $36,558.34 | $1,588,600.00 |
| 120802 | 36.010 | Ohio | HAM | Group | District 8 Engineering | HAM IR 74 0.00 Cable | I-74 from Indiana state line to I-275 | Install median cable barrier on I-74 from the Indiana State Line to I-275. | Roadside / Median Improvement (Safety) | Exempt | 2026 | CO | 0 | Labor | $93,045.34 | $1,588,600.00 |
| 120803 | 40.064 | Ohio | Warren | Individual | District 8 Engineering | WAR SR 48 24.63 | SR-48 and Lytle Five Points Rd | Convert the existing signalized intersection of SR-48 and Lytle Five Points Rd to a single lane roundabout. | Intersection Improvement (Safety) | Exempt | 2027 | DD | 1 | Safety | $71,789.00 | $4,275,911.00 |
| 120803 | 40.065 | Ohio | Warren | Individual | District 8 Engineering | WAR SR 48 24.63 | SR-48 and Lytle Five Points Rd | Convert the existing signalized intersection of SR-48 and Lytle Five Points Rd to a single lane roundabout. | Intersection Improvement (Safety) | Exempt | 2027 | RW | 3 | Safety | $300,000.00 | $4,275,911.00 |
| 120803 | 40.066 | Ohio | Warren | Individual | District 8 Engineering | WAR SR 48 24.63 | SR-48 and Lytle Five Points Rd | Convert the existing signalized intersection of SR-48 and Lytle Five Points Rd to a single lane roundabout. | Intersection Improvement (Safety) | Exempt | 2028 | CO | 5 | Safety | $3,202,000.00 | $4,275,911.00 |
| 120803 | 40.067 | Ohio | Warren | Individual | District 8 Engineering | WAR SR 48 24.63 | SR-48 and Lytle Five Points Rd | Convert the existing signalized intersection of SR-48 and Lytle Five Points Rd to a single lane roundabout. | Intersection Improvement (Safety) | Exempt | 2028 | CO | 6 | Labor | $224,140.00 | $4,275,911.00 |
| 120804 | 39.854 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75/IR 275 Interchange | Interchange of I-75 and I-275; Northbound I-75 to Union Center Blvd | Evaluate interchange alternative improvements for the system-to-system interchange of IR-75 and IR-275. Alternatives should also consider additional capacity improvements from the interchange north to Union Centre Blvd. | Interchange Expansion | Non-Exempt (Analyzed) | 2026 | ENV | 1 | Major Programs | $4,440,794.40 | $96,147,125.00 |
| 120804 | 39.855 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75/IR 275 Interchange | Interchange of I-75 and I-275; Northbound I-75 to Union Center Blvd | Evaluate interchange alternative improvements for the system-to-system interchange of IR-75 and IR-275. Alternatives should also consider additional capacity improvements from the interchange north to Union Centre Blvd. | Interchange Expansion | Non-Exempt (Analyzed) | 2026 | ENV | 2 | State | $1,110,198.60 | $96,147,125.00 |
| 120850 | 39.856 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Cincinnati LickRun Connector | West: Dunham Rec Center trails; South: Rapid Run Park & Glenway Avenue; East: Existing path in the Lick Run Greenway | Construction of 2.4 miles of shared use path connecting Dunham Recreation Center trails, trails on Feguson and Glen Hills in Westwood, Glenway Avenue and Rapid Run Park in West Price Hill, to the existing paths in the Lick Run Greenway in South Fairmount | Shared Use Path | Exempt | 2026 | RW | 3 | MPO CMAQ | $120,000.00 | $10,812,578.00 |
| 120850 | 39.857 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Cincinnati LickRun Connector | West: Dunham Rec Center trails; South: Rapid Run Park & Glenway Avenue; East: Existing path in the Lick Run Greenway | Construction of 2.4 miles of shared use path connecting Dunham Recreation Center trails, trails on Feguson and Glen Hills in Westwood, Glenway Avenue and Rapid Run Park in West Price Hill, to the existing paths in the Lick Run Greenway in South Fairmount | Shared Use Path | Exempt | RW | 4 | Labor | $10,812,578.00 | ||
| 120850 | 39.858 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Cincinnati LickRun Connector | West: Dunham Rec Center trails; South: Rapid Run Park & Glenway Avenue; East: Existing path in the Lick Run Greenway | Construction of 2.4 miles of shared use path connecting Dunham Recreation Center trails, trails on Feguson and Glen Hills in Westwood, Glenway Avenue and Rapid Run Park in West Price Hill, to the existing paths in the Lick Run Greenway in South Fairmount | Shared Use Path | Exempt | 2026 | RW | 5 | Local | $30,000.00 | $10,812,578.00 |
| 120850 | 39.859 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Cincinnati LickRun Connector | West: Dunham Rec Center trails; South: Rapid Run Park & Glenway Avenue; East: Existing path in the Lick Run Greenway | Construction of 2.4 miles of shared use path connecting Dunham Recreation Center trails, trails on Feguson and Glen Hills in Westwood, Glenway Avenue and Rapid Run Park in West Price Hill, to the existing paths in the Lick Run Greenway in South Fairmount | Shared Use Path | Exempt | 2028 | CO | 6 | MPO CMAQ | $7,880,000.00 | $10,812,578.00 |
| 120850 | 39.860 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Cincinnati LickRun Connector | West: Dunham Rec Center trails; South: Rapid Run Park & Glenway Avenue; East: Existing path in the Lick Run Greenway | Construction of 2.4 miles of shared use path connecting Dunham Recreation Center trails, trails on Feguson and Glen Hills in Westwood, Glenway Avenue and Rapid Run Park in West Price Hill, to the existing paths in the Lick Run Greenway in South Fairmount | Shared Use Path | Exempt | 2028 | CO | 7 | Labor | $689,500.00 | $10,812,578.00 |
| 120850 | 39.861 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Cincinnati LickRun Connector | West: Dunham Rec Center trails; South: Rapid Run Park & Glenway Avenue; East: Existing path in the Lick Run Greenway | Construction of 2.4 miles of shared use path connecting Dunham Recreation Center trails, trails on Feguson and Glen Hills in Westwood, Glenway Avenue and Rapid Run Park in West Price Hill, to the existing paths in the Lick Run Greenway in South Fairmount | Shared Use Path | Exempt | 2028 | CO | 8 | Local | $1,970,000.00 | $10,812,578.00 |
| 120858 | 39.862 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Reading & Asmann Sidewalk | Reading Road: from Asmann Avenue north for approximately 550'; Asmann Avenue from Reading Road east for approximately 700 feet | Construction of sidewalk on the east side of Reading Road from Asmann Avenue north to existing sidewalk, and along the north side of Asmann Avenue from Reading Road to the east, where it will tie into sidewalk being constructed by a developer. | Pedestrian Facilities | Exempt | 2026 | RW | 3 | MPO TA | $56,000.00 | $1,332,600.00 |
| 120858 | 39.863 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Reading & Asmann Sidewalk | Reading Road: from Asmann Avenue north for approximately 550'; Asmann Avenue from Reading Road east for approximately 700 feet | Construction of sidewalk on the east side of Reading Road from Asmann Avenue north to existing sidewalk, and along the north side of Asmann Avenue from Reading Road to the east, where it will tie into sidewalk being constructed by a developer. | Pedestrian Facilities | Exempt | 2026 | RW | 4 | Local | $14,000.00 | $1,332,600.00 |
| 120858 | 39.864 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Reading & Asmann Sidewalk | Reading Road: from Asmann Avenue north for approximately 550'; Asmann Avenue from Reading Road east for approximately 700 feet | Construction of sidewalk on the east side of Reading Road from Asmann Avenue north to existing sidewalk, and along the north side of Asmann Avenue from Reading Road to the east, where it will tie into sidewalk being constructed by a developer. | Pedestrian Facilities | Exempt | 2027 | CO | 5 | MPO TA | $944,000.00 | $1,332,600.00 |
| 120858 | 39.865 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Reading & Asmann Sidewalk | Reading Road: from Asmann Avenue north for approximately 550'; Asmann Avenue from Reading Road east for approximately 700 feet | Construction of sidewalk on the east side of Reading Road from Asmann Avenue north to existing sidewalk, and along the north side of Asmann Avenue from Reading Road to the east, where it will tie into sidewalk being constructed by a developer. | Pedestrian Facilities | Exempt | 2027 | CO | 6 | Local | $318,600.00 | $1,332,600.00 |
| 120861 | 39.866 | Ohio | Hamilton | Individual | Colerain Township (Hamilton County) | HAM CR 96 3.92-Sidewalk | Springdale Road from Poole Road to the elementary and middle schools just west of Yellowwood Drive. | Construction of sidewalk on both sides of Springdale Road from Poole Road to the elementary and middle schools just west of Yellowwood Drive. | Pedestrian Facilities | Exempt | 2026 | RW | 3 | MPO TA | $67,487.00 | $1,041,572.00 |
| 120861 | 39.867 | Ohio | Hamilton | Individual | Colerain Township (Hamilton County) | HAM CR 96 3.92-Sidewalk | Springdale Road from Poole Road to the elementary and middle schools just west of Yellowwood Drive. | Construction of sidewalk on both sides of Springdale Road from Poole Road to the elementary and middle schools just west of Yellowwood Drive. | Pedestrian Facilities | Exempt | 2026 | RW | 4 | Local | $67,487.00 | $1,041,572.00 |
| 120861 | 39.868 | Ohio | Hamilton | Individual | Colerain Township (Hamilton County) | HAM CR 96 3.92-Sidewalk | Springdale Road from Poole Road to the elementary and middle schools just west of Yellowwood Drive. | Construction of sidewalk on both sides of Springdale Road from Poole Road to the elementary and middle schools just west of Yellowwood Drive. | Pedestrian Facilities | Exempt | 2027 | CO | 5 | MPO TA | $334,556.00 | $1,041,572.00 |
| 120861 | 39.869 | Ohio | Hamilton | Individual | Colerain Township (Hamilton County) | HAM CR 96 3.92-Sidewalk | Springdale Road from Poole Road to the elementary and middle schools just west of Yellowwood Drive. | Construction of sidewalk on both sides of Springdale Road from Poole Road to the elementary and middle schools just west of Yellowwood Drive. | Pedestrian Facilities | Exempt | 2026 | CO | 6 | Labor | $82,418.00 | $1,041,572.00 |
| 120861 | 39.870 | Ohio | Hamilton | Individual | Colerain Township (Hamilton County) | HAM CR 96 3.92-Sidewalk | Springdale Road from Poole Road to the elementary and middle schools just west of Yellowwood Drive. | Construction of sidewalk on both sides of Springdale Road from Poole Road to the elementary and middle schools just west of Yellowwood Drive. | Pedestrian Facilities | Exempt | 2027 | CO | 7 | Local | $489,624.00 | $1,041,572.00 |
| 120878 | 39.871 | Ohio | Butler | Individual | Fairfield, City of | BUT GMRT Fairfield Extension | Existing Great Miami River Trail terminus at Waterworks Park south to the existing trail network in Marsh Park | Construction of shared use path from the current Great Miami River Trail (GMRT) at Waterworks Park, south to the existing trail network in Marsh Park. | Shared Use Path | Exempt | 2027 | CO | 6 | MPO TA | $800,634.25 | $1,717,444.34 |
| 120878 | 39.872 | Ohio | Butler | Individual | Fairfield, City of | BUT GMRT Fairfield Extension | Existing Great Miami River Trail terminus at Waterworks Park south to the existing trail network in Marsh Park | Construction of shared use path from the current Great Miami River Trail (GMRT) at Waterworks Park, south to the existing trail network in Marsh Park. | Shared Use Path | Exempt | 2027 | CO | 7 | Local | $905,677.09 | $1,717,444.34 |
| 120879 | 39.873 | Ohio | Butler | Individual | Fairfield, City of | BUT US 127 0.61 Pleasant Ave | Pleasant Avenue (US 127) from Hunter Road to Wessel Drive | Construction of multi-use path along Pleasant Avenue (US 127) from Hunter Road to Wessel Drive. | Shared Use Path | Exempt | 2027 | CO | 6 | MPO CMAQ | $1,912,119.00 | $5,664,443.01 |
| 120879 | 39.874 | Ohio | Butler | Individual | Fairfield, City of | BUT US 127 0.61 Pleasant Ave | Pleasant Avenue (US 127) from Hunter Road to Wessel Drive | Construction of multi-use path along Pleasant Avenue (US 127) from Hunter Road to Wessel Drive. | Shared Use Path | Exempt | 2027 | CO | 7 | Local | $3,673,900.01 | $5,664,443.01 |
| 120924 | 36.011 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 29.49 - Ramp | HAM-US 50-29.49 - Ramp from Redbank Road to US-50 | Repair erosion/slide at the ramp from Redbank Road to US-50 caused by meandering stream. Repair headwalls of two conduits at the ramp location. | Geologic Maintenance / Slide Repair | Exempt | 2026 | ENV | 0 | State | $152,356.00 | $1,079,856.00 |
| 120924 | 36.012 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 29.49 - Ramp | HAM-US 50-29.49 - Ramp from Redbank Road to US-50 | Repair erosion/slide at the ramp from Redbank Road to US-50 caused by meandering stream. Repair headwalls of two conduits at the ramp location. | Geologic Maintenance / Slide Repair | Exempt | 2026 | DD | 0 | Preservation | $100,000.00 | $1,079,856.00 |
| 120924 | 36.013 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 29.49 - Ramp | HAM-US 50-29.49 - Ramp from Redbank Road to US-50 | Repair erosion/slide at the ramp from Redbank Road to US-50 caused by meandering stream. Repair headwalls of two conduits at the ramp location. | Geologic Maintenance / Slide Repair | Exempt | 2026 | DD | 0 | State | $25,000.00 | $1,079,856.00 |
| 120924 | 36.014 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 29.49 - Ramp | HAM-US 50-29.49 - Ramp from Redbank Road to US-50 | Repair erosion/slide at the ramp from Redbank Road to US-50 caused by meandering stream. Repair headwalls of two conduits at the ramp location. | Geologic Maintenance / Slide Repair | Exempt | 2029 | CO | 0 | Preservation | $600,000.00 | $1,079,856.00 |
| 120924 | 36.015 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 29.49 - Ramp | HAM-US 50-29.49 - Ramp from Redbank Road to US-50 | Repair erosion/slide at the ramp from Redbank Road to US-50 caused by meandering stream. Repair headwalls of two conduits at the ramp location. | Geologic Maintenance / Slide Repair | Exempt | 2029 | CO | 0 | State | $150,000.00 | $1,079,856.00 |
| 120924 | 36.408 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 29.49 - Ramp | HAM-US 50-29.49 - Ramp from Redbank Road to US-50 | Repair erosion/slide at the ramp from Redbank Road to US-50 caused by meandering stream. Repair headwalls of two conduits at the ramp location. | Geologic Maintenance / Slide Repair | Exempt | 2029 | CO | 0 | Labor | $52,500.00 | $1,079,856.00 |
| 120978 | 36.409 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 CS FY2029 | TBD | District wide crack sealing in FY2029 | Pavement Maintenance | Exempt | 2029 | CO | 0 | Preservation | $640,000.00 | $856,000.00 |
| 120978 | 36.410 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 CS FY2029 | TBD | District wide crack sealing in FY2029 | Pavement Maintenance | Exempt | 2029 | CO | 0 | State | $160,000.00 | $856,000.00 |
| 120978 | 36.411 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 CS FY2029 | TBD | District wide crack sealing in FY2029 | Pavement Maintenance | Exempt | 2029 | CO | 0 | Labor | $56,000.00 | $856,000.00 |
| 120995 | 36.412 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 15.68 | HAM SR 126: SLM 15.68-19.41 | Resurfacing a portion of SR 126 in Hamilton County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Preservation | $2,624,887.32 | $3,481,903.00 |
| 120995 | 36.413 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 15.68 | HAM SR 126: SLM 15.68-19.41 | Resurfacing a portion of SR 126 in Hamilton County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | State | $656,221.83 | $3,481,903.00 |
| 120995 | 36.414 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 15.68 | HAM SR 126: SLM 15.68-19.41 | Resurfacing a portion of SR 126 in Hamilton County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Labor | $131,240.85 | $3,481,903.00 |
| 120997 | 36.415 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 128 5.67 | HAM SR 128: SLM 5.62-10.71 | Resurfacing on a portion of SR 128 in Hamilton County | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Preservation | $1,104,400.00 | $1,435,720.00 |
| 120997 | 36.416 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 128 5.67 | HAM SR 128: SLM 5.62-10.71 | Resurfacing on a portion of SR 128 in Hamilton County | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | State | $276,100.00 | $1,435,720.00 |
| 120997 | 36.417 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 128 5.67 | HAM SR 128: SLM 5.62-10.71 | Resurfacing on a portion of SR 128 in Hamilton County | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Labor | $55,220.00 | $1,435,720.00 |
| 121004 | 36.418 | Ohio | HAM | Group | Cincinnati, City of | HAM SR 125 1.85 | HAM SR 125: SLM 1.85-3.05 | FY2027 Urban Paving in the City of Cincinnati on a portion of SR 125 | Roadway Minor Rehab | Exempt | 2026 | ENV | 0 | Labor | $92,435.00 | $2,411,629.00 |
| 121004 | 36.419 | Ohio | HAM | Group | Cincinnati, City of | HAM SR 125 1.85 | HAM SR 125: SLM 1.85-3.05 | FY2027 Urban Paving in the City of Cincinnati on a portion of SR 125 | Roadway Minor Rehab | Exempt | 2026 | DD | 0 | Labor | $16,312.00 | $2,411,629.00 |
| 121004 | 36.420 | Ohio | HAM | Group | Cincinnati, City of | HAM SR 125 1.85 | HAM SR 125: SLM 1.85-3.05 | FY2027 Urban Paving in the City of Cincinnati on a portion of SR 125 | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | Preservation | $1,066,148.80 | $2,411,629.00 |
| 121004 | 36.421 | Ohio | HAM | Group | Cincinnati, City of | HAM SR 125 1.85 | HAM SR 125: SLM 1.85-3.05 | FY2027 Urban Paving in the City of Cincinnati on a portion of SR 125 | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | Labor | $170,584.00 | $2,411,629.00 |
| 121004 | 36.422 | Ohio | HAM | Group | Cincinnati, City of | HAM SR 125 1.85 | HAM SR 125: SLM 1.85-3.05 | FY2027 Urban Paving in the City of Cincinnati on a portion of SR 125 | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | Local | $1,066,149.20 | $2,411,629.00 |
| 121005 | 36.423 | Ohio | HAM | Group | Cincinnati, City of | HAM SR 4 0.00 | HAM SR 4: SLM 0-2.02 | FY2028 Urban Paving in the City of Cincinnati on a portion of SR 4 in Hamilton County | Roadway Minor Rehab | Exempt | 2027 | ENV | 0 | Labor | $83,007.00 | $3,248,600.00 |
| 121005 | 36.424 | Ohio | HAM | Group | Cincinnati, City of | HAM SR 4 0.00 | HAM SR 4: SLM 0-2.02 | FY2028 Urban Paving in the City of Cincinnati on a portion of SR 4 in Hamilton County | Roadway Minor Rehab | Exempt | 2027 | DD | 0 | Labor | $14,661.00 | $3,248,600.00 |
| 121005 | 36.425 | Ohio | HAM | Group | Cincinnati, City of | HAM SR 4 0.00 | HAM SR 4: SLM 0-2.02 | FY2028 Urban Paving in the City of Cincinnati on a portion of SR 4 in Hamilton County | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Preservation | $1,458,764.80 | $3,248,600.00 |
| 121005 | 36.426 | Ohio | HAM | Group | Cincinnati, City of | HAM SR 4 0.00 | HAM SR 4: SLM 0-2.02 | FY2028 Urban Paving in the City of Cincinnati on a portion of SR 4 in Hamilton County | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Labor | $233,402.00 | $3,248,600.00 |
| 121005 | 36.427 | Ohio | HAM | Group | Cincinnati, City of | HAM SR 4 0.00 | HAM SR 4: SLM 0-2.02 | FY2028 Urban Paving in the City of Cincinnati on a portion of SR 4 in Hamilton County | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Local | $1,458,765.20 | $3,248,600.00 |
| 121006 | 36.428 | Ohio | BUT | Group | Monroe, City of | BUT SR 4 15.31 | BUT SR 4: SLM 15.28-17.76 | FY2028 Urban Paving in the City of Monroe on a portion of SR 4. | Roadway Minor Rehab | Exempt | 2027 | ENV | 0 | Labor | $141,440.00 | $6,544,741.00 |
| 121006 | 36.429 | Ohio | BUT | Group | Monroe, City of | BUT SR 4 15.31 | BUT SR 4: SLM 15.28-17.76 | FY2028 Urban Paving in the City of Monroe on a portion of SR 4. | Roadway Minor Rehab | Exempt | 2027 | DD | 0 | Labor | $24,960.00 | $6,544,741.00 |
| 121006 | 36.430 | Ohio | BUT | Group | Monroe, City of | BUT SR 4 15.31 | BUT SR 4: SLM 15.28-17.76 | FY2028 Urban Paving in the City of Monroe on a portion of SR 4. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Preservation | $2,952,936.00 | $6,544,741.00 |
| 121006 | 36.431 | Ohio | BUT | Group | Monroe, City of | BUT SR 4 15.31 | BUT SR 4: SLM 15.28-17.76 | FY2028 Urban Paving in the City of Monroe on a portion of SR 4. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Labor | $472,469.00 | $6,544,741.00 |
| 121006 | 36.432 | Ohio | BUT | Group | Monroe, City of | BUT SR 4 15.31 | BUT SR 4: SLM 15.28-17.76 | FY2028 Urban Paving in the City of Monroe on a portion of SR 4. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Local | $2,952,936.00 | $6,544,741.00 |
| 121010 | 36.433 | Ohio | WAR | Group | ODNR | WAR Ceasar Creek FY2029 | Ceasar Creek State Park - Camprgrounds Phase I | ODNR project to resurface sections within Ceasar Creek State Park. Resurfacing of campgrounds (Phase I). | Parks | Exempt | 2029 | CO | 0 | State | $1,200,000.00 | $1,344,000.00 |
| 121010 | 36.434 | Ohio | WAR | Group | ODNR | WAR Ceasar Creek FY2029 | Ceasar Creek State Park - Camprgrounds Phase I | ODNR project to resurface sections within Ceasar Creek State Park. Resurfacing of campgrounds (Phase I). | Parks | Exempt | 2029 | CO | 0 | Labor | $144,000.00 | $1,344,000.00 |
| 121040 | 36.435 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Tunnel Maint FY29-30 | HAM-71: Lytle Tunnel | Routine Maintenance on the Lytle Tunnel in FY2029 + FY2030 | Bridge / Culvert Maintenance | Exempt | 2029 | OTH | 0 | State | $300,000.00 | $600,000.00 |
| 121041 | 36.436 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Tunnel Insp FY29-30 | Lytle Tunnel (structure HAM-71-0134) | Project to Inspect and maintain the Lytle Tunnel (Structure HAM-71-0134) that passes I-71 under Lytle Park in downtown Cincinnati. Includes NTIS inspection, routine excercising of ventilation, standpipe, air quality sensors, fire detection systems, draina | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | State | $200,000.00 | $350,000.00 |
| 121077 | 39.875 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM CR 457 19.68 Structure Demo | Properties at 1445, 1457, and 1501 Harrison Avenue in Cincinnati, OH | Demolition of structures at 1445, 1457, and 1501 Harrison Avenue in Cincinnati. Sites were acquired as part of the Western Hills Viaduct project (PID 105349) and get removed for construction of the western approach roadways to the new viaduct. | Building Demolition | Exempt | 2026 | CO | 6 | MPO STBG | $757,749.20 | $957,573.50 |
| 121077 | 39.876 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM CR 457 19.68 Structure Demo | Properties at 1445, 1457, and 1501 Harrison Avenue in Cincinnati, OH | Demolition of structures at 1445, 1457, and 1501 Harrison Avenue in Cincinnati. Sites were acquired as part of the Western Hills Viaduct project (PID 105349) and get removed for construction of the western approach roadways to the new viaduct. | Building Demolition | Exempt | 2026 | CO | 7 | Local | $189,437.30 | $957,573.50 |
| 121240 | 36.437 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 SIGNS FY2026 | Various locations in D8. TBD | FY2026 Sign replacement project on IR-74 from the state line to Dry Fork Interchange (0.00-3.68) and IR-275 from the Clermont County line to Five Mile Rd interchange (35.07-37.60). Sign truss installations at HAM-74-15.60, HAM-275-0.05, and HAM-275-17.17. | Traffic Control (Safety) | Exempt | 2026 | CO | 0 | Preservation | $634,432.50 | $697,880.00 |
| 121240 | 36.438 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 SIGNS FY2026 | Various locations in D8. TBD | FY2026 Sign replacement project on IR-74 from the state line to Dry Fork Interchange (0.00-3.68) and IR-275 from the Clermont County line to Five Mile Rd interchange (35.07-37.60). Sign truss installations at HAM-74-15.60, HAM-275-0.05, and HAM-275-17.17. | Traffic Control (Safety) | Exempt | 2026 | CO | 0 | Labor | $63,447.50 | $697,880.00 |
| 121305 | 36.439 | Ohio | HAM | Group | Cincinnati, City of | HAM US 27 2.38 Central Pkwy Impr | Central Parkway from Ezzard Charles to Liberty | Project will improve pedestrian facilities in the corridor using complete street strategies. Project includes implementation of a road diet, installation of curb bump outs, installation of bike lanes, landscaping, and new signals along Central Parkway fro | Pedestrian Facilities | Exempt | 2028 | CO | 0 | Discretionary / Earmark | $4,116,279.00 | $25,790,110.49 |
| 121305 | 36.440 | Ohio | HAM | Group | Cincinnati, City of | HAM US 27 2.38 Central Pkwy Impr | Central Parkway from Ezzard Charles to Liberty | Project will improve pedestrian facilities in the corridor using complete street strategies. Project includes implementation of a road diet, installation of curb bump outs, installation of bike lanes, landscaping, and new signals along Central Parkway fro | Pedestrian Facilities | Exempt | 2028 | CO | 0 | Local | $21,673,831.49 | $25,790,110.49 |
| 121406 | 36.441 | Ohio | BUT, WAR | Group | ODOT Sponsoring Agency | BUT/WAR IR 75 7.04/0.00 Long Jts | BUT IR 75 and WAR IR 75 | GAP project in FY2027 for longitudinal joints repairs on IR 75 in Butler and Warren Counties | Pavement Maintenance | Exempt | 2026 | ENV | 0 | Labor | $121,440.00 | $4,140,390.00 |
| 121406 | 36.442 | Ohio | BUT, WAR | Group | ODOT Sponsoring Agency | BUT/WAR IR 75 7.04/0.00 Long Jts | BUT IR 75 and WAR IR 75 | GAP project in FY2027 for longitudinal joints repairs on IR 75 in Butler and Warren Counties | Pavement Maintenance | Exempt | 2026 | DD | 0 | Labor | $24,960.00 | $4,140,390.00 |
| 121406 | 36.443 | Ohio | BUT, WAR | Group | ODOT Sponsoring Agency | BUT/WAR IR 75 7.04/0.00 Long Jts | BUT IR 75 and WAR IR 75 | GAP project in FY2027 for longitudinal joints repairs on IR 75 in Butler and Warren Counties | Pavement Maintenance | Exempt | 2027 | CO | 0 | Preservation | $3,381,300.00 | $4,140,390.00 |
| 121406 | 36.444 | Ohio | BUT, WAR | Group | ODOT Sponsoring Agency | BUT/WAR IR 75 7.04/0.00 Long Jts | BUT IR 75 and WAR IR 75 | GAP project in FY2027 for longitudinal joints repairs on IR 75 in Butler and Warren Counties | Pavement Maintenance | Exempt | 2027 | CO | 0 | State | $375,700.00 | $4,140,390.00 |
| 121406 | 36.445 | Ohio | BUT, WAR | Group | ODOT Sponsoring Agency | BUT/WAR IR 75 7.04/0.00 Long Jts | BUT IR 75 and WAR IR 75 | GAP project in FY2027 for longitudinal joints repairs on IR 75 in Butler and Warren Counties | Pavement Maintenance | Exempt | 2027 | CO | 0 | Labor | $236,990.00 | $4,140,390.00 |
| 121407 | 36.446 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 GR Replace FY28 | Locations TBD | District wide guardrail improvement in District 8 | Guardrail / Roadside Maintenance | Exempt | 2027 | RW | 0 | State | $300,000.00 | $3,600,000.00 |
| 121407 | 36.447 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 GR Replace FY28 | Locations TBD | District wide guardrail improvement in District 8 | Guardrail / Roadside Maintenance | Exempt | 2028 | CO | 0 | Preservation | $2,400,000.00 | $3,600,000.00 |
| 121407 | 36.448 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 GR Replace FY28 | Locations TBD | District wide guardrail improvement in District 8 | Guardrail / Roadside Maintenance | Exempt | 2028 | CO | 0 | State | $600,000.00 | $3,600,000.00 |
| 121407 | 36.449 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 GR Replace FY28 | Locations TBD | District wide guardrail improvement in District 8 | Guardrail / Roadside Maintenance | Exempt | 2028 | CO | 0 | Labor | $300,000.00 | $3,600,000.00 |
| 121408 | 36.450 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Noise Walls FY2029 | Locations TBD | Replace and rehabilitate noise wall panels which have been damaged throughout District 8. | Noise Wall | Exempt | 2029 | CO | 0 | Preservation | $4,000,000.00 | $5,350,000.00 |
| 121408 | 36.451 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Noise Walls FY2029 | Locations TBD | Replace and rehabilitate noise wall panels which have been damaged throughout District 8. | Noise Wall | Exempt | 2029 | CO | 0 | State | $1,000,000.00 | $5,350,000.00 |
| 121408 | 36.452 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Noise Walls FY2029 | Locations TBD | Replace and rehabilitate noise wall panels which have been damaged throughout District 8. | Noise Wall | Exempt | 2029 | CO | 0 | Labor | $350,000.00 | $5,350,000.00 |
| 121423 | 39.877 | Ohio | Warren | Individual | ODOT Sponsoring Agency | WAR US 22 3.57 | From 500 feet south to intersection with Old 3C highway. | Project to replace and widen bridge WAR-22-0357 (SFN 8300062) that carries US 22 over Bear Run. A left turn lane will be added on EB US-22 at Old 3C Highway. | Bridge Preservation | Exempt | 2027 | DD | 3 | Preservation | $160,000.00 | $6,439,965.00 |
| 121423 | 39.878 | Ohio | Warren | Individual | ODOT Sponsoring Agency | WAR US 22 3.57 | From 500 feet south to intersection with Old 3C highway. | Project to replace and widen bridge WAR-22-0357 (SFN 8300062) that carries US 22 over Bear Run. A left turn lane will be added on EB US-22 at Old 3C Highway. | Bridge Preservation | Exempt | 2027 | DD | 2 | State | $40,000.00 | $6,439,965.00 |
| 121423 | 39.879 | Ohio | Warren | Individual | ODOT Sponsoring Agency | WAR US 22 3.57 | From 500 feet south to intersection with Old 3C highway. | Project to replace and widen bridge WAR-22-0357 (SFN 8300062) that carries US 22 over Bear Run. A left turn lane will be added on EB US-22 at Old 3C Highway. | Bridge Preservation | Exempt | 2027 | RW | 3 | Safety | $27,000.00 | $6,439,965.00 |
| 121423 | 39.880 | Ohio | Warren | Individual | ODOT Sponsoring Agency | WAR US 22 3.57 | From 500 feet south to intersection with Old 3C highway. | Project to replace and widen bridge WAR-22-0357 (SFN 8300062) that carries US 22 over Bear Run. A left turn lane will be added on EB US-22 at Old 3C Highway. | Bridge Preservation | Exempt | 2028 | RW | 3 | Safety | $63,000.00 | $6,439,965.00 |
| 121423 | 39.881 | Ohio | Warren | Individual | ODOT Sponsoring Agency | WAR US 22 3.57 | From 500 feet south to intersection with Old 3C highway. | Project to replace and widen bridge WAR-22-0357 (SFN 8300062) that carries US 22 over Bear Run. A left turn lane will be added on EB US-22 at Old 3C Highway. | Bridge Preservation | Exempt | 2027 | RW | 4 | State | $3,000.00 | $6,439,965.00 |
| 121423 | 39.882 | Ohio | Warren | Individual | ODOT Sponsoring Agency | WAR US 22 3.57 | From 500 feet south to intersection with Old 3C highway. | Project to replace and widen bridge WAR-22-0357 (SFN 8300062) that carries US 22 over Bear Run. A left turn lane will be added on EB US-22 at Old 3C Highway. | Bridge Preservation | Exempt | 2028 | RW | 4 | State | $7,000.00 | $6,439,965.00 |
| 121423 | 39.883 | Ohio | Warren | Individual | ODOT Sponsoring Agency | WAR US 22 3.57 | From 500 feet south to intersection with Old 3C highway. | Project to replace and widen bridge WAR-22-0357 (SFN 8300062) that carries US 22 over Bear Run. A left turn lane will be added on EB US-22 at Old 3C Highway. | Bridge Preservation | Exempt | 2029 | CO | 5 | Preservation | $2,863,200.00 | $6,439,965.00 |
| 121423 | 39.884 | Ohio | Warren | Individual | ODOT Sponsoring Agency | WAR US 22 3.57 | From 500 feet south to intersection with Old 3C highway. | Project to replace and widen bridge WAR-22-0357 (SFN 8300062) that carries US 22 over Bear Run. A left turn lane will be added on EB US-22 at Old 3C Highway. | Bridge Preservation | Exempt | 2029 | CO | 6 | Safety | $1,624,500.00 | $6,439,965.00 |
| 121423 | 39.885 | Ohio | Warren | Individual | ODOT Sponsoring Agency | WAR US 22 3.57 | From 500 feet south to intersection with Old 3C highway. | Project to replace and widen bridge WAR-22-0357 (SFN 8300062) that carries US 22 over Bear Run. A left turn lane will be added on EB US-22 at Old 3C Highway. | Bridge Preservation | Exempt | 2029 | CO | 7 | State | $896,300.00 | $6,439,965.00 |
| 121423 | 39.886 | Ohio | Warren | Individual | ODOT Sponsoring Agency | WAR US 22 3.57 | From 500 feet south to intersection with Old 3C highway. | Project to replace and widen bridge WAR-22-0357 (SFN 8300062) that carries US 22 over Bear Run. A left turn lane will be added on EB US-22 at Old 3C Highway. | Bridge Preservation | Exempt | 2029 | CO | 8 | Labor | $376,880.00 | $6,439,965.00 |
| 121447 | 39.892 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 7.85 | IR 75 from SR 562 to Regina Greater Way; SR 562 from I 75 to Paddock Avenue | Phase 8D of the Mill Creek Expressway. Reconstruction and widening of I-75 from SR 562 to Regina Greater Way. Reconstruction of SR 562 from I 75 to the Paddock Avenue interchange. | Add Through Lane(s) | Non-Exempt (Analyzed) | 2027 | DBT | 10 | Garvee / SIB Repayments | $894,104.00 | $175,200,000.00 |
| 121447 | 39.893 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 7.85 | IR 75 from SR 562 to Regina Greater Way; SR 562 from I 75 to Paddock Avenue | Phase 8D of the Mill Creek Expressway. Reconstruction and widening of I-75 from SR 562 to Regina Greater Way. Reconstruction of SR 562 from I 75 to the Paddock Avenue interchange. | Add Through Lane(s) | Non-Exempt (Analyzed) | 2028 | DBT | 10 | Garvee / SIB Repayments | $1,090,770.00 | $175,200,000.00 |
| 121447 | 39.894 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 7.85 | IR 75 from SR 562 to Regina Greater Way; SR 562 from I 75 to Paddock Avenue | Phase 8D of the Mill Creek Expressway. Reconstruction and widening of I-75 from SR 562 to Regina Greater Way. Reconstruction of SR 562 from I 75 to the Paddock Avenue interchange. | Add Through Lane(s) | Non-Exempt (Analyzed) | 2029 | DBT | 10 | Garvee / SIB Repayments | $1,090,769.00 | $175,200,000.00 |
| 121447 | 41.572 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 7.85 | IR 75 from SR 562 to Regina Greater Way; SR 562 from I 75 to Paddock Avenue | Phase 8D of the Mill Creek Expressway. Reconstruction and widening of I-75 from SR 562 to Regina Greater Way. Reconstruction of SR 562 from I 75 to the Paddock Avenue interchange. | Add Through Lane(s) | Non-Exempt (Analyzed) | 2027 | CO | 1 | Garvee / SIB | $43,420,000.00 | $175,200,000.00 |
| 121447 | 41.573 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 7.85 | IR 75 from SR 562 to Regina Greater Way; SR 562 from I 75 to Paddock Avenue | Phase 8D of the Mill Creek Expressway. Reconstruction and widening of I-75 from SR 562 to Regina Greater Way. Reconstruction of SR 562 from I 75 to the Paddock Avenue interchange. | Add Through Lane(s) | Non-Exempt (Analyzed) | 2027 | CO | 2 | Major Programs | $24,820,000.00 | $175,200,000.00 |
| 121447 | 41.574 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 7.85 | IR 75 from SR 562 to Regina Greater Way; SR 562 from I 75 to Paddock Avenue | Phase 8D of the Mill Creek Expressway. Reconstruction and widening of I-75 from SR 562 to Regina Greater Way. Reconstruction of SR 562 from I 75 to the Paddock Avenue interchange. | Add Through Lane(s) | Non-Exempt (Analyzed) | 2027 | CO | 3 | National Highway Freight | $41,700,000.00 | $175,200,000.00 |
| 121447 | 41.575 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 7.85 | IR 75 from SR 562 to Regina Greater Way; SR 562 from I 75 to Paddock Avenue | Phase 8D of the Mill Creek Expressway. Reconstruction and widening of I-75 from SR 562 to Regina Greater Way. Reconstruction of SR 562 from I 75 to the Paddock Avenue interchange. | Add Through Lane(s) | Non-Exempt (Analyzed) | 2027 | CO | 4 | Preservation | $800,000.00 | $175,200,000.00 |
| 121447 | 41.576 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 7.85 | IR 75 from SR 562 to Regina Greater Way; SR 562 from I 75 to Paddock Avenue | Phase 8D of the Mill Creek Expressway. Reconstruction and widening of I-75 from SR 562 to Regina Greater Way. Reconstruction of SR 562 from I 75 to the Paddock Avenue interchange. | Add Through Lane(s) | Non-Exempt (Analyzed) | 2028 | CO | 4 | Preservation | $799,999.99 | $175,200,000.00 |
| 121447 | 41.577 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 7.85 | IR 75 from SR 562 to Regina Greater Way; SR 562 from I 75 to Paddock Avenue | Phase 8D of the Mill Creek Expressway. Reconstruction and widening of I-75 from SR 562 to Regina Greater Way. Reconstruction of SR 562 from I 75 to the Paddock Avenue interchange. | Add Through Lane(s) | Non-Exempt (Analyzed) | 2029 | CO | 4 | Preservation | $1,199,999.99 | $175,200,000.00 |
| 121447 | 41.578 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 7.85 | IR 75 from SR 562 to Regina Greater Way; SR 562 from I 75 to Paddock Avenue | Phase 8D of the Mill Creek Expressway. Reconstruction and widening of I-75 from SR 562 to Regina Greater Way. Reconstruction of SR 562 from I 75 to the Paddock Avenue interchange. | Add Through Lane(s) | Non-Exempt (Analyzed) | 2027 | CO | 5 | Bonds | $33,430,000.00 | $175,200,000.00 |
| 121447 | 41.579 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 7.85 | IR 75 from SR 562 to Regina Greater Way; SR 562 from I 75 to Paddock Avenue | Phase 8D of the Mill Creek Expressway. Reconstruction and widening of I-75 from SR 562 to Regina Greater Way. Reconstruction of SR 562 from I 75 to the Paddock Avenue interchange. | Add Through Lane(s) | Non-Exempt (Analyzed) | 2027 | CO | 6 | State | $16,830,000.01 | $175,200,000.00 |
| 121447 | 41.580 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 7.85 | IR 75 from SR 562 to Regina Greater Way; SR 562 from I 75 to Paddock Avenue | Phase 8D of the Mill Creek Expressway. Reconstruction and widening of I-75 from SR 562 to Regina Greater Way. Reconstruction of SR 562 from I 75 to the Paddock Avenue interchange. | Add Through Lane(s) | Non-Exempt (Analyzed) | 2028 | CO | 6 | State | $200,000.01 | $175,200,000.00 |
| 121447 | 41.581 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 7.85 | IR 75 from SR 562 to Regina Greater Way; SR 562 from I 75 to Paddock Avenue | Phase 8D of the Mill Creek Expressway. Reconstruction and widening of I-75 from SR 562 to Regina Greater Way. Reconstruction of SR 562 from I 75 to the Paddock Avenue interchange. | Add Through Lane(s) | Non-Exempt (Analyzed) | 2029 | CO | 6 | State | $300,000.00 | $175,200,000.00 |
| 121447 | 41.582 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 7.85 | IR 75 from SR 562 to Regina Greater Way; SR 562 from I 75 to Paddock Avenue | Phase 8D of the Mill Creek Expressway. Reconstruction and widening of I-75 from SR 562 to Regina Greater Way. Reconstruction of SR 562 from I 75 to the Paddock Avenue interchange. | Add Through Lane(s) | Non-Exempt (Analyzed) | 2027 | CO | 7 | Labor | $11,200,000.00 | $175,200,000.00 |
| 121471 | 36.453 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 52 35.22 | HAM US 52: 35.216-40.066 | GAP project in FY2026 for joints repairs on US 52 in Hamilton County | Pavement Maintenance | Exempt | 2026 | CO | 0 | Preservation | $795,806.47 | $1,129,490.00 |
| 121471 | 36.454 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 52 35.22 | HAM US 52: 35.216-40.066 | GAP project in FY2026 for joints repairs on US 52 in Hamilton County | Pavement Maintenance | Exempt | 2026 | CO | 0 | State | $198,951.62 | $1,129,490.00 |
| 121471 | 36.455 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 52 35.22 | HAM US 52: 35.216-40.066 | GAP project in FY2026 for joints repairs on US 52 in Hamilton County | Pavement Maintenance | Exempt | 2026 | CO | 0 | Labor | $69,631.91 | $1,129,490.00 |
| 121472 | 36.456 | Ohio | HAM, CLE | Group | ODOT Sponsoring Agency | HAM/CLE US 52 35.22/0.00 | HAM US 52: 35.216-40.066 and CLE US 52: 0-2.768 | GAP project in FY2027 for joints repairs on US 52 in Hamilton and Clermont Counties | Pavement Maintenance | Exempt | 2026 | ENV | 0 | Labor | $55,335.00 | $901,100.00 |
| 121472 | 36.457 | Ohio | HAM, CLE | Group | ODOT Sponsoring Agency | HAM/CLE US 52 35.22/0.00 | HAM US 52: 35.216-40.066 and CLE US 52: 0-2.768 | GAP project in FY2027 for joints repairs on US 52 in Hamilton and Clermont Counties | Pavement Maintenance | Exempt | 2026 | DD | 0 | Labor | $9,765.00 | $901,100.00 |
| 121472 | 36.458 | Ohio | HAM, CLE | Group | ODOT Sponsoring Agency | HAM/CLE US 52 35.22/0.00 | HAM US 52: 35.216-40.066 and CLE US 52: 0-2.768 | GAP project in FY2027 for joints repairs on US 52 in Hamilton and Clermont Counties | Pavement Maintenance | Exempt | 2027 | CO | 0 | Preservation | $608,000.00 | $901,100.00 |
| 121472 | 36.459 | Ohio | HAM, CLE | Group | ODOT Sponsoring Agency | HAM/CLE US 52 35.22/0.00 | HAM US 52: 35.216-40.066 and CLE US 52: 0-2.768 | GAP project in FY2027 for joints repairs on US 52 in Hamilton and Clermont Counties | Pavement Maintenance | Exempt | 2027 | CO | 0 | State | $152,000.00 | $901,100.00 |
| 121472 | 36.460 | Ohio | HAM, CLE | Group | ODOT Sponsoring Agency | HAM/CLE US 52 35.22/0.00 | HAM US 52: 35.216-40.066 and CLE US 52: 0-2.768 | GAP project in FY2027 for joints repairs on US 52 in Hamilton and Clermont Counties | Pavement Maintenance | Exempt | 2027 | CO | 0 | Labor | $76,000.00 | $901,100.00 |
| 121473 | 36.461 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 75 3.20 | HAM IR 75: SLM 3.20 - 3.22 | Repair and reconstruction of approximately 250 ft. of roadway embankment along I-75 southbound between the Hopple Street entrance ramp and Marshall Avenue to stabilize the slope. | Geologic Maintenance / Slide Repair | Exempt | 2026 | DD | 0 | State | $168,736.00 | $1,880,736.00 |
| 121473 | 36.462 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 75 3.20 | HAM IR 75: SLM 3.20 - 3.22 | Repair and reconstruction of approximately 250 ft. of roadway embankment along I-75 southbound between the Hopple Street entrance ramp and Marshall Avenue to stabilize the slope. | Geologic Maintenance / Slide Repair | Exempt | 2028 | CO | 0 | Other | $1,440,000.00 | $1,880,736.00 |
| 121473 | 36.463 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 75 3.20 | HAM IR 75: SLM 3.20 - 3.22 | Repair and reconstruction of approximately 250 ft. of roadway embankment along I-75 southbound between the Hopple Street entrance ramp and Marshall Avenue to stabilize the slope. | Geologic Maintenance / Slide Repair | Exempt | 2028 | CO | 0 | State | $160,000.00 | $1,880,736.00 |
| 121473 | 36.464 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 75 3.20 | HAM IR 75: SLM 3.20 - 3.22 | Repair and reconstruction of approximately 250 ft. of roadway embankment along I-75 southbound between the Hopple Street entrance ramp and Marshall Avenue to stabilize the slope. | Geologic Maintenance / Slide Repair | Exempt | 2028 | CO | 0 | Labor | $112,000.00 | $1,880,736.00 |
| 121506 | 36.465 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 11.40 | HAM IR 275: SLM 11.42 | Slope stabilization along a portion of IR 275 in Hamilton County. Replace small culverts HAM-275-1144 (1997091), and HAM-275-1146 (1800207). | Geologic Maintenance / Slide Repair | Exempt | 2026 | ENV | 0 | State | $155,807.00 | $3,355,616.00 |
| 121506 | 36.466 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 11.40 | HAM IR 275: SLM 11.42 | Slope stabilization along a portion of IR 275 in Hamilton County. Replace small culverts HAM-275-1144 (1997091), and HAM-275-1146 (1800207). | Geologic Maintenance / Slide Repair | Exempt | 2026 | DD | 0 | Preservation | $36,000.00 | $3,355,616.00 |
| 121506 | 36.467 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 11.40 | HAM IR 275: SLM 11.42 | Slope stabilization along a portion of IR 275 in Hamilton County. Replace small culverts HAM-275-1144 (1997091), and HAM-275-1146 (1800207). | Geologic Maintenance / Slide Repair | Exempt | 2026 | DD | 0 | State | $4,000.00 | $3,355,616.00 |
| 121506 | 36.468 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 11.40 | HAM IR 275: SLM 11.42 | Slope stabilization along a portion of IR 275 in Hamilton County. Replace small culverts HAM-275-1144 (1997091), and HAM-275-1146 (1800207). | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | PROTECT | $2,270,024.00 | $3,355,616.00 |
| 121506 | 36.469 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 11.40 | HAM IR 275: SLM 11.42 | Slope stabilization along a portion of IR 275 in Hamilton County. Replace small culverts HAM-275-1144 (1997091), and HAM-275-1146 (1800207). | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | State | $567,506.00 | $3,355,616.00 |
| 121506 | 36.470 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 275 11.40 | HAM IR 275: SLM 11.42 | Slope stabilization along a portion of IR 275 in Hamilton County. Replace small culverts HAM-275-1144 (1997091), and HAM-275-1146 (1800207). | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | Labor | $198,627.00 | $3,355,616.00 |
| 121522 | 36.471 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 75 6.35 | HAM IR 275: SLM 29.3 | Repair and reconstruction of roadway embankment along IR 75 ramp from Mitchell interchange | Geologic Maintenance / Slide Repair | Exempt | 2028 | DD | 0 | Preservation | $240,000.00 | $7,138,889.00 |
| 121522 | 36.472 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 75 6.35 | HAM IR 275: SLM 29.3 | Repair and reconstruction of roadway embankment along IR 75 ramp from Mitchell interchange | Geologic Maintenance / Slide Repair | Exempt | 2028 | DD | 0 | State | $60,000.00 | $7,138,889.00 |
| 121522 | 36.473 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 75 6.35 | HAM IR 275: SLM 29.3 | Repair and reconstruction of roadway embankment along IR 75 ramp from Mitchell interchange | Geologic Maintenance / Slide Repair | Exempt | 2029 | RW | 0 | Preservation | $240,000.00 | $7,138,889.00 |
| 121522 | 36.474 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 75 6.35 | HAM IR 275: SLM 29.3 | Repair and reconstruction of roadway embankment along IR 75 ramp from Mitchell interchange | Geologic Maintenance / Slide Repair | Exempt | 2029 | RW | 0 | State | $60,000.00 | $7,138,889.00 |
| 121527 | 36.475 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 126 0.30 | CLE SR 126: SLM 0.3-0.5 | Repair and reconstruction of roadway embankment along SR 126 in Clermont County due to a landslide. | Geologic Maintenance / Slide Repair | Exempt | 2027 | DD | 0 | State | $150,000.00 | $1,805,000.00 |
| 121527 | 36.476 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 126 0.30 | CLE SR 126: SLM 0.3-0.5 | Repair and reconstruction of roadway embankment along SR 126 in Clermont County due to a landslide. | Geologic Maintenance / Slide Repair | Exempt | 2028 | RW | 0 | State | $50,000.00 | $1,805,000.00 |
| 121527 | 36.477 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 126 0.30 | CLE SR 126: SLM 0.3-0.5 | Repair and reconstruction of roadway embankment along SR 126 in Clermont County due to a landslide. | Geologic Maintenance / Slide Repair | Exempt | 2029 | CO | 0 | Preservation | $1,200,000.00 | $1,805,000.00 |
| 121527 | 36.478 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 126 0.30 | CLE SR 126: SLM 0.3-0.5 | Repair and reconstruction of roadway embankment along SR 126 in Clermont County due to a landslide. | Geologic Maintenance / Slide Repair | Exempt | 2029 | CO | 0 | State | $300,000.00 | $1,805,000.00 |
| 121527 | 36.479 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 126 0.30 | CLE SR 126: SLM 0.3-0.5 | Repair and reconstruction of roadway embankment along SR 126 in Clermont County due to a landslide. | Geologic Maintenance / Slide Repair | Exempt | 2029 | CO | 0 | Labor | $105,000.00 | $1,805,000.00 |
| 121571 | 36.480 | Ohio | D07, D08 | Group | ODOT Sponsoring Agency | D07/D08 GES Task Order FY29/30 | District 7 & District 8 Design Task Order for FY29-30 | District 7 and District 8 Design Task Order for FY2029-2030 | General Engineering | Exempt | 2029 | ENV | 0 | State | $750,000.00 | $1,500,000.00 |
| 121735 | 36.481 | Ohio | HAM | Group | Cincinnati, City of | HAM CR 163 5.5 Hopple St Bridge | Spring Grove Ave. and Mill Creek | maintenance and major preventative project on Hopple Street Bridge (SFN 3136337) | Bridge / Culvert Maintenance | Exempt | 2026 | ENV | 0 | Local Programs | $427,500.00 | $10,459,997.66 |
| 121735 | 36.482 | Ohio | HAM | Group | Cincinnati, City of | HAM CR 163 5.5 Hopple St Bridge | Spring Grove Ave. and Mill Creek | maintenance and major preventative project on Hopple Street Bridge (SFN 3136337) | Bridge / Culvert Maintenance | Exempt | 2026 | ENV | 0 | Local | $22,500.00 | $10,459,997.66 |
| 121735 | 36.483 | Ohio | HAM | Group | Cincinnati, City of | HAM CR 163 5.5 Hopple St Bridge | Spring Grove Ave. and Mill Creek | maintenance and major preventative project on Hopple Street Bridge (SFN 3136337) | Bridge / Culvert Maintenance | Exempt | 2027 | CO | 0 | Local Programs | $9,040,000.00 | $10,459,997.66 |
| 121735 | 36.484 | Ohio | HAM | Group | Cincinnati, City of | HAM CR 163 5.5 Hopple St Bridge | Spring Grove Ave. and Mill Creek | maintenance and major preventative project on Hopple Street Bridge (SFN 3136337) | Bridge / Culvert Maintenance | Exempt | 2026 | CO | 0 | Local | $494,208.19 | $10,459,997.66 |
| 121735 | 36.485 | Ohio | HAM | Group | Cincinnati, City of | HAM CR 163 5.5 Hopple St Bridge | Spring Grove Ave. and Mill Creek | maintenance and major preventative project on Hopple Street Bridge (SFN 3136337) | Bridge / Culvert Maintenance | Exempt | 2027 | CO | 0 | Local | $475,789.47 | $10,459,997.66 |
| 121740 | 36.486 | Ohio | HAM | Group | Hamilton County Engineer | HAM CR 235 5.60 Sharon Rd Bridge | Bridge HAM-CR 235-5.60 (SFN: 3138011) carrying Sharon Road over a Norfolk Southern RR yard and Sharon Creek. | Rehabilitation of the Sharon Road Bridge (SFN 3138011) over a Norfolk Southern RR yard and Sharon Creek. | Bridge / Culvert Maintenance | Exempt | 2027 | CO | 0 | Local Programs | $592,449.00 | $649,000.00 |
| 121740 | 36.487 | Ohio | HAM | Group | Hamilton County Engineer | HAM CR 235 5.60 Sharon Rd Bridge | Bridge HAM-CR 235-5.60 (SFN: 3138011) carrying Sharon Road over a Norfolk Southern RR yard and Sharon Creek. | Rehabilitation of the Sharon Road Bridge (SFN 3138011) over a Norfolk Southern RR yard and Sharon Creek. | Bridge / Culvert Maintenance | Exempt | 2027 | CO | 0 | Local | $56,551.00 | $649,000.00 |
| 121828 | 39.895 | Ohio | Butler | Individual | Fairfield, City of | BUT Fairfield EV Chargers FY26 | varies | Project includes installation of electric vehicle charging infrastructure stations at the Fairfield Community Art Center, Fairfield Justice Center, Fairfield Lane Library, Harbin Park and Waterworks Park. | Emission Reduction | Exempt | 2026 | CO | 6 | MPO CRP | $570,916.00 | $639,012.00 |
| 121828 | 39.896 | Ohio | Butler | Individual | Fairfield, City of | BUT Fairfield EV Chargers FY26 | varies | Project includes installation of electric vehicle charging infrastructure stations at the Fairfield Community Art Center, Fairfield Justice Center, Fairfield Lane Library, Harbin Park and Waterworks Park. | Emission Reduction | Exempt | 2026 | CO | 7 | Local | $68,096.00 | $639,012.00 |
| 121829 | 39.897 | Ohio | Butler | Individual | Metroparks of Butler County | BUT MetroPark EV Charger FY26 | Voice of America Park | installation of (1) EV charging station at VOA MetroPark | Emission Reduction | Exempt | 2026 | ENV | 1 | MPO CRP | $36,300.00 | $113,213.00 |
| 121829 | 39.898 | Ohio | Butler | Individual | Metroparks of Butler County | BUT MetroPark EV Charger FY26 | Voice of America Park | installation of (1) EV charging station at VOA MetroPark | Emission Reduction | Exempt | 2026 | DD | 2 | MPO CRP | $18,700.00 | $113,213.00 |
| 121829 | 39.899 | Ohio | Butler | Individual | Metroparks of Butler County | BUT MetroPark EV Charger FY26 | Voice of America Park | installation of (1) EV charging station at VOA MetroPark | Emission Reduction | Exempt | 2026 | CO | 6 | MPO CRP | $58,213.00 | $113,213.00 |
| 121830 | 39.900 | Ohio | Hamilton | Individual | Anderson Township (Hamilton County) | HAM Anderson EV Charger FY26 | Anderson Center | installation of two EV charging stations at Anderson Center in Anderson Township | Emission Reduction | Exempt | 2026 | CO | 6 | MPO CRP | $50,753.00 | $55,828.30 |
| 121830 | 40.073 | Ohio | Hamilton | Individual | Anderson Township (Hamilton County) | HAM Anderson EV Charger FY26 | Anderson Center | installation of two EV charging stations at Anderson Center in Anderson Township | Emission Reduction | Exempt | 2026 | CO | 7 | Labor | $5,075.30 | $55,828.30 |
| 121831 | 40.074 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Mt. Washington EV Charger | Mt. Washington Neighborhood Business District | Installation of one EV charging station in Mt. Washington Neighborhood Business District | Emission Reduction | Exempt | 2026 | CO | 6 | MPO CRP | $196,000.00 | $232,350.00 |
| 121831 | 40.075 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Mt. Washington EV Charger | Mt. Washington Neighborhood Business District | Installation of one EV charging station in Mt. Washington Neighborhood Business District | Emission Reduction | Exempt | 2026 | CO | 7 | Local | $36,350.00 | $232,350.00 |
| 121832 | 40.076 | Ohio | Hamilton | Individual | Forest Park, City of | HAM Forest Park EV Charger FY26 | City of Forest Park Municipal Campus | installation of EV Charging stations at the City of Forest Park Municipal Campus | Emission Reduction | Exempt | 2026 | DD | 1 | MPO CRP | $7,000.00 | $34,954.31 |
| 121832 | 40.077 | Ohio | Hamilton | Individual | Forest Park, City of | HAM Forest Park EV Charger FY26 | City of Forest Park Municipal Campus | installation of EV Charging stations at the City of Forest Park Municipal Campus | Emission Reduction | Exempt | 2026 | CO | 6 | MPO CRP | $25,413.00 | $34,954.31 |
| 121832 | 40.078 | Ohio | Hamilton | Individual | Forest Park, City of | HAM Forest Park EV Charger FY26 | City of Forest Park Municipal Campus | installation of EV Charging stations at the City of Forest Park Municipal Campus | Emission Reduction | Exempt | 2026 | CO | 7 | Local | $2,541.31 | $34,954.31 |
| 121837 | 40.079 | Ohio | Butler | Individual | Trenton, City of | BUT Trenton EV Charger FY26 | City of Trenton City Hall | installation of three EV charging stations in the City of Trenton | Emission Reduction | Exempt | 2026 | DD | 1 | MPO CRP | $8,000.00 | $59,199.50 |
| 121837 | 41.583 | Ohio | Butler | Individual | Trenton, City of | BUT Trenton EV Charger FY26 | City of Trenton City Hall | installation of three EV charging stations in the City of Trenton | Emission Reduction | Exempt | 2026 | CO | 5 | MPO CRP | $46,545.00 | $141,100.00 |
| 121837 | 41.584 | Ohio | Butler | Individual | Trenton, City of | BUT Trenton EV Charger FY26 | City of Trenton City Hall | installation of three EV charging stations in the City of Trenton | Emission Reduction | Exempt | 2026 | CO | 6 | Local | $86,555.00 | $141,100.00 |
| 121859 | 36.488 | Ohio | HAM | Group | Cincinnati, City of | HAM UC Traffic Calming FY25 | City of Cincinnati | Install concrete speed cushions on Jefferson Ave, MLK Dr, and Clifton Ave near the University of Cincinnati. | Traffic Control (Safety) | Exempt | 2026 | CO | 0 | State | $154,019.50 | $169,421.45 |
| 121859 | 36.489 | Ohio | HAM | Group | Cincinnati, City of | HAM UC Traffic Calming FY25 | City of Cincinnati | Install concrete speed cushions on Jefferson Ave, MLK Dr, and Clifton Ave near the University of Cincinnati. | Traffic Control (Safety) | Exempt | 2026 | CO | 0 | Local | $15,401.95 | $169,421.45 |
| 121860 | 36.490 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR US 22 2.60 | Both intersections of US-22 & Old 3C. | Install concrete islands to restrict left turns on Old 3C Highway at both US-22 intersections. At the eastern junction, improve turning radius. | Intersection Improvement (Safety) | Exempt | 2027 | CO | 0 | Safety | $405,000.00 | $495,000.00 |
| 121860 | 36.491 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR US 22 2.60 | Both intersections of US-22 & Old 3C. | Install concrete islands to restrict left turns on Old 3C Highway at both US-22 intersections. At the eastern junction, improve turning radius. | Intersection Improvement (Safety) | Exempt | 2027 | CO | 0 | State | $45,000.00 | $495,000.00 |
| 121860 | 36.492 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR US 22 2.60 | Both intersections of US-22 & Old 3C. | Install concrete islands to restrict left turns on Old 3C Highway at both US-22 intersections. At the eastern junction, improve turning radius. | Intersection Improvement (Safety) | Exempt | 2027 | CO | 0 | Labor | $45,000.00 | $495,000.00 |
| 121896 | 36.493 | Ohio | BUT | Group | Butler County Engineer | BUT TR 21 0.00 | Hamilton Mason Rd from SR747 to 375' east of Quail Run Dr | Widen Hamilton Mason Rd between SR747 & 375' east of Quail Run Dr to provide 11' lanes and 2' shoulders. Project also includes removal of fixed objects, vertical profile adjustments and a left turn lane at Van Gorden Rd. | Roadway Improvement (Safety) | Exempt | 2027 | CO | 0 | Safety | $2,852,583.30 | $4,239,257.00 |
| 121896 | 36.494 | Ohio | BUT | Group | Butler County Engineer | BUT TR 21 0.00 | Hamilton Mason Rd from SR747 to 375' east of Quail Run Dr | Widen Hamilton Mason Rd between SR747 & 375' east of Quail Run Dr to provide 11' lanes and 2' shoulders. Project also includes removal of fixed objects, vertical profile adjustments and a left turn lane at Van Gorden Rd. | Roadway Improvement (Safety) | Exempt | 2027 | CO | 0 | Local | $1,386,673.70 | $4,239,257.00 |
| 121898 | 36.495 | Ohio | HAM | Group | Cincinnati, City of | HAM Cincinnati Crossings FY26 | City of Cincinnati | Install 7 raised crosswalks in the City of Cincinnati. | Enhanced Crossing | Exempt | 2026 | CO | 0 | Safety | $1,457,327.16 | $1,619,252.40 |
| 121898 | 36.496 | Ohio | HAM | Group | Cincinnati, City of | HAM Cincinnati Crossings FY26 | City of Cincinnati | Install 7 raised crosswalks in the City of Cincinnati. | Enhanced Crossing | Exempt | 2026 | CO | 0 | Local | $161,925.24 | $1,619,252.40 |
| 121899 | 40.082 | Ohio | Clermont | Individual | Loveland, City of | CLE/WAR SR 48 6.65 Sidewalk | CLE-48-6.65 to WAR-48-0.47 | Install sidewalk on SR48 in the City of Loveland. | Pedestrian Facilities | Exempt | 2026 | DD | 1 | Safety | $32,537.70 | $4,580,037.33 |
| 121899 | 40.083 | Ohio | Clermont | Individual | Loveland, City of | CLE/WAR SR 48 6.65 Sidewalk | CLE-48-6.65 to WAR-48-0.47 | Install sidewalk on SR48 in the City of Loveland. | Pedestrian Facilities | Exempt | 2026 | DD | 2 | Local | $3,615.30 | $4,580,037.33 |
| 121899 | 40.084 | Ohio | Clermont | Individual | Loveland, City of | CLE/WAR SR 48 6.65 Sidewalk | CLE-48-6.65 to WAR-48-0.47 | Install sidewalk on SR48 in the City of Loveland. | Pedestrian Facilities | Exempt | 2026 | RW | 3 | Safety | $53,577.00 | $4,580,037.33 |
| 121899 | 40.085 | Ohio | Clermont | Individual | Loveland, City of | CLE/WAR SR 48 6.65 Sidewalk | CLE-48-6.65 to WAR-48-0.47 | Install sidewalk on SR48 in the City of Loveland. | Pedestrian Facilities | Exempt | 2027 | RW | 3 | Safety | $180,000.00 | $4,580,037.33 |
| 121899 | 40.086 | Ohio | Clermont | Individual | Loveland, City of | CLE/WAR SR 48 6.65 Sidewalk | CLE-48-6.65 to WAR-48-0.47 | Install sidewalk on SR48 in the City of Loveland. | Pedestrian Facilities | Exempt | 2026 | RW | 4 | Local | $5,953.00 | $4,580,037.33 |
| 121899 | 40.087 | Ohio | Clermont | Individual | Loveland, City of | CLE/WAR SR 48 6.65 Sidewalk | CLE-48-6.65 to WAR-48-0.47 | Install sidewalk on SR48 in the City of Loveland. | Pedestrian Facilities | Exempt | 2027 | RW | 4 | Local | $20,000.00 | $4,580,037.33 |
| 121899 | 40.088 | Ohio | Clermont | Individual | Loveland, City of | CLE/WAR SR 48 6.65 Sidewalk | CLE-48-6.65 to WAR-48-0.47 | Install sidewalk on SR48 in the City of Loveland. | Pedestrian Facilities | Exempt | 2028 | CO | 6 | MPO TA | $761,242.95 | $4,580,037.33 |
| 121899 | 40.089 | Ohio | Clermont | Individual | Loveland, City of | CLE/WAR SR 48 6.65 Sidewalk | CLE-48-6.65 to WAR-48-0.47 | Install sidewalk on SR48 in the City of Loveland. | Pedestrian Facilities | Exempt | 2028 | CO | 7 | Safety | $1,266,022.80 | $4,580,037.33 |
| 121899 | 40.090 | Ohio | Clermont | Individual | Loveland, City of | CLE/WAR SR 48 6.65 Sidewalk | CLE-48-6.65 to WAR-48-0.47 | Install sidewalk on SR48 in the City of Loveland. | Pedestrian Facilities | Exempt | 2028 | CO | 8 | Labor | $261,263.00 | $4,580,037.33 |
| 121899 | 40.091 | Ohio | Clermont | Individual | Loveland, City of | CLE/WAR SR 48 6.65 Sidewalk | CLE-48-6.65 to WAR-48-0.47 | Install sidewalk on SR48 in the City of Loveland. | Pedestrian Facilities | Exempt | 2028 | CO | 9 | Local | $1,705,071.25 | $4,580,037.33 |
| 121926 | 40.092 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 275 28.69 | HAM IR 275 from US 42 to IR 71 | Reduce congestion on I-275 eastbound by constructing a braided roadway from Reed Hartman Highway to I-71, separating traffic heading to I-71 from traffic using I-275 eastbound. | Roadway Improvement (Safety) | Non-Exempt (Analyzed) | 2027 | RW | 3 | Major Programs | $184,000.00 | $52,392,532.00 |
| 121926 | 40.093 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 275 28.69 | HAM IR 275 from US 42 to IR 71 | Reduce congestion on I-275 eastbound by constructing a braided roadway from Reed Hartman Highway to I-71, separating traffic heading to I-71 from traffic using I-275 eastbound. | Roadway Improvement (Safety) | Non-Exempt (Analyzed) | 2027 | RW | 4 | State | $46,000.00 | $52,392,532.00 |
| 121932 | 36.497 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 VAR DMS & QWS Replacement | Various locations within District 8 | Replacement of dynamic message signs and queue warning signs at various locations in District 8. Installation of one new queue warning sign on I-675 SB north of Wilmington Pike. | Transport System Mgmt and Ops (TSMO) | Exempt | 2026 | CO | 0 | State | $9,278,000.00 | $10,540,334.00 |
| 121932 | 36.498 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 VAR DMS & QWS Replacement | Various locations within District 8 | Replacement of dynamic message signs and queue warning signs at various locations in District 8. Installation of one new queue warning sign on I-675 SB north of Wilmington Pike. | Transport System Mgmt and Ops (TSMO) | Exempt | 2026 | CO | 0 | Labor | $649,460.00 | $10,540,334.00 |
| 121949 | 36.499 | Ohio | HAM | Group | Cincinnati, City of | HAM Cincinnati APS FY27 | City of Cincinnati | Install accessible pedestrian signals along 3 corridors in the City of Cincinnati. | Enhanced Crossing | Exempt | 2027 | CO | 0 | Safety | $753,300.00 | $920,700.00 |
| 121949 | 36.500 | Ohio | HAM | Group | Cincinnati, City of | HAM Cincinnati APS FY27 | City of Cincinnati | Install accessible pedestrian signals along 3 corridors in the City of Cincinnati. | Enhanced Crossing | Exempt | 2027 | CO | 0 | Local | $167,400.00 | $920,700.00 |
| 121997 | 36.501 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 42 2.20 - Pt. 1 | HAM-42 2.2-2.5 | Part 1- Reconstruct the intersection of US-42, I-71 ramps and Elsinore Place. Part 2- Project to replace the wearing surface of bridge HAM-71-0233 that carries a ramp from US 42 to NB I-71 over I-71; bridge HAM-42-0235R which carries US 42 Northboun | Traffic Control (Safety) | Exempt | 2026 | DD | 0 | Safety | $45,421.20 | $4,383,778.00 |
| 121997 | 36.502 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 42 2.20 - Pt. 1 | HAM-42 2.2-2.5 | Part 1- Reconstruct the intersection of US-42, I-71 ramps and Elsinore Place. Part 2- Project to replace the wearing surface of bridge HAM-71-0233 that carries a ramp from US 42 to NB I-71 over I-71; bridge HAM-42-0235R which carries US 42 Northboun | Traffic Control (Safety) | Exempt | 2026 | DD | 0 | State | $5,046.80 | $4,383,778.00 |
| 121997 | 36.503 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 42 2.20 - Pt. 1 | HAM-42 2.2-2.5 | Part 1- Reconstruct the intersection of US-42, I-71 ramps and Elsinore Place. Part 2- Project to replace the wearing surface of bridge HAM-71-0233 that carries a ramp from US 42 to NB I-71 over I-71; bridge HAM-42-0235R which carries US 42 Northboun | Traffic Control (Safety) | Exempt | 2027 | CO | 0 | Preservation | $3,026,502.00 | $4,383,778.00 |
| 121997 | 36.504 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 42 2.20 - Pt. 1 | HAM-42 2.2-2.5 | Part 1- Reconstruct the intersection of US-42, I-71 ramps and Elsinore Place. Part 2- Project to replace the wearing surface of bridge HAM-71-0233 that carries a ramp from US 42 to NB I-71 over I-71; bridge HAM-42-0235R which carries US 42 Northboun | Traffic Control (Safety) | Exempt | 2027 | CO | 0 | Safety | $506,997.00 | $4,383,778.00 |
| 121997 | 36.505 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 42 2.20 - Pt. 1 | HAM-42 2.2-2.5 | Part 1- Reconstruct the intersection of US-42, I-71 ramps and Elsinore Place. Part 2- Project to replace the wearing surface of bridge HAM-71-0233 that carries a ramp from US 42 to NB I-71 over I-71; bridge HAM-42-0235R which carries US 42 Northboun | Traffic Control (Safety) | Exempt | 2027 | CO | 0 | State | $392,611.00 | $4,383,778.00 |
| 121997 | 36.506 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 42 2.20 - Pt. 1 | HAM-42 2.2-2.5 | Part 1- Reconstruct the intersection of US-42, I-71 ramps and Elsinore Place. Part 2- Project to replace the wearing surface of bridge HAM-71-0233 that carries a ramp from US 42 to NB I-71 over I-71; bridge HAM-42-0235R which carries US 42 Northboun | Traffic Control (Safety) | Exempt | 2027 | CO | 0 | Labor | $274,828.00 | $4,383,778.00 |
| 122012 | 36.016 | Ohio | BUT | Group | Butler County Engineer | BUT TR 118 McCauley Rd Rdbt | Intersection of West Chester Rd and McCauly Rd | Construct a roundabout at West Chester Rd and McCauly Rd. | Intersection Improvement (Safety) | Exempt | 2027 | CO | 0 | Safety | $1,038,645.00 | $1,146,557.00 |
| 122012 | 36.017 | Ohio | BUT | Group | Butler County Engineer | BUT TR 118 McCauley Rd Rdbt | Intersection of West Chester Rd and McCauly Rd | Construct a roundabout at West Chester Rd and McCauly Rd. | Intersection Improvement (Safety) | Exempt | 2027 | CO | 0 | Local | $107,912.00 | $1,146,557.00 |
| 122048 | 40.094 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 1.05 | HAM-75 between Linn - Findlay | Work includes the reconstruction of Linn Street over mainline 75 using the City of Cincinnati preferred typical section based on their street diet project on Linn Street. Work also includes Linn street approach work, W Court Street, Winchell Avenue, and | Add Through Lane(s) | Exempt | 2026 | CO | 6 | Bonds | $35,771,401.06 | $42,980,399.14 |
| 122048 | 40.095 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 1.05 | HAM-75 between Linn - Findlay | Work includes the reconstruction of Linn Street over mainline 75 using the City of Cincinnati preferred typical section based on their street diet project on Linn Street. Work also includes Linn street approach work, W Court Street, Winchell Avenue, and | Add Through Lane(s) | Exempt | 2026 | CO | 7 | State | $4,705,000.00 | $42,980,399.14 |
| 122048 | 40.096 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 1.05 | HAM-75 between Linn - Findlay | Work includes the reconstruction of Linn Street over mainline 75 using the City of Cincinnati preferred typical section based on their street diet project on Linn Street. Work also includes Linn street approach work, W Court Street, Winchell Avenue, and | Add Through Lane(s) | Exempt | 2026 | CO | 8 | Labor | $2,503,998.08 | $42,980,399.14 |
| 122120 | 36.018 | Ohio | BUT | Group | Butler County Engineer | BUT TR 72 1.30 Shurz Rd Bridge | Bridge BUT-TR 72-1.30 (SFN: 0933635): 0.05 miles north of Mill Rd. to approximately 0.15 miles north of Mill Rd. | Replacement of a deteriorating bridge (SFN 0933635) which carries Shurz Road over Elk Creek, with a structure type to be determined by the design-build team. | Bridge Preservation | Exempt | 2026 | DD | 0 | Local Programs | $249,876.60 | $2,107,639.32 |
| 122120 | 36.019 | Ohio | BUT | Group | Butler County Engineer | BUT TR 72 1.30 Shurz Rd Bridge | Bridge BUT-TR 72-1.30 (SFN: 0933635): 0.05 miles north of Mill Rd. to approximately 0.15 miles north of Mill Rd. | Replacement of a deteriorating bridge (SFN 0933635) which carries Shurz Road over Elk Creek, with a structure type to be determined by the design-build team. | Bridge Preservation | Exempt | 2026 | DD | 0 | Local | $13,151.40 | $2,107,639.32 |
| 122120 | 36.020 | Ohio | BUT | Group | Butler County Engineer | BUT TR 72 1.30 Shurz Rd Bridge | Bridge BUT-TR 72-1.30 (SFN: 0933635): 0.05 miles north of Mill Rd. to approximately 0.15 miles north of Mill Rd. | Replacement of a deteriorating bridge (SFN 0933635) which carries Shurz Road over Elk Creek, with a structure type to be determined by the design-build team. | Bridge Preservation | Exempt | 2026 | CO | 0 | Local Programs | $1,856,117.61 | $2,107,639.32 |
| 122120 | 36.021 | Ohio | BUT | Group | Butler County Engineer | BUT TR 72 1.30 Shurz Rd Bridge | Bridge BUT-TR 72-1.30 (SFN: 0933635): 0.05 miles north of Mill Rd. to approximately 0.15 miles north of Mill Rd. | Replacement of a deteriorating bridge (SFN 0933635) which carries Shurz Road over Elk Creek, with a structure type to be determined by the design-build team. | Bridge Preservation | Exempt | 2026 | CO | 0 | Local | $97,690.40 | $2,107,639.32 |
| 122217 | 36.022 | Ohio | BUT | Group | Butler County Engineer | BUT Dimmick-Irwin-Simpson RAB | 300' in each direction of the intersection of Butler Warren Rd and Dimmick Rd/Irwin Simpson Rd. | Project involves converting the existing All way stop controlled intersection to a single lane roundabout | Intersection Improvement (Safety) | Exempt | 2029 | CO | 0 | Local Programs | $1,485,063.62 | $1,856,329.52 |
| 122217 | 36.507 | Ohio | BUT | Group | Butler County Engineer | BUT Dimmick-Irwin-Simpson RAB | 300' in each direction of the intersection of Butler Warren Rd and Dimmick Rd/Irwin Simpson Rd. | Project involves converting the existing All way stop controlled intersection to a single lane roundabout | Intersection Improvement (Safety) | Exempt | 2029 | CO | 0 | Local | $371,265.90 | $1,856,329.52 |
| 122242 | 36.508 | Ohio | BUT | Group | Hamilton, City of | BUT Crawford Woods SRTS 2024 | Grand Blvd (CR-21): from SLM 0.00 (Parkamo Ave) to SLM 0.18 (Address 2505 Grand Blvd) | Construct sidewalk and ADA compliant pedestrian crossings along Grand Blvd (CR-21) in the City of Hamilton to improve access and safety to Crawford Woods Elementary School. | Pedestrian Facilities | Exempt | 2026 | DD | 0 | Local Programs | $24,575.00 | $591,814.00 |
| 122242 | 36.509 | Ohio | BUT | Group | Hamilton, City of | BUT Crawford Woods SRTS 2024 | Grand Blvd (CR-21): from SLM 0.00 (Parkamo Ave) to SLM 0.18 (Address 2505 Grand Blvd) | Construct sidewalk and ADA compliant pedestrian crossings along Grand Blvd (CR-21) in the City of Hamilton to improve access and safety to Crawford Woods Elementary School. | Pedestrian Facilities | Exempt | 2027 | CO | 0 | Local Programs | $399,026.00 | $591,814.00 |
| 122242 | 36.510 | Ohio | BUT | Group | Hamilton, City of | BUT Crawford Woods SRTS 2024 | Grand Blvd (CR-21): from SLM 0.00 (Parkamo Ave) to SLM 0.18 (Address 2505 Grand Blvd) | Construct sidewalk and ADA compliant pedestrian crossings along Grand Blvd (CR-21) in the City of Hamilton to improve access and safety to Crawford Woods Elementary School. | Pedestrian Facilities | Exempt | 2027 | CO | 0 | Local | $91,814.00 | $591,814.00 |
| 122246 | 36.511 | Ohio | D08 | Group | District 8-Maintenance | D08 Conduit Cleanout FY2025(C) | District wide culvert cleanout project | A statewide project to clean out culvert pipes through state contract 314-14 using PROTECT funding. | Bridge / Culvert Maintenance | Exempt | 2026 | OTH | 0 | State | $125,000.00 | $132,254.00 |
| 122252 | 36.512 | Ohio | BUT | Group | Fairfield Township (Butler County) | BUT Fairfield East SRTS 2024 | Morris Rd (TR-106): from SLM 1.91 to SLM 2.11 & Princeton Rd (CR-18): from SLM 0.51 to SLM 0.71 | Construct sidewalk and pedestrian crossings along Morris Rd (TR-106) and Princeton Rd (CR-18) in Fairfield Township to increase connectivity and safety at Fairfield East Elementary School. | Pedestrian Facilities | Exempt | 2026 | DD | 0 | Local Programs | $23,480.00 | $1,053,073.00 |
| 122252 | 36.513 | Ohio | BUT | Group | Fairfield Township (Butler County) | BUT Fairfield East SRTS 2024 | Morris Rd (TR-106): from SLM 1.91 to SLM 2.11 & Princeton Rd (CR-18): from SLM 0.51 to SLM 0.71 | Construct sidewalk and pedestrian crossings along Morris Rd (TR-106) and Princeton Rd (CR-18) in Fairfield Township to increase connectivity and safety at Fairfield East Elementary School. | Pedestrian Facilities | Exempt | DD | 0 | Labor | $1,053,073.00 | ||
| 122252 | 36.514 | Ohio | BUT | Group | Fairfield Township (Butler County) | BUT Fairfield East SRTS 2024 | Morris Rd (TR-106): from SLM 1.91 to SLM 2.11 & Princeton Rd (CR-18): from SLM 0.51 to SLM 0.71 | Construct sidewalk and pedestrian crossings along Morris Rd (TR-106) and Princeton Rd (CR-18) in Fairfield Township to increase connectivity and safety at Fairfield East Elementary School. | Pedestrian Facilities | Exempt | 2026 | RW | 0 | Local Programs | $35,000.00 | $1,053,073.00 |
| 122252 | 36.515 | Ohio | BUT | Group | Fairfield Township (Butler County) | BUT Fairfield East SRTS 2024 | Morris Rd (TR-106): from SLM 1.91 to SLM 2.11 & Princeton Rd (CR-18): from SLM 0.51 to SLM 0.71 | Construct sidewalk and pedestrian crossings along Morris Rd (TR-106) and Princeton Rd (CR-18) in Fairfield Township to increase connectivity and safety at Fairfield East Elementary School. | Pedestrian Facilities | Exempt | 2027 | RW | 0 | Local Programs | $25,000.00 | $1,053,073.00 |
| 122252 | 36.516 | Ohio | BUT | Group | Fairfield Township (Butler County) | BUT Fairfield East SRTS 2024 | Morris Rd (TR-106): from SLM 1.91 to SLM 2.11 & Princeton Rd (CR-18): from SLM 0.51 to SLM 0.71 | Construct sidewalk and pedestrian crossings along Morris Rd (TR-106) and Princeton Rd (CR-18) in Fairfield Township to increase connectivity and safety at Fairfield East Elementary School. | Pedestrian Facilities | Exempt | RW | 0 | Labor | $1,053,073.00 | ||
| 122252 | 36.517 | Ohio | BUT | Group | Fairfield Township (Butler County) | BUT Fairfield East SRTS 2024 | Morris Rd (TR-106): from SLM 1.91 to SLM 2.11 & Princeton Rd (CR-18): from SLM 0.51 to SLM 0.71 | Construct sidewalk and pedestrian crossings along Morris Rd (TR-106) and Princeton Rd (CR-18) in Fairfield Township to increase connectivity and safety at Fairfield East Elementary School. | Pedestrian Facilities | Exempt | 2028 | CO | 0 | Local Programs | $466,464.00 | $1,053,073.00 |
| 122252 | 36.518 | Ohio | BUT | Group | Fairfield Township (Butler County) | BUT Fairfield East SRTS 2024 | Morris Rd (TR-106): from SLM 1.91 to SLM 2.11 & Princeton Rd (CR-18): from SLM 0.51 to SLM 0.71 | Construct sidewalk and pedestrian crossings along Morris Rd (TR-106) and Princeton Rd (CR-18) in Fairfield Township to increase connectivity and safety at Fairfield East Elementary School. | Pedestrian Facilities | Exempt | 2028 | CO | 0 | Labor | $59,400.00 | $1,053,073.00 |
| 122252 | 36.519 | Ohio | BUT | Group | Fairfield Township (Butler County) | BUT Fairfield East SRTS 2024 | Morris Rd (TR-106): from SLM 1.91 to SLM 2.11 & Princeton Rd (CR-18): from SLM 0.51 to SLM 0.71 | Construct sidewalk and pedestrian crossings along Morris Rd (TR-106) and Princeton Rd (CR-18) in Fairfield Township to increase connectivity and safety at Fairfield East Elementary School. | Pedestrian Facilities | Exempt | 2028 | CO | 0 | Local | $127,536.00 | $1,053,073.00 |
| 122275 | 36.520 | Ohio | CLE | Group | Clermont County Engineer | CLE CR 107 1.31 Shayler Rd Rehab | 0.2 feet south and north of SFN 1358952 | Project involves rehabilitation of bridge SFN 1358952 along Shayler Road. | Bridge Preservation | Exempt | 2027 | CO | 0 | Local Programs | $409,312.00 | $562,800.00 |
| 122275 | 36.521 | Ohio | CLE | Group | Clermont County Engineer | CLE CR 107 1.31 Shayler Rd Rehab | 0.2 feet south and north of SFN 1358952 | Project involves rehabilitation of bridge SFN 1358952 along Shayler Road. | Bridge Preservation | Exempt | 2027 | CO | 0 | State | $40,928.00 | $562,800.00 |
| 122275 | 36.522 | Ohio | CLE | Group | Clermont County Engineer | CLE CR 107 1.31 Shayler Rd Rehab | 0.2 feet south and north of SFN 1358952 | Project involves rehabilitation of bridge SFN 1358952 along Shayler Road. | Bridge Preservation | Exempt | 2027 | CO | 0 | Local | $112,560.00 | $562,800.00 |
| 122278 | 36.523 | Ohio | D08 | Group | District 8-Maintenance | D08 Conduit Cleanout FY2025 (B) | District wide culvert cleanout project | A statewide project to clean out culvert pipes through state contract 314-14 using PROTECT funding. | Bridge / Culvert Maintenance | Exempt | 2026 | OTH | 0 | State | $67,408.00 | $96,254.00 |
| 122358 | 41.585 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 11.09 Part 2 | Existing railroad bridge at SLM 11.09 on southbound IR 75 in the Lockland split (phase 4 of TTV) | Part 2 project to TTV Phase 4. Construction of a portion of the ramp and CD system to and from Galbraith Road proposed as part of TTV Phase 5+ development, under the existing railroad bridge. Design funding for mod held in PID 117167. Part 1 of TTV Pha | New Roadway | Non-Exempt (Analyzed) | 2027 | DD | 1 | Major Programs | $189,889.60 | $1,835,452.00 |
| 122358 | 41.586 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 11.09 Part 2 | Existing railroad bridge at SLM 11.09 on southbound IR 75 in the Lockland split (phase 4 of TTV) | Part 2 project to TTV Phase 4. Construction of a portion of the ramp and CD system to and from Galbraith Road proposed as part of TTV Phase 5+ development, under the existing railroad bridge. Design funding for mod held in PID 117167. Part 1 of TTV Pha | New Roadway | Non-Exempt (Analyzed) | 2027 | DD | 2 | State | $47,472.40 | $1,835,452.00 |
| 122468 | 36.524 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT US 27 4.84 | BUT US 27: SLM 4.84-5.12 | Drainage improvements along BUT US 27 to improve existing flooding issues. | Geologic Maintenance / Slide Repair | Exempt | 2026 | RW | 0 | Preservation | $40,000.00 | $594,500.00 |
| 122468 | 36.525 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT US 27 4.84 | BUT US 27: SLM 4.84-5.12 | Drainage improvements along BUT US 27 to improve existing flooding issues. | Geologic Maintenance / Slide Repair | Exempt | 2026 | RW | 0 | State | $10,000.00 | $594,500.00 |
| 122468 | 36.526 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT US 27 4.84 | BUT US 27: SLM 4.84-5.12 | Drainage improvements along BUT US 27 to improve existing flooding issues. | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | Preservation | $36,000.00 | $594,500.00 |
| 122468 | 36.527 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT US 27 4.84 | BUT US 27: SLM 4.84-5.12 | Drainage improvements along BUT US 27 to improve existing flooding issues. | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | PROTECT | $360,000.00 | $594,500.00 |
| 122468 | 36.528 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT US 27 4.84 | BUT US 27: SLM 4.84-5.12 | Drainage improvements along BUT US 27 to improve existing flooding issues. | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | State | $99,000.00 | $594,500.00 |
| 122468 | 36.529 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT US 27 4.84 | BUT US 27: SLM 4.84-5.12 | Drainage improvements along BUT US 27 to improve existing flooding issues. | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | Labor | $49,500.00 | $594,500.00 |
| 122472 | 36.530 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 48 21.02 | SR 48: 0.24mi to 0.33mi north of Terrace Creek Ct | Install Rock Channel Protection along the rear abutment and southeast wingwall where the stream has meandered towards the WAR-48-2102 Structure that carries SR 48 over Clear Creek. | Bridge / Culvert Maintenance | Exempt | 2026 | ENV | 0 | State | $7,130.00 | $1,033,769.00 |
| 122472 | 36.531 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 48 21.02 | SR 48: 0.24mi to 0.33mi north of Terrace Creek Ct | Install Rock Channel Protection along the rear abutment and southeast wingwall where the stream has meandered towards the WAR-48-2102 Structure that carries SR 48 over Clear Creek. | Bridge / Culvert Maintenance | Exempt | 2027 | DD | 0 | Preservation | $40,000.00 | $1,033,769.00 |
| 122472 | 36.532 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 48 21.02 | SR 48: 0.24mi to 0.33mi north of Terrace Creek Ct | Install Rock Channel Protection along the rear abutment and southeast wingwall where the stream has meandered towards the WAR-48-2102 Structure that carries SR 48 over Clear Creek. | Bridge / Culvert Maintenance | Exempt | 2027 | DD | 0 | State | $10,000.00 | $1,033,769.00 |
| 122472 | 36.533 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 48 21.02 | SR 48: 0.24mi to 0.33mi north of Terrace Creek Ct | Install Rock Channel Protection along the rear abutment and southeast wingwall where the stream has meandered towards the WAR-48-2102 Structure that carries SR 48 over Clear Creek. | Bridge / Culvert Maintenance | Exempt | 2028 | CO | 0 | PROTECT | $640,000.00 | $1,033,769.00 |
| 122472 | 36.534 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 48 21.02 | SR 48: 0.24mi to 0.33mi north of Terrace Creek Ct | Install Rock Channel Protection along the rear abutment and southeast wingwall where the stream has meandered towards the WAR-48-2102 Structure that carries SR 48 over Clear Creek. | Bridge / Culvert Maintenance | Exempt | 2028 | CO | 0 | State | $160,000.00 | $1,033,769.00 |
| 122472 | 36.535 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 48 21.02 | SR 48: 0.24mi to 0.33mi north of Terrace Creek Ct | Install Rock Channel Protection along the rear abutment and southeast wingwall where the stream has meandered towards the WAR-48-2102 Structure that carries SR 48 over Clear Creek. | Bridge / Culvert Maintenance | Exempt | 2028 | CO | 0 | Labor | $80,000.00 | $1,033,769.00 |
| 122589 | 36.536 | Ohio | HAM | Group | Cincinnati, City of | HAM US 50/US 52 PROTECT | Columbia Parkway: site 1 is south of Beechmont and site 2 is at the Rookwood overpass | Stabilize landslides above retaining walls at two sites along Columbia Parkway. | Geologic Maintenance / Slide Repair | Exempt | 2026 | DD | 0 | Discretionary / Earmark | $16,000.00 | $1,991,651.45 |
| 122589 | 36.537 | Ohio | HAM | Group | Cincinnati, City of | HAM US 50/US 52 PROTECT | Columbia Parkway: site 1 is south of Beechmont and site 2 is at the Rookwood overpass | Stabilize landslides above retaining walls at two sites along Columbia Parkway. | Geologic Maintenance / Slide Repair | Exempt | 2026 | DD | 0 | Local | $4,000.00 | $1,991,651.45 |
| 122589 | 36.538 | Ohio | HAM | Group | Cincinnati, City of | HAM US 50/US 52 PROTECT | Columbia Parkway: site 1 is south of Beechmont and site 2 is at the Rookwood overpass | Stabilize landslides above retaining walls at two sites along Columbia Parkway. | Geologic Maintenance / Slide Repair | Exempt | 2026 | CO | 0 | Discretionary / Earmark | $566,000.00 | $1,991,651.45 |
| 122589 | 36.539 | Ohio | HAM | Group | Cincinnati, City of | HAM US 50/US 52 PROTECT | Columbia Parkway: site 1 is south of Beechmont and site 2 is at the Rookwood overpass | Stabilize landslides above retaining walls at two sites along Columbia Parkway. | Geologic Maintenance / Slide Repair | Exempt | 2026 | CO | 0 | Local | $1,287,758.95 | $1,991,651.45 |
| 122591 | 36.540 | Ohio | HAM | Group | Cincinnati, City of | HAM Faraday Rd PROTECT | Faraday Road: from Cass Avenue for approximately 800 feet to the southwest | Stabilize Faraday Road by piping and filling a ravine that parallels the road and has seen excessive erosion. | Geologic Maintenance / Slide Repair | Exempt | 2026 | DD | 0 | Discretionary / Earmark | $44,664.00 | $1,789,398.00 |
| 122591 | 36.541 | Ohio | HAM | Group | Cincinnati, City of | HAM Faraday Rd PROTECT | Faraday Road: from Cass Avenue for approximately 800 feet to the southwest | Stabilize Faraday Road by piping and filling a ravine that parallels the road and has seen excessive erosion. | Geologic Maintenance / Slide Repair | Exempt | 2026 | DD | 0 | Local | $11,166.00 | $1,789,398.00 |
| 122591 | 36.542 | Ohio | HAM | Group | Cincinnati, City of | HAM Faraday Rd PROTECT | Faraday Road: from Cass Avenue for approximately 800 feet to the southwest | Stabilize Faraday Road by piping and filling a ravine that parallels the road and has seen excessive erosion. | Geologic Maintenance / Slide Repair | Exempt | 2026 | RW | 0 | Discretionary / Earmark | $28,000.00 | $1,789,398.00 |
| 122591 | 36.543 | Ohio | HAM | Group | Cincinnati, City of | HAM Faraday Rd PROTECT | Faraday Road: from Cass Avenue for approximately 800 feet to the southwest | Stabilize Faraday Road by piping and filling a ravine that parallels the road and has seen excessive erosion. | Geologic Maintenance / Slide Repair | Exempt | 2026 | RW | 0 | Local | $7,000.00 | $1,789,398.00 |
| 122591 | 36.544 | Ohio | HAM | Group | Cincinnati, City of | HAM Faraday Rd PROTECT | Faraday Road: from Cass Avenue for approximately 800 feet to the southwest | Stabilize Faraday Road by piping and filling a ravine that parallels the road and has seen excessive erosion. | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | Discretionary / Earmark | $1,116,000.00 | $1,789,398.00 |
| 122591 | 36.545 | Ohio | HAM | Group | Cincinnati, City of | HAM Faraday Rd PROTECT | Faraday Road: from Cass Avenue for approximately 800 feet to the southwest | Stabilize Faraday Road by piping and filling a ravine that parallels the road and has seen excessive erosion. | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | Local | $384,000.00 | $1,789,398.00 |
| 122593 | 36.546 | Ohio | HAM | Group | Cincinnati, City of | HAM Eleanor Pl & Coy St PROTECT | Site 1: Jackson Hill Park (Elanor Pl near Malvern Pl); Site 2: Coy Street (north of Straight Street) | Site 1: Replace a failed retaining wall in Jackson Hill Park. Improve structural stairs that connect Gage Street to Elanore Place. Site 2: Repair landslide along Coy Street. | Geologic Maintenance / Slide Repair | Exempt | 2026 | DD | 0 | Discretionary / Earmark | $16,000.00 | $1,666,737.34 |
| 122593 | 36.547 | Ohio | HAM | Group | Cincinnati, City of | HAM Eleanor Pl & Coy St PROTECT | Site 1: Jackson Hill Park (Elanor Pl near Malvern Pl); Site 2: Coy Street (north of Straight Street) | Site 1: Replace a failed retaining wall in Jackson Hill Park. Improve structural stairs that connect Gage Street to Elanore Place. Site 2: Repair landslide along Coy Street. | Geologic Maintenance / Slide Repair | Exempt | 2026 | DD | 0 | Local | $4,000.00 | $1,666,737.34 |
| 122593 | 36.548 | Ohio | HAM | Group | Cincinnati, City of | HAM Eleanor Pl & Coy St PROTECT | Site 1: Jackson Hill Park (Elanor Pl near Malvern Pl); Site 2: Coy Street (north of Straight Street) | Site 1: Replace a failed retaining wall in Jackson Hill Park. Improve structural stairs that connect Gage Street to Elanore Place. Site 2: Repair landslide along Coy Street. | Geologic Maintenance / Slide Repair | Exempt | 2026 | RW | 0 | Discretionary / Earmark | $28,000.00 | $1,666,737.34 |
| 122593 | 36.549 | Ohio | HAM | Group | Cincinnati, City of | HAM Eleanor Pl & Coy St PROTECT | Site 1: Jackson Hill Park (Elanor Pl near Malvern Pl); Site 2: Coy Street (north of Straight Street) | Site 1: Replace a failed retaining wall in Jackson Hill Park. Improve structural stairs that connect Gage Street to Elanore Place. Site 2: Repair landslide along Coy Street. | Geologic Maintenance / Slide Repair | Exempt | 2026 | RW | 0 | Local | $7,000.00 | $1,666,737.34 |
| 122593 | 36.550 | Ohio | HAM | Group | Cincinnati, City of | HAM Eleanor Pl & Coy St PROTECT | Site 1: Jackson Hill Park (Elanor Pl near Malvern Pl); Site 2: Coy Street (north of Straight Street) | Site 1: Replace a failed retaining wall in Jackson Hill Park. Improve structural stairs that connect Gage Street to Elanore Place. Site 2: Repair landslide along Coy Street. | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | Discretionary / Earmark | $1,199,999.87 | $1,666,737.34 |
| 122593 | 36.551 | Ohio | HAM | Group | Cincinnati, City of | HAM Eleanor Pl & Coy St PROTECT | Site 1: Jackson Hill Park (Elanor Pl near Malvern Pl); Site 2: Coy Street (north of Straight Street) | Site 1: Replace a failed retaining wall in Jackson Hill Park. Improve structural stairs that connect Gage Street to Elanore Place. Site 2: Repair landslide along Coy Street. | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | Local | $299,999.97 | $1,666,737.34 |
| 122594 | 36.552 | Ohio | HAM | Group | Cincinnati, City of | HAM Hillside Avenue PROTECT | Various locations along Hillside Avenue, generally between 3487 and 4291 Hillside Avenue | Repair areas of roadway pavement distress impacted by slope instability along Hillside Avenue. | Geologic Maintenance / Slide Repair | Exempt | 2026 | DD | 0 | Discretionary / Earmark | $30,000.00 | $3,817,944.20 |
| 122594 | 36.553 | Ohio | HAM | Group | Cincinnati, City of | HAM Hillside Avenue PROTECT | Various locations along Hillside Avenue, generally between 3487 and 4291 Hillside Avenue | Repair areas of roadway pavement distress impacted by slope instability along Hillside Avenue. | Geologic Maintenance / Slide Repair | Exempt | 2026 | DD | 0 | Local | $7,500.00 | $3,817,944.20 |
| 122594 | 36.554 | Ohio | HAM | Group | Cincinnati, City of | HAM Hillside Avenue PROTECT | Various locations along Hillside Avenue, generally between 3487 and 4291 Hillside Avenue | Repair areas of roadway pavement distress impacted by slope instability along Hillside Avenue. | Geologic Maintenance / Slide Repair | Exempt | 2026 | RW | 0 | Discretionary / Earmark | $66,000.00 | $3,817,944.20 |
| 122594 | 36.555 | Ohio | HAM | Group | Cincinnati, City of | HAM Hillside Avenue PROTECT | Various locations along Hillside Avenue, generally between 3487 and 4291 Hillside Avenue | Repair areas of roadway pavement distress impacted by slope instability along Hillside Avenue. | Geologic Maintenance / Slide Repair | Exempt | 2026 | RW | 0 | Local | $16,500.00 | $3,817,944.20 |
| 122594 | 36.556 | Ohio | HAM | Group | Cincinnati, City of | HAM Hillside Avenue PROTECT | Various locations along Hillside Avenue, generally between 3487 and 4291 Hillside Avenue | Repair areas of roadway pavement distress impacted by slope instability along Hillside Avenue. | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | Discretionary / Earmark | $2,829,623.36 | $3,817,944.20 |
| 122594 | 36.557 | Ohio | HAM | Group | Cincinnati, City of | HAM Hillside Avenue PROTECT | Various locations along Hillside Avenue, generally between 3487 and 4291 Hillside Avenue | Repair areas of roadway pavement distress impacted by slope instability along Hillside Avenue. | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | Local | $707,405.84 | $3,817,944.20 |
| 122595 | 36.558 | Ohio | HAM | Group | Cincinnati, City of | HAM Riverside Dr PROTECT | Riverside Drive (US 52) retaining wall at Friendship Park | Stabilize the upper portions of the retaining wall and replace the inadequate / failing guardrail with a combination vehicle and bicycle railing. | Geologic Maintenance / Slide Repair | Exempt | 2026 | DD | 0 | Discretionary / Earmark | $125,384.00 | $2,242,528.75 |
| 122595 | 36.559 | Ohio | HAM | Group | Cincinnati, City of | HAM Riverside Dr PROTECT | Riverside Drive (US 52) retaining wall at Friendship Park | Stabilize the upper portions of the retaining wall and replace the inadequate / failing guardrail with a combination vehicle and bicycle railing. | Geologic Maintenance / Slide Repair | Exempt | 2026 | DD | 0 | Local | $31,346.00 | $2,242,528.75 |
| 122595 | 36.560 | Ohio | HAM | Group | Cincinnati, City of | HAM Riverside Dr PROTECT | Riverside Drive (US 52) retaining wall at Friendship Park | Stabilize the upper portions of the retaining wall and replace the inadequate / failing guardrail with a combination vehicle and bicycle railing. | Geologic Maintenance / Slide Repair | Exempt | 2026 | RW | 0 | Discretionary / Earmark | $52,000.00 | $2,242,528.75 |
| 122595 | 36.561 | Ohio | HAM | Group | Cincinnati, City of | HAM Riverside Dr PROTECT | Riverside Drive (US 52) retaining wall at Friendship Park | Stabilize the upper portions of the retaining wall and replace the inadequate / failing guardrail with a combination vehicle and bicycle railing. | Geologic Maintenance / Slide Repair | Exempt | 2026 | RW | 0 | Local | $13,000.00 | $2,242,528.75 |
| 122595 | 36.562 | Ohio | HAM | Group | Cincinnati, City of | HAM Riverside Dr PROTECT | Riverside Drive (US 52) retaining wall at Friendship Park | Stabilize the upper portions of the retaining wall and replace the inadequate / failing guardrail with a combination vehicle and bicycle railing. | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | Discretionary / Earmark | $1,440,000.00 | $2,242,528.75 |
| 122595 | 36.563 | Ohio | HAM | Group | Cincinnati, City of | HAM Riverside Dr PROTECT | Riverside Drive (US 52) retaining wall at Friendship Park | Stabilize the upper portions of the retaining wall and replace the inadequate / failing guardrail with a combination vehicle and bicycle railing. | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | Local | $360,000.00 | $2,242,528.75 |
| 122596 | 36.564 | Ohio | HAM | Group | Cincinnati, City of | HAM River Road PROTECT | River Road (US 50) from Southside Avenue to the Speedway at 2857 River Road. | Correct a landslide that impacts River Road (US 50) between Southside Avenue and Speedway (2857 River Road). | Geologic Maintenance / Slide Repair | Exempt | 2026 | DD | 0 | Discretionary / Earmark | $17,186.00 | $1,630,465.80 |
| 122596 | 36.565 | Ohio | HAM | Group | Cincinnati, City of | HAM River Road PROTECT | River Road (US 50) from Southside Avenue to the Speedway at 2857 River Road. | Correct a landslide that impacts River Road (US 50) between Southside Avenue and Speedway (2857 River Road). | Geologic Maintenance / Slide Repair | Exempt | 2026 | DD | 0 | Local | $4,296.50 | $1,630,465.80 |
| 122596 | 36.566 | Ohio | HAM | Group | Cincinnati, City of | HAM River Road PROTECT | River Road (US 50) from Southside Avenue to the Speedway at 2857 River Road. | Correct a landslide that impacts River Road (US 50) between Southside Avenue and Speedway (2857 River Road). | Geologic Maintenance / Slide Repair | Exempt | 2026 | RW | 0 | Discretionary / Earmark | $192,000.00 | $1,630,465.80 |
| 122596 | 36.567 | Ohio | HAM | Group | Cincinnati, City of | HAM River Road PROTECT | River Road (US 50) from Southside Avenue to the Speedway at 2857 River Road. | Correct a landslide that impacts River Road (US 50) between Southside Avenue and Speedway (2857 River Road). | Geologic Maintenance / Slide Repair | Exempt | 2026 | RW | 0 | Local | $48,000.00 | $1,630,465.80 |
| 122596 | 36.568 | Ohio | HAM | Group | Cincinnati, City of | HAM River Road PROTECT | River Road (US 50) from Southside Avenue to the Speedway at 2857 River Road. | Correct a landslide that impacts River Road (US 50) between Southside Avenue and Speedway (2857 River Road). | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | Discretionary / Earmark | $810,746.64 | $1,630,465.80 |
| 122596 | 36.569 | Ohio | HAM | Group | Cincinnati, City of | HAM River Road PROTECT | River Road (US 50) from Southside Avenue to the Speedway at 2857 River Road. | Correct a landslide that impacts River Road (US 50) between Southside Avenue and Speedway (2857 River Road). | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | Local | $202,686.66 | $1,630,465.80 |
| 122597 | 36.570 | Ohio | HAM | Group | Cincinnati, City of | HAM Sycamore Street PROTECT | Sycamore Street near Walker Street in Mt. Auburn | Reconstruct existing failing retaining wall along Sycamore Street. | Geologic Maintenance / Slide Repair | Exempt | 2026 | DD | 0 | Discretionary / Earmark | $20,000.00 | $343,351.09 |
| 122597 | 36.571 | Ohio | HAM | Group | Cincinnati, City of | HAM Sycamore Street PROTECT | Sycamore Street near Walker Street in Mt. Auburn | Reconstruct existing failing retaining wall along Sycamore Street. | Geologic Maintenance / Slide Repair | Exempt | 2026 | DD | 0 | Local | $5,000.00 | $343,351.09 |
| 122597 | 36.572 | Ohio | HAM | Group | Cincinnati, City of | HAM Sycamore Street PROTECT | Sycamore Street near Walker Street in Mt. Auburn | Reconstruct existing failing retaining wall along Sycamore Street. | Geologic Maintenance / Slide Repair | Exempt | 2026 | RW | 0 | Discretionary / Earmark | $8,000.00 | $343,351.09 |
| 122597 | 36.573 | Ohio | HAM | Group | Cincinnati, City of | HAM Sycamore Street PROTECT | Sycamore Street near Walker Street in Mt. Auburn | Reconstruct existing failing retaining wall along Sycamore Street. | Geologic Maintenance / Slide Repair | Exempt | 2026 | RW | 0 | Local | $2,000.00 | $343,351.09 |
| 122597 | 36.574 | Ohio | HAM | Group | Cincinnati, City of | HAM Sycamore Street PROTECT | Sycamore Street near Walker Street in Mt. Auburn | Reconstruct existing failing retaining wall along Sycamore Street. | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | Discretionary / Earmark | $174,562.87 | $343,351.09 |
| 122597 | 36.575 | Ohio | HAM | Group | Cincinnati, City of | HAM Sycamore Street PROTECT | Sycamore Street near Walker Street in Mt. Auburn | Reconstruct existing failing retaining wall along Sycamore Street. | Geologic Maintenance / Slide Repair | Exempt | 2027 | CO | 0 | Local | $43,640.72 | $343,351.09 |
| 122808 | 39.905 | Ohio | Hamilton | Individual | Springdale, City of | HAM Springdale EV Charge FY26 | City Municipal building | Installation of electric vehicle charging infrastructure at the City of Springdale municipal building site, and Springdale Parks & Recreation | Emission Reduction | Exempt | 2026 | DD | 1 | MPO CRP | $45,000.00 | $549,711.39 |
| 122808 | 39.906 | Ohio | Hamilton | Individual | Springdale, City of | HAM Springdale EV Charge FY26 | City Municipal building | Installation of electric vehicle charging infrastructure at the City of Springdale municipal building site, and Springdale Parks & Recreation | Emission Reduction | Exempt | 2026 | CO | 6 | MPO CRP | $458,828.54 | $549,711.39 |
| 122808 | 39.907 | Ohio | Hamilton | Individual | Springdale, City of | HAM Springdale EV Charge FY26 | City Municipal building | Installation of electric vehicle charging infrastructure at the City of Springdale municipal building site, and Springdale Parks & Recreation | Emission Reduction | Exempt | 2026 | CO | 7 | Local | $45,882.85 | $549,711.39 |
| 122811 | 39.908 | Ohio | Hamilton | Individual | Anderson Township (Hamilton County) | HAM Anderson Twnshp EV Charging | varies | Construction of EV charging stations at four locations throughout Anderson Township (RecPlex, Bauer Preserve, Anderson Center, Five Mile Trailhead) | Emission Reduction | Exempt | 2026 | CO | 6 | MPO CRP | $1,319,236.00 | $1,508,494.16 |
| 122811 | 39.909 | Ohio | Hamilton | Individual | Anderson Township (Hamilton County) | HAM Anderson Twnshp EV Charging | varies | Construction of EV charging stations at four locations throughout Anderson Township (RecPlex, Bauer Preserve, Anderson Center, Five Mile Trailhead) | Emission Reduction | Exempt | 2026 | CO | 7 | Local | $189,258.16 | $1,508,494.16 |
| 122816 | 39.910 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Cincinnati EV Charging | Hartwell | Installation of EV Charging stations at 3 locations throughout Cincinnati (East Price Hill, Hartwell, Madisonville) | Emission Reduction | Exempt | 2026 | CO | 6 | MPO CRP | $998,238.00 | $1,151,956.65 |
| 122816 | 39.911 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Cincinnati EV Charging | Hartwell | Installation of EV Charging stations at 3 locations throughout Cincinnati (East Price Hill, Hartwell, Madisonville) | Emission Reduction | Exempt | 2026 | CO | 7 | Local | $153,718.65 | $1,151,956.65 |
| 122822 | 39.914 | Ohio | Butler | Individual | Hamilton, City of | BUT Hamilton Golf Course EV | Multiple Locations | Installation of EV Charging Systems at 4 locations in the City of Hamilton. | Emission Reduction | Exempt | 2026 | CO | 6 | MPO CRP | $418,749.00 | $530,543.76 |
| 122822 | 39.915 | Ohio | Butler | Individual | Hamilton, City of | BUT Hamilton Golf Course EV | Multiple Locations | Installation of EV Charging Systems at 4 locations in the City of Hamilton. | Emission Reduction | Exempt | 2026 | CO | 7 | Local | $111,794.76 | $530,543.76 |
| 122824 | 39.916 | Ohio | Hamilton | Individual | Hamilton County Engineer | HAM County Lbry EV Charging | Various Libraries in Hamilton County | Installation of EV Charging Systems at North Central, Anderson, Harrison, Sharonville, and Walnut Hills Library Branches | Emission Reduction | Exempt | 2026 | CO | 6 | MPO CRP | $454,582.00 | $496,493.90 |
| 122824 | 39.917 | Ohio | Hamilton | Individual | Hamilton County Engineer | HAM County Lbry EV Charging | Various Libraries in Hamilton County | Installation of EV Charging Systems at North Central, Anderson, Harrison, Sharonville, and Walnut Hills Library Branches | Emission Reduction | Exempt | 2026 | CO | 7 | Local | $41,911.90 | $496,493.90 |
| 122828 | 40.099 | Ohio | Clermont | Individual | Union Township (Clermont County) | CLE Union Twp Ev Charging | 2 locations in Union Township | Installation of EV Charging Systems at 2 locations in Union Township. | Emission Reduction | Exempt | 2026 | DD | 1 | MPO CRP | $20,000.00 | $947,540.00 |
| 122828 | 40.100 | Ohio | Clermont | Individual | Union Township (Clermont County) | CLE Union Twp Ev Charging | 2 locations in Union Township | Installation of EV Charging Systems at 2 locations in Union Township. | Emission Reduction | Exempt | 2026 | CO | 6 | MPO CRP | $927,540.00 | $947,540.00 |
| 122829 | 40.101 | Ohio | Clermont | Individual | New Richmond, Village of | CLE New Richmond EV Charging | Two locations within the Village of New Richmond (Clermont County) | Installation of EV charging systems in the Village of New Richmond | Emission Reduction | Exempt | 2026 | DD | 1 | MPO CRP | $6,000.00 | $139,487.15 |
| 122829 | 40.102 | Ohio | Clermont | Individual | New Richmond, Village of | CLE New Richmond EV Charging | Two locations within the Village of New Richmond (Clermont County) | Installation of EV charging systems in the Village of New Richmond | Emission Reduction | Exempt | 2026 | DD | 2 | Local | $1,500.00 | $139,487.15 |
| 122829 | 40.103 | Ohio | Clermont | Individual | New Richmond, Village of | CLE New Richmond EV Charging | Two locations within the Village of New Richmond (Clermont County) | Installation of EV charging systems in the Village of New Richmond | Emission Reduction | Exempt | 2026 | CO | 6 | MPO CRP | $125,945.00 | $139,487.15 |
| 122829 | 40.104 | Ohio | Clermont | Individual | New Richmond, Village of | CLE New Richmond EV Charging | Two locations within the Village of New Richmond (Clermont County) | Installation of EV charging systems in the Village of New Richmond | Emission Reduction | Exempt | 2026 | CO | 7 | Local | $6,042.15 | $139,487.15 |
| 122830 | 40.105 | Ohio | Butler | Individual | West Chester Township (Butler County) | BUT West Chester EV Charging | Two locations in Butler County | Installation of EV Charging Systems at 3 locations in West Chester Township | Emission Reduction | Exempt | 2026 | ENV | 1 | Local | $20,000.00 | $246,370.00 |
| 122830 | 40.106 | Ohio | Butler | Individual | West Chester Township (Butler County) | BUT West Chester EV Charging | Two locations in Butler County | Installation of EV Charging Systems at 3 locations in West Chester Township | Emission Reduction | Exempt | 2026 | DD | 2 | MPO CRP | $15,000.00 | $246,370.00 |
| 122830 | 40.107 | Ohio | Butler | Individual | West Chester Township (Butler County) | BUT West Chester EV Charging | Two locations in Butler County | Installation of EV Charging Systems at 3 locations in West Chester Township | Emission Reduction | Exempt | 2026 | CO | 6 | MPO CRP | $211,370.00 | $246,370.00 |
| 122837 | 36.576 | Ohio | WAR | Group | Warren County Engineer | WAR CR 24 0.12 Morrow-Woodville | 200' east and west of SFN 8330824 | Superstructure replacement with Prestressed Composite Box Beam. involves increased profile to accommodate superstructure height. | Bridge Preservation | Exempt | 2026 | CO | 0 | State | $321,152.28 | $338,055.03 |
| 122837 | 36.577 | Ohio | WAR | Group | Warren County Engineer | WAR CR 24 0.12 Morrow-Woodville | 200' east and west of SFN 8330824 | Superstructure replacement with Prestressed Composite Box Beam. involves increased profile to accommodate superstructure height. | Bridge Preservation | Exempt | 2026 | CO | 0 | Local | $16,902.75 | $338,055.03 |
| 122838 | 36.578 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 123 16.79 | WAR 123 | Rebuild and widen shoulder on a portion of SR-123; resurface I-71 & SR-123 ramps for enhanced pavement friction. | Roadway Improvement (Safety) | Exempt | 2026 | CO | 0 | Safety | $736,200.00 | $970,551.00 |
| 122838 | 36.579 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 123 16.79 | WAR 123 | Rebuild and widen shoulder on a portion of SR-123; resurface I-71 & SR-123 ramps for enhanced pavement friction. | Roadway Improvement (Safety) | Exempt | 2026 | CO | 0 | State | $81,800.00 | $970,551.00 |
| 122838 | 36.580 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 123 16.79 | WAR 123 | Rebuild and widen shoulder on a portion of SR-123; resurface I-71 & SR-123 ramps for enhanced pavement friction. | Roadway Improvement (Safety) | Exempt | 2026 | CO | 0 | Labor | $81,800.00 | $970,551.00 |
| 122892 | 36.581 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE-IR 275 Rest Areas TP | CLE IR 275 NB and SB vacant Rest Areas in Clermont County | Construction of trucking parking at CLE-I275 NB and SB vacant rest areas. Development will be completed under PID 122865. | Other Building / Facility Work | Exempt | 2026 | CO | 0 | State | $7,899,482.35 | $8,425,218.00 |
| 122892 | 36.582 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE-IR 275 Rest Areas TP | CLE IR 275 NB and SB vacant Rest Areas in Clermont County | Construction of trucking parking at CLE-I275 NB and SB vacant rest areas. Development will be completed under PID 122865. | Other Building / Facility Work | Exempt | 2026 | CO | 0 | Labor | $525,735.65 | $8,425,218.00 |
| 122893 | 36.583 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-IR 71 Rest Areas TP | WAR IR 71 NB and SB Rest Areas in Warren County | Construction of trucking parking at WAR-I71 NB and SB rest areas. Development will be completed under PID 122865. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | State | $17,227,050.00 | $18,432,943.50 |
| 122893 | 36.584 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-IR 71 Rest Areas TP | WAR IR 71 NB and SB Rest Areas in Warren County | Construction of trucking parking at WAR-I71 NB and SB rest areas. Development will be completed under PID 122865. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Labor | $1,205,893.50 | $18,432,943.50 |
| 122902 | 40.108 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 1.25 Trunk Line | HAM IR 75: SLM 1.25-2.45. Between Gest St and WHV | New large diameter storm sewer trunk line between Gest St and WHV along IR 75 in the Brent Spence Corridor | Add Through Lane(s) | Exempt | 2028 | DD | 2 | State | $5,000,000.00 | $97,500,000.00 |
| 122902 | 40.109 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 1.25 Trunk Line | HAM IR 75: SLM 1.25-2.45. Between Gest St and WHV | New large diameter storm sewer trunk line between Gest St and WHV along IR 75 in the Brent Spence Corridor | Add Through Lane(s) | Exempt | 2028 | CO | 6 | Bonds | $84,900,000.00 | $97,500,000.00 |
| 122902 | 40.110 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 1.25 Trunk Line | HAM IR 75: SLM 1.25-2.45. Between Gest St and WHV | New large diameter storm sewer trunk line between Gest St and WHV along IR 75 in the Brent Spence Corridor | Add Through Lane(s) | Exempt | 2028 | CO | 7 | State | $2,600,000.00 | $97,500,000.00 |
| 122902 | 40.111 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 1.25 Trunk Line | HAM IR 75: SLM 1.25-2.45. Between Gest St and WHV | New large diameter storm sewer trunk line between Gest St and WHV along IR 75 in the Brent Spence Corridor | Add Through Lane(s) | Exempt | 2028 | CO | 8 | Labor | $5,000,000.00 | $97,500,000.00 |
| 122964 | 36.585 | Ohio | HAM | Group | District 8-Bridges | HAM US 22 11.41 | HAM-22-1141 (US 22 over IR 71) | Project to repair damage to HAM-22-1141 (SFN 3100901). The bridge carries US 22 (Montgomery Rd) over IR 71. | Bridge / Culvert Maintenance | Exempt | 2026 | CO | 0 | State | $364,463.00 | $400,910.00 |
| 122964 | 36.586 | Ohio | HAM | Group | District 8-Bridges | HAM US 22 11.41 | HAM-22-1141 (US 22 over IR 71) | Project to repair damage to HAM-22-1141 (SFN 3100901). The bridge carries US 22 (Montgomery Rd) over IR 71. | Bridge / Culvert Maintenance | Exempt | 2026 | CO | 0 | Labor | $36,447.00 | $400,910.00 |
| 122966 | 39.919 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Cincinnati Plum St | Entire length of Plum St in downtown Cincinnati + W Central Pkwy from Plum St to Elm St | Narrow road and widen sidewalks, reduce intersection size through work zone via lane reduction/bump-outs on Plum St in downtown Cincinnati, followed by repaving. | Pedestrian Facilities | Exempt | 2028 | CO | 7 | Local | $5,874,300.00 | $13,054,000.00 |
| 122966 | 40.112 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Cincinnati Plum St | Entire length of Plum St in downtown Cincinnati + W Central Pkwy from Plum St to Elm St | Narrow road and widen sidewalks, reduce intersection size through work zone via lane reduction/bump-outs on Plum St in downtown Cincinnati, followed by repaving. | Pedestrian Facilities | Exempt | 2028 | CO | 6 | MPO STBG | $7,179,700.00 | $13,054,000.00 |
| 122969 | 39.920 | Ohio | Clermont | Individual | Clermont County T.I.D. | CLE Bach Buxton/Shayler | intersection of Bach-Buxton Rd & Shayler Rd, Bach-Buxton near Provision Living senior housing development | This project provides roadway widening and reconstruction along Bach Buxton Road, proposed sidewalk extension along Bach Buxton Road, Shayler Road, and Clough Pike in Clermont County, Ohio. Totaling approx. 1.91 miles in length including two modern rounda | Intersection Improvement (Safety) | Exempt | 2026 | RW | 3 | State | $150,000.00 | $8,634,996.21 |
| 122969 | 39.921 | Ohio | Clermont | Individual | Clermont County T.I.D. | CLE Bach Buxton/Shayler | intersection of Bach-Buxton Rd & Shayler Rd, Bach-Buxton near Provision Living senior housing development | This project provides roadway widening and reconstruction along Bach Buxton Road, proposed sidewalk extension along Bach Buxton Road, Shayler Road, and Clough Pike in Clermont County, Ohio. Totaling approx. 1.91 miles in length including two modern rounda | Intersection Improvement (Safety) | Exempt | 2027 | CO | 6 | MPO STBG | $2,811,802.00 | $8,634,996.21 |
| 122969 | 39.922 | Ohio | Clermont | Individual | Clermont County T.I.D. | CLE Bach Buxton/Shayler | intersection of Bach-Buxton Rd & Shayler Rd, Bach-Buxton near Provision Living senior housing development | This project provides roadway widening and reconstruction along Bach Buxton Road, proposed sidewalk extension along Bach Buxton Road, Shayler Road, and Clough Pike in Clermont County, Ohio. Totaling approx. 1.91 miles in length including two modern rounda | Intersection Improvement (Safety) | Exempt | 2027 | CO | 6 | MPO TA | $704,579.00 | $8,634,996.21 |
| 122969 | 39.923 | Ohio | Clermont | Individual | Clermont County T.I.D. | CLE Bach Buxton/Shayler | intersection of Bach-Buxton Rd & Shayler Rd, Bach-Buxton near Provision Living senior housing development | This project provides roadway widening and reconstruction along Bach Buxton Road, proposed sidewalk extension along Bach Buxton Road, Shayler Road, and Clough Pike in Clermont County, Ohio. Totaling approx. 1.91 miles in length including two modern rounda | Intersection Improvement (Safety) | Exempt | 2027 | CO | 7 | Local | $4,968,615.21 | $8,634,996.21 |
| 122970 | 39.924 | Ohio | Hamilton | Individual | Evendale, Village of | HAM 42 Evendale Signals | Various intersections along us 42, various intersections along Glendale Milford | Upgrade of traffic signals at 17 intersections and addition LED street name signs. | Traffic Control (Safety) | Exempt | 2027 | CO | 6 | MPO STBG | $1,522,974.00 | $2,036,977.73 |
| 122970 | 39.925 | Ohio | Hamilton | Individual | Evendale, Village of | HAM 42 Evendale Signals | Various intersections along us 42, various intersections along Glendale Milford | Upgrade of traffic signals at 17 intersections and addition LED street name signs. | Traffic Control (Safety) | Exempt | 2027 | CO | 7 | Local | $514,003.73 | $2,036,977.73 |
| 122971 | 39.926 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Great Parks Oasis Trail | Oasis Rail Corridor: from the Montgomery Inn Boathouse to Carrel Street | Construction of Phases 1 and 2 of the Ohio River Trail on the Oasis rail corridor. | Shared Use Path | Exempt | 2026 | RW | 3 | Local Programs | $2,500,000.00 | $24,797,892.40 |
| 122971 | 39.927 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Great Parks Oasis Trail | Oasis Rail Corridor: from the Montgomery Inn Boathouse to Carrel Street | Construction of Phases 1 and 2 of the Ohio River Trail on the Oasis rail corridor. | Shared Use Path | Exempt | 2026 | RW | 4 | Safety | $2,500,000.00 | $24,797,892.40 |
| 122971 | 39.928 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Great Parks Oasis Trail | Oasis Rail Corridor: from the Montgomery Inn Boathouse to Carrel Street | Construction of Phases 1 and 2 of the Ohio River Trail on the Oasis rail corridor. | Shared Use Path | Exempt | 2029 | CO | 6 | MPO CMAQ | $14,000,000.00 | $24,797,892.40 |
| 122971 | 39.929 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Great Parks Oasis Trail | Oasis Rail Corridor: from the Montgomery Inn Boathouse to Carrel Street | Construction of Phases 1 and 2 of the Ohio River Trail on the Oasis rail corridor. | Shared Use Path | Exempt | 2029 | CO | 7 | Local | $5,797,892.40 | $24,797,892.40 |
| 122986 | 39.930 | Ohio | Warren | Individual | Mason, City of | WAR US 42 Bike Path Connection | US-42 from Heritage Oak Park to State Route 741 | US 42 bike path connection will construct a 4,800-foot long, 10-foot-wide path separated by a grass lawn from the roadway. The project will connect an existing path that circles Heritage Oak Park to new sections of path constructed during the 2023 SR-741 | Bike Facility | Exempt | 2028 | CO | 6 | MPO TA | $895,101.00 | $1,197,197.59 |
| 122986 | 39.931 | Ohio | Warren | Individual | Mason, City of | WAR US 42 Bike Path Connection | US-42 from Heritage Oak Park to State Route 741 | US 42 bike path connection will construct a 4,800-foot long, 10-foot-wide path separated by a grass lawn from the roadway. The project will connect an existing path that circles Heritage Oak Park to new sections of path constructed during the 2023 SR-741 | Bike Facility | Exempt | 2028 | CO | 7 | Local | $302,096.59 | $1,197,197.59 |
| 122987 | 39.932 | Ohio | Butler | Individual | Oxford, City of | BUT Miami Univ Airport OXD EV | Miami University Airport | installation of EV charging stations at the Miami University Airport (OXD). | Emission Reduction | Exempt | 2026 | DD | 1 | MPO CRP | $200,000.00 | $1,000,000.00 |
| 122987 | 39.933 | Ohio | Butler | Individual | Oxford, City of | BUT Miami Univ Airport OXD EV | Miami University Airport | installation of EV charging stations at the Miami University Airport (OXD). | Emission Reduction | Exempt | 2026 | CO | 6 | MPO CRP | $800,000.00 | $1,000,000.00 |
| 122989 | 40.113 | Ohio | Hamilton | Individual | Colerain Township (Hamilton County) | HAM Compton Rd Sidewalk | Compton Rd | Sidewalk along Compton Rd from Colerain Rd to Pippin Rd in Colerain Township | Pedestrian Facilities | Exempt | 2028 | CO | 6 | MPO TA | $1,000,000.00 | $1,337,500.00 |
| 122989 | 40.114 | Ohio | Hamilton | Individual | Colerain Township (Hamilton County) | HAM Compton Rd Sidewalk | Compton Rd | Sidewalk along Compton Rd from Colerain Rd to Pippin Rd in Colerain Township | Pedestrian Facilities | Exempt | 2028 | CO | 7 | Labor | $87,500.00 | $1,337,500.00 |
| 122989 | 40.115 | Ohio | Hamilton | Individual | Colerain Township (Hamilton County) | HAM Compton Rd Sidewalk | Compton Rd | Sidewalk along Compton Rd from Colerain Rd to Pippin Rd in Colerain Township | Pedestrian Facilities | Exempt | 2028 | CO | 8 | Local | $250,000.00 | $1,337,500.00 |
| 122990 | 40.116 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Purcell Ave Sidewalk | Purcell Ave | New sidewalk on Purcell Ave between Warsaw and Price Ave | Pedestrian Facilities | Exempt | 2028 | CO | 6 | MPO TA | $480,000.00 | $600,000.00 |
| 122990 | 40.117 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Purcell Ave Sidewalk | Purcell Ave | New sidewalk on Purcell Ave between Warsaw and Price Ave | Pedestrian Facilities | Exempt | 2028 | CO | 7 | Local | $120,000.00 | $600,000.00 |
| 123096 | 36.587 | Ohio | HAM | Group | District 8 Engineering | HAM IR 275 0.00 Cable | Indiana State line to I-74 | Install median cable barrier on I-275 from the Indiana State line to I-74 in Hamilton County. | Roadside / Median Improvement (Safety) | Exempt | 2027 | CO | 0 | Safety | $1,477,000.00 | $1,580,390.00 |
| 123096 | 36.588 | Ohio | HAM | Group | District 8 Engineering | HAM IR 275 0.00 Cable | Indiana State line to I-74 | Install median cable barrier on I-275 from the Indiana State line to I-74 in Hamilton County. | Roadside / Median Improvement (Safety) | Exempt | 2027 | CO | 0 | Labor | $103,390.00 | $1,580,390.00 |
| 123101 | 36.589 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR US 22 8.05 | US-22 at Stubbs Mills Rd | Install an eastbound left turn lane on US-22 at Stubbs Mills Rd | Intersection Improvement (Safety) | Exempt | 2027 | DD | 0 | Safety | $71,015.40 | $3,040,550.00 |
| 123101 | 36.590 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR US 22 8.05 | US-22 at Stubbs Mills Rd | Install an eastbound left turn lane on US-22 at Stubbs Mills Rd | Intersection Improvement (Safety) | Exempt | 2027 | DD | 0 | State | $7,890.60 | $3,040,550.00 |
| 123101 | 36.591 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR US 22 8.05 | US-22 at Stubbs Mills Rd | Install an eastbound left turn lane on US-22 at Stubbs Mills Rd | Intersection Improvement (Safety) | Exempt | 2027 | RW | 0 | Safety | $112,500.00 | $3,040,550.00 |
| 123101 | 36.592 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR US 22 8.05 | US-22 at Stubbs Mills Rd | Install an eastbound left turn lane on US-22 at Stubbs Mills Rd | Intersection Improvement (Safety) | Exempt | 2027 | RW | 0 | State | $12,500.00 | $3,040,550.00 |
| 123101 | 36.593 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR US 22 8.05 | US-22 at Stubbs Mills Rd | Install an eastbound left turn lane on US-22 at Stubbs Mills Rd | Intersection Improvement (Safety) | Exempt | 2028 | CO | 0 | Safety | $2,088,000.00 | $3,040,550.00 |
| 123101 | 36.594 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR US 22 8.05 | US-22 at Stubbs Mills Rd | Install an eastbound left turn lane on US-22 at Stubbs Mills Rd | Intersection Improvement (Safety) | Exempt | 2028 | CO | 0 | State | $232,000.00 | $3,040,550.00 |
| 123101 | 36.595 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR US 22 8.05 | US-22 at Stubbs Mills Rd | Install an eastbound left turn lane on US-22 at Stubbs Mills Rd | Intersection Improvement (Safety) | Exempt | 2028 | CO | 0 | Labor | $162,400.00 | $3,040,550.00 |
| 123140 | 40.118 | Ohio | Hamilton | Individual | OKI | HAM OKI FY 2028 Clean Air Progra | 0 | HAM OKI SFY 2028 Air Quality Planning Funds | Statewide / Regional Planning | Exempt | 2028 | OTH | 8 | MPO CMAQ | $203,519.00 | $203,519.00 |
| 123141 | 40.119 | Ohio | Hamilton | Individual | OKI | HAM OKI FY 2029 Clean Air Progra | 0 | HAM OKI SFY 2029 Air Quality Planning Funds | Statewide / Regional Planning | Exempt | 2029 | OTH | 8 | MPO CMAQ | $203,519.00 | $203,519.00 |
| 123142 | 40.120 | Ohio | Hamilton | Individual | OKI | HAM OKI FY 2028 Rideshare | 0 | SFY 2028 Rideshare funding | Statewide / Regional Planning | Exempt | 2028 | OTH | 8 | MPO CMAQ | $169,959.00 | $169,959.00 |
| 123143 | 40.121 | Ohio | Hamilton | Individual | OKI | HAM OKI FY 2029 Rideshare | 0 | SFY 2029 Rideshare funding | Statewide / Regional Planning | Exempt | 2029 | OTH | 8 | MPO CMAQ | $169,959.00 | $169,959.00 |
| 123144 | 40.122 | Ohio | Hamilton | Individual | OKI | HAM OKI 28 Reg Trans Plng - LU | 0 | SFY 2028 OKI Regional Transportation Planning - Land Use | Statewide / Regional Planning | Exempt | 2028 | OTH | 8 | MPO STBG | $796,096.00 | $796,096.00 |
| 123145 | 40.123 | Ohio | Hamilton | Individual | OKI | HAM OKI 29 Reg Trans Plng - LU | 0 | SFY 2029 OKI Regional Transportation Planning - Land Use | Statewide / Regional Planning | Exempt | 2029 | OTH | 8 | MPO STBG | $796,096.00 | $796,096.00 |
| 123146 | 40.124 | Ohio | Hamilton | Individual | OKI | HAM OKI 2028 Reg Plng - FIAM | 0 | OKI State Fiscal Year 2028 Fiscal Impact Analysis Model Project | Statewide / Regional Planning | Exempt | 2028 | OTH | 8 | MPO STBG | $74,616.00 | $74,616.00 |
| 123147 | 40.125 | Ohio | Hamilton | Individual | OKI | HAM OKI 2029 Reg Plng - FIAM | 0 | OKI State Fiscal Year 2029 Fiscal Impact Analysis Model Project | Statewide / Regional Planning | Exempt | 2029 | OTH | 8 | MPO STBG | $74,616.00 | $74,616.00 |
| 123336 | 36.596 | Ohio | CLE | Group | Batavia, Village of | CLE SR 32 9.80 Herold Rd | SR-32 & Herold Rd | Reconstruct the intersection of SR-32 & Herold Rd in the Village of Batavia. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 0 | Preservation | $130,327.19 | $822,908.99 |
| 123336 | 36.597 | Ohio | CLE | Group | Batavia, Village of | CLE SR 32 9.80 Herold Rd | SR-32 & Herold Rd | Reconstruct the intersection of SR-32 & Herold Rd in the Village of Batavia. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 0 | Safety | $540,000.00 | $822,908.99 |
| 123336 | 36.598 | Ohio | CLE | Group | Batavia, Village of | CLE SR 32 9.80 Herold Rd | SR-32 & Herold Rd | Reconstruct the intersection of SR-32 & Herold Rd in the Village of Batavia. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 0 | State | $92,581.80 | $822,908.99 |
| 123336 | 36.599 | Ohio | CLE | Group | Batavia, Village of | CLE SR 32 9.80 Herold Rd | SR-32 & Herold Rd | Reconstruct the intersection of SR-32 & Herold Rd in the Village of Batavia. | Intersection Improvement (Safety) | Exempt | 2026 | CO | 0 | Labor | $60,000.00 | $822,908.99 |
| 123369 | 36.600 | Ohio | HAM | Group | Reading, City of | HAM US 42 10.07 Reading Rd | US-42 in the City of Reading | Implement Target Speed Pilot Program countermeasures on US-42 in the City of Reading including a road diet, enhanced crosswalks, RRFB's, raised medians, in an effort to lower travel speeds and increase vehicular and pedestrian safety. | Traffic Control (Safety) | Exempt | 2026 | ENV | 0 | Safety | $7,200.00 | $3,967,366.00 |
| 123369 | 36.601 | Ohio | HAM | Group | Reading, City of | HAM US 42 10.07 Reading Rd | US-42 in the City of Reading | Implement Target Speed Pilot Program countermeasures on US-42 in the City of Reading including a road diet, enhanced crosswalks, RRFB's, raised medians, in an effort to lower travel speeds and increase vehicular and pedestrian safety. | Traffic Control (Safety) | Exempt | 2026 | ENV | 0 | State | $800.00 | $3,967,366.00 |
| 123369 | 36.602 | Ohio | HAM | Group | Reading, City of | HAM US 42 10.07 Reading Rd | US-42 in the City of Reading | Implement Target Speed Pilot Program countermeasures on US-42 in the City of Reading including a road diet, enhanced crosswalks, RRFB's, raised medians, in an effort to lower travel speeds and increase vehicular and pedestrian safety. | Traffic Control (Safety) | Exempt | 2026 | DD | 0 | Safety | $114,218.10 | $3,967,366.00 |
| 123369 | 36.603 | Ohio | HAM | Group | Reading, City of | HAM US 42 10.07 Reading Rd | US-42 in the City of Reading | Implement Target Speed Pilot Program countermeasures on US-42 in the City of Reading including a road diet, enhanced crosswalks, RRFB's, raised medians, in an effort to lower travel speeds and increase vehicular and pedestrian safety. | Traffic Control (Safety) | Exempt | 2026 | DD | 0 | State | $12,690.90 | $3,967,366.00 |
| 123369 | 36.604 | Ohio | HAM | Group | Reading, City of | HAM US 42 10.07 Reading Rd | US-42 in the City of Reading | Implement Target Speed Pilot Program countermeasures on US-42 in the City of Reading including a road diet, enhanced crosswalks, RRFB's, raised medians, in an effort to lower travel speeds and increase vehicular and pedestrian safety. | Traffic Control (Safety) | Exempt | 2026 | RW | 0 | Safety | $82,800.00 | $3,967,366.00 |
| 123369 | 36.605 | Ohio | HAM | Group | Reading, City of | HAM US 42 10.07 Reading Rd | US-42 in the City of Reading | Implement Target Speed Pilot Program countermeasures on US-42 in the City of Reading including a road diet, enhanced crosswalks, RRFB's, raised medians, in an effort to lower travel speeds and increase vehicular and pedestrian safety. | Traffic Control (Safety) | Exempt | 2026 | RW | 0 | State | $9,200.00 | $3,967,366.00 |
| 123369 | 36.606 | Ohio | HAM | Group | Reading, City of | HAM US 42 10.07 Reading Rd | US-42 in the City of Reading | Implement Target Speed Pilot Program countermeasures on US-42 in the City of Reading including a road diet, enhanced crosswalks, RRFB's, raised medians, in an effort to lower travel speeds and increase vehicular and pedestrian safety. | Traffic Control (Safety) | Exempt | 2027 | CO | 0 | Safety | $2,700,000.00 | $3,967,366.00 |
| 123369 | 36.607 | Ohio | HAM | Group | Reading, City of | HAM US 42 10.07 Reading Rd | US-42 in the City of Reading | Implement Target Speed Pilot Program countermeasures on US-42 in the City of Reading including a road diet, enhanced crosswalks, RRFB's, raised medians, in an effort to lower travel speeds and increase vehicular and pedestrian safety. | Traffic Control (Safety) | Exempt | 2027 | CO | 0 | State | $300,000.00 | $3,967,366.00 |
| 123369 | 36.608 | Ohio | HAM | Group | Reading, City of | HAM US 42 10.07 Reading Rd | US-42 in the City of Reading | Implement Target Speed Pilot Program countermeasures on US-42 in the City of Reading including a road diet, enhanced crosswalks, RRFB's, raised medians, in an effort to lower travel speeds and increase vehicular and pedestrian safety. | Traffic Control (Safety) | Exempt | 2027 | CO | 0 | Labor | $210,000.00 | $3,967,366.00 |
| 123461 | 36.609 | Ohio | HAM | Group | Madeira, City of | Madeira Non-Infra TAP Study | Along Camargo Rd from City limits | Feasibility study of a regional trail connecting Madeira and neighboring communities to Cincinnati's CROWN trail network. | Safety Related Studies | Exempt | 2026 | OTH | 0 | Local Programs | $75,000.00 | $75,000.00 |
| 123504 | 36.610 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM VAR Signal Timing | HAM VAR Signal Timing | Signal Timing Analyses along HAM-22 near I-71, HAM-New Haven Rd. near I-74, and HAM/WAR Fields Ertel/Mason Montgomery | Other Studies/ Tasks | Exempt | 2027 | OTH | 0 | Safety | $60,000.00 | $279,276.00 |
| 123526 | 36.611 | Ohio | HAM | Group | Hamilton County Engineer | HAM CR374 Newton Rd Bridge Rehab | 50' north and south of Bridge SFN 1314156 | Rehabilitation of bridge (SFN 3134156) along Newton Road | Bridge Preservation | Exempt | 2029 | CO | 0 | Local Programs | $337,680.00 | $422,100.00 |
| 123526 | 36.612 | Ohio | HAM | Group | Hamilton County Engineer | HAM CR374 Newton Rd Bridge Rehab | 50' north and south of Bridge SFN 1314156 | Rehabilitation of bridge (SFN 3134156) along Newton Road | Bridge Preservation | Exempt | 2029 | CO | 0 | Local | $84,420.00 | $422,100.00 |
| 123528 | 36.613 | Ohio | HAM | Group | Hamilton County Engineer | HAM CR20 Suspension Bridge rehab | 50' to either side of Suspension Bridge Road bridge, or end of road. | Preventative maintenance work on Suspension Bridge Road/Bridge under Local Major Bridge Program. | Bridge Preservation | Exempt | 2029 | CO | 0 | Local Programs | $932,800.00 | $1,166,000.00 |
| 123528 | 36.614 | Ohio | HAM | Group | Hamilton County Engineer | HAM CR20 Suspension Bridge rehab | 50' to either side of Suspension Bridge Road bridge, or end of road. | Preventative maintenance work on Suspension Bridge Road/Bridge under Local Major Bridge Program. | Bridge Preservation | Exempt | 2029 | CO | 0 | Local | $233,200.00 | $1,166,000.00 |
| 123552 | 36.615 | Ohio | CLE | Group | Clermont County Engineer | CLE CR 54 0.16 Glancy Corner | Bridge No CLE-CR 54-0016 (SFN: 1358030) located 0.16 miles north of SR 133 | Replacement of Bridge No CLE-CR 54-0016 (SFN: 1358030) which carries Glancy Corner Marathon Road over Pleasant Run. | Bridge Preservation | Exempt | 2028 | CO | 0 | Local Programs | $263,360.00 | $362,120.00 |
| 123552 | 36.616 | Ohio | CLE | Group | Clermont County Engineer | CLE CR 54 0.16 Glancy Corner | Bridge No CLE-CR 54-0016 (SFN: 1358030) located 0.16 miles north of SR 133 | Replacement of Bridge No CLE-CR 54-0016 (SFN: 1358030) which carries Glancy Corner Marathon Road over Pleasant Run. | Bridge Preservation | Exempt | 2028 | CO | 0 | Local | $98,760.00 | $362,120.00 |
| 123560 | 36.617 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 R-W/R FY2028 | Various locations in D8 | Installation of Reflective/Wet Reflective (R-W/R) long line pavement markings to be installed FY2028. | Traffic Control Maintenance | Exempt | 2028 | CO | 0 | State | $250,000.00 | $275,000.00 |
| 123560 | 36.618 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 R-W/R FY2028 | Various locations in D8 | Installation of Reflective/Wet Reflective (R-W/R) long line pavement markings to be installed FY2028. | Traffic Control Maintenance | Exempt | 2028 | CO | 0 | Labor | $25,000.00 | $275,000.00 |
| 123561 | 36.619 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 LED LG FY2027 | Ham Co and beneath bridges in D8 | Highway Lighting upgrades to LED lights in Hamilton County | Lighting (Safety) | Exempt | 2027 | CO | 0 | Preservation | $2,405,700.00 | $2,860,110.00 |
| 123561 | 36.620 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 LED LG FY2027 | Ham Co and beneath bridges in D8 | Highway Lighting upgrades to LED lights in Hamilton County | Lighting (Safety) | Exempt | 2027 | CO | 0 | State | $267,300.00 | $2,860,110.00 |
| 123561 | 36.621 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 LED LG FY2027 | Ham Co and beneath bridges in D8 | Highway Lighting upgrades to LED lights in Hamilton County | Lighting (Safety) | Exempt | 2027 | CO | 0 | Labor | $187,110.00 | $2,860,110.00 |
| 123562 | 36.622 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 SIGNS FY2030 (B) | HAM-74 and HAM-275 | FY2030 Systematic sign replacement on HAM-74 and HAM-275. Work includes flat sheet sign and support replacements and overhead sign support replacements. Extrusheet signs shall be reused with this project. | Traffic Control (Safety) | Exempt | 2028 | DD | 0 | State | $450,000.00 | $5,265,000.00 |
| 123563 | 36.623 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 R-W/R FY2029 | Various locations in D8 | Installation of Reflective/Wet Reflective (R-W/R) long line pavement markings to be installed FY2029. | Traffic Control Maintenance | Exempt | 2029 | CO | 0 | State | $1,000,000.00 | $1,100,000.00 |
| 123563 | 36.624 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 R-W/R FY2029 | Various locations in D8 | Installation of Reflective/Wet Reflective (R-W/R) long line pavement markings to be installed FY2029. | Traffic Control Maintenance | Exempt | 2029 | CO | 0 | Labor | $100,000.00 | $1,100,000.00 |
| 123564 | 36.625 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 SIGNS FY2030 (A) | HAM-275 | FY2030 Systematic sign replacement on HAM-275. In the HAM-275-(20.5-28.4) section, work includes the replacement of flatsheet signs, ground mounted posts, and extrusheet signs but the reuse of the overhead sign supports. In the HAM-275-(35.07-41.7) sectio | Traffic Control (Safety) | Exempt | 2028 | DD | 0 | State | $450,000.00 | $5,265,000.00 |
| 123566 | 36.626 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 Lighting Ph 2 | HAM IR 71: MLK to Ridge | Lighting system replacement along a portion of IR 71 in Hamilton County | Traffic Control Maintenance | Exempt | 2029 | DD | 0 | Preservation | $810,000.00 | $10,530,000.00 |
| 123566 | 36.627 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 71 Lighting Ph 2 | HAM IR 71: MLK to Ridge | Lighting system replacement along a portion of IR 71 in Hamilton County | Traffic Control Maintenance | Exempt | 2029 | DD | 0 | State | $90,000.00 | $10,530,000.00 |
| 123567 | 36.628 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 TSG R/W FY2031 | TBD locations in D8 | FY2031 District Wide Signal Replacement requiring R/W project. | Traffic Control (Safety) | Exempt | 2028 | ENV | 0 | State | $300,000.00 | $2,700,000.00 |
| 123585 | 36.629 | Ohio | BUT | Group | District 8 Engineering - Hydraulics | BUT Culverts FY26 | varies | Pave small culverts BUT-129-2236 (1841767) and pave invert small culvert HAM-126-1108 (1870525) through state contract 313-26. | Culvert Preservation | Exempt | 2026 | CO | 0 | State | $245,404.00 | $245,404.00 |
| 123587 | 36.630 | Ohio | WAR, GRE | Group | ODOT Sponsoring Agency | WAR/GRE Culverts FY28 | varies | Sockline small culverts WAR-73-1179 (1856262) and WAR-73-1367 (1853742). Pave invert WAR-42-2384 (1853672). Replace broken back GRE-35-0044 (1850343). Ditch outlet of WAR-21-2115 (1874382). | Culvert Preservation | Exempt | 2026 | ENV | 0 | State | $25,972.00 | $613,972.00 |
| 123587 | 36.631 | Ohio | WAR, GRE | Group | ODOT Sponsoring Agency | WAR/GRE Culverts FY28 | varies | Sockline small culverts WAR-73-1179 (1856262) and WAR-73-1367 (1853742). Pave invert WAR-42-2384 (1853672). Replace broken back GRE-35-0044 (1850343). Ditch outlet of WAR-21-2115 (1874382). | Culvert Preservation | Exempt | 2027 | RW | 0 | State | $5,000.00 | $613,972.00 |
| 123587 | 36.632 | Ohio | WAR, GRE | Group | ODOT Sponsoring Agency | WAR/GRE Culverts FY28 | varies | Sockline small culverts WAR-73-1179 (1856262) and WAR-73-1367 (1853742). Pave invert WAR-42-2384 (1853672). Replace broken back GRE-35-0044 (1850343). Ditch outlet of WAR-21-2115 (1874382). | Culvert Preservation | Exempt | 2028 | CO | 0 | Preservation | $424,000.00 | $613,972.00 |
| 123587 | 36.633 | Ohio | WAR, GRE | Group | ODOT Sponsoring Agency | WAR/GRE Culverts FY28 | varies | Sockline small culverts WAR-73-1179 (1856262) and WAR-73-1367 (1853742). Pave invert WAR-42-2384 (1853672). Replace broken back GRE-35-0044 (1850343). Ditch outlet of WAR-21-2115 (1874382). | Culvert Preservation | Exempt | 2028 | CO | 0 | State | $106,000.00 | $613,972.00 |
| 123587 | 36.634 | Ohio | WAR, GRE | Group | ODOT Sponsoring Agency | WAR/GRE Culverts FY28 | varies | Sockline small culverts WAR-73-1179 (1856262) and WAR-73-1367 (1853742). Pave invert WAR-42-2384 (1853672). Replace broken back GRE-35-0044 (1850343). Ditch outlet of WAR-21-2115 (1874382). | Culvert Preservation | Exempt | 2028 | CO | 0 | Labor | $53,000.00 | $613,972.00 |
| 123648 | 36.635 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 PM Bridge FY27 | TBD | Project to perform preventative maintenance on some bridges in District 8. Treatments include seal, patching and wrapping bridge columns with Fiber Reinforced Polymer at multiple bridge locations. Other locations may be added. | Bridge Preservation | Exempt | 2027 | CO | 0 | Preservation | $2,634,765.00 | $3,140,225.00 |
| 123648 | 36.636 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 PM Bridge FY27 | TBD | Project to perform preventative maintenance on some bridges in District 8. Treatments include seal, patching and wrapping bridge columns with Fiber Reinforced Polymer at multiple bridge locations. Other locations may be added. | Bridge Preservation | Exempt | 2027 | CO | 0 | State | $300,025.00 | $3,140,225.00 |
| 123648 | 36.637 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 PM Bridge FY27 | TBD | Project to perform preventative maintenance on some bridges in District 8. Treatments include seal, patching and wrapping bridge columns with Fiber Reinforced Polymer at multiple bridge locations. Other locations may be added. | Bridge Preservation | Exempt | 2027 | CO | 0 | Labor | $205,435.00 | $3,140,225.00 |
| 123662 | 36.638 | Ohio | HAM | Group | District 8-Bridges | HAM US 22 4.46 | HAM-22-0446 (US 22 over IR 71) | Project to Replace Superstructure of US 22 over I-71. Vertical Clearance will be increased. Minor substructure repairs will be made. | Bridge Preservation | Exempt | 2028 | ENV | 0 | Preservation | $315,000.00 | $9,852,870.00 |
| 123662 | 36.639 | Ohio | HAM | Group | District 8-Bridges | HAM US 22 4.46 | HAM-22-0446 (US 22 over IR 71) | Project to Replace Superstructure of US 22 over I-71. Vertical Clearance will be increased. Minor substructure repairs will be made. | Bridge Preservation | Exempt | 2028 | ENV | 0 | State | $35,000.00 | $9,852,870.00 |
| 123666 | 36.640 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR US 42 19.15 | WAR US 42 near SLM 19.15 | Project to replace the wearing surface, perform repair abutments, and paint the pier piling on two bridges on US 42 in Warren County. | Bridge Preservation | Exempt | 2027 | ENV | 0 | State | $150,000.00 | $2,183,000.00 |
| 123686 | 36.641 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 PM Bridge FY29 | TBD | Bridge Preventative Maintenance Project to Seal and Wrap Bridge Columns with FRP, to replace expansion joint seals, and/or to replace Polymer Modified Joints. Locations to be determined. | Bridge Preservation | Exempt | 2029 | CO | 0 | Preservation | $2,556,000.00 | $3,038,800.00 |
| 123686 | 36.642 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 PM Bridge FY29 | TBD | Bridge Preventative Maintenance Project to Seal and Wrap Bridge Columns with FRP, to replace expansion joint seals, and/or to replace Polymer Modified Joints. Locations to be determined. | Bridge Preservation | Exempt | 2029 | CO | 0 | State | $284,000.00 | $3,038,800.00 |
| 123686 | 36.643 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 PM Bridge FY29 | TBD | Bridge Preventative Maintenance Project to Seal and Wrap Bridge Columns with FRP, to replace expansion joint seals, and/or to replace Polymer Modified Joints. Locations to be determined. | Bridge Preservation | Exempt | 2029 | CO | 0 | Labor | $198,800.00 | $3,038,800.00 |
| 123687 | 36.644 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 PM Bridge FY28 | TBD | Bridge Preventative Maintenance Project to Seal and Wrap Bridge Columns with FRP, to replace expansion joint seals, and/or to replace Polymer Modified Joints. Locations to be determined. | Bridge Preservation | Exempt | 2028 | CO | 0 | Preservation | $1,242,000.00 | $1,476,600.00 |
| 123687 | 36.645 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 PM Bridge FY28 | TBD | Bridge Preventative Maintenance Project to Seal and Wrap Bridge Columns with FRP, to replace expansion joint seals, and/or to replace Polymer Modified Joints. Locations to be determined. | Bridge Preservation | Exempt | 2028 | CO | 0 | State | $138,000.00 | $1,476,600.00 |
| 123687 | 36.646 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 PM Bridge FY28 | TBD | Bridge Preventative Maintenance Project to Seal and Wrap Bridge Columns with FRP, to replace expansion joint seals, and/or to replace Polymer Modified Joints. Locations to be determined. | Bridge Preservation | Exempt | 2028 | CO | 0 | Labor | $96,600.00 | $1,476,600.00 |
| 123699 | 36.647 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Pump Station O&M FY29-30 | HAM-75 pump stations | Routine Maintenance on the Pump Stations in Hamilton County for FY29-30 | Bridge / Culvert Maintenance | Exempt | 2029 | OTH | 0 | State | $200,000.00 | $400,000.00 |
| 123700 | 36.648 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Retaining Wall FY28 | Location TBD. May include GRE + CLI-68 + WAR | District wide retaining wall maintenance. Repairs to aging lagging or replacement with concrete lagging is expected. Locations to be determined | Geologic Maintenance / Slide Repair | Exempt | 2028 | CO | 0 | State | $200,000.00 | $220,000.00 |
| 123700 | 36.649 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Retaining Wall FY28 | Location TBD. May include GRE + CLI-68 + WAR | District wide retaining wall maintenance. Repairs to aging lagging or replacement with concrete lagging is expected. Locations to be determined | Geologic Maintenance / Slide Repair | Exempt | 2028 | CO | 0 | Labor | $20,000.00 | $220,000.00 |
| 123701 | 40.126 | Ohio | Hamilton | Individual | Harrison, City of | HAM CR 14 3.41 Dry Fork South | Dry Fork Road from Harrison Avenue to the EB I-74 on-ramp and the existing EB I-74 off ramp to Dry Fork Road | Addition of a northbound right turn lane from Dry Fork Road to the eastbound I-74 on ramp. Addition of a right turn lane from the eastbound I-74 off ramp to southbound Dry Fork Road. | Interchange Expansion | Exempt | 2026 | ENV | 1 | Major Programs | $187,535.20 | $4,593,539.00 |
| 123701 | 40.127 | Ohio | Hamilton | Individual | Harrison, City of | HAM CR 14 3.41 Dry Fork South | Dry Fork Road from Harrison Avenue to the EB I-74 on-ramp and the existing EB I-74 off ramp to Dry Fork Road | Addition of a northbound right turn lane from Dry Fork Road to the eastbound I-74 on ramp. Addition of a right turn lane from the eastbound I-74 off ramp to southbound Dry Fork Road. | Interchange Expansion | Exempt | 2026 | ENV | 2 | Local | $46,883.80 | $4,593,539.00 |
| 123701 | 40.168 | Ohio | Hamilton | Individual | Harrison, City of | HAM CR 14 3.41 Dry Fork South | Dry Fork Road from Harrison Avenue to the EB I-74 on-ramp and the existing EB I-74 off ramp to Dry Fork Road | Addition of a northbound right turn lane from Dry Fork Road to the eastbound I-74 on ramp. Addition of a right turn lane from the eastbound I-74 off ramp to southbound Dry Fork Road. | Interchange Expansion | Exempt | 2027 | DD | 1 | Major Programs | $63,296.00 | $2,413,215.62 |
| 123701 | 40.169 | Ohio | Hamilton | Individual | Harrison, City of | HAM CR 14 3.41 Dry Fork South | Dry Fork Road from Harrison Avenue to the EB I-74 on-ramp and the existing EB I-74 off ramp to Dry Fork Road | Addition of a northbound right turn lane from Dry Fork Road to the eastbound I-74 on ramp. Addition of a right turn lane from the eastbound I-74 off ramp to southbound Dry Fork Road. | Interchange Expansion | Exempt | 2027 | DD | 2 | Local | $15,824.00 | $2,413,215.62 |
| 123701 | 40.170 | Ohio | Hamilton | Individual | Harrison, City of | HAM CR 14 3.41 Dry Fork South | Dry Fork Road from Harrison Avenue to the EB I-74 on-ramp and the existing EB I-74 off ramp to Dry Fork Road | Addition of a northbound right turn lane from Dry Fork Road to the eastbound I-74 on ramp. Addition of a right turn lane from the eastbound I-74 off ramp to southbound Dry Fork Road. | Interchange Expansion | Exempt | 2028 | CO | 5 | Major Programs | $1,569,851.68 | $2,413,215.62 |
| 123701 | 40.171 | Ohio | Hamilton | Individual | Harrison, City of | HAM CR 14 3.41 Dry Fork South | Dry Fork Road from Harrison Avenue to the EB I-74 on-ramp and the existing EB I-74 off ramp to Dry Fork Road | Addition of a northbound right turn lane from Dry Fork Road to the eastbound I-74 on ramp. Addition of a right turn lane from the eastbound I-74 off ramp to southbound Dry Fork Road. | Interchange Expansion | Exempt | 2028 | CO | 6 | Labor | $137,362.02 | $2,413,215.62 |
| 123701 | 40.172 | Ohio | Hamilton | Individual | Harrison, City of | HAM CR 14 3.41 Dry Fork South | Dry Fork Road from Harrison Avenue to the EB I-74 on-ramp and the existing EB I-74 off ramp to Dry Fork Road | Addition of a northbound right turn lane from Dry Fork Road to the eastbound I-74 on ramp. Addition of a right turn lane from the eastbound I-74 off ramp to southbound Dry Fork Road. | Interchange Expansion | Exempt | 2028 | CO | 7 | Local | $392,462.92 | $2,413,215.62 |
| 123861 | 36.650 | Ohio | HAM | Group | Ohio Rail Development Commission | HAM Harris Ave IORY | HAM Harris Avenue, City of Norwood, at the Indiana and Ohio River Railroad crossing DOT #525295W | Modification of grade crossing warning devices at the Indiana and Ohio River Railroad grade crossing DOT # 525295W to include traffic signal preemption at the intersection of Harris Avenue and Forest Avenue in the city of Norwood. Installation will includ | Railroad Crossing Protection | Exempt | 2027 | ENV | 0 | Rail | $110,000.00 | $829,240.00 |
| 123861 | 36.651 | Ohio | HAM | Group | Ohio Rail Development Commission | HAM Harris Ave IORY | HAM Harris Avenue, City of Norwood, at the Indiana and Ohio River Railroad crossing DOT #525295W | Modification of grade crossing warning devices at the Indiana and Ohio River Railroad grade crossing DOT # 525295W to include traffic signal preemption at the intersection of Harris Avenue and Forest Avenue in the city of Norwood. Installation will includ | Railroad Crossing Protection | Exempt | 2027 | DD | 0 | Rail | $10,000.00 | $829,240.00 |
| 123861 | 36.652 | Ohio | HAM | Group | Ohio Rail Development Commission | HAM Harris Ave IORY | HAM Harris Avenue, City of Norwood, at the Indiana and Ohio River Railroad crossing DOT #525295W | Modification of grade crossing warning devices at the Indiana and Ohio River Railroad grade crossing DOT # 525295W to include traffic signal preemption at the intersection of Harris Avenue and Forest Avenue in the city of Norwood. Installation will includ | Railroad Crossing Protection | Exempt | 2027 | CO | 0 | Rail | $200,000.00 | $829,240.00 |
| 123861 | 36.653 | Ohio | HAM | Group | Ohio Rail Development Commission | HAM Harris Ave IORY | HAM Harris Avenue, City of Norwood, at the Indiana and Ohio River Railroad crossing DOT #525295W | Modification of grade crossing warning devices at the Indiana and Ohio River Railroad grade crossing DOT # 525295W to include traffic signal preemption at the intersection of Harris Avenue and Forest Avenue in the city of Norwood. Installation will includ | Railroad Crossing Protection | Exempt | 2028 | CO | 0 | Rail | $463,240.00 | $829,240.00 |
| 123861 | 36.654 | Ohio | HAM | Group | Ohio Rail Development Commission | HAM Harris Ave IORY | HAM Harris Avenue, City of Norwood, at the Indiana and Ohio River Railroad crossing DOT #525295W | Modification of grade crossing warning devices at the Indiana and Ohio River Railroad grade crossing DOT # 525295W to include traffic signal preemption at the intersection of Harris Avenue and Forest Avenue in the city of Norwood. Installation will includ | Railroad Crossing Protection | Exempt | 2028 | CO | 0 | Labor | $46,000.00 | $829,240.00 |
| 123891 | 36.655 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR73 19.65 | SR73 from SLM 19.60 to 19.50 | Multiple catchbasin replacement or repairs along SR73 that includes : 19.65, 19.27, 19.36, 19.49, 19.05, and 18.92. Sockline 1965. Replace broken back WAR-73-1836. | Culvert Preservation | Exempt | 2026 | DD | 0 | State | $200,000.00 | $805,000.00 |
| 123974 | 36.656 | Ohio | HAM | Group | Ohio Rail Development Commission | HAM CR 15 Lawrenceburg Rd CIND | HAM CR 15 / Lawrenceburg Road, near Elizabethtown, at the Central Railroad Company of Indiana grade crossing DOT #524781H | Installation of flashing lights and roadway gates at the Central Railroad Company of Indiana grade crossing DOT #1524781H. Installation will include any ancillary work to make warning devices function as designed, MUTCD compliant, and visible to roadway u | Railroad Crossing Protection | Exempt | 2026 | DD | 0 | Rail | $10,000.00 | $363,000.00 |
| 123974 | 36.657 | Ohio | HAM | Group | Ohio Rail Development Commission | HAM CR 15 Lawrenceburg Rd CIND | HAM CR 15 / Lawrenceburg Road, near Elizabethtown, at the Central Railroad Company of Indiana grade crossing DOT #524781H | Installation of flashing lights and roadway gates at the Central Railroad Company of Indiana grade crossing DOT #1524781H. Installation will include any ancillary work to make warning devices function as designed, MUTCD compliant, and visible to roadway u | Railroad Crossing Protection | Exempt | 2026 | CO | 0 | Rail | $350,000.00 | $363,000.00 |
| 123974 | 36.658 | Ohio | HAM | Group | Ohio Rail Development Commission | HAM CR 15 Lawrenceburg Rd CIND | HAM CR 15 / Lawrenceburg Road, near Elizabethtown, at the Central Railroad Company of Indiana grade crossing DOT #524781H | Installation of flashing lights and roadway gates at the Central Railroad Company of Indiana grade crossing DOT #1524781H. Installation will include any ancillary work to make warning devices function as designed, MUTCD compliant, and visible to roadway u | Railroad Crossing Protection | Exempt | 2026 | CO | 0 | Labor | $3,000.00 | $363,000.00 |
| 123977 | 36.659 | Ohio | WAR | Group | Ohio Rail Development Commission | WAR CR 174 Cozaddale Rd IORY | WAR CR 174 / Cozaddale Road, near Pleasant Plain at the Indiana and Ohio River Railway grade crossing DOT #151324T | Installation of flashing lights and roadway gates, to include a new roadway surface at the Indiana and Ohio River Railway grade crossing DOT #151324T. Installation will include any ancillary work to make warning devices function as designed, MUTCD complia | Railroad Crossing Protection | Exempt | 2026 | DD | 0 | Rail | $10,000.00 | $378,000.00 |
| 123977 | 36.660 | Ohio | WAR | Group | Ohio Rail Development Commission | WAR CR 174 Cozaddale Rd IORY | WAR CR 174 / Cozaddale Road, near Pleasant Plain at the Indiana and Ohio River Railway grade crossing DOT #151324T | Installation of flashing lights and roadway gates, to include a new roadway surface at the Indiana and Ohio River Railway grade crossing DOT #151324T. Installation will include any ancillary work to make warning devices function as designed, MUTCD complia | Railroad Crossing Protection | Exempt | 2026 | CO | 0 | Rail | $365,000.00 | $378,000.00 |
| 123977 | 36.661 | Ohio | WAR | Group | Ohio Rail Development Commission | WAR CR 174 Cozaddale Rd IORY | WAR CR 174 / Cozaddale Road, near Pleasant Plain at the Indiana and Ohio River Railway grade crossing DOT #151324T | Installation of flashing lights and roadway gates, to include a new roadway surface at the Indiana and Ohio River Railway grade crossing DOT #151324T. Installation will include any ancillary work to make warning devices function as designed, MUTCD complia | Railroad Crossing Protection | Exempt | 2026 | CO | 0 | Labor | $3,000.00 | $378,000.00 |
| 124090 | 36.662 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT Ross Twp Sign Grant | BUT Ross Twp Sign Grant | Township sign grant to combat run off the road and intersection crashes. | Roadside / Median Improvement (Safety) | Exempt | 2026 | OTH | 0 | Safety | $46,767.16 | $46,767.16 |
| 124094 | 36.663 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE Wayne Twp Sign Grant | CLE Wayne Twp Sign Grant | Township sign grant to combat run off the road and intersection crashes. | Roadside / Median Improvement (Safety) | Exempt | 2026 | OTH | 0 | Safety | $19,818.23 | $19,818.23 |
| 124133 | 36.664 | Ohio | HAM | Group | Norwood, City of | HAM US 22 6.32 Montgomery Rd | US-22 in the City of Norwood | Implement Target Speed Pilot Program countermeasures on US-22 in the City of Norwood including signage, curb extensions, RRFBs and/or PHBs in an effort to lower travel speeds and increase vehicular and pedestrian safety. | Traffic Control (Safety) | Exempt | 2026 | ENV | 0 | State | $27,949.00 | $868,925.10 |
| 124133 | 36.665 | Ohio | HAM | Group | Norwood, City of | HAM US 22 6.32 Montgomery Rd | US-22 in the City of Norwood | Implement Target Speed Pilot Program countermeasures on US-22 in the City of Norwood including signage, curb extensions, RRFBs and/or PHBs in an effort to lower travel speeds and increase vehicular and pedestrian safety. | Traffic Control (Safety) | Exempt | 2026 | DD | 0 | Safety | $20,707.20 | $868,925.10 |
| 124133 | 36.666 | Ohio | HAM | Group | Norwood, City of | HAM US 22 6.32 Montgomery Rd | US-22 in the City of Norwood | Implement Target Speed Pilot Program countermeasures on US-22 in the City of Norwood including signage, curb extensions, RRFBs and/or PHBs in an effort to lower travel speeds and increase vehicular and pedestrian safety. | Traffic Control (Safety) | Exempt | 2026 | DD | 0 | State | $2,300.80 | $868,925.10 |
| 124133 | 36.667 | Ohio | HAM | Group | Norwood, City of | HAM US 22 6.32 Montgomery Rd | US-22 in the City of Norwood | Implement Target Speed Pilot Program countermeasures on US-22 in the City of Norwood including signage, curb extensions, RRFBs and/or PHBs in an effort to lower travel speeds and increase vehicular and pedestrian safety. | Traffic Control (Safety) | Exempt | 2027 | CO | 0 | Safety | $534,974.80 | $868,925.10 |
| 124133 | 36.668 | Ohio | HAM | Group | Norwood, City of | HAM US 22 6.32 Montgomery Rd | US-22 in the City of Norwood | Implement Target Speed Pilot Program countermeasures on US-22 in the City of Norwood including signage, curb extensions, RRFBs and/or PHBs in an effort to lower travel speeds and increase vehicular and pedestrian safety. | Traffic Control (Safety) | Exempt | 2027 | CO | 0 | State | $59,441.65 | $868,925.10 |
| 124133 | 36.669 | Ohio | HAM | Group | Norwood, City of | HAM US 22 6.32 Montgomery Rd | US-22 in the City of Norwood | Implement Target Speed Pilot Program countermeasures on US-22 in the City of Norwood including signage, curb extensions, RRFBs and/or PHBs in an effort to lower travel speeds and increase vehicular and pedestrian safety. | Traffic Control (Safety) | Exempt | 2027 | CO | 0 | Labor | $59,441.65 | $868,925.10 |
| 124134 | 36.670 | Ohio | BUT | Group | Monroe, City of | BUT SR 63 Monroe Signal Upgrades | SR-63 from Lawton Ave to Britton Ln | Install backplates and supplemental signal heads at SR-63 and Lawton Ave, SR-63 and Main St and SR-63 and Britton Ln. in the City of Monroe. | Traffic Control (Safety) | Exempt | 2026 | CO | 0 | Safety | $92,972.41 | $101,306.41 |
| 124134 | 36.671 | Ohio | BUT | Group | Monroe, City of | BUT SR 63 Monroe Signal Upgrades | SR-63 from Lawton Ave to Britton Ln | Install backplates and supplemental signal heads at SR-63 and Lawton Ave, SR-63 and Main St and SR-63 and Britton Ln. in the City of Monroe. | Traffic Control (Safety) | Exempt | 2026 | CO | 0 | Local | $8,334.00 | $101,306.41 |
| 124136 | 36.672 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR Deerfield Twp Sign Grant | WAR Deerfield Twp Sign Grant | Township sign grant to combat run off the road and intersection crashes. | Roadside / Median Improvement (Safety) | Exempt | 2026 | OTH | 0 | Safety | $35,391.44 | $35,391.44 |
| 124141 | 36.673 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE Goshen Twp Sign Grant | CLE Goshen Twp Safety Sign Grant | Township sign grant to combat run off the road and intersection crashes. | Roadside / Median Improvement (Safety) | Exempt | 2026 | OTH | 0 | Safety | $56,467.55 | $56,467.55 |
| 124148 | 36.674 | Ohio | WAR | Group | Lebanon, City of | WAR MasonMorrowMillgrove Imprvmt | Mason Morrow Millgrove Road west of Columbia Road to Cox-Smith Road | Full depth reclamation and widening for approximately 1,550 linear feet of Mason Morrow Millgrove Road | Roadway Improvement (Jobs & Commerce) | Exempt | 2027 | CO | 0 | State | $125,000.00 | $510,137.00 |
| 124148 | 36.675 | Ohio | WAR | Group | Lebanon, City of | WAR MasonMorrowMillgrove Imprvmt | Mason Morrow Millgrove Road west of Columbia Road to Cox-Smith Road | Full depth reclamation and widening for approximately 1,550 linear feet of Mason Morrow Millgrove Road | Roadway Improvement (Jobs & Commerce) | Exempt | 2026 | CO | 0 | Local | $385,137.00 | $510,137.00 |
| 124166 | 36.676 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT Oxford Twp Sign Grant | BUT Oxford Twp Safety Sign Grant | Township sign grant to combat run off the road and intersection crashes. | Roadside / Median Improvement (Safety) | Exempt | 2026 | OTH | 0 | Safety | $35,567.14 | $35,567.14 |
| 124172 | 36.677 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE Pierce Twp Sign Grant | CLE Pierce Twp Safety Sign Grant | Township sign grant to combat run off the road and intersection crashes. | Roadside / Median Improvement (Safety) | Exempt | 2026 | OTH | 0 | Safety | $71,394.72 | $71,394.72 |
| 124217 | 36.678 | Ohio | WAR | Group | District 8 Engineering - Hydraulics | WAR Culverts FY28 state contract | varies | to sockline small culverts WAR-350-0836 (1867789) and WAR-350-0846 (1867786). | Culvert Preservation | Exempt | 2028 | CO | 0 | State | $80,000.00 | $80,000.00 |
| 124231 | 36.679 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Sycamore Twp Sign Grant | HAM Sycamore Twp Safety Sign Grant | Township sign grant to combat run off the road and intersection crashes. | Roadside / Median Improvement (Safety) | Exempt | 2026 | OTH | 0 | Safety | $38,381.13 | $38,381.13 |
| 124278 | 36.680 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE Franklin Twp Sign Grant | CLE Franklinn Twp Safety Sign Grant | Township sign grant to combat run off the road and intersection crashes. | Roadside / Median Improvement (Safety) | Exempt | 2026 | OTH | 0 | Safety | $63,352.81 | $63,352.81 |
| 124318 | 36.681 | Ohio | HAM | Group | Springdale, City of | HAM E Kemper Road Improvements | E. Kemper Road between Commons Drive/Century Boulevard and Chesterdale Road | Road and pedestrian upgrades to improve transit accessibility and multi-modal transportation for local food manufacturer's and other companies' workforce along corridor. | Roadway Improvement (Jobs & Commerce) | Exempt | 2027 | CO | 0 | State | $100,000.00 | $1,924,421.00 |
| 124318 | 36.682 | Ohio | HAM | Group | Springdale, City of | HAM E Kemper Road Improvements | E. Kemper Road between Commons Drive/Century Boulevard and Chesterdale Road | Road and pedestrian upgrades to improve transit accessibility and multi-modal transportation for local food manufacturer's and other companies' workforce along corridor. | Roadway Improvement (Jobs & Commerce) | Exempt | 2026 | CO | 0 | Local | $1,824,421.00 | $1,924,421.00 |
| 124426 | 36.683 | Ohio | HAM | Group | District 8 Engineering - Hydraulics | HAM IR71 1983 FY26 | HAM IR 71 SLM 19.82 to 19.84 | To replace approximately 20 foot section 60 inch CMP pipe for the HAM-71-1983 (1880387) small culvert via purchase order.; Additionally, to seal up joints using state contract 313B-26 via purchase order. | Culvert Preservation | Exempt | 2026 | CO | 0 | State | $180,566.71 | $180,566.71 |
| 124438 | 36.684 | Ohio | CLE | Group | Clermont County TID | CLE Mt Carmel-Tobasco/Clough Pk | Intersection of Mt. Carmel-Tobasco Road and Clough PIke | This project in Union Township includes the detailed design of intersection improvements at Mt. Carmel-Tobasco Rd and Clough Pike. | Roadway Improvement (Jobs & Commerce) | Exempt | 2026 | DD | 0 | State | $385,000.00 | $385,000.00 |
| 124504 | 36.685 | Ohio | D08 | Group | District 8 Engineering - Hydraulics | D08 Conduit Cleanout FY2029 | varies | A statewide project to clean out culvert pipes through a state contract | Culvert Preservation | Exempt | 2029 | OTH | 0 | Preservation | $240,000.00 | $300,000.00 |
| 124504 | 36.686 | Ohio | D08 | Group | District 8 Engineering - Hydraulics | D08 Conduit Cleanout FY2029 | varies | A statewide project to clean out culvert pipes through a state contract | Culvert Preservation | Exempt | 2029 | OTH | 0 | State | $60,000.00 | $300,000.00 |
| 124559 | 36.687 | Ohio | HAM | Group | FHWA | STIC - HCEO PaVision | Hamilton County | State Transportation Innovation Council (STIC) Project "PaVision Low-Cost Data Collection and Analysis" - FFY25 SFY26 - Hamilton County Engineer's Office | Other Studies/ Tasks | Exempt | 2026 | OTH | 0 | Discretionary / Earmark | $25,000.00 | $31,250.00 |
| 124559 | 36.688 | Ohio | HAM | Group | FHWA | STIC - HCEO PaVision | Hamilton County | State Transportation Innovation Council (STIC) Project "PaVision Low-Cost Data Collection and Analysis" - FFY25 SFY26 - Hamilton County Engineer's Office | Other Studies/ Tasks | Exempt | 2026 | OTH | 0 | Local | $6,250.00 | $31,250.00 |
| 124569 | 36.689 | Ohio | HAM, STW | Group | Ohio Rail Development Commission | HAM IORY Brookville Sub | 39.179393, -84.776647 IORY Brookville Sub Cleves, OH | Project is replacement of old 80# rail with 115# CWR, between the CFER switch to the IORY Brookville sub and the Melvin Stone facility about a mile north. Also includes rehabilitation of 4 grade surfaces (1 public, Cilley Road 524788F and 3 private), a fe | Railroad Improvements & Rehabilitation | Exempt | 2026 | OTH | 0 | State | $589,505.00 | $1,179,009.00 |
| 124569 | 36.690 | Ohio | HAM, STW | Group | Ohio Rail Development Commission | HAM IORY Brookville Sub | 39.179393, -84.776647 IORY Brookville Sub Cleves, OH | Project is replacement of old 80# rail with 115# CWR, between the CFER switch to the IORY Brookville sub and the Melvin Stone facility about a mile north. Also includes rehabilitation of 4 grade surfaces (1 public, Cilley Road 524788F and 3 private), a fe | Railroad Improvements & Rehabilitation | Exempt | 2026 | OTH | 0 | Local | $589,504.00 | $1,179,009.00 |
| 124588 | 40.133 | Ohio | Warren | Individual | ODOT Sponsoring Agency | WAR US 42 16.56 - Part 1 | WAR 42 15.66-15.80 & 16.53-16.69 | Improve safety by constructing a roundabout at US-42, Old 122 & Middletown Rd. | Intersection Improvement (Safety) | Exempt | 2026 | ENV | 1 | Safety | $500,000.00 | $5,548,944.00 |
| 124588 | 40.134 | Ohio | Warren | Individual | ODOT Sponsoring Agency | WAR US 42 16.56 - Part 1 | WAR 42 15.66-15.80 & 16.53-16.69 | Improve safety by constructing a roundabout at US-42, Old 122 & Middletown Rd. | Intersection Improvement (Safety) | Exempt | 2026 | ENV | 2 | State | $32,944.00 | $5,548,944.00 |
| 124588 | 40.135 | Ohio | Warren | Individual | ODOT Sponsoring Agency | WAR US 42 16.56 - Part 1 | WAR 42 15.66-15.80 & 16.53-16.69 | Improve safety by constructing a roundabout at US-42, Old 122 & Middletown Rd. | Intersection Improvement (Safety) | Exempt | 2027 | DD | 3 | Safety | $100,000.00 | $5,548,944.00 |
| 124588 | 40.136 | Ohio | Warren | Individual | ODOT Sponsoring Agency | WAR US 42 16.56 - Part 1 | WAR 42 15.66-15.80 & 16.53-16.69 | Improve safety by constructing a roundabout at US-42, Old 122 & Middletown Rd. | Intersection Improvement (Safety) | Exempt | 2028 | RW | 4 | Safety | $550,000.00 | $5,548,944.00 |
| 124588 | 40.137 | Ohio | Warren | Individual | ODOT Sponsoring Agency | WAR US 42 16.56 - Part 1 | WAR 42 15.66-15.80 & 16.53-16.69 | Improve safety by constructing a roundabout at US-42, Old 122 & Middletown Rd. | Intersection Improvement (Safety) | Exempt | 2029 | CO | 6 | Safety | $3,800,000.00 | $5,548,944.00 |
| 124588 | 40.138 | Ohio | Warren | Individual | ODOT Sponsoring Agency | WAR US 42 16.56 - Part 1 | WAR 42 15.66-15.80 & 16.53-16.69 | Improve safety by constructing a roundabout at US-42, Old 122 & Middletown Rd. | Intersection Improvement (Safety) | Exempt | 2029 | CO | 7 | Labor | $266,000.00 | $5,548,944.00 |
| 124594 | 36.691 | Ohio | HAM | Group | Cincinnati, City of | HAM MR 8594 0.60 Duck Creek Rd | Duck Creek Rd from Crane Ave to Dana Ave | Install sidewalk and remove a travel lane on a portion of Duck Creek Rd in the City of Cincinnati. | Pedestrian Facilities | Exempt | 2027 | CO | 0 | Safety | $593,563.50 | $725,467.00 |
| 124594 | 36.692 | Ohio | HAM | Group | Cincinnati, City of | HAM MR 8594 0.60 Duck Creek Rd | Duck Creek Rd from Crane Ave to Dana Ave | Install sidewalk and remove a travel lane on a portion of Duck Creek Rd in the City of Cincinnati. | Pedestrian Facilities | Exempt | 2027 | CO | 0 | Local | $131,903.50 | $725,467.00 |
| 124595 | 36.693 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE CR 171 3.24 Old 74 Sidewalk | Old 74 from Schoolhouse Rd to Dogwood Dr. | Install sidewalk on a portion of Old 74 from Schoolhouse Rd to Dogwood Drive in Union Township, Clermont County, Ohio. | Pedestrian Facilities | Exempt | 2026 | ENV | 0 | Safety | $184,189.60 | $1,821,376.34 |
| 124595 | 36.694 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE CR 171 3.24 Old 74 Sidewalk | Old 74 from Schoolhouse Rd to Dogwood Dr. | Install sidewalk on a portion of Old 74 from Schoolhouse Rd to Dogwood Drive in Union Township, Clermont County, Ohio. | Pedestrian Facilities | Exempt | 2026 | ENV | 0 | Local | $46,047.40 | $1,821,376.34 |
| 124595 | 36.695 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE CR 171 3.24 Old 74 Sidewalk | Old 74 from Schoolhouse Rd to Dogwood Dr. | Install sidewalk on a portion of Old 74 from Schoolhouse Rd to Dogwood Drive in Union Township, Clermont County, Ohio. | Pedestrian Facilities | Exempt | 2027 | DD | 0 | Safety | $22,129.60 | $1,821,376.34 |
| 124595 | 36.696 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE CR 171 3.24 Old 74 Sidewalk | Old 74 from Schoolhouse Rd to Dogwood Dr. | Install sidewalk on a portion of Old 74 from Schoolhouse Rd to Dogwood Drive in Union Township, Clermont County, Ohio. | Pedestrian Facilities | Exempt | 2027 | DD | 0 | Local | $5,532.40 | $1,821,376.34 |
| 124595 | 36.697 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE CR 171 3.24 Old 74 Sidewalk | Old 74 from Schoolhouse Rd to Dogwood Dr. | Install sidewalk on a portion of Old 74 from Schoolhouse Rd to Dogwood Drive in Union Township, Clermont County, Ohio. | Pedestrian Facilities | Exempt | 2028 | RW | 0 | Safety | $91,800.00 | $1,821,376.34 |
| 124595 | 36.698 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE CR 171 3.24 Old 74 Sidewalk | Old 74 from Schoolhouse Rd to Dogwood Dr. | Install sidewalk on a portion of Old 74 from Schoolhouse Rd to Dogwood Drive in Union Township, Clermont County, Ohio. | Pedestrian Facilities | Exempt | 2028 | RW | 0 | Local | $10,200.00 | $1,821,376.34 |
| 124595 | 36.699 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE CR 171 3.24 Old 74 Sidewalk | Old 74 from Schoolhouse Rd to Dogwood Dr. | Install sidewalk on a portion of Old 74 from Schoolhouse Rd to Dogwood Drive in Union Township, Clermont County, Ohio. | Pedestrian Facilities | Exempt | 2029 | CO | 0 | Safety | $1,229,280.00 | $1,821,376.34 |
| 124595 | 36.700 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE CR 171 3.24 Old 74 Sidewalk | Old 74 from Schoolhouse Rd to Dogwood Dr. | Install sidewalk on a portion of Old 74 from Schoolhouse Rd to Dogwood Drive in Union Township, Clermont County, Ohio. | Pedestrian Facilities | Exempt | 2029 | CO | 0 | Labor | $95,610.67 | $1,821,376.34 |
| 124595 | 36.701 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE CR 171 3.24 Old 74 Sidewalk | Old 74 from Schoolhouse Rd to Dogwood Dr. | Install sidewalk on a portion of Old 74 from Schoolhouse Rd to Dogwood Drive in Union Township, Clermont County, Ohio. | Pedestrian Facilities | Exempt | 2029 | CO | 0 | Local | $136,586.67 | $1,821,376.34 |
| 124605 | 36.702 | Ohio | WAR, CLI | Group | ODOT Sponsoring Agency | WAR/CLI US 22 19.24/2.62 | US-22 @ Clarksville Rd, US-22 @ SR-380/Creek Rd | Construct single lane roundabouts on US-22 at Clarksville Rd and US-22 at SR-380/Creek Rd | Intersection Improvement (Safety) | Exempt | 2026 | ENV | 0 | Safety | $800,000.00 | $6,932,532.00 |
| 124605 | 36.703 | Ohio | WAR, CLI | Group | ODOT Sponsoring Agency | WAR/CLI US 22 19.24/2.62 | US-22 @ Clarksville Rd, US-22 @ SR-380/Creek Rd | Construct single lane roundabouts on US-22 at Clarksville Rd and US-22 at SR-380/Creek Rd | Intersection Improvement (Safety) | Exempt | 2028 | DD | 0 | Safety | $250,000.00 | $6,932,532.00 |
| 124605 | 36.704 | Ohio | WAR, CLI | Group | ODOT Sponsoring Agency | WAR/CLI US 22 19.24/2.62 | US-22 @ Clarksville Rd, US-22 @ SR-380/Creek Rd | Construct single lane roundabouts on US-22 at Clarksville Rd and US-22 at SR-380/Creek Rd | Intersection Improvement (Safety) | Exempt | 2028 | RW | 0 | Safety | $400,000.00 | $6,932,532.00 |
| 124605 | 36.705 | Ohio | WAR, CLI | Group | ODOT Sponsoring Agency | WAR/CLI US 22 19.24/2.62 | US-22 @ Clarksville Rd, US-22 @ SR-380/Creek Rd | Construct single lane roundabouts on US-22 at Clarksville Rd and US-22 at SR-380/Creek Rd | Intersection Improvement (Safety) | Exempt | 2029 | CO | 0 | Safety | $5,123,862.00 | $6,932,532.00 |
| 124605 | 36.706 | Ohio | WAR, CLI | Group | ODOT Sponsoring Agency | WAR/CLI US 22 19.24/2.62 | US-22 @ Clarksville Rd, US-22 @ SR-380/Creek Rd | Construct single lane roundabouts on US-22 at Clarksville Rd and US-22 at SR-380/Creek Rd | Intersection Improvement (Safety) | Exempt | 2029 | CO | 0 | Labor | $358,670.00 | $6,932,532.00 |
| 124609 | 36.707 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 129 23.16 | on SR 129 from 0.2 miles west to 0.12 miles east of Maud Hughes Rd. | Project to rehabilitate the BUT-129-2316 bridges that carry SR 129 over Maud-Hughes Rd, Norfolk Southern Railroad, and Gregory Creek. The proposed rehabilitation will include installation of a new rigid overlay, barrier repairs, sealing of concrete surfac | Bridge Preservation | Exempt | 2029 | CO | 0 | Major Programs | $10,000,000.00 | $13,361,000.00 |
| 124609 | 36.708 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 129 23.16 | on SR 129 from 0.2 miles west to 0.12 miles east of Maud Hughes Rd. | Project to rehabilitate the BUT-129-2316 bridges that carry SR 129 over Maud-Hughes Rd, Norfolk Southern Railroad, and Gregory Creek. The proposed rehabilitation will include installation of a new rigid overlay, barrier repairs, sealing of concrete surfac | Bridge Preservation | Exempt | 2029 | CO | 0 | State | $2,500,000.00 | $13,361,000.00 |
| 124609 | 36.709 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 129 23.16 | on SR 129 from 0.2 miles west to 0.12 miles east of Maud Hughes Rd. | Project to rehabilitate the BUT-129-2316 bridges that carry SR 129 over Maud-Hughes Rd, Norfolk Southern Railroad, and Gregory Creek. The proposed rehabilitation will include installation of a new rigid overlay, barrier repairs, sealing of concrete surfac | Bridge Preservation | Exempt | 2029 | CO | 0 | Labor | $861,000.00 | $13,361,000.00 |
| 124627 | 36.710 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 19.80 | On US 50 from 0.13 miles west to 0.03 mi east of Linn St. | Project to rehabilitate the bridges carrying US 50 over three railroad lines and Linn Street in the City of Cincinnati. This Major Rehabilitation is to include replacement of the concrete decks and painting of the structural steel. | Bridge Preservation | Exempt | 2027 | DD | 0 | Preservation | $280,000.00 | $25,681,000.00 |
| 124627 | 36.711 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 19.80 | On US 50 from 0.13 miles west to 0.03 mi east of Linn St. | Project to rehabilitate the bridges carrying US 50 over three railroad lines and Linn Street in the City of Cincinnati. This Major Rehabilitation is to include replacement of the concrete decks and painting of the structural steel. | Bridge Preservation | Exempt | 2027 | DD | 0 | State | $70,000.00 | $25,681,000.00 |
| 124627 | 36.712 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 19.80 | On US 50 from 0.13 miles west to 0.03 mi east of Linn St. | Project to rehabilitate the bridges carrying US 50 over three railroad lines and Linn Street in the City of Cincinnati. This Major Rehabilitation is to include replacement of the concrete decks and painting of the structural steel. | Bridge Preservation | Exempt | 2029 | CO | 0 | Major Programs | $9,320,000.00 | $25,681,000.00 |
| 124627 | 36.713 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 19.80 | On US 50 from 0.13 miles west to 0.03 mi east of Linn St. | Project to rehabilitate the bridges carrying US 50 over three railroad lines and Linn Street in the City of Cincinnati. This Major Rehabilitation is to include replacement of the concrete decks and painting of the structural steel. | Bridge Preservation | Exempt | 2029 | CO | 0 | Preservation | $9,640,000.00 | $25,681,000.00 |
| 124627 | 36.714 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 19.80 | On US 50 from 0.13 miles west to 0.03 mi east of Linn St. | Project to rehabilitate the bridges carrying US 50 over three railroad lines and Linn Street in the City of Cincinnati. This Major Rehabilitation is to include replacement of the concrete decks and painting of the structural steel. | Bridge Preservation | Exempt | 2029 | CO | 0 | State | $4,740,000.00 | $25,681,000.00 |
| 124627 | 36.715 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 50 19.80 | On US 50 from 0.13 miles west to 0.03 mi east of Linn St. | Project to rehabilitate the bridges carrying US 50 over three railroad lines and Linn Street in the City of Cincinnati. This Major Rehabilitation is to include replacement of the concrete decks and painting of the structural steel. | Bridge Preservation | Exempt | 2029 | CO | 0 | Labor | $1,631,000.00 | $25,681,000.00 |
| 124651 | 36.716 | Ohio | BUT | Group | Monroe, City of | BUT Monroe Bicentennial Pk Loop | Bicentennial Commons Park | Construction of a 1-mile multi-use path around the Bicentennial Commons Park in the City of Monroe | Shared Use Path | Exempt | 2026 | ENV | 0 | Safety | $33,903.00 | $1,336,570.92 |
| 124651 | 36.717 | Ohio | BUT | Group | Monroe, City of | BUT Monroe Bicentennial Pk Loop | Bicentennial Commons Park | Construction of a 1-mile multi-use path around the Bicentennial Commons Park in the City of Monroe | Shared Use Path | Exempt | 2026 | ENV | 0 | Local | $3,767.00 | $1,336,570.92 |
| 124651 | 36.718 | Ohio | BUT | Group | Monroe, City of | BUT Monroe Bicentennial Pk Loop | Bicentennial Commons Park | Construction of a 1-mile multi-use path around the Bicentennial Commons Park in the City of Monroe | Shared Use Path | Exempt | 2026 | CO | 0 | Safety | $887,812.29 | $1,336,570.92 |
| 124651 | 36.719 | Ohio | BUT | Group | Monroe, City of | BUT Monroe Bicentennial Pk Loop | Bicentennial Commons Park | Construction of a 1-mile multi-use path around the Bicentennial Commons Park in the City of Monroe | Shared Use Path | Exempt | 2026 | CO | 0 | Local | $411,088.63 | $1,336,570.92 |
| 124653 | 36.720 | Ohio | BUT | Group | Monroe, City of | BUT Monroe Riverside Trail | Bicentennial Commons Park loop trail to City of Monroe northern corp limits | Construction of a 1.8-mile multi-use path from the Bicentennial Commons Park loop north to City limits, including stream bank stabilization along Dicks Creek on the northern end of the project. | Shared Use Path | Exempt | 2026 | ENV | 0 | Safety | $346,752.90 | $3,639,267.00 |
| 124653 | 36.721 | Ohio | BUT | Group | Monroe, City of | BUT Monroe Riverside Trail | Bicentennial Commons Park loop trail to City of Monroe northern corp limits | Construction of a 1.8-mile multi-use path from the Bicentennial Commons Park loop north to City limits, including stream bank stabilization along Dicks Creek on the northern end of the project. | Shared Use Path | Exempt | 2026 | ENV | 0 | Local | $38,528.10 | $3,639,267.00 |
| 124653 | 36.722 | Ohio | BUT | Group | Monroe, City of | BUT Monroe Riverside Trail | Bicentennial Commons Park loop trail to City of Monroe northern corp limits | Construction of a 1.8-mile multi-use path from the Bicentennial Commons Park loop north to City limits, including stream bank stabilization along Dicks Creek on the northern end of the project. | Shared Use Path | Exempt | 2028 | DD | 0 | Safety | $46,284.30 | $3,639,267.00 |
| 124653 | 36.723 | Ohio | BUT | Group | Monroe, City of | BUT Monroe Riverside Trail | Bicentennial Commons Park loop trail to City of Monroe northern corp limits | Construction of a 1.8-mile multi-use path from the Bicentennial Commons Park loop north to City limits, including stream bank stabilization along Dicks Creek on the northern end of the project. | Shared Use Path | Exempt | 2028 | DD | 0 | Local | $5,142.70 | $3,639,267.00 |
| 124653 | 36.724 | Ohio | BUT | Group | Monroe, City of | BUT Monroe Riverside Trail | Bicentennial Commons Park loop trail to City of Monroe northern corp limits | Construction of a 1.8-mile multi-use path from the Bicentennial Commons Park loop north to City limits, including stream bank stabilization along Dicks Creek on the northern end of the project. | Shared Use Path | Exempt | 2029 | CO | 0 | Safety | $568,136.70 | $3,639,267.00 |
| 124653 | 36.725 | Ohio | BUT | Group | Monroe, City of | BUT Monroe Riverside Trail | Bicentennial Commons Park loop trail to City of Monroe northern corp limits | Construction of a 1.8-mile multi-use path from the Bicentennial Commons Park loop north to City limits, including stream bank stabilization along Dicks Creek on the northern end of the project. | Shared Use Path | Exempt | 2029 | CO | 0 | Local | $2,634,422.30 | $3,639,267.00 |
| 124675 | 36.726 | Ohio | BUT | Group | Butler County Engineer | BUT Port Union & LeSaint Dr Rdbt | Intersection of CR 116 and TR 2222 | Construction of a single lane roundabout at the intersection of CR 116 (Port Union Rd.) and TR 2222 (LeSaint Dr.) | Intersection Improvement (Safety) | Exempt | 2026 | ENV | 0 | Local Programs | $14,746.02 | $1,139,746.02 |
| 124676 | 36.727 | Ohio | BUT | Group | Butler County Engineer | BUT Prnctn Rd & Lbrty Frfld RdBt | Intersection of CR 18 (Princeton Rd) and CR 113 (Liberty Fairfield Rd) | Construction of single lane roundabout at the intersection of CR 18 (Princeton Rd.) and CR 113 (Liberty Fairfield Rd.) | Intersection Improvement (Safety) | Exempt | 2026 | ENV | 0 | Local Programs | $14,061.06 | $1,132,061.06 |
| 124681 | 36.728 | Ohio | CLE | Group | Owensville, Village of | CLE US 50 11.47 | Main St (US-50) from SLM 11.47 (just east of Johnnytown Rd) to SLM 11.74 (Clermont County Public Library) | Construct new sidewalk and pedestrian crossings along the north and south side of Main St (US-50) from just east of Johnnytown Rd (MR-447) to Clermont County Public Library. | Pedestrian Facilities | Exempt | 2026 | ENV | 0 | Local Programs | $116,419.00 | $116,419.00 |
| 124774 | 36.729 | Ohio | WAR | Group | Warren County Engineer | WAR CR VAR GR FY29 | TBD | CEAO HSIP funded project to add guardrail to various county routes in Warren County | Roadside / Median Improvement (Safety) | Exempt | 2029 | CO | 0 | Local Programs | $200,000.00 | $200,000.00 |
| 124780 | 36.730 | Ohio | HAM | Group | Symmes Township (Hamilton County) | HAM SR 126 23.78 RRFB | SR126 & Lincoln Rd | Purchase RRFB for SR-126 & Lincoln Rd in Symmes Township. | Enhanced Crossing | Exempt | 2026 | OTH | 0 | State | $13,952.00 | $13,952.00 |
| 124859 | 36.731 | Ohio | HAM | Group | District 8 Engineering - Bridges | HAM IR 275 23.38L | HAM-275-2338L | Project to repair the damage to steel beams of HAM-275-2338L | Bridge / Culvert Maintenance | Exempt | 2026 | ENV | 0 | State | $56,128.00 | $644,628.00 |
| 124859 | 36.732 | Ohio | HAM | Group | District 8 Engineering - Bridges | HAM IR 275 23.38L | HAM-275-2338L | Project to repair the damage to steel beams of HAM-275-2338L | Bridge / Culvert Maintenance | Exempt | 2027 | CO | 0 | State | $550,000.00 | $644,628.00 |
| 124859 | 36.733 | Ohio | HAM | Group | District 8 Engineering - Bridges | HAM IR 275 23.38L | HAM-275-2338L | Project to repair the damage to steel beams of HAM-275-2338L | Bridge / Culvert Maintenance | Exempt | 2027 | CO | 0 | Labor | $38,500.00 | $644,628.00 |
| 124882 | 36.734 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR IR 75 SR 63 FY26 Traffic Ops | I-75 interchange with SR 63 (exit 28) | Traffic control and operations at the I-75 ramps to and from SR 63 during Black Friday CY 2025. | Transport System Mgmt and Ops (TSMO) | Exempt | 2026 | OTH | 0 | State | $10,287.50 | $10,287.50 |
| 124904 | 36.735 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 VAR DMS & QWS Replace FY29 | Various locations within District 8 | Replacement of dynamic message signs and queue warning signs at various locations in District 8. | Transport System Mgmt and Ops (TSMO) | Exempt | 2029 | CO | 0 | State | $4,000,000.00 | $4,280,000.00 |
| 124904 | 36.736 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 VAR DMS & QWS Replace FY29 | Various locations within District 8 | Replacement of dynamic message signs and queue warning signs at various locations in District 8. | Transport System Mgmt and Ops (TSMO) | Exempt | 2029 | CO | 0 | Labor | $280,000.00 | $4,280,000.00 |
| 124934 | 40.139 | Ohio | Hamilton | Individual | Forest Park, City of | HAM West Kemper Rd Resurfacing | West Kemper Rd: from Mill Rd to Winton Rd | Resurfacing West Kemper Road between Mill and Winton Roads | Roadway Minor Rehab | Exempt | 2027 | CO | 6 | MPO STBG | $800,000.00 | $800,000.00 |
| 124935 | 40.140 | Ohio | Hamilton | Individual | Hamilton County Engineer | HAM Neeb Rd Resurfacing | Neeb Road from Cleves-Warsaw Road to Muddy Creek Road | Mill and resurfacing of Neeb Road from Cleves-Warsaw Road to Muddy Creek Road. | Roadway Minor Rehab | Exempt | 2027 | CO | 6 | MPO STBG | $546,920.00 | $590,673.60 |
| 124935 | 40.141 | Ohio | Hamilton | Individual | Hamilton County Engineer | HAM Neeb Rd Resurfacing | Neeb Road from Cleves-Warsaw Road to Muddy Creek Road | Mill and resurfacing of Neeb Road from Cleves-Warsaw Road to Muddy Creek Road. | Roadway Minor Rehab | Exempt | 2027 | CO | 7 | Local | $43,753.60 | $590,673.60 |
| 124935 | 41.587 | Ohio | Hamilton | Individual | Hamilton County Engineer | HAM Neeb Rd Resurfacing | Neeb Road from Cleves-Warsaw Road to Muddy Creek Road | Mill and resurfacing of Neeb Road from Cleves-Warsaw Road to Muddy Creek Road. | Roadway Minor Rehab | Exempt | 2027 | CO | 5 | MPO STBG | $546,920.00 | $590,673.60 |
| 124935 | 41.588 | Ohio | Hamilton | Individual | Hamilton County Engineer | HAM Neeb Rd Resurfacing | Neeb Road from Cleves-Warsaw Road to Muddy Creek Road | Mill and resurfacing of Neeb Road from Cleves-Warsaw Road to Muddy Creek Road. | Roadway Minor Rehab | Exempt | 2027 | CO | 6 | Local | $43,753.60 | $590,673.60 |
| 124944 | 40.144 | Ohio | Hamilton | Individual | Hamilton County Engineer | HAM Newtown and Neeb RPP | Newtown Road from Ragland Road to Bartels Road, Neeb Road from Cleves Warsaw Pike to Muddy Creek Road | Resurfacing of Newtown Road from Ragland Road to Bartels Road, and Neeb Road from Cleves Warsaw Pike to Muddy Creek Road. | Roadway Minor Rehab | Exempt | 2027 | CO | 6 | MPO STBG | $1,105,500.00 | $1,182,885.00 |
| 124944 | 40.145 | Ohio | Hamilton | Individual | Hamilton County Engineer | HAM Newtown and Neeb RPP | Newtown Road from Ragland Road to Bartels Road, Neeb Road from Cleves Warsaw Pike to Muddy Creek Road | Resurfacing of Newtown Road from Ragland Road to Bartels Road, and Neeb Road from Cleves Warsaw Pike to Muddy Creek Road. | Roadway Minor Rehab | Exempt | 2027 | CO | 7 | Local | $77,385.00 | $1,182,885.00 |
| 124949 | 40.173 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Cincy Eggleston RPP | Eggleston Avenue from Pete Rose Way to Court Street | Resurfacing of Eggleston Avenue from Pete Rose Way to Court Street, and 4th Street from Pike Street to Central Avenue - full depth repairs as needed. | Roadway Minor Rehab | Exempt | 2027 | CO | 5 | MPO STBG | $800,000.00 | $4,859,999.55 |
| 124949 | 40.174 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM Cincy Eggleston RPP | Eggleston Avenue from Pete Rose Way to Court Street | Resurfacing of Eggleston Avenue from Pete Rose Way to Court Street, and 4th Street from Pike Street to Central Avenue - full depth repairs as needed. | Roadway Minor Rehab | Exempt | 2027 | CO | 6 | Local | $4,059,999.55 | $4,859,999.55 |
| 124951 | 40.150 | Ohio | Clermont | Individual | Clermont County Engineer | CLE AOB & Clough Pike RPP | Between SR 125 and SR 74 on Amelia Olive Branch Rd, between Bach Buxton and Amelia Olive Branch Rd on Clough Pike | Milling and resurfacing of Amelia Olive Branch Road from State Route 125 to Old State Route 74 as well as milling and resurfacing of Clough Pike from Bach Buxton Rd to Amelia Olive Branch Road. Full depth asphalt repairs will be made in limited areas as n | Roadway Minor Rehab | Exempt | 2027 | CO | 6 | MPO STBG | $800,000.00 | $800,000.00 |
| 124953 | 40.151 | Ohio | Hamilton | Individual | Deer Park | HAM Deer Park Galbraith RPP | Entire length of Galbraith Road within Deer Park city limits | Resurfacing of the entire length of Galbraith Road within the City limits of Deer Park | Roadway Minor Rehab | Exempt | 2027 | CO | 6 | MPO STBG | $800,000.00 | $800,000.00 |
| 124954 | 39.934 | Ohio | Butler | Individual | Butler County Engineer | BUT Cin-Day RPP | Cincinnati Dayton Road from Crescentville Rd to Dimmick Rd | Resurfacing of Cincinnati Dayton Road in Butler County, from Crescentville Road to Dimmick Road. | Roadway Minor Rehab | Exempt | 2027 | CO | 7 | Local | $349,964.95 | $1,149,964.95 |
| 124954 | 40.152 | Ohio | Butler | Individual | Butler County Engineer | BUT Cin-Day RPP | Cincinnati Dayton Road from Crescentville Rd to Dimmick Rd | Resurfacing of Cincinnati Dayton Road in Butler County, from Crescentville Road to Dimmick Road. | Roadway Minor Rehab | Exempt | 2027 | CO | 6 | MPO STBG | $800,000.00 | $1,149,964.95 |
| 124959 | 39.939 | Ohio | Warren | Individual | Mason, City of | WAR Mason Montgomery Rd Resurf | Mason Montgomery Rd from Tylersville Rd to I&O Railroad overpass bridge | Resurfacing of Mason Montgomery Rd from Tylersville Road to I&O Railroad overpass bridge. | Roadway Minor Rehab | Exempt | 2027 | CO | 6 | MPO STBG | $800,000.00 | $856,000.00 |
| 124959 | 39.940 | Ohio | Warren | Individual | Mason, City of | WAR Mason Montgomery Rd Resurf | Mason Montgomery Rd from Tylersville Rd to I&O Railroad overpass bridge | Resurfacing of Mason Montgomery Rd from Tylersville Road to I&O Railroad overpass bridge. | Roadway Minor Rehab | Exempt | 2027 | CO | 7 | Local | $56,000.00 | $856,000.00 |
| 124960 | 41.589 | Ohio | Warren | Individual | Middletown, City of | BUT S.University Blvd Repaving | South University Boulveard between University/Roosevelt Blvd. Overpass to Lafayette Ave | Repaving of South University Boulevard between University/Roosevelt Blvd. Overpass to Lafayette Ave. Includes a 3-inch mill and fill with spot full depth base repair. | Roadway Minor Rehab | Exempt | 2027 | CO | 5 | MPO STBG | $744,000.00 | $800,000.00 |
| 124960 | 41.590 | Ohio | Warren | Individual | Middletown, City of | BUT S.University Blvd Repaving | South University Boulveard between University/Roosevelt Blvd. Overpass to Lafayette Ave | Repaving of South University Boulevard between University/Roosevelt Blvd. Overpass to Lafayette Ave. Includes a 3-inch mill and fill with spot full depth base repair. | Roadway Minor Rehab | Exempt | 2027 | CO | 6 | Local | $56,000.00 | $800,000.00 |
| 124961 | 39.942 | Ohio | Butler | Individual | Trenton, City of | BUT Hamilton Trenton Rd Resurf | Hamilton Trenton Road between State Street (SR73) and Edgewood Drive | Resurfacing of Hamilton Trenton Road between State Street (SR73) and Edgewood Drive | Roadway Minor Rehab | Exempt | 2027 | CO | 6 | MPO STBG | $800,000.00 | $800,000.00 |
| 124965 | 36.737 | Ohio | HAM | Group | Woodlawn, Village of | HAM Woodlawn ATP Study | Not applicable | Project to fund and create an Active Transportation Plan for the Village of Woodlawn | Safety Related Studies | Exempt | 2026 | OTH | 0 | Local Programs | $92,800.00 | $145,000.00 |
| 124965 | 36.738 | Ohio | HAM | Group | Woodlawn, Village of | HAM Woodlawn ATP Study | Not applicable | Project to fund and create an Active Transportation Plan for the Village of Woodlawn | Safety Related Studies | Exempt | 2026 | OTH | 0 | Safety | $23,200.00 | $145,000.00 |
| 124965 | 36.739 | Ohio | HAM | Group | Woodlawn, Village of | HAM Woodlawn ATP Study | Not applicable | Project to fund and create an Active Transportation Plan for the Village of Woodlawn | Safety Related Studies | Exempt | 2026 | OTH | 0 | Local | $29,000.00 | $145,000.00 |
| 124966 | 39.943 | Ohio | Hamilton | Individual | Woodlawn, Village of | HAM Glendale Milford Resurfacing | Glendale Milford Road from Springfield Pike to Wayne Avenue | Resurfacing of Glendale Milford Road from Springfield Pike to Wayne Avenue in the Village of Woodlawn | Roadway Minor Rehab | Exempt | 2027 | CO | 6 | MPO STBG | $782,344.00 | $782,344.00 |
| 124985 | 36.740 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 27 11.56 Lighting PO | HAM 27 11.56-14.78 | Purchase Order to install LED lighting on US-27 between Galbraith Rd and Struble Rd. | Lighting (Safety) | Exempt | 2026 | OTH | 0 | State | $195,682.00 | $195,682.00 |
| 124995 | 36.741 | Ohio | HAM, ADA, BRO, CLE, LAW, SCI | Group | Ohio River Way, Inc. | HAM Ohio River Trail Comp Plan | North Bend, Ohio to Cheapeake, Ohio | Project will consolidate existing local bike plans along the Ohio River corridor, identify current gaps and explore route options, and align individual community efforts detailing next steps for a long-distance cycling connection from North Bend to Chesap | Other Studies/ Tasks | Exempt | 2026 | OTH | 0 | Local Programs | $275,000.00 | $275,000.00 |
| 125029 | 36.742 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT IR 75 & UCB Type 1 ER | I-75 interchange with Union Centre Boulevard in Butler County | Type 1 Emergency for repairs at the Union Centre Boulevard interchange with I-75 in response to the tanker truck fire on 10/28/25. | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | State | $130,000.00 | $143,000.00 |
| 125029 | 36.743 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT IR 75 & UCB Type 1 ER | I-75 interchange with Union Centre Boulevard in Butler County | Type 1 Emergency for repairs at the Union Centre Boulevard interchange with I-75 in response to the tanker truck fire on 10/28/25. | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Labor | $13,000.00 | $143,000.00 |
| 125070 | 36.744 | Ohio | CLE | Group | Ohio Rail Development Commission | CLE CCET Bridge 24.58 - SR 132 | CCET Mainline Bridge SR 132, SR 222 | This project is for the rehabilitation of the bridge spanning State Routes 132 and 222 and the East Fork Little Miami River at Mile Post 24.58 on the CCET main line in Clermont County, OH. Agreement 2025-22. | Railroad Improvements & Rehabilitation | Exempt | 2026 | OTH | 0 | State | $300,000.00 | $600,000.00 |
| 125070 | 36.745 | Ohio | CLE | Group | Ohio Rail Development Commission | CLE CCET Bridge 24.58 - SR 132 | CCET Mainline Bridge SR 132, SR 222 | This project is for the rehabilitation of the bridge spanning State Routes 132 and 222 and the East Fork Little Miami River at Mile Post 24.58 on the CCET main line in Clermont County, OH. Agreement 2025-22. | Railroad Improvements & Rehabilitation | Exempt | 2026 | OTH | 0 | Local | $300,000.00 | $600,000.00 |
| 125126 | 36.746 | Ohio | HAM | Group | Madeira, City of | HAM CR 292 2.76 Camargo Phase 2 | Camargo Road: from Osceola Drive to Blome Road | Reconstruction of Camargo Road and addition of sidewalk between Osceola Drive and Blome Road. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Discretionary / Earmark | $850,000.00 | $4,665,200.00 |
| 125126 | 36.747 | Ohio | HAM | Group | Madeira, City of | HAM CR 292 2.76 Camargo Phase 2 | Camargo Road: from Osceola Drive to Blome Road | Reconstruction of Camargo Road and addition of sidewalk between Osceola Drive and Blome Road. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Labor | $305,200.00 | $4,665,200.00 |
| 125126 | 36.748 | Ohio | HAM | Group | Madeira, City of | HAM CR 292 2.76 Camargo Phase 2 | Camargo Road: from Osceola Drive to Blome Road | Reconstruction of Camargo Road and addition of sidewalk between Osceola Drive and Blome Road. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Local | $3,510,000.00 | $4,665,200.00 |
| 125161 | 36.749 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR - 2026 CEAO Curve Sign Upgd | Various county routes inside Warren County | CEAO 2026 Curve Sign Upgrade Project for Warren County | Roadway Improvement (Safety) | Exempt | 2026 | OTH | 0 | Local Programs | $29,497.00 | $29,497.00 |
| 125191 | 36.750 | Ohio | HAM | Group | Kentucky, Commonwealth of | Brent Spence Br Insp FY27 | HAM-71-0.00 | Brent Spence Bridge Inspection - FY27 | Asset Inventory / Inspection | Exempt | 2027 | OTH | 0 | Major Programs | $100,000.00 | $250,000.00 |
| 125191 | 36.751 | Ohio | HAM | Group | Kentucky, Commonwealth of | Brent Spence Br Insp FY27 | HAM-71-0.00 | Brent Spence Bridge Inspection - FY27 | Asset Inventory / Inspection | Exempt | 2027 | OTH | 0 | State | $25,000.00 | $250,000.00 |
| 125191 | 36.752 | Ohio | HAM | Group | Kentucky, Commonwealth of | Brent Spence Br Insp FY27 | HAM-71-0.00 | Brent Spence Bridge Inspection - FY27 | Asset Inventory / Inspection | Exempt | 2027 | OTH | 0 | Local | $125,000.00 | $250,000.00 |
| 125192 | 36.753 | Ohio | HAM | Group | Kentucky, Commonwealth of | Brent Spence BrInsp FY28 | HAM-71-0.00 | Brent Spence Bridge Inspection - FY28 | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | Major Programs | $4,800.00 | $12,000.00 |
| 125192 | 36.754 | Ohio | HAM | Group | Kentucky, Commonwealth of | Brent Spence BrInsp FY28 | HAM-71-0.00 | Brent Spence Bridge Inspection - FY28 | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | State | $1,200.00 | $12,000.00 |
| 125192 | 36.755 | Ohio | HAM | Group | Kentucky, Commonwealth of | Brent Spence BrInsp FY28 | HAM-71-0.00 | Brent Spence Bridge Inspection - FY28 | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | Local | $6,000.00 | $12,000.00 |
| 125193 | 36.756 | Ohio | HAM | Group | Kentucky, Commonwealth of | Brent Spence Br Insp FY29 | HAM-71-0.00 | Brent Spence Bridge Inspection - FY29 | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | Major Programs | $100,000.00 | $250,000.00 |
| 125193 | 36.757 | Ohio | HAM | Group | Kentucky, Commonwealth of | Brent Spence Br Insp FY29 | HAM-71-0.00 | Brent Spence Bridge Inspection - FY29 | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | State | $25,000.00 | $250,000.00 |
| 125193 | 36.758 | Ohio | HAM | Group | Kentucky, Commonwealth of | Brent Spence Br Insp FY29 | HAM-71-0.00 | Brent Spence Bridge Inspection - FY29 | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | Local | $125,000.00 | $250,000.00 |
| 125204 | 36.759 | Ohio | HAM | Group | Kentucky, Commonwealth of | Clay Wade Bailey Br Insp FY27 | HAM-42-0.00 | Clay Wade Bailey Fracture Critical Bridge Inspection FY27 | Asset Inventory / Inspection | Exempt | 2027 | OTH | 0 | Major Programs | $72,000.00 | $180,000.00 |
| 125204 | 36.760 | Ohio | HAM | Group | Kentucky, Commonwealth of | Clay Wade Bailey Br Insp FY27 | HAM-42-0.00 | Clay Wade Bailey Fracture Critical Bridge Inspection FY27 | Asset Inventory / Inspection | Exempt | 2027 | OTH | 0 | State | $18,000.00 | $180,000.00 |
| 125204 | 36.761 | Ohio | HAM | Group | Kentucky, Commonwealth of | Clay Wade Bailey Br Insp FY27 | HAM-42-0.00 | Clay Wade Bailey Fracture Critical Bridge Inspection FY27 | Asset Inventory / Inspection | Exempt | 2027 | OTH | 0 | Local | $90,000.00 | $180,000.00 |
| 125205 | 36.762 | Ohio | HAM | Group | Kentucky, Commonwealth of | Clay Wade Bailey Br Insp FY28 | HAM-42-0.00 | Clay Wade Bailey Underwater Bridge Inspection FY28 | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | Major Programs | $60,000.00 | $150,000.00 |
| 125205 | 36.763 | Ohio | HAM | Group | Kentucky, Commonwealth of | Clay Wade Bailey Br Insp FY28 | HAM-42-0.00 | Clay Wade Bailey Underwater Bridge Inspection FY28 | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | State | $15,000.00 | $150,000.00 |
| 125205 | 36.764 | Ohio | HAM | Group | Kentucky, Commonwealth of | Clay Wade Bailey Br Insp FY28 | HAM-42-0.00 | Clay Wade Bailey Underwater Bridge Inspection FY28 | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | Local | $75,000.00 | $150,000.00 |
| 125206 | 36.765 | Ohio | HAM | Group | Kentucky, Commonwealth of | Clay Wade Bailey Br Insp FY29 | HAM-42-0.00 | Clay Wade Bailey Underwater Bridge Inspection FY29 | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | Major Programs | $60,000.00 | $150,000.00 |
| 125206 | 36.766 | Ohio | HAM | Group | Kentucky, Commonwealth of | Clay Wade Bailey Br Insp FY29 | HAM-42-0.00 | Clay Wade Bailey Underwater Bridge Inspection FY29 | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | State | $15,000.00 | $150,000.00 |
| 125206 | 36.767 | Ohio | HAM | Group | Kentucky, Commonwealth of | Clay Wade Bailey Br Insp FY29 | HAM-42-0.00 | Clay Wade Bailey Underwater Bridge Inspection FY29 | Asset Inventory / Inspection | Exempt | 2026 | OTH | 0 | Local | $75,000.00 | $150,000.00 |
| 125213 | 39.944 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 11.50 RW Acquisition | SB I-75 at the Village of Lockland corporation limit near Millsdale Street | Acquisition of 3 parcels of right of way near the proposed I-75 SB ramps with Millsdale Street in order to preserve the corridor required for construction of PID 117167. | Add Through Lane(s) | Non-Exempt (Analyzed) | 2026 | RW | 3 | Major Programs | $1,200,000.00 | $1,500,000.00 |
| 125213 | 39.945 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 11.50 RW Acquisition | SB I-75 at the Village of Lockland corporation limit near Millsdale Street | Acquisition of 3 parcels of right of way near the proposed I-75 SB ramps with Millsdale Street in order to preserve the corridor required for construction of PID 117167. | Add Through Lane(s) | Non-Exempt (Analyzed) | 2026 | RW | 7 | State | $300,000.00 | $1,500,000.00 |
| 125213 | 41.591 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 11.50 RW Acquisition | SB I-75 at the Village of Lockland corporation limit near Millsdale Street | Acquisition of 3 parcels of right of way near the proposed I-75 SB ramps with Millsdale Street in order to preserve the corridor required for construction of PID 117167. | Add Through Lane(s) | Non-Exempt (Analyzed) | 2026 | RW | 3 | Major Programs | $240,000.00 | $1,500,000.00 |
| 125213 | 41.592 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 11.50 RW Acquisition | SB I-75 at the Village of Lockland corporation limit near Millsdale Street | Acquisition of 3 parcels of right of way near the proposed I-75 SB ramps with Millsdale Street in order to preserve the corridor required for construction of PID 117167. | Add Through Lane(s) | Non-Exempt (Analyzed) | 2026 | RW | 4 | State | $1,260,000.00 | $1,500,000.00 |
| 125227 | 36.768 | Ohio | HAM | Group | Kentucky, Commonwealth of | Brent Spence Br Insp FY24-25 | HAM-71-0.00 | Brent Spence Bridge Inspection - FY24/25 | Asset Inventory / Inspection | Exempt | 2026 | OTH | 0 | State | $136,073.49 | $136,073.49 |
| 125230 | 36.769 | Ohio | HAM | Group | Kentucky, Commonwealth of | John A Roebling Br Insp FY26-27 | HAM-CR600-0.01 | HAM John A. Roebling Bridge FY26-27 NSTM Bridge Inspection - KYTC lead Ohio River Bridge Inspection. | Asset Inventory / Inspection | Exempt | 2026 | OTH | 0 | Major Programs | $88,000.00 | $440,000.00 |
| 125230 | 36.770 | Ohio | HAM | Group | Kentucky, Commonwealth of | John A Roebling Br Insp FY26-27 | HAM-CR600-0.01 | HAM John A. Roebling Bridge FY26-27 NSTM Bridge Inspection - KYTC lead Ohio River Bridge Inspection. | Asset Inventory / Inspection | Exempt | 2027 | OTH | 0 | Major Programs | $88,000.00 | $440,000.00 |
| 125230 | 36.771 | Ohio | HAM | Group | Kentucky, Commonwealth of | John A Roebling Br Insp FY26-27 | HAM-CR600-0.01 | HAM John A. Roebling Bridge FY26-27 NSTM Bridge Inspection - KYTC lead Ohio River Bridge Inspection. | Asset Inventory / Inspection | Exempt | 2026 | OTH | 0 | State | $22,000.00 | $440,000.00 |
| 125230 | 36.772 | Ohio | HAM | Group | Kentucky, Commonwealth of | John A Roebling Br Insp FY26-27 | HAM-CR600-0.01 | HAM John A. Roebling Bridge FY26-27 NSTM Bridge Inspection - KYTC lead Ohio River Bridge Inspection. | Asset Inventory / Inspection | Exempt | 2027 | OTH | 0 | State | $22,000.00 | $440,000.00 |
| 125230 | 36.773 | Ohio | HAM | Group | Kentucky, Commonwealth of | John A Roebling Br Insp FY26-27 | HAM-CR600-0.01 | HAM John A. Roebling Bridge FY26-27 NSTM Bridge Inspection - KYTC lead Ohio River Bridge Inspection. | Asset Inventory / Inspection | Exempt | 2026 | OTH | 0 | Local | $110,000.00 | $440,000.00 |
| 125230 | 36.774 | Ohio | HAM | Group | Kentucky, Commonwealth of | John A Roebling Br Insp FY26-27 | HAM-CR600-0.01 | HAM John A. Roebling Bridge FY26-27 NSTM Bridge Inspection - KYTC lead Ohio River Bridge Inspection. | Asset Inventory / Inspection | Exempt | 2027 | OTH | 0 | Local | $110,000.00 | $440,000.00 |
| 125240 | 39.946 | Ohio | Butler | Individual | Hamilton, City of | BUT Kettering Hospital EV | 910 Cereal Ave | Installation of EV Charging Systems at Kettering Hospital Parking Lot in the City of Hamilton | Emission Reduction | Exempt | 2026 | CO | 6 | MPO CRP | $415,352.00 | $456,887.20 |
| 125240 | 39.947 | Ohio | Butler | Individual | Hamilton, City of | BUT Kettering Hospital EV | 910 Cereal Ave | Installation of EV Charging Systems at Kettering Hospital Parking Lot in the City of Hamilton | Emission Reduction | Exempt | 2026 | CO | 7 | Local | $41,535.20 | $456,887.20 |
| 125241 | 39.948 | Ohio | Butler | Individual | Hamilton, City of | BUT Justice Center EV | 801 S 8th St | Installation of EV Charging Systems at Justice Center Parking Lot in the City of Hamilton | Emission Reduction | Exempt | 2026 | CO | 6 | MPO CRP | $358,014.00 | $393,815.40 |
| 125241 | 39.949 | Ohio | Butler | Individual | Hamilton, City of | BUT Justice Center EV | 801 S 8th St | Installation of EV Charging Systems at Justice Center Parking Lot in the City of Hamilton | Emission Reduction | Exempt | 2026 | CO | 7 | Local | $35,801.40 | $393,815.40 |
| 125242 | 39.950 | Ohio | Butler | Individual | Hamilton, City of | BUT Hamilton Miami Univ EV | 1606 University Blvd | Installation of EV Charging Systems at Miami University Parking Lot in the City of Hamilton | Emission Reduction | Exempt | 2026 | CO | 6 | MPO CRP | $404,953.00 | $445,448.30 |
| 125242 | 40.153 | Ohio | Butler | Individual | Hamilton, City of | BUT Hamilton Miami Univ EV | 1606 University Blvd | Installation of EV Charging Systems at Miami University Parking Lot in the City of Hamilton | Emission Reduction | Exempt | 2026 | CO | 7 | Local | $40,495.30 | $445,448.30 |
| 125317 | 36.775 | Ohio | HAM | Group | Kentucky, Commonwealth of | John A Roebling Br Insp FY28-29 | HAM-CR600-0.01 | FY28-29 NSTM, Routine, & Underwater Bridge Inspections of the HAM John A. Roebling Bridge over the Ohio River. KYTC will perform the inspections and invoice Ohio for reimbursement. | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | Major Programs | $92,800.00 | $452,000.00 |
| 125317 | 36.776 | Ohio | HAM | Group | Kentucky, Commonwealth of | John A Roebling Br Insp FY28-29 | HAM-CR600-0.01 | FY28-29 NSTM, Routine, & Underwater Bridge Inspections of the HAM John A. Roebling Bridge over the Ohio River. KYTC will perform the inspections and invoice Ohio for reimbursement. | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | Major Programs | $88,000.00 | $452,000.00 |
| 125317 | 36.777 | Ohio | HAM | Group | Kentucky, Commonwealth of | John A Roebling Br Insp FY28-29 | HAM-CR600-0.01 | FY28-29 NSTM, Routine, & Underwater Bridge Inspections of the HAM John A. Roebling Bridge over the Ohio River. KYTC will perform the inspections and invoice Ohio for reimbursement. | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | State | $23,200.00 | $452,000.00 |
| 125317 | 36.778 | Ohio | HAM | Group | Kentucky, Commonwealth of | John A Roebling Br Insp FY28-29 | HAM-CR600-0.01 | FY28-29 NSTM, Routine, & Underwater Bridge Inspections of the HAM John A. Roebling Bridge over the Ohio River. KYTC will perform the inspections and invoice Ohio for reimbursement. | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | State | $22,000.00 | $452,000.00 |
| 125317 | 36.779 | Ohio | HAM | Group | Kentucky, Commonwealth of | John A Roebling Br Insp FY28-29 | HAM-CR600-0.01 | FY28-29 NSTM, Routine, & Underwater Bridge Inspections of the HAM John A. Roebling Bridge over the Ohio River. KYTC will perform the inspections and invoice Ohio for reimbursement. | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | Local | $116,000.00 | $452,000.00 |
| 125317 | 36.780 | Ohio | HAM | Group | Kentucky, Commonwealth of | John A Roebling Br Insp FY28-29 | HAM-CR600-0.01 | FY28-29 NSTM, Routine, & Underwater Bridge Inspections of the HAM John A. Roebling Bridge over the Ohio River. KYTC will perform the inspections and invoice Ohio for reimbursement. | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | Local | $110,000.00 | $452,000.00 |
| 125321 | 36.781 | Ohio | HAM | Group | Kentucky, Commonwealth of | Taylor Southgate Br Insp FY25 | Taylor Southgate Bridge | Fracture Critical Inspection of the Taylor Southgate Bridge across the Ohio River. KYTC will be the lead agency and will invoice ODOT for the Ohio share of the cost of inpsections. | Asset Inventory / Inspection | Exempt | 2026 | OTH | 0 | State | $64,100.05 | $111,719.38 |
| 125321 | 36.782 | Ohio | HAM | Group | Kentucky, Commonwealth of | Taylor Southgate Br Insp FY25 | Taylor Southgate Bridge | Fracture Critical Inspection of the Taylor Southgate Bridge across the Ohio River. KYTC will be the lead agency and will invoice ODOT for the Ohio share of the cost of inpsections. | Asset Inventory / Inspection | Exempt | 2026 | OTH | 0 | Local | $47,619.33 | $111,719.38 |
| 125322 | 36.783 | Ohio | HAM | Group | Kentucky, Commonwealth of | Taylor Southgate Br Insp FY27 | Taylor Southgate Bridge | FY27 Fracture Critical Inspection of the Taylor Southgate Bridge across the Ohio River. KYTC will be the lead agency and will invoice ODOT for the Ohio share of the cost of inspections. | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | Major Programs | $60,000.00 | $150,000.00 |
| 125322 | 36.784 | Ohio | HAM | Group | Kentucky, Commonwealth of | Taylor Southgate Br Insp FY27 | Taylor Southgate Bridge | FY27 Fracture Critical Inspection of the Taylor Southgate Bridge across the Ohio River. KYTC will be the lead agency and will invoice ODOT for the Ohio share of the cost of inspections. | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | State | $15,000.00 | $150,000.00 |
| 125322 | 36.785 | Ohio | HAM | Group | Kentucky, Commonwealth of | Taylor Southgate Br Insp FY27 | Taylor Southgate Bridge | FY27 Fracture Critical Inspection of the Taylor Southgate Bridge across the Ohio River. KYTC will be the lead agency and will invoice ODOT for the Ohio share of the cost of inspections. | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | Local | $75,000.00 | $150,000.00 |
| 125323 | 36.786 | Ohio | HAM | Group | Kentucky, Commonwealth of | Taylor Southgate Br Insp FY28 | Taylor Southgate Bridge | FY28 Underwater and Fracture Critical Inspection of the Taylor Southgate Bridge across the Ohio River. KYTC will be the lead agency and will invoice ODOT for the Ohio share of the cost of inspections. | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | Major Programs | $4,800.00 | $162,000.00 |
| 125323 | 36.787 | Ohio | HAM | Group | Kentucky, Commonwealth of | Taylor Southgate Br Insp FY28 | Taylor Southgate Bridge | FY28 Underwater and Fracture Critical Inspection of the Taylor Southgate Bridge across the Ohio River. KYTC will be the lead agency and will invoice ODOT for the Ohio share of the cost of inspections. | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | Major Programs | $60,000.00 | $162,000.00 |
| 125323 | 36.788 | Ohio | HAM | Group | Kentucky, Commonwealth of | Taylor Southgate Br Insp FY28 | Taylor Southgate Bridge | FY28 Underwater and Fracture Critical Inspection of the Taylor Southgate Bridge across the Ohio River. KYTC will be the lead agency and will invoice ODOT for the Ohio share of the cost of inspections. | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | State | $1,200.00 | $162,000.00 |
| 125323 | 36.789 | Ohio | HAM | Group | Kentucky, Commonwealth of | Taylor Southgate Br Insp FY28 | Taylor Southgate Bridge | FY28 Underwater and Fracture Critical Inspection of the Taylor Southgate Bridge across the Ohio River. KYTC will be the lead agency and will invoice ODOT for the Ohio share of the cost of inspections. | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | State | $15,000.00 | $162,000.00 |
| 125323 | 36.790 | Ohio | HAM | Group | Kentucky, Commonwealth of | Taylor Southgate Br Insp FY28 | Taylor Southgate Bridge | FY28 Underwater and Fracture Critical Inspection of the Taylor Southgate Bridge across the Ohio River. KYTC will be the lead agency and will invoice ODOT for the Ohio share of the cost of inspections. | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | Local | $6,000.00 | $162,000.00 |
| 125323 | 36.791 | Ohio | HAM | Group | Kentucky, Commonwealth of | Taylor Southgate Br Insp FY28 | Taylor Southgate Bridge | FY28 Underwater and Fracture Critical Inspection of the Taylor Southgate Bridge across the Ohio River. KYTC will be the lead agency and will invoice ODOT for the Ohio share of the cost of inspections. | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | Local | $75,000.00 | $162,000.00 |
| 125326 | 36.792 | Ohio | HAM | Group | Kentucky, Commonwealth of | Daniel Carter Beard Br FY25 Ins | Daniel Carter Beard (Big Mac) Bridge NB and SB | Daniel Carter Beard Bridge FY25 Fracture Critical Inspections NB & SB | Asset Inventory / Inspection | Exempt | 2026 | OTH | 0 | State | $236,524.72 | $411,524.72 |
| 125326 | 36.793 | Ohio | HAM | Group | Kentucky, Commonwealth of | Daniel Carter Beard Br FY25 Ins | Daniel Carter Beard (Big Mac) Bridge NB and SB | Daniel Carter Beard Bridge FY25 Fracture Critical Inspections NB & SB | Asset Inventory / Inspection | Exempt | 2026 | OTH | 0 | Local | $175,000.00 | $411,524.72 |
| 125327 | 36.794 | Ohio | HAM | Group | Kentucky, Commonwealth of | Daniel Carter Beard Br FY27 Ins | Daniel Carter Beard (Big Mac) Bridge NB and SB | Daniel Carter Beard Bridge FY27 Fracture Critical Inspections NB & SB | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | Major Programs | $140,000.00 | $350,000.00 |
| 125327 | 36.795 | Ohio | HAM | Group | Kentucky, Commonwealth of | Daniel Carter Beard Br FY27 Ins | Daniel Carter Beard (Big Mac) Bridge NB and SB | Daniel Carter Beard Bridge FY27 Fracture Critical Inspections NB & SB | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | State | $35,000.00 | $350,000.00 |
| 125327 | 36.796 | Ohio | HAM | Group | Kentucky, Commonwealth of | Daniel Carter Beard Br FY27 Ins | Daniel Carter Beard (Big Mac) Bridge NB and SB | Daniel Carter Beard Bridge FY27 Fracture Critical Inspections NB & SB | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | Local | $175,000.00 | $350,000.00 |
| 125329 | 36.797 | Ohio | HAM | Group | Kentucky, Commonwealth of | Daniel Carter Beard Br FY28-29 | Daniel Carter Beard (Big Mac) Bridge NB and SB | Daniel Carter Beard Bridge FY28 and FY29 Fracture Critical and Underwater Inspections NB & SB | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | Major Programs | $8,800.00 | $372,000.00 |
| 125329 | 36.798 | Ohio | HAM | Group | Kentucky, Commonwealth of | Daniel Carter Beard Br FY28-29 | Daniel Carter Beard (Big Mac) Bridge NB and SB | Daniel Carter Beard Bridge FY28 and FY29 Fracture Critical and Underwater Inspections NB & SB | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | State | $2,200.00 | $372,000.00 |
| 125329 | 36.799 | Ohio | HAM | Group | Kentucky, Commonwealth of | Daniel Carter Beard Br FY28-29 | Daniel Carter Beard (Big Mac) Bridge NB and SB | Daniel Carter Beard Bridge FY28 and FY29 Fracture Critical and Underwater Inspections NB & SB | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | Local | $11,000.00 | $372,000.00 |
| 125335 | 36.800 | Ohio | HAM | Group | Kentucky, Commonwealth of | Combs-Hehl Bridge FY24 NDT | Combs-Hehl Bridge which carries I-275 over the Ohio River | Non-Destructive Testing (NDT) of Fracture Critical Members AASHTO M244 Grade 100 (ASTM A514/A517) Steel on the Combs-Hehl Bridge WB & EB in FY24. KYTC is the lead agency and invoice Ohio for their share of the costs. | Asset Inventory / Inspection | Exempt | 2026 | OTH | 0 | State | $506,750.00 | $1,013,500.00 |
| 125335 | 36.801 | Ohio | HAM | Group | Kentucky, Commonwealth of | Combs-Hehl Bridge FY24 NDT | Combs-Hehl Bridge which carries I-275 over the Ohio River | Non-Destructive Testing (NDT) of Fracture Critical Members AASHTO M244 Grade 100 (ASTM A514/A517) Steel on the Combs-Hehl Bridge WB & EB in FY24. KYTC is the lead agency and invoice Ohio for their share of the costs. | Asset Inventory / Inspection | Exempt | 2026 | OTH | 0 | Local | $506,750.00 | $1,013,500.00 |
| 125337 | 36.802 | Ohio | HAM | Group | Kentucky, Commonwealth of | Combs-Hehl Bridge FY25 Insp | HAM-275-41.6 | FY25 Fracture Critical Inspection of the Combs-Hehl Bridge (WB & EB) which carries I-275 across the Ohio River. | Asset Inventory / Inspection | Exempt | 2026 | OTH | 0 | State | $12,783.96 | $172,783.96 |
| 125337 | 36.803 | Ohio | HAM | Group | Kentucky, Commonwealth of | Combs-Hehl Bridge FY25 Insp | HAM-275-41.6 | FY25 Fracture Critical Inspection of the Combs-Hehl Bridge (WB & EB) which carries I-275 across the Ohio River. | Asset Inventory / Inspection | Exempt | 2026 | OTH | 0 | Local | $160,000.00 | $172,783.96 |
| 125338 | 36.804 | Ohio | HAM | Group | Kentucky, Commonwealth of | Combs-Hehl Bridge FY27 Insp | HAM-275-41.6 | FY27 Fracture Critical Inspection of the Combs-Hehl Bridge (WB & EB) which carries I-275 across the Ohio River. | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | Major Programs | $152,000.00 | $380,000.00 |
| 125338 | 36.805 | Ohio | HAM | Group | Kentucky, Commonwealth of | Combs-Hehl Bridge FY27 Insp | HAM-275-41.6 | FY27 Fracture Critical Inspection of the Combs-Hehl Bridge (WB & EB) which carries I-275 across the Ohio River. | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | State | $38,000.00 | $380,000.00 |
| 125338 | 36.806 | Ohio | HAM | Group | Kentucky, Commonwealth of | Combs-Hehl Bridge FY27 Insp | HAM-275-41.6 | FY27 Fracture Critical Inspection of the Combs-Hehl Bridge (WB & EB) which carries I-275 across the Ohio River. | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | Local | $190,000.00 | $380,000.00 |
| 125339 | 36.807 | Ohio | HAM | Group | Kentucky, Commonwealth of | Combs-Hehl Bridge FY28-29 In | HAM-275-41.6 | FY28-29 Underwater and Fracture Critical Inspection of the Combs-Hehl Bridge (WB & EB) which carries I-275 across the Ohio River. | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | Major Programs | $8,800.00 | $402,000.00 |
| 125339 | 36.808 | Ohio | HAM | Group | Kentucky, Commonwealth of | Combs-Hehl Bridge FY28-29 In | HAM-275-41.6 | FY28-29 Underwater and Fracture Critical Inspection of the Combs-Hehl Bridge (WB & EB) which carries I-275 across the Ohio River. | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | Major Programs | $152,000.00 | $402,000.00 |
| 125339 | 36.809 | Ohio | HAM | Group | Kentucky, Commonwealth of | Combs-Hehl Bridge FY28-29 In | HAM-275-41.6 | FY28-29 Underwater and Fracture Critical Inspection of the Combs-Hehl Bridge (WB & EB) which carries I-275 across the Ohio River. | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | State | $2,200.00 | $402,000.00 |
| 125339 | 36.810 | Ohio | HAM | Group | Kentucky, Commonwealth of | Combs-Hehl Bridge FY28-29 In | HAM-275-41.6 | FY28-29 Underwater and Fracture Critical Inspection of the Combs-Hehl Bridge (WB & EB) which carries I-275 across the Ohio River. | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | State | $38,000.00 | $402,000.00 |
| 125339 | 36.811 | Ohio | HAM | Group | Kentucky, Commonwealth of | Combs-Hehl Bridge FY28-29 In | HAM-275-41.6 | FY28-29 Underwater and Fracture Critical Inspection of the Combs-Hehl Bridge (WB & EB) which carries I-275 across the Ohio River. | Asset Inventory / Inspection | Exempt | 2028 | OTH | 0 | Local | $11,000.00 | $402,000.00 |
| 125339 | 36.812 | Ohio | HAM | Group | Kentucky, Commonwealth of | Combs-Hehl Bridge FY28-29 In | HAM-275-41.6 | FY28-29 Underwater and Fracture Critical Inspection of the Combs-Hehl Bridge (WB & EB) which carries I-275 across the Ohio River. | Asset Inventory / Inspection | Exempt | 2029 | OTH | 0 | Local | $190,000.00 | $402,000.00 |
| 125443 | 36.813 | Ohio | BUT | Group | Fairfield, City of | BUT MR 25 0.44 Augusta Bridge | Bridge No. BUT MR 25 0.44 (SFN 0963100) carrying Augusta Blvd. over a tributary to Pleasant Run | Replacement of Augusta Blvd Bridge (SFN 0963100) over Pleasant Run. | Bridge Preservation | Exempt | 2026 | ENV | 0 | Local Programs | $96,471.58 | $1,086,624.21 |
| 125443 | 36.814 | Ohio | BUT | Group | Fairfield, City of | BUT MR 25 0.44 Augusta Bridge | Bridge No. BUT MR 25 0.44 (SFN 0963100) carrying Augusta Blvd. over a tributary to Pleasant Run | Replacement of Augusta Blvd Bridge (SFN 0963100) over Pleasant Run. | Bridge Preservation | Exempt | 2026 | ENV | 0 | Local | $24,117.89 | $1,086,624.21 |
| 125443 | 36.815 | Ohio | BUT | Group | Fairfield, City of | BUT MR 25 0.44 Augusta Bridge | Bridge No. BUT MR 25 0.44 (SFN 0963100) carrying Augusta Blvd. over a tributary to Pleasant Run | Replacement of Augusta Blvd Bridge (SFN 0963100) over Pleasant Run. | Bridge Preservation | Exempt | 2027 | DD | 0 | Local Programs | $48,235.79 | $1,086,624.21 |
| 125443 | 36.816 | Ohio | BUT | Group | Fairfield, City of | BUT MR 25 0.44 Augusta Bridge | Bridge No. BUT MR 25 0.44 (SFN 0963100) carrying Augusta Blvd. over a tributary to Pleasant Run | Replacement of Augusta Blvd Bridge (SFN 0963100) over Pleasant Run. | Bridge Preservation | Exempt | 2027 | DD | 0 | Local | $12,058.95 | $1,086,624.21 |
| 125454 | 36.817 | Ohio | HAM | Group | Kentucky, Commonwealth of | Clay Wade Bailey Br Insp FY25 | HAM-42-0.00 | Clay Wade Bailey Bridge FY25 Fracture Critical Inspections - KY will lead and invoice ODOT for Ohio's share of the inspection costs. | Asset Inventory / Inspection | Exempt | 2026 | OTH | 0 | State | $25,018.50 | $100,018.50 |
| 125454 | 36.818 | Ohio | HAM | Group | Kentucky, Commonwealth of | Clay Wade Bailey Br Insp FY25 | HAM-42-0.00 | Clay Wade Bailey Bridge FY25 Fracture Critical Inspections - KY will lead and invoice ODOT for Ohio's share of the inspection costs. | Asset Inventory / Inspection | Exempt | 2026 | OTH | 0 | Local | $75,000.00 | $100,018.50 |
| 125472 | 40.154 | Ohio | Butler | Individual | Butler County Engineer | BUT County Wide Signals PH 2 | Various intersections across Butler County | Improvements to 34 signals across Butler County | Intersection Improvement (Safety) | Exempt | 2029 | CO | 6 | MPO STBG | $1,111,110.00 | $1,698,411.00 |
| 125472 | 40.155 | Ohio | Butler | Individual | Butler County Engineer | BUT County Wide Signals PH 2 | Various intersections across Butler County | Improvements to 34 signals across Butler County | Intersection Improvement (Safety) | Exempt | 2029 | CO | 7 | Local | $587,301.00 | $1,698,411.00 |
| 125474 | 40.156 | Ohio | Hamilton | Individual | Harrison, City of | HAM Harrison Signals FY29 | The intersections of New Haven Road and Harrison Avenue and West Road and Harrison Avenue in the City of Harrison | Improvement of traffic signals at New Haven Rd & Harrison Ave, and West Rd and Harrison Ave. | Intersection Improvement (Safety) | Exempt | 2028 | RW | 3 | MPO STBG | $80,000.00 | $961,210.75 |
| 125474 | 40.157 | Ohio | Hamilton | Individual | Harrison, City of | HAM Harrison Signals FY29 | The intersections of New Haven Road and Harrison Avenue and West Road and Harrison Avenue in the City of Harrison | Improvement of traffic signals at New Haven Rd & Harrison Ave, and West Rd and Harrison Ave. | Intersection Improvement (Safety) | Exempt | 2028 | RW | 4 | Local | $20,000.00 | $961,210.75 |
| 125474 | 40.158 | Ohio | Hamilton | Individual | Harrison, City of | HAM Harrison Signals FY29 | The intersections of New Haven Road and Harrison Avenue and West Road and Harrison Avenue in the City of Harrison | Improvement of traffic signals at New Haven Rd & Harrison Ave, and West Rd and Harrison Ave. | Intersection Improvement (Safety) | Exempt | 2029 | CO | 6 | MPO STBG | $626,335.00 | $961,210.75 |
| 125474 | 40.159 | Ohio | Hamilton | Individual | Harrison, City of | HAM Harrison Signals FY29 | The intersections of New Haven Road and Harrison Avenue and West Road and Harrison Avenue in the City of Harrison | Improvement of traffic signals at New Haven Rd & Harrison Ave, and West Rd and Harrison Ave. | Intersection Improvement (Safety) | Exempt | 2029 | CO | 7 | Labor | $78,292.00 | $961,210.75 |
| 125474 | 40.160 | Ohio | Hamilton | Individual | Harrison, City of | HAM Harrison Signals FY29 | The intersections of New Haven Road and Harrison Avenue and West Road and Harrison Avenue in the City of Harrison | Improvement of traffic signals at New Haven Rd & Harrison Ave, and West Rd and Harrison Ave. | Intersection Improvement (Safety) | Exempt | 2029 | CO | 8 | Local | $156,583.75 | $961,210.75 |
| 125475 | 40.161 | Ohio | Hamilton | Individual | Forest Park, City of | HAM Winton Rd Shared Use Path | Winton Road from Sharon Road to Kemper Road | Construction of a shared use path (SUP) along Winton Rd between Sharon Rd and Kemper Rd. | Shared Use Path | Exempt | 2026 | DD | 3 | Local Programs | $200,000.00 | $1,770,589.00 |
| 125475 | 40.162 | Ohio | Hamilton | Individual | Forest Park, City of | HAM Winton Rd Shared Use Path | Winton Road from Sharon Road to Kemper Road | Construction of a shared use path (SUP) along Winton Rd between Sharon Rd and Kemper Rd. | Shared Use Path | Exempt | 2029 | CO | 6 | MPO CMAQ | $1,027,488.00 | $1,770,589.00 |
| 125475 | 40.163 | Ohio | Hamilton | Individual | Forest Park, City of | HAM Winton Rd Shared Use Path | Winton Road from Sharon Road to Kemper Road | Construction of a shared use path (SUP) along Winton Rd between Sharon Rd and Kemper Rd. | Shared Use Path | Exempt | 2029 | CO | 7 | Local | $543,101.00 | $1,770,589.00 |
| 125476 | 40.164 | Ohio | Warren | Individual | Mason, City of | WAR MM&SF Intersection Improv | Intersection of Mason Montgomery Rd with Socialville Fosters Rd | Addition of a southbound right turn lane from Mason Montgomery Road to Socialville Fosters Road. Widening of Socialville Fosters Road to add a second left turn lane in each direction. Traffic signal updates to accommodate the additional lanes. | Intersection Improvement (Safety) | Exempt | 2029 | CO | 6 | MPO STBG | $1,829,171.00 | $3,262,021.33 |
| 125476 | 40.165 | Ohio | Warren | Individual | Mason, City of | WAR MM&SF Intersection Improv | Intersection of Mason Montgomery Rd with Socialville Fosters Rd | Addition of a southbound right turn lane from Mason Montgomery Road to Socialville Fosters Road. Widening of Socialville Fosters Road to add a second left turn lane in each direction. Traffic signal updates to accommodate the additional lanes. | Intersection Improvement (Safety) | Exempt | 2029 | CO | 7 | Local | $1,432,850.33 | $3,262,021.33 |
| 125477 | 39.951 | Ohio | Warren | Individual | Lebanon, City of | WAR Lebanon Signals FY29 | Various intersections in the City of Lebanon, OH | Improvements to the traffic signals at various intersections in the City of Lebanon. | Intersection Improvement (Safety) | Exempt | 2029 | CO | 4 | Local | $515,040.00 | $1,489,440.00 |
| 125477 | 40.166 | Ohio | Warren | Individual | Lebanon, City of | WAR Lebanon Signals FY29 | Various intersections in the City of Lebanon, OH | Improvements to the traffic signals at various intersections in the City of Lebanon. | Intersection Improvement (Safety) | Exempt | 2029 | CO | 6 | MPO STBG | $974,400.00 | $1,489,440.00 |
| 125478 | 39.952 | Ohio | Butler | Individual | Monroe, City of | BUT SR 63 Signal Upgrades | SR-63 from SR 4 to Miami Valley Gaming | Upgrades to existing signal system along State Route 63 within the City of Monroe. | Traffic Control (Safety) | Exempt | 2029 | CO | 6 | MPO STBG | $1,527,979.00 | $2,043,671.91 |
| 125478 | 39.953 | Ohio | Butler | Individual | Monroe, City of | BUT SR 63 Signal Upgrades | SR-63 from SR 4 to Miami Valley Gaming | Upgrades to existing signal system along State Route 63 within the City of Monroe. | Traffic Control (Safety) | Exempt | 2029 | CO | 7 | Local | $515,692.91 | $2,043,671.91 |
| 125483 | 39.954 | Ohio | Butler | Individual | Trenton, City of | BUT SR 73 16.65 Trenton TWLTL | SR 73 from Poplin Place to Radabaugh Road | Widening of SR 73 in Trenton for the purpose of adding a two-way left turn lane (TWLTL) between Radabaugh Road and Popplin Place. | Roadway Improvement (Safety) | Exempt | 2029 | CO | 6 | MPO STBG | $356,699.20 | $490,461.40 |
| 125483 | 39.955 | Ohio | Butler | Individual | Trenton, City of | BUT SR 73 16.65 Trenton TWLTL | SR 73 from Poplin Place to Radabaugh Road | Widening of SR 73 in Trenton for the purpose of adding a two-way left turn lane (TWLTL) between Radabaugh Road and Popplin Place. | Roadway Improvement (Safety) | Exempt | 2029 | CO | 7 | Labor | $44,587.40 | $490,461.40 |
| 125483 | 39.956 | Ohio | Butler | Individual | Trenton, City of | BUT SR 73 16.65 Trenton TWLTL | SR 73 from Poplin Place to Radabaugh Road | Widening of SR 73 in Trenton for the purpose of adding a two-way left turn lane (TWLTL) between Radabaugh Road and Popplin Place. | Roadway Improvement (Safety) | Exempt | 2029 | CO | 8 | Local | $89,174.80 | $490,461.40 |
| 125484 | 39.957 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM MR 8582 Victory Parkway Ph2 | Victory Parkway from William Howard Taft to Gilbert Avenue | Project will include dedicated bike lanes along Victory Parkway from William Howard Taft to Gilbert Ave by reducing the number of lanes. Removal of 3 slip lanes at MLK/Victory Parkway/Madison | Roadway Minor Rehab | Exempt | 2029 | CO | 6 | MPO STBG | $6,000,000.00 | $8,560,000.00 |
| 125484 | 39.958 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM MR 8582 Victory Parkway Ph2 | Victory Parkway from William Howard Taft to Gilbert Avenue | Project will include dedicated bike lanes along Victory Parkway from William Howard Taft to Gilbert Ave by reducing the number of lanes. Removal of 3 slip lanes at MLK/Victory Parkway/Madison | Roadway Minor Rehab | Exempt | 2029 | CO | 7 | Local | $2,560,000.00 | $8,560,000.00 |
| 125486 | 39.959 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM US 22 Gilbert Ave Rehab Ph2 | Gilbert Avenue from MLK to Dixmont | The project includes a road diet along Gilbert Avenue from MLK to Dixmont. There will be curb, sidewalk, drainage, resurfacing and pavement markings. Includes removal of 2 slip lanes at intersection of Gilbert and Victory, and 1 slip lane at intersection | Roadway Minor Rehab | Exempt | 2029 | CO | 6 | MPO STBG | $6,000,000.00 | $8,025,000.00 |
| 125486 | 39.960 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM US 22 Gilbert Ave Rehab Ph2 | Gilbert Avenue from MLK to Dixmont | The project includes a road diet along Gilbert Avenue from MLK to Dixmont. There will be curb, sidewalk, drainage, resurfacing and pavement markings. Includes removal of 2 slip lanes at intersection of Gilbert and Victory, and 1 slip lane at intersection | Roadway Minor Rehab | Exempt | 2029 | CO | 7 | Local | $2,025,000.00 | $8,025,000.00 |
| 125487 | 39.961 | Ohio | Butler | Individual | Hamilton, City of | BUT RiversEdge SUP Connection | Along the Great Miami River from RiversEdge/Marcum Park to the Black Street Bridge | Construction of a half mile section of a shared use path (SUP) from RiversEdge/Marcum Park to the Black Street Bridge. | Shared Use Path | Exempt | 2029 | CO | 6 | MPO TA | $998,447.00 | $1,335,422.86 |
| 125487 | 39.962 | Ohio | Butler | Individual | Hamilton, City of | BUT RiversEdge SUP Connection | Along the Great Miami River from RiversEdge/Marcum Park to the Black Street Bridge | Construction of a half mile section of a shared use path (SUP) from RiversEdge/Marcum Park to the Black Street Bridge. | Shared Use Path | Exempt | 2029 | CO | 7 | Local | $336,975.86 | $1,335,422.86 |
| 125488 | 39.963 | Ohio | Clermont | Individual | Miami Township (Clermont County) | CLE Miami Twp Ped Crossing | Intersection of Branch Hill Guinea Pike and Loveland Miamiville Road | Installation of pedestrian crossing facilities at the intersection of Branch Hill Guinea Pike and Loveland Miamiville Road. | Enhanced Crossing | Exempt | 2029 | CO | 6 | MPO TA | $89,797.00 | $120,103.50 |
| 125488 | 39.964 | Ohio | Clermont | Individual | Miami Township (Clermont County) | CLE Miami Twp Ped Crossing | Intersection of Branch Hill Guinea Pike and Loveland Miamiville Road | Installation of pedestrian crossing facilities at the intersection of Branch Hill Guinea Pike and Loveland Miamiville Road. | Enhanced Crossing | Exempt | 2029 | CO | 7 | Local | $30,306.50 | $120,103.50 |
| 125489 | 39.965 | Ohio | Hamilton | Individual | Woodlawn, Village of | HAM Marion & Chester Rd Sidewalk | Marion Rd: from Springfield Pike to Wayne Avenue; Chester Rd: from Marion Road to Linden Avenue | Replacement of existing and construction of new sidewalk along Marion Road and Chester Road in the Village of Woodlawn. | Pedestrian Facilities | Exempt | 2029 | CO | 6 | MPO TA | $520,442.00 | $715,607.50 |
| 125489 | 39.966 | Ohio | Hamilton | Individual | Woodlawn, Village of | HAM Marion & Chester Rd Sidewalk | Marion Rd: from Springfield Pike to Wayne Avenue; Chester Rd: from Marion Road to Linden Avenue | Replacement of existing and construction of new sidewalk along Marion Road and Chester Road in the Village of Woodlawn. | Pedestrian Facilities | Exempt | 2029 | CO | 7 | Labor | $65,055.00 | $715,607.50 |
| 125489 | 39.967 | Ohio | Hamilton | Individual | Woodlawn, Village of | HAM Marion & Chester Rd Sidewalk | Marion Rd: from Springfield Pike to Wayne Avenue; Chester Rd: from Marion Road to Linden Avenue | Replacement of existing and construction of new sidewalk along Marion Road and Chester Road in the Village of Woodlawn. | Pedestrian Facilities | Exempt | 2029 | CO | 8 | Local | $130,110.50 | $715,607.50 |
| 125490 | 39.968 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM ORT Sawyer Pt/Yeatman's Cove | Ohio River Trail from Broadway Street to the Boathouse | Project includes reconstruction of 0.75 miles of the Ohio River Trail from Broadway Street to the Boathouse. Will include removal of railroad tracks currently within the trail. | Bike Facility | Exempt | 2029 | CO | 6 | MPO TA | $1,000,000.00 | $2,140,000.00 |
| 125490 | 39.969 | Ohio | Hamilton | Individual | Cincinnati, City of | HAM ORT Sawyer Pt/Yeatman's Cove | Ohio River Trail from Broadway Street to the Boathouse | Project includes reconstruction of 0.75 miles of the Ohio River Trail from Broadway Street to the Boathouse. Will include removal of railroad tracks currently within the trail. | Bike Facility | Exempt | 2029 | CO | 7 | Local | $1,140,000.00 | $2,140,000.00 |
| 125493 | 39.970 | Ohio | Hamilton | Individual | Anderson Township (Hamilton County) | HAM Clough Pike & 8 Mile Impr | Intersection of Clough Pike & Eight Mile Road in Anderson Township (Hamilton County), OH | Improvements to the intersection of Clough Pike & Eight Mile Road in Anderson Township (Hamilton County), OH. | Intersection Improvement (Safety) | Exempt | 2028 | RW | 3 | MPO CMAQ | $280,000.00 | $1,004,720.00 |
| 125493 | 39.971 | Ohio | Hamilton | Individual | Anderson Township (Hamilton County) | HAM Clough Pike & 8 Mile Impr | Intersection of Clough Pike & Eight Mile Road in Anderson Township (Hamilton County), OH | Improvements to the intersection of Clough Pike & Eight Mile Road in Anderson Township (Hamilton County), OH. | Intersection Improvement (Safety) | Exempt | 2028 | RW | 4 | Local | $70,000.00 | $1,004,720.00 |
| 125493 | 39.972 | Ohio | Hamilton | Individual | Anderson Township (Hamilton County) | HAM Clough Pike & 8 Mile Impr | Intersection of Clough Pike & Eight Mile Road in Anderson Township (Hamilton County), OH | Improvements to the intersection of Clough Pike & Eight Mile Road in Anderson Township (Hamilton County), OH. | Intersection Improvement (Safety) | Exempt | 2029 | CO | 6 | MPO CMAQ | $476,160.00 | $1,004,720.00 |
| 125493 | 39.973 | Ohio | Hamilton | Individual | Anderson Township (Hamilton County) | HAM Clough Pike & 8 Mile Impr | Intersection of Clough Pike & Eight Mile Road in Anderson Township (Hamilton County), OH | Improvements to the intersection of Clough Pike & Eight Mile Road in Anderson Township (Hamilton County), OH. | Intersection Improvement (Safety) | Exempt | 2029 | CO | 7 | Local | $178,560.00 | $1,004,720.00 |
| 125498 | 39.974 | Ohio | Warren | Individual | Lebanon, City of | WAR TR 101 1.30 Miller Rd SUP | Miller Road from SR 48 to Drake Road | Construction of a shared use path (SUP) along Miller Road from SR 48 to Drake Road. | Shared Use Path | Exempt | 2029 | CO | 6 | MPO TA | $969,777.00 | $1,482,374.15 |
| 125498 | 39.975 | Ohio | Warren | Individual | Lebanon, City of | WAR TR 101 1.30 Miller Rd SUP | Miller Road from SR 48 to Drake Road | Construction of a shared use path (SUP) along Miller Road from SR 48 to Drake Road. | Shared Use Path | Exempt | 2029 | CO | 7 | Local | $512,597.15 | $1,482,374.15 |
| 125499 | 39.976 | Ohio | Clermont | Individual | Pierce Township (Clermont County) | CLE Pierce Twp Jenny Lind SUP | Jenny Lind Road: from Clermont County Amelia Olive Branch library to Sedona Ridge | Construct a SUP to connect Sedona Ridge to the Amelia Olive Branch Clermont County Library branch | Pedestrian Facilities | Exempt | 2027 | RW | 3 | MPO TA | $40,000.00 | $726,455.30 |
| 125499 | 39.977 | Ohio | Clermont | Individual | Pierce Township (Clermont County) | CLE Pierce Twp Jenny Lind SUP | Jenny Lind Road: from Clermont County Amelia Olive Branch library to Sedona Ridge | Construct a SUP to connect Sedona Ridge to the Amelia Olive Branch Clermont County Library branch | Pedestrian Facilities | Exempt | 2028 | RW | 3 | MPO TA | $48,960.00 | $726,455.30 |
| 125499 | 39.978 | Ohio | Clermont | Individual | Pierce Township (Clermont County) | CLE Pierce Twp Jenny Lind SUP | Jenny Lind Road: from Clermont County Amelia Olive Branch library to Sedona Ridge | Construct a SUP to connect Sedona Ridge to the Amelia Olive Branch Clermont County Library branch | Pedestrian Facilities | Exempt | 2027 | RW | 4 | Local | $10,000.00 | $726,455.30 |
| 125499 | 39.979 | Ohio | Clermont | Individual | Pierce Township (Clermont County) | CLE Pierce Twp Jenny Lind SUP | Jenny Lind Road: from Clermont County Amelia Olive Branch library to Sedona Ridge | Construct a SUP to connect Sedona Ridge to the Amelia Olive Branch Clermont County Library branch | Pedestrian Facilities | Exempt | 2028 | RW | 4 | Local | $12,240.00 | $726,455.30 |
| 125499 | 39.980 | Ohio | Clermont | Individual | Pierce Township (Clermont County) | CLE Pierce Twp Jenny Lind SUP | Jenny Lind Road: from Clermont County Amelia Olive Branch library to Sedona Ridge | Construct a SUP to connect Sedona Ridge to the Amelia Olive Branch Clermont County Library branch | Pedestrian Facilities | Exempt | 2029 | CO | 5 | MPO TA | $492,204.24 | $726,455.30 |
| 125499 | 39.981 | Ohio | Clermont | Individual | Pierce Township (Clermont County) | CLE Pierce Twp Jenny Lind SUP | Jenny Lind Road: from Clermont County Amelia Olive Branch library to Sedona Ridge | Construct a SUP to connect Sedona Ridge to the Amelia Olive Branch Clermont County Library branch | Pedestrian Facilities | Exempt | 2029 | CO | 6 | Local | $123,051.06 | $726,455.30 |
| 125545 | 39.982 | Ohio | Butler | Individual | Butler County TID | BUT N. B and Rhea Roundabout | 150' South of Black street and 150' North of Gordon Avenue | Project will include a roundabout at Rhea ave and N. B Street, addition of a median, sidewalk and a multi use path. | Intersection Improvement (Safety) | Exempt | 2027 | RW | 3 | MPO STBG | $40,000.00 | $5,279,458.80 |
| 125545 | 39.983 | Ohio | Butler | Individual | Butler County TID | BUT N. B and Rhea Roundabout | 150' South of Black street and 150' North of Gordon Avenue | Project will include a roundabout at Rhea ave and N. B Street, addition of a median, sidewalk and a multi use path. | Intersection Improvement (Safety) | Exempt | 2028 | RW | 3 | MPO STBG | $752,000.00 | $5,279,458.80 |
| 125545 | 39.984 | Ohio | Butler | Individual | Butler County TID | BUT N. B and Rhea Roundabout | 150' South of Black street and 150' North of Gordon Avenue | Project will include a roundabout at Rhea ave and N. B Street, addition of a median, sidewalk and a multi use path. | Intersection Improvement (Safety) | Exempt | 2027 | RW | 4 | Local | $10,000.00 | $5,279,458.80 |
| 125545 | 39.985 | Ohio | Butler | Individual | Butler County TID | BUT N. B and Rhea Roundabout | 150' South of Black street and 150' North of Gordon Avenue | Project will include a roundabout at Rhea ave and N. B Street, addition of a median, sidewalk and a multi use path. | Intersection Improvement (Safety) | Exempt | 2028 | RW | 4 | Local | $188,000.00 | $5,279,458.80 |
| 125545 | 39.986 | Ohio | Butler | Individual | Butler County TID | BUT N. B and Rhea Roundabout | 150' South of Black street and 150' North of Gordon Avenue | Project will include a roundabout at Rhea ave and N. B Street, addition of a median, sidewalk and a multi use path. | Intersection Improvement (Safety) | Exempt | 2029 | CO | 6 | MPO STBG | $3,207,072.00 | $5,279,458.80 |
| 125545 | 39.987 | Ohio | Butler | Individual | Butler County TID | BUT N. B and Rhea Roundabout | 150' South of Black street and 150' North of Gordon Avenue | Project will include a roundabout at Rhea ave and N. B Street, addition of a median, sidewalk and a multi use path. | Intersection Improvement (Safety) | Exempt | 2029 | CO | 7 | Local | $1,082,386.80 | $5,279,458.80 |
| 125546 | 39.988 | Ohio | Hamilton | Individual | Loveland, City of | HAM CR 299 Loveland Madeira Ph2 | intersection of S. Lebanon and Loveland Madeira street to intersection of W.Loveland and Loveland Madeira Street | project includes curb and gutter, access management, medians, drainage, signage and resurfacing to rehabilitate the corridor. | Roadway Minor Rehab | Exempt | 2027 | RW | 3 | MPO STBG | $107,835.00 | $5,552,932.06 |
| 125546 | 39.989 | Ohio | Hamilton | Individual | Loveland, City of | HAM CR 299 Loveland Madeira Ph2 | intersection of S. Lebanon and Loveland Madeira street to intersection of W.Loveland and Loveland Madeira Street | project includes curb and gutter, access management, medians, drainage, signage and resurfacing to rehabilitate the corridor. | Roadway Minor Rehab | Exempt | 2028 | RW | 3 | MPO STBG | $869,000.00 | $5,552,932.06 |
| 125546 | 39.990 | Ohio | Hamilton | Individual | Loveland, City of | HAM CR 299 Loveland Madeira Ph2 | intersection of S. Lebanon and Loveland Madeira street to intersection of W.Loveland and Loveland Madeira Street | project includes curb and gutter, access management, medians, drainage, signage and resurfacing to rehabilitate the corridor. | Roadway Minor Rehab | Exempt | 2027 | RW | 4 | Local | $26,958.75 | $5,552,932.06 |
| 125546 | 39.991 | Ohio | Hamilton | Individual | Loveland, City of | HAM CR 299 Loveland Madeira Ph2 | intersection of S. Lebanon and Loveland Madeira street to intersection of W.Loveland and Loveland Madeira Street | project includes curb and gutter, access management, medians, drainage, signage and resurfacing to rehabilitate the corridor. | Roadway Minor Rehab | Exempt | 2028 | RW | 4 | Local | $217,250.00 | $5,552,932.06 |
| 125546 | 39.992 | Ohio | Hamilton | Individual | Loveland, City of | HAM CR 299 Loveland Madeira Ph2 | intersection of S. Lebanon and Loveland Madeira street to intersection of W.Loveland and Loveland Madeira Street | project includes curb and gutter, access management, medians, drainage, signage and resurfacing to rehabilitate the corridor. | Roadway Minor Rehab | Exempt | 2029 | CO | 6 | MPO STBG | $3,238,795.00 | $5,552,932.06 |
| 125546 | 40.167 | Ohio | Hamilton | Individual | Loveland, City of | HAM CR 299 Loveland Madeira Ph2 | intersection of S. Lebanon and Loveland Madeira street to intersection of W.Loveland and Loveland Madeira Street | project includes curb and gutter, access management, medians, drainage, signage and resurfacing to rehabilitate the corridor. | Roadway Minor Rehab | Exempt | 2029 | CO | 7 | Local | $1,093,093.31 | $5,552,932.06 |
| 125554 | 36.819 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 73 10.73 | intersection of SR-73 and SR-503 (BUT SR 73 10.73) | Construct a single lane modern roundabout at the intersection of Trenton Oxford Rd (SR-73) and W Elkton Rd (SR-503) in Butler County. | Intersection Improvement (Safety) | Exempt | 2028 | RW | 0 | Safety | $315,000.00 | $3,931,392.00 |
| 125554 | 36.820 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 73 10.73 | intersection of SR-73 and SR-503 (BUT SR 73 10.73) | Construct a single lane modern roundabout at the intersection of Trenton Oxford Rd (SR-73) and W Elkton Rd (SR-503) in Butler County. | Intersection Improvement (Safety) | Exempt | 2028 | RW | 0 | State | $35,000.00 | $3,931,392.00 |
| 125565 | 36.821 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM PCL 22 | HAM US 27 near SLM 1.63 | PID for Purchase Order for Hamilton County taxes on an ODOT owned parcel. | Miscellaneous | Exempt | 2026 | OTH | 0 | Local | $10,493.46 | $10,493.46 |
| 125617 | 36.822 | Ohio | CLE | Group | Union Township (Clermont County) | CLE Union Twp STP | N/A | 2026 School Travel Plan for Union Twp, Clermont Co | Other Studies/ Tasks | Exempt | 2026 | OTH | 0 | Local Programs | $43,872.00 | $43,872.00 |
| 125624 | 36.823 | Ohio | BUT | Group | Butler County Engineer | BUT CR 178 1.17 Ross Hanover Rd | Ross Hanover Rd (CR 178) SLM 1.17-1.29 | Adjust vertical profile and cross section on a portion of Ross Hanover Rd. | Roadway Improvement (Safety) | Exempt | 2028 | CO | 0 | Safety | $714,115.80 | $872,808.20 |
| 125624 | 36.824 | Ohio | BUT | Group | Butler County Engineer | BUT CR 178 1.17 Ross Hanover Rd | Ross Hanover Rd (CR 178) SLM 1.17-1.29 | Adjust vertical profile and cross section on a portion of Ross Hanover Rd. | Roadway Improvement (Safety) | Exempt | 2028 | CO | 0 | Local | $158,692.40 | $872,808.20 |
| 125625 | 36.825 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 32 4.20 Cable | CLE 32 4.20-5.80 | Install median cable barrier on a portion of SR-32 in Clermont County. | Roadside / Median Improvement (Safety) | Exempt | 2027 | CO | 0 | Preservation | $135,000.00 | $825,000.00 |
| 125625 | 36.826 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 32 4.20 Cable | CLE 32 4.20-5.80 | Install median cable barrier on a portion of SR-32 in Clermont County. | Roadside / Median Improvement (Safety) | Exempt | 2027 | CO | 0 | Safety | $540,000.00 | $825,000.00 |
| 125625 | 36.827 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 32 4.20 Cable | CLE 32 4.20-5.80 | Install median cable barrier on a portion of SR-32 in Clermont County. | Roadside / Median Improvement (Safety) | Exempt | 2027 | CO | 0 | State | $75,000.00 | $825,000.00 |
| 125625 | 36.828 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 32 4.20 Cable | CLE 32 4.20-5.80 | Install median cable barrier on a portion of SR-32 in Clermont County. | Roadside / Median Improvement (Safety) | Exempt | 2027 | CO | 0 | Labor | $75,000.00 | $825,000.00 |
| 125631 | 36.829 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 131 0.97-2.10 Sidewalk FS | SR-131: from McCormick Trail (SLM 0.97) to Wolfpen Pleasant Hill Rd (SLM 2.10) | Complete a Feasibility Study to determine a preferred alternative for sidewalk along SR-131 between McCormick Trail (TR-3082) and Wolfpen Pleasant Hill Rd (CR-132). | Preliminary Development Tasks | Exempt | 2027 | OTH | 0 | Safety | $135,000.00 | $150,000.00 |
| 125631 | 36.830 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 131 0.97-2.10 Sidewalk FS | SR-131: from McCormick Trail (SLM 0.97) to Wolfpen Pleasant Hill Rd (SLM 2.10) | Complete a Feasibility Study to determine a preferred alternative for sidewalk along SR-131 between McCormick Trail (TR-3082) and Wolfpen Pleasant Hill Rd (CR-132). | Preliminary Development Tasks | Exempt | 2027 | OTH | 0 | State | $15,000.00 | $150,000.00 |
| 125645 | 36.831 | Ohio | CLE | Group | District 8 Engineering | CLE SR 222 21.53 | SR-222 at Mt Holly Rd/Chapel Rd | Flatten out horizontal curve at SR-222 and Mt Holly Rd/Chapel Rd and realign existing intersection through new curve. | Roadway Improvement (Safety) | Exempt | 2028 | RW | 0 | Safety | $270,000.00 | $1,584,000.00 |
| 125645 | 36.832 | Ohio | CLE | Group | District 8 Engineering | CLE SR 222 21.53 | SR-222 at Mt Holly Rd/Chapel Rd | Flatten out horizontal curve at SR-222 and Mt Holly Rd/Chapel Rd and realign existing intersection through new curve. | Roadway Improvement (Safety) | Exempt | 2028 | RW | 0 | State | $30,000.00 | $1,584,000.00 |
| 125645 | 36.833 | Ohio | CLE | Group | District 8 Engineering | CLE SR 222 21.53 | SR-222 at Mt Holly Rd/Chapel Rd | Flatten out horizontal curve at SR-222 and Mt Holly Rd/Chapel Rd and realign existing intersection through new curve. | Roadway Improvement (Safety) | Exempt | 2029 | CO | 0 | Safety | $1,155,600.00 | $1,584,000.00 |
| 125645 | 36.834 | Ohio | CLE | Group | District 8 Engineering | CLE SR 222 21.53 | SR-222 at Mt Holly Rd/Chapel Rd | Flatten out horizontal curve at SR-222 and Mt Holly Rd/Chapel Rd and realign existing intersection through new curve. | Roadway Improvement (Safety) | Exempt | 2029 | CO | 0 | State | $128,400.00 | $1,584,000.00 |
| 125654 | 36.835 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 350 4.30 | WAR 350 4.303-7.887 | Resurface a portion of SR350 in Warren County. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Preservation | $789,360.00 | $1,055,769.00 |
| 125654 | 36.836 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 350 4.30 | WAR 350 4.303-7.887 | Resurface a portion of SR350 in Warren County. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | State | $197,340.00 | $1,055,769.00 |
| 125654 | 36.837 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR SR 350 4.30 | WAR 350 4.303-7.887 | Resurface a portion of SR350 in Warren County. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Labor | $69,069.00 | $1,055,769.00 |
| 125656 | 36.838 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 222 5.12 | CLE 222 5.118-18.036 | Resurface a portion of SR-222 in Clermont County. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Preservation | $2,566,960.00 | $3,337,048.00 |
| 125656 | 36.839 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 222 5.12 | CLE 222 5.118-18.036 | Resurface a portion of SR-222 in Clermont County. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | State | $641,740.00 | $3,337,048.00 |
| 125656 | 36.840 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 222 5.12 | CLE 222 5.118-18.036 | Resurface a portion of SR-222 in Clermont County. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Labor | $128,348.00 | $3,337,048.00 |
| 125658 | 36.841 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT IR 75 5.51 | BUT 75 5.513-7.127 | Resurfacing a portion of I-75 in Butler County. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Preservation | $3,591,720.00 | $4,150,432.00 |
| 125658 | 36.842 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT IR 75 5.51 | BUT 75 5.513-7.127 | Resurfacing a portion of I-75 in Butler County. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | State | $399,080.00 | $4,150,432.00 |
| 125658 | 36.843 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT IR 75 5.51 | BUT 75 5.513-7.127 | Resurfacing a portion of I-75 in Butler County. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Labor | $159,632.00 | $4,150,432.00 |
| 125660 | 36.844 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR CHIP FY2028 | Varies | Chip sealing various routes in Warren County. | Pavement Maintenance | Exempt | 2028 | CO | 0 | Preservation | $673,600.00 | $900,685.00 |
| 125660 | 36.845 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR CHIP FY2028 | Varies | Chip sealing various routes in Warren County. | Pavement Maintenance | Exempt | 2028 | CO | 0 | State | $168,400.00 | $900,685.00 |
| 125660 | 36.846 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR CHIP FY2028 | Varies | Chip sealing various routes in Warren County. | Pavement Maintenance | Exempt | 2028 | CO | 0 | Labor | $58,685.00 | $900,685.00 |
| 125679 | 36.847 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Bridge Patching FY2027 | Various | Project to fund Purchase Orders in FY 2027 for patching of concrete bridge decks using State Term Contract | Bridge / Culvert Maintenance | Exempt | 2027 | OTH | 0 | State | $600,000.00 | $600,000.00 |
| 125680 | 36.848 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Bridge Patching FY2028 | Various | Project to fund Purchase Orders in FY 2028 for patching of concrete bridge decks using State Term Contract | Bridge / Culvert Maintenance | Exempt | 2028 | OTH | 0 | State | $400,000.00 | $400,000.00 |
| 125759 | 36.849 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 Bridge Patching FY2029 | Various | Project to fund Purchase Orders in FY 2029 for patching of concrete bridge decks using State Term Contract | Bridge / Culvert Maintenance | Exempt | 2029 | OTH | 0 | State | $400,000.00 | $400,000.00 |
| 125835 | 36.850 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 52 31.99 | HAM 52 31.99 | Project to replace the deck of the HAM-52-3199 bridge that carries a ramp from Eastbound US 52 to Salem Rd over US 52. | Bridge Preservation | Exempt | 2029 | ENV | 0 | Preservation | $320,000.00 | $2,915,480.00 |
| 125835 | 36.851 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 52 31.99 | HAM 52 31.99 | Project to replace the deck of the HAM-52-3199 bridge that carries a ramp from Eastbound US 52 to Salem Rd over US 52. | Bridge Preservation | Exempt | 2029 | ENV | 0 | State | $80,000.00 | $2,915,480.00 |
| 125924 | 36.852 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM IR 75 0.00 Sign | HAM 75 0.00-8.00 | TRAFFIC OPERATIONS PURCHASE ORDER PROJECT TO OVERLAY OVERHEAD GUIDE SIGNS DOWNTOWN ON I-75 AS GAP PROJECT. | Traffic Control (Safety) | Exempt | 2027 | OTH | 0 | State | $200,000.00 | $200,000.00 |
| 125925 | 36.853 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 OUPS FY2028 | Various | Consultant OUPS Location Contract for Signals/Lighting/ITS in District 8. | Other Studies/ Tasks | Exempt | 2028 | OTH | 0 | State | $200,000.00 | $200,000.00 |
| 125926 | 36.854 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 ITS MAINTENANCE FY2028/29 | Various | District Wide ITS Maintenance | Traffic Control Maintenance | Exempt | 2028 | CO | 0 | Preservation | $800,000.00 | $1,070,000.00 |
| 125926 | 36.855 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 ITS MAINTENANCE FY2028/29 | Various | District Wide ITS Maintenance | Traffic Control Maintenance | Exempt | 2028 | CO | 0 | State | $200,000.00 | $1,070,000.00 |
| 125926 | 36.856 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 ITS MAINTENANCE FY2028/29 | Various | District Wide ITS Maintenance | Traffic Control Maintenance | Exempt | 2028 | CO | 0 | Labor | $70,000.00 | $1,070,000.00 |
| 125927 | 36.857 | Ohio | D08 | Group | ODOT Sponsoring Agency | D08 OUPS FY2029 | Various | Consultant OUPS Location Contract for Signals/Lighting/ITS in District 8. | Other Studies/ Tasks | Exempt | 2029 | OTH | 0 | State | $200,000.00 | $200,000.00 |
| 125943 | 36.858 | Ohio | BUT | Group | Butler County Engineer | BUT SR 63 1.92 Yankee | SR-63 & Yankee Rd | Extend the EB left turn lane and WB right turn lane on SR-63 at Yankee Rd. | Intersection Improvement (Safety) | Exempt | 2027 | CO | 0 | Safety | $257,364.00 | $314,553.00 |
| 125943 | 36.859 | Ohio | BUT | Group | Butler County Engineer | BUT SR 63 1.92 Yankee | SR-63 & Yankee Rd | Extend the EB left turn lane and WB right turn lane on SR-63 at Yankee Rd. | Intersection Improvement (Safety) | Exempt | 2027 | CO | 0 | State | $28,596.00 | $314,553.00 |
| 125943 | 36.860 | Ohio | BUT | Group | Butler County Engineer | BUT SR 63 1.92 Yankee | SR-63 & Yankee Rd | Extend the EB left turn lane and WB right turn lane on SR-63 at Yankee Rd. | Intersection Improvement (Safety) | Exempt | 2027 | CO | 0 | Labor | $28,593.00 | $314,553.00 |
| 125944 | 36.861 | Ohio | CLE | Group | Goshen Local School District (Clermont County) | CLE Goshen STP 2026 | Goshen Local School District | Development of a School Travel Plan for Goshen Local School District in Goshen Township. | Safety Related Studies | Exempt | 2026 | OTH | 0 | Local Programs | $46,690.89 | $46,690.89 |
| 126079 | 36.862 | Ohio | BUT | Group | Butler County Engineer | BUT Windisch Rd Brdg Replacement | Windisch Road between Crescentville Road and Allen Road | This project is a superstructure replacement over Mill Creek, which also involves encasing steel piles for a stronger foundation of the bridge in West Chester Township. | Roadway Improvement (Jobs & Commerce) | Exempt | 2027 | CO | 0 | State | $250,000.00 | $1,292,439.00 |
| 126079 | 36.863 | Ohio | BUT | Group | Butler County Engineer | BUT Windisch Rd Brdg Replacement | Windisch Road between Crescentville Road and Allen Road | This project is a superstructure replacement over Mill Creek, which also involves encasing steel piles for a stronger foundation of the bridge in West Chester Township. | Roadway Improvement (Jobs & Commerce) | Exempt | 2026 | CO | 0 | Local | $345,815.00 | $1,292,439.00 |
| 126079 | 36.864 | Ohio | BUT | Group | Butler County Engineer | BUT Windisch Rd Brdg Replacement | Windisch Road between Crescentville Road and Allen Road | This project is a superstructure replacement over Mill Creek, which also involves encasing steel piles for a stronger foundation of the bridge in West Chester Township. | Roadway Improvement (Jobs & Commerce) | Exempt | 2027 | CO | 0 | Local | $696,624.00 | $1,292,439.00 |
| 126082 | 36.865 | Ohio | BUT | Group | Butler County Engineer | BUT Liberty Fairfield Brdg Repl | 400 feet south of State Route 4 on Liberty Fairfield Road | Bridge replacement on Liberty Fairfield Road with a new concrete structure | Roadway Improvement (Jobs & Commerce) | Exempt | 2026 | CO | 0 | State | $200,000.00 | $704,595.00 |
| 126082 | 36.866 | Ohio | BUT | Group | Butler County Engineer | BUT Liberty Fairfield Brdg Repl | 400 feet south of State Route 4 on Liberty Fairfield Road | Bridge replacement on Liberty Fairfield Road with a new concrete structure | Roadway Improvement (Jobs & Commerce) | Exempt | 2026 | CO | 0 | Local | $504,595.00 | $704,595.00 |
| 126111 | 36.867 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM Bridge ROW FY29 | Location TBD | Purchasing ROW beneath ODOT bridges in Hamilton County in FY2029. | Real Estate Services | Exempt | 2029 | RW | 0 | State | $200,000.00 | $200,000.00 |
| 126128 | 36.868 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 11.38 FY28 | HAM SR 126: SLM 11.38-15.68 | GAP Pavement repairs on a portion of SR 126 (Cross County) in Hamilton County | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Preservation | $800,000.00 | $1,070,000.00 |
| 126128 | 36.869 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 11.38 FY28 | HAM SR 126: SLM 11.38-15.68 | GAP Pavement repairs on a portion of SR 126 (Cross County) in Hamilton County | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | State | $200,000.00 | $1,070,000.00 |
| 126128 | 36.870 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 126 11.38 FY28 | HAM SR 126: SLM 11.38-15.68 | GAP Pavement repairs on a portion of SR 126 (Cross County) in Hamilton County | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Labor | $70,000.00 | $1,070,000.00 |
| 126136 | 36.871 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT US 127 17.60 | BUT US 127: SLM 17.6 - 21.09 | GAP Resurfacing a portion of US 127 in Butler County. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Preservation | $1,824,800.00 | $2,372,240.00 |
| 126136 | 36.872 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT US 127 17.60 | BUT US 127: SLM 17.6 - 21.09 | GAP Resurfacing a portion of US 127 in Butler County. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | State | $456,200.00 | $2,372,240.00 |
| 126136 | 36.873 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT US 127 17.60 | BUT US 127: SLM 17.6 - 21.09 | GAP Resurfacing a portion of US 127 in Butler County. | Roadway Minor Rehab | Exempt | 2028 | CO | 0 | Labor | $91,240.00 | $2,372,240.00 |
| 126146 | 36.874 | Ohio | HAM | Group | District 8 Engineering - Hydraulics | HAM Culverts FY28 state contract | varies | sockline small culverts HAM-74-7.08 and 7.35 | Culvert Preservation | Exempt | 2028 | CO | 0 | State | $210,000.00 | $210,000.00 |
| 126250 | 36.875 | Ohio | CLE | Group | CO Facilities | D08 CLE IR275 TP Restrooms NB/SB | Clermont IR-275 NB/SB Truck Parking | Clermont IR-275 NB/SB Truck Parking Restrooms | Other Building / Facility Work | Exempt | 2026 | DD | 0 | State | $82,050.00 | $89,669.05 |
| 126250 | 36.876 | Ohio | CLE | Group | CO Facilities | D08 CLE IR275 TP Restrooms NB/SB | Clermont IR-275 NB/SB Truck Parking | Clermont IR-275 NB/SB Truck Parking Restrooms | Other Building / Facility Work | Exempt | 2026 | CO | 0 | State | $7,619.05 | $89,669.05 |
| 126278 | 36.877 | Ohio | BUT | Group | Ohio Rail Development Commission | BUT Hamilton Consolidation CSXT | City of Hamilton, Butler County, at the CSXT grade crossings of Butler St. (DOT# 152404P) and Ludlow St. (DOT# 152400M) | Permanent closure of the CSX Transportation grade crossings at Butler St. (DOT# 152404P) and Ludlow St. (DOT# 152400M) in the City of Hamilton, Butler County, in exchange for incentive payments under 23 USC Section 130. | Railroad Crossing Protection | Exempt | 2026 | CO | 0 | Rail | $60,000.00 | $120,000.00 |
| 126278 | 36.878 | Ohio | BUT | Group | Ohio Rail Development Commission | BUT Hamilton Consolidation CSXT | City of Hamilton, Butler County, at the CSXT grade crossings of Butler St. (DOT# 152404P) and Ludlow St. (DOT# 152400M) | Permanent closure of the CSX Transportation grade crossings at Butler St. (DOT# 152404P) and Ludlow St. (DOT# 152400M) in the City of Hamilton, Butler County, in exchange for incentive payments under 23 USC Section 130. | Railroad Crossing Protection | Exempt | 2026 | CO | 0 | Local | $60,000.00 | $120,000.00 |
| 126286 | 36.879 | Ohio | WAR | Group | Warren County Park District | WAR Gulley Park Resurfacing | Gulley Park (2168 Middleboro Road, Clarksville, OH 45113) | Perform pavement repair and overlay existing driveway and parking area in Gulley Park. | Parks | Exempt | 2026 | OTH | 0 | State | $126,330.00 | $126,330.00 |
| 126289 | 36.880 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE-CR-389-NEVI RD3 | CR 00389 (Clepper Ln) - 0.400 to 0.581 | Installing Electric Vehicle Charging Stations along Clepper Ln (CR 00389) in Clermont County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Other | $34,000.00 | $1,056,600.00 |
| 126289 | 36.881 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE-CR-389-NEVI RD3 | CR 00389 (Clepper Ln) - 0.400 to 0.581 | Installing Electric Vehicle Charging Stations along Clepper Ln (CR 00389) in Clermont County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Local | $8,500.00 | $1,056,600.00 |
| 126289 | 36.882 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE-CR-389-NEVI RD3 | CR 00389 (Clepper Ln) - 0.400 to 0.581 | Installing Electric Vehicle Charging Stations along Clepper Ln (CR 00389) in Clermont County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Other | $811,280.00 | $1,056,600.00 |
| 126289 | 36.883 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE-CR-389-NEVI RD3 | CR 00389 (Clepper Ln) - 0.400 to 0.581 | Installing Electric Vehicle Charging Stations along Clepper Ln (CR 00389) in Clermont County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Local | $202,820.00 | $1,056,600.00 |
| 126303 | 36.884 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-SR-48-NEVI RD3 | SR 00048 (Route 48) - 6.400 to 6.635. | Installing Electric Vehicle Charging Stations along Route 48 (SR 00048) in Warren County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Other | $50,050.00 | $1,385,500.00 |
| 126303 | 36.885 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-SR-48-NEVI RD3 | SR 00048 (Route 48) - 6.400 to 6.635. | Installing Electric Vehicle Charging Stations along Route 48 (SR 00048) in Warren County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Local | $21,450.00 | $1,385,500.00 |
| 126303 | 36.886 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-SR-48-NEVI RD3 | SR 00048 (Route 48) - 6.400 to 6.635. | Installing Electric Vehicle Charging Stations along Route 48 (SR 00048) in Warren County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Other | $919,800.00 | $1,385,500.00 |
| 126303 | 36.887 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-SR-48-NEVI RD3 | SR 00048 (Route 48) - 6.400 to 6.635. | Installing Electric Vehicle Charging Stations along Route 48 (SR 00048) in Warren County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Local | $394,200.00 | $1,385,500.00 |
| 126304 | 36.888 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-US-42-NEVI RD3 | US 00042 (Columbus Ave) - 12.000 to 12.289 | Installing Electric Vehicle Charging Stations along Columbus Ave (US 00042) in Warren County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Other | $50,050.00 | $1,355,500.00 |
| 126304 | 36.889 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-US-42-NEVI RD3 | US 00042 (Columbus Ave) - 12.000 to 12.289 | Installing Electric Vehicle Charging Stations along Columbus Ave (US 00042) in Warren County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Local | $21,450.00 | $1,355,500.00 |
| 126304 | 36.890 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-US-42-NEVI RD3 | US 00042 (Columbus Ave) - 12.000 to 12.289 | Installing Electric Vehicle Charging Stations along Columbus Ave (US 00042) in Warren County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Other | $898,800.00 | $1,355,500.00 |
| 126304 | 36.891 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-US-42-NEVI RD3 | US 00042 (Columbus Ave) - 12.000 to 12.289 | Installing Electric Vehicle Charging Stations along Columbus Ave (US 00042) in Warren County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Local | $385,200.00 | $1,355,500.00 |
| 126306 | 36.892 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-SR-741-NEVI RD3 | King Mills Rd (SR 00741) - 1.065 to 1.300. | Installing Electric Vehicle Charging Stations along King Mills Rd (SR 00741) in Warren County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Other | $50,050.00 | $1,375,500.00 |
| 126306 | 36.893 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-SR-741-NEVI RD3 | King Mills Rd (SR 00741) - 1.065 to 1.300. | Installing Electric Vehicle Charging Stations along King Mills Rd (SR 00741) in Warren County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Local | $21,450.00 | $1,375,500.00 |
| 126306 | 36.894 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-SR-741-NEVI RD3 | King Mills Rd (SR 00741) - 1.065 to 1.300. | Installing Electric Vehicle Charging Stations along King Mills Rd (SR 00741) in Warren County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Other | $912,800.00 | $1,375,500.00 |
| 126306 | 36.895 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-SR-741-NEVI RD3 | King Mills Rd (SR 00741) - 1.065 to 1.300. | Installing Electric Vehicle Charging Stations along King Mills Rd (SR 00741) in Warren County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Local | $391,200.00 | $1,375,500.00 |
| 126307 | 36.896 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM-US-42-NEVI RD3 | US 00042 (Lebanon Rd) - 15.66 - 15.800 | Installing Electric Vehicle Charging Stations along Lebanon Rd (US 00042) in Hamilton County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Other | $50,050.00 | $1,355,500.00 |
| 126307 | 36.897 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM-US-42-NEVI RD3 | US 00042 (Lebanon Rd) - 15.66 - 15.800 | Installing Electric Vehicle Charging Stations along Lebanon Rd (US 00042) in Hamilton County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Local | $21,450.00 | $1,355,500.00 |
| 126307 | 36.898 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM-US-42-NEVI RD3 | US 00042 (Lebanon Rd) - 15.66 - 15.800 | Installing Electric Vehicle Charging Stations along Lebanon Rd (US 00042) in Hamilton County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Other | $898,800.00 | $1,355,500.00 |
| 126307 | 36.899 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM-US-42-NEVI RD3 | US 00042 (Lebanon Rd) - 15.66 - 15.800 | Installing Electric Vehicle Charging Stations along Lebanon Rd (US 00042) in Hamilton County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Local | $385,200.00 | $1,355,500.00 |
| 126318 | 36.900 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM-US-27-NEVI RD3 | US 00027 - 11.25 to 11.565 | Installing Electric Vehicle Charging Stations along US 27 (US 00027) in Hamilton County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Other | $72,600.00 | $883,790.00 |
| 126318 | 36.901 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM-US-27-NEVI RD3 | US 00027 - 11.25 to 11.565 | Installing Electric Vehicle Charging Stations along US 27 (US 00027) in Hamilton County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Local | $48,400.00 | $883,790.00 |
| 126318 | 36.902 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM-US-27-NEVI RD3 | US 00027 - 11.25 to 11.565 | Installing Electric Vehicle Charging Stations along US 27 (US 00027) in Hamilton County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Other | $457,674.00 | $883,790.00 |
| 126318 | 36.903 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM-US-27-NEVI RD3 | US 00027 - 11.25 to 11.565 | Installing Electric Vehicle Charging Stations along US 27 (US 00027) in Hamilton County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Local | $305,116.00 | $883,790.00 |
| 126319 | 36.904 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT-CR-20-NEVI RD3 | Tylersville Rd (CR 00020) - 10.382 to 10.750 | Installing Electric Vehicle Charging Stations along Tylersville Rd (CR 00020) in Butler County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Other | $72,600.00 | $883,790.00 |
| 126319 | 36.905 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT-CR-20-NEVI RD3 | Tylersville Rd (CR 00020) - 10.382 to 10.750 | Installing Electric Vehicle Charging Stations along Tylersville Rd (CR 00020) in Butler County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Local | $48,400.00 | $883,790.00 |
| 126319 | 36.906 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT-CR-20-NEVI RD3 | Tylersville Rd (CR 00020) - 10.382 to 10.750 | Installing Electric Vehicle Charging Stations along Tylersville Rd (CR 00020) in Butler County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Other | $457,674.00 | $883,790.00 |
| 126319 | 36.907 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT-CR-20-NEVI RD3 | Tylersville Rd (CR 00020) - 10.382 to 10.750 | Installing Electric Vehicle Charging Stations along Tylersville Rd (CR 00020) in Butler County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Local | $305,116.00 | $883,790.00 |
| 126323 | 36.908 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE-CR-87-NEVI RD3 | Mt Carmel Tobasco Rd (CR 00087) - 2.250 to 2.600 | Installing Electric Vehicle Charging Stations along Mt Carmel Tobasco Rd (CR 00087) in Clermont County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Other | $41,400.00 | $1,360,486.00 |
| 126323 | 36.909 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE-CR-87-NEVI RD3 | Mt Carmel Tobasco Rd (CR 00087) - 2.250 to 2.600 | Installing Electric Vehicle Charging Stations along Mt Carmel Tobasco Rd (CR 00087) in Clermont County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Local | $10,350.00 | $1,360,486.00 |
| 126323 | 36.910 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE-CR-87-NEVI RD3 | Mt Carmel Tobasco Rd (CR 00087) - 2.250 to 2.600 | Installing Electric Vehicle Charging Stations along Mt Carmel Tobasco Rd (CR 00087) in Clermont County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Other | $1,046,988.80 | $1,360,486.00 |
| 126323 | 36.911 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE-CR-87-NEVI RD3 | Mt Carmel Tobasco Rd (CR 00087) - 2.250 to 2.600 | Installing Electric Vehicle Charging Stations along Mt Carmel Tobasco Rd (CR 00087) in Clermont County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Local | $261,747.20 | $1,360,486.00 |
| 126325 | 36.912 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT-TR-18-NEVI RD3 | Princeton Rd (TR 00018) - 1.000 to 1.600 | Installing Electric Vehicle Charging Stations along Princeton Rd (TR 00018) in Butler County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Other | $41,400.00 | $1,310,003.00 |
| 126325 | 36.913 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT-TR-18-NEVI RD3 | Princeton Rd (TR 00018) - 1.000 to 1.600 | Installing Electric Vehicle Charging Stations along Princeton Rd (TR 00018) in Butler County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Local | $10,350.00 | $1,310,003.00 |
| 126325 | 36.914 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT-TR-18-NEVI RD3 | Princeton Rd (TR 00018) - 1.000 to 1.600 | Installing Electric Vehicle Charging Stations along Princeton Rd (TR 00018) in Butler County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Other | $1,006,602.40 | $1,310,003.00 |
| 126325 | 36.915 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT-TR-18-NEVI RD3 | Princeton Rd (TR 00018) - 1.000 to 1.600 | Installing Electric Vehicle Charging Stations along Princeton Rd (TR 00018) in Butler County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Local | $251,650.60 | $1,310,003.00 |
| 126352 | 36.916 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM-SR-125-NEVI RD3 | SR 00125 (Beechmont Ave) - 1.700 to 1.810. | Installing Electric Vehicle Charging Stations along Beechmont Ave (SR 00125) in Hamilton County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Other | $50,050.00 | $1,355,500.00 |
| 126352 | 36.917 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM-SR-125-NEVI RD3 | SR 00125 (Beechmont Ave) - 1.700 to 1.810. | Installing Electric Vehicle Charging Stations along Beechmont Ave (SR 00125) in Hamilton County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Local | $21,450.00 | $1,355,500.00 |
| 126352 | 36.918 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM-SR-125-NEVI RD3 | SR 00125 (Beechmont Ave) - 1.700 to 1.810. | Installing Electric Vehicle Charging Stations along Beechmont Ave (SR 00125) in Hamilton County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Other | $898,800.00 | $1,355,500.00 |
| 126352 | 36.919 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM-SR-125-NEVI RD3 | SR 00125 (Beechmont Ave) - 1.700 to 1.810. | Installing Electric Vehicle Charging Stations along Beechmont Ave (SR 00125) in Hamilton County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Local | $385,200.00 | $1,355,500.00 |
| 126354 | 36.920 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-SR-122-NEVI RD3 | SR 00122 (OH-122) - 0.990 to 1.500 | Installing Electric Vehicle Charging Stations along OH-122(SR 00122) in Warren County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Other | $34,650.00 | $1,149,497.00 |
| 126354 | 36.921 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-SR-122-NEVI RD3 | SR 00122 (OH-122) - 0.990 to 1.500 | Installing Electric Vehicle Charging Stations along OH-122(SR 00122) in Warren County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Local | $10,350.00 | $1,149,497.00 |
| 126354 | 36.922 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-SR-122-NEVI RD3 | SR 00122 (OH-122) - 0.990 to 1.500 | Installing Electric Vehicle Charging Stations along OH-122(SR 00122) in Warren County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Other | $850,462.69 | $1,149,497.00 |
| 126354 | 36.923 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-SR-122-NEVI RD3 | SR 00122 (OH-122) - 0.990 to 1.500 | Installing Electric Vehicle Charging Stations along OH-122(SR 00122) in Warren County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Local | $254,034.31 | $1,149,497.00 |
| 126360 | 36.924 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-SR-350-NEVI RD3 | SR 00350 (OH-350) - 0.000 to 0.550 | Installing Electric Vehicle Charging Stations along OH-350 (SR 00350) in Warren County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Other | $21,600.00 | $1,250,776.00 |
| 126360 | 36.925 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-SR-350-NEVI RD3 | SR 00350 (OH-350) - 0.000 to 0.550 | Installing Electric Vehicle Charging Stations along OH-350 (SR 00350) in Warren County. | Other Building / Facility Work | Exempt | 2027 | DD | 0 | Local | $14,400.00 | $1,250,776.00 |
| 126360 | 36.926 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-SR-350-NEVI RD3 | SR 00350 (OH-350) - 0.000 to 0.550 | Installing Electric Vehicle Charging Stations along OH-350 (SR 00350) in Warren County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Other | $728,865.60 | $1,250,776.00 |
| 126360 | 36.927 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR-SR-350-NEVI RD3 | SR 00350 (OH-350) - 0.000 to 0.550 | Installing Electric Vehicle Charging Stations along OH-350 (SR 00350) in Warren County. | Other Building / Facility Work | Exempt | 2027 | CO | 0 | Local | $485,910.40 | $1,250,776.00 |
| 126403 | 36.928 | Ohio | BUT | Group | Monroe, City of | BUT SR 63 0.07 | BUT SR 63: SLM 0.07-1.59 | FY2029 Urban Paving in the City of Monroe on a portion of SR 63. | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Preservation | $2,236,875.20 | $4,831,651.00 |
| 126403 | 36.929 | Ohio | BUT | Group | Monroe, City of | BUT SR 63 0.07 | BUT SR 63: SLM 0.07-1.59 | FY2029 Urban Paving in the City of Monroe on a portion of SR 63. | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Labor | $357,901.00 | $4,831,651.00 |
| 126403 | 36.930 | Ohio | BUT | Group | Monroe, City of | BUT SR 63 0.07 | BUT SR 63: SLM 0.07-1.59 | FY2029 Urban Paving in the City of Monroe on a portion of SR 63. | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Local | $2,236,874.80 | $4,831,651.00 |
| 126532 | 36.931 | Ohio | CLE | Group | District 8 Traffic | CLE SR-232 Swings Corner LEDs | SR-232 @ Swings Corner Pt Isabel Rd | CLE SR-232 @ Swings Coner Pt Isabel Rd intersection LED warning signs | Traffic Control (Safety) | Exempt | 2026 | OTH | 0 | State | $6,306.64 | $6,306.64 |
| 126533 | 36.932 | Ohio | CLE | Group | Clermont County Park District | CLE Sycamore Park Resurfacing | Sycamore Park (4082 SR 132, Batavia, OH 45103): Entrance driveway to Bill Stearns Sundeck lot | Mill and paving of Sycamore Park entrance driveway in Clermont County. | Parks | Exempt | 2026 | CO | 0 | State | $94,495.00 | $94,495.00 |
| 1383726 | 41.593 | Indiana | Dearborn | Individual | INDOT | SR 62 | 3.7 miles west of SR 262 over Hayes Branch | Bridge replacement | maintenance/reconstruction | Exempt | 2023 | CO | 1 | STBG | $1,475,383.00 | $1,844,229.00 |
| 1383726 | 41.594 | Indiana | Dearborn | Individual | INDOT | SR 62 | 3.7 miles west of SR 262 over Hayes Branch | Bridge replacement | maintenance/reconstruction | Exempt | 2023 | CO | 2 | State | $368,846.00 | $1,844,229.00 |
| 1701459 | 41.595 | Indiana | Dearborn | Group | INDOT | IR 74 | 0.71 mile W of US 52, White River, CR & RD EBL | Bridge Replacement, Concrete | Bridge, Culvert and Small Structure Preservation | Exempt | 2019 | PE | 1 | NHPP | $450,000.00 | |
| 1701459 | 41.596 | Indiana | Dearborn | Group | INDOT | IR 74 | 0.71 mile W of US 52, White River, CR & RD EBL | Bridge Replacement, Concrete | Bridge, Culvert and Small Structure Preservation | Exempt | 2019 | PE | 2 | State | $50,000.00 | |
| 1702226 | 41.597 | Indiana | Dearborn | Group | INDOT | Curve Sign and Marking Visibility Improvements | Various locations in Dearborn County | Curve Sign and Marking Visibility Imrpovements | Signing, marking, striping and rumble strips | Exempt | 2020 | CO | 6 | HSIP | $254,994.00 | |
| 1702226 | 41.598 | Indiana | Dearborn | Group | INDOT | Curve Sign and Marking Visibility Improvements | Various locations in Dearborn County | Curve Sign and Marking Visibility Imrpovements | Signing, marking, striping and rumble strips | Exempt | 2020 | CO | 7 | State | $63,748.00 | |
| 1802826 | 41.599 | Indiana | Dearborn | Group | INDOT | Statewide On-Call Consultant Review | Various | PE Funding for Statewide On-Call Consultant Review | Statewide and non-construction activities | Exempt | 2020 | PE | 1 | STBG | $1,680,000.00 | |
| 1802826 | 41.600 | Indiana | Dearborn | Group | INDOT | Statewide On-Call Consultant Review | Various | PE Funding for Statewide On-Call Consultant Review | Statewide and non-construction activities | Exempt | 2023 | PE | 1 | STBG | $1,680,000.00 | |
| 1802826 | 41.601 | Indiana | Dearborn | Group | INDOT | Statewide On-Call Consultant Review | Various | PE Funding for Statewide On-Call Consultant Review | Statewide and non-construction activities | Exempt | 2022 | PE | 1 | STBG | $1,680,000.00 | |
| 1802826 | 41.602 | Indiana | Dearborn | Group | INDOT | Statewide On-Call Consultant Review | Various | PE Funding for Statewide On-Call Consultant Review | Statewide and non-construction activities | Exempt | 2021 | PE | 1 | STBG | $1,680,000.00 | |
| 1802826 | 41.603 | Indiana | Dearborn | Group | INDOT | Statewide On-Call Consultant Review | Various | PE Funding for Statewide On-Call Consultant Review | Statewide and non-construction activities | Exempt | 2020 | PE | 2 | State | $420,000.00 | |
| 1802826 | 41.604 | Indiana | Dearborn | Group | INDOT | Statewide On-Call Consultant Review | Various | PE Funding for Statewide On-Call Consultant Review | Statewide and non-construction activities | Exempt | 2022 | PE | 2 | State | $420,000.00 | |
| 1802826 | 41.605 | Indiana | Dearborn | Group | INDOT | Statewide On-Call Consultant Review | Various | PE Funding for Statewide On-Call Consultant Review | Statewide and non-construction activities | Exempt | 2023 | PE | 2 | State | $420,000.00 | |
| 1802826 | 41.606 | Indiana | Dearborn | Group | INDOT | Statewide On-Call Consultant Review | Various | PE Funding for Statewide On-Call Consultant Review | Statewide and non-construction activities | Exempt | 2021 | PE | 2 | State | $420,000.00 | |
| 1900007 | 41.607 | Indiana | Dearborn | Group | INDOT | Survey Equipment | Various Statewide | Survey equipment for various locations and capital oversight | Statewide and non-construction activities | Exempt | 2019 | CO | 1 | STP | $1,133,505.00 | |
| 1900007 | 41.608 | Indiana | Dearborn | Group | INDOT | Survey Equipment | Various Statewide | Survey equipment for various locations and capital oversight | Statewide and non-construction activities | Exempt | 2019 | CO | 2 | State | $283,376.00 | |
| 1900008 | 41.609 | Indiana | Dearborn | Group | INDOT | INDOT Drone | Various Statewide | INDOT Drone to monitor existing assets | Statewide and non-construction activities | Exempt | 2019 | CO | 1 | STP | $13,578.00 | |
| 1900008 | 41.610 | Indiana | Dearborn | Group | INDOT | INDOT Drone | Various Statewide | INDOT Drone to monitor existing assets | Statewide and non-construction activities | Exempt | 2019 | CO | 2 | State | $3,394.00 | |
| 1900010 | 41.611 | Indiana | Dearborn | Group | INDOT | ISP Drones | Various Statewide | ISP Drones to monitor existing assets | Statewide and non-construction activities | Exempt | 2019 | CO | 1 | STP | $60,178.00 | |
| 1900010 | 41.612 | Indiana | Dearborn | Group | INDOT | ISP Drones | Various Statewide | ISP Drones to monitor existing assets | Statewide and non-construction activities | Exempt | 2019 | CO | 2 | State | $15,046.00 | |
| 1900013 | 41.613 | Indiana | Dearborn | Group | INDOT | Statewide - Other Type Project | Various statewide | Battery Backups at various locations including Dearborn County | Statewide and non-construction activities | Exempt | 2020 | CO | 1 | HSIP | $300,000.00 | |
| 1900554 | 41.614 | Indiana | Dearborn | Group | INDOT | Statewide Hoosiers Helpers Program | Statewide | PE funding for continuation of Statewide HELPERS Program performed by LTAP | Statewide and non-construction activities | Exempt | 2020 | PE | 1 | HSIP | $1,039,144.00 | |
| 1900554 | 41.615 | Indiana | Dearborn | Group | INDOT | Statewide Hoosiers Helpers Program | Statewide | PE funding for continuation of Statewide HELPERS Program performed by LTAP | Statewide and non-construction activities | Exempt | 2020 | PE | 2 | State | $115,460.00 | |
| 1900611 | 41.616 | Indiana | Dearborn | Group | INDOT | IR 275 | Carroll Cropper Bridge over the Ohio River | Bridge Inspection FY23 | Bridge, Culvert and Small Structure Preservation | Exempt | 2023 | PE | 1 | NHPP | $90,000.00 | |
| 1900611 | 41.617 | Indiana | Dearborn | Group | INDOT | IR 275 | Carroll Cropper Bridge over the Ohio River | Bridge Inspection FY23 | Bridge, Culvert and Small Structure Preservation | Exempt | 2023 | PE | 2 | State | $10,000.00 | |
| 1900701 | 41.618 | Indiana | Dearborn | Group | INDOT | I-74 | At New Point-Rossb Rd, 0.55 mile W of Franklin | Bridge Painting | Bridge, Culvert and Small Structure Preservation | Exempt | 2022 | CO | 1 | NHPP | $318,516.00 | |
| 1900701 | 41.619 | Indiana | Dearborn | Group | INDOT | I-74 | At New Point-Rossb Rd, 0.55 mile W of Franklin | Bridge Painting | Bridge, Culvert and Small Structure Preservation | Exempt | 2022 | CO | 2 | State | $35,391.00 | |
| 1901701 | 41.620 | Indiana | Dearborn | Individual | INDOT | US 50 | Various locations on US 50 | Guardrail Attenuators, New Or Modernize | maintenance/reconstruction | Exempt | 2024 | CO | 5 | STBG | $960,000.00 | |
| 1901701 | 41.621 | Indiana | Dearborn | Individual | INDOT | US 50 | Various locations on US 50 | Guardrail Attenuators, New Or Modernize | maintenance/reconstruction | Exempt | 2024 | CO | 6 | State | $240,000.00 | |
| 1901706 | 41.622 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Traffic Signal Visibility Improvements | Statewide and non-construction activities | Exempt | 2024 | CO | 1 | STBG | $380,000.00 | |
| 1901706 | 41.623 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Traffic Signal Visibility Improvements | Statewide and non-construction activities | Exempt | 2024 | CO | 2 | State | $95,000.00 | |
| 1901790 | 41.624 | Indiana | Dearborn | Group | INDOT | US 50 | US 50 and Front St, US 50 and Arch St in Lawrenceburg | Traffic signal modernization | Traffic signal system and lighting improvements | Exempt | 2020 | PE | 1 | HSIP | $225,000.00 | |
| 1901790 | 41.625 | Indiana | Dearborn | Group | INDOT | US 50 | US 50 and Front St, US 50 and Arch St in Lawrenceburg | Traffic signal modernization | Traffic signal system and lighting improvements | Exempt | 2020 | PE | 2 | State | $25,000.00 | |
| 1901790 | 41.626 | Indiana | Dearborn | Group | INDOT | US 50 | US 50 and Front St, US 50 and Arch St in Lawrenceburg | Traffic signal modernization | Traffic signal system and lighting improvements | Exempt | 2023 | RW | 3 | NHPP | $68,000.00 | |
| 1901790 | 41.627 | Indiana | Dearborn | Group | INDOT | US 50 | US 50 and Front St, US 50 and Arch St in Lawrenceburg | Traffic signal modernization | Traffic signal system and lighting improvements | Exempt | 2023 | RW | 4 | State | $17,000.00 | |
| 1901790 | 41.628 | Indiana | Dearborn | Group | INDOT | US 50 | US 50 and Front St, US 50 and Arch St in Lawrenceburg | Traffic signal modernization | Traffic signal system and lighting improvements | Exempt | 2024 | CO | 5 | NHPP | $385,600.00 | |
| 1901790 | 41.629 | Indiana | Dearborn | Group | INDOT | US 50 | US 50 and Front St, US 50 and Arch St in Lawrenceburg | Traffic signal modernization | Traffic signal system and lighting improvements | Exempt | 2024 | CO | 6 | State | $96,400.00 | |
| 1901791 | 41.630 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Raised Pavement Markings, Refurbished | Signing, marking, striping and rumble strips | Exempt | 2024 | CO | 1 | NHS | $676,331.00 | |
| 1901791 | 41.631 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Raised Pavement Markings, Refurbished | Signing, marking, striping and rumble strips | Exempt | 2024 | CO | 2 | State | $75,148.00 | |
| 1901967 | 41.632 | Indiana | Dearborn | Group | INDOT | US 50 | Various | Guard rail attenuators, new of modernize | Median guardrail/cable projects (no change to access) | Exempt | 2020 | PE | 1 | HSIP | $45,000.00 | |
| 1901967 | 41.633 | Indiana | Dearborn | Group | INDOT | US 50 | Various | Guard rail attenuators, new of modernize | Median guardrail/cable projects (no change to access) | Exempt | 2020 | PE | 2 | State | $5,000.00 | |
| 1901967 | 41.634 | Indiana | Dearborn | Group | INDOT | US 50 | Various | Guard rail attenuators, new of modernize | Median guardrail/cable projects (no change to access) | Exempt | 2022 | CO | 3 | HSIP | $1,170,000.00 | |
| 1901967 | 41.635 | Indiana | Dearborn | Group | INDOT | US 50 | Various | Guard rail attenuators, new of modernize | Median guardrail/cable projects (no change to access) | Exempt | 2022 | CO | 4 | State | $1,200.00 | |
| 1901968 | 41.636 | Indiana | Dearborn | Group | INDOT | IR 74 | Various locations in Ripley, Decatur and Dearborn Counties | Install new cable rail barriers | Median guardrail/cable projects (no change to access) | Exempt | 2020 | PE | 1 | HSIP | $45,000.00 | |
| 1901968 | 41.637 | Indiana | Dearborn | Group | INDOT | IR 74 | Various locations in Ripley, Decatur and Dearborn Counties | Install new cable rail barriers | Median guardrail/cable projects (no change to access) | Exempt | 2020 | PE | 2 | State | $5,000.00 | |
| 1901968 | 41.638 | Indiana | Dearborn | Group | INDOT | IR 74 | Various locations in Ripley, Decatur and Dearborn Counties | Install new cable rail barriers | Median guardrail/cable projects (no change to access) | Exempt | 2022 | CO | 3 | HSIP | $2,899,548.00 | |
| 1901968 | 41.639 | Indiana | Dearborn | Group | INDOT | IR 74 | Various locations in Ripley, Decatur and Dearborn Counties | Install new cable rail barriers | Median guardrail/cable projects (no change to access) | Exempt | 2022 | CO | 4 | State | $724,887.00 | |
| 1901969 | 41.640 | Indiana | Dearborn | Group | INDOT | US 50 | Various | Traffic Signal Visibility Improvements | Traffic signal system and lighting improvements | Exempt | 2022 | CO | 1 | HSIP | $560,000.00 | |
| 1901969 | 41.641 | Indiana | Dearborn | Group | INDOT | US 50 | Various | Traffic Signal Visibility Improvements | Traffic signal system and lighting improvements | Exempt | 2022 | CO | 2 | State | $140,000.00 | |
| 1902018 | 41.642 | Indiana | Dearborn | Group | INDOT | Various Districtwide | Various | Raised pavement markings, refurbised | Signing, marking, striping and rumble strips | Exempt | 2022 | CO | 1 | HSIP | $405,000.00 | |
| 1902018 | 41.643 | Indiana | Dearborn | Group | INDOT | Various Districtwide | Various | Raised pavement markings, refurbised | Signing, marking, striping and rumble strips | Exempt | 2022 | CO | 2 | State | $45,000.00 | |
| 1902019 | 41.644 | Indiana | Dearborn | Group | INDOT | US 50 | Various locations along US 50 in Dearborn | Guard rail attenuators, new or modernize | Median guardrail/cable projects (no change to access) | Exempt | 2020 | PE | 1 | HSIP | $18,000.00 | |
| 1902019 | 41.645 | Indiana | Dearborn | Group | INDOT | US 50 | Various locations along US 50 in Dearborn | Guard rail attenuators, new or modernize | Median guardrail/cable projects (no change to access) | Exempt | 2020 | PE | 2 | State | $2,000.00 | |
| 1902019 | 41.646 | Indiana | Dearborn | Group | INDOT | US 50 | Various locations along US 50 in Dearborn | Guard rail attenuators, new or modernize | Median guardrail/cable projects (no change to access) | Exempt | 2023 | CO | 3 | HSIP | $1,616,000.00 | |
| 1902019 | 41.647 | Indiana | Dearborn | Group | INDOT | US 50 | Various locations along US 50 in Dearborn | Guard rail attenuators, new or modernize | Median guardrail/cable projects (no change to access) | Exempt | 2023 | CO | 4 | State | $404,000.00 | |
| 1902890 | 41.648 | Indiana | Dearborn | Group | INDOT | Various IDIQ | Seymour District | District Wide Bridge Maintenance | Bridge, Culvert and Small Structure Preservation | Exempt | 2022 | CO | 1 | STBG | $800,000.00 | |
| 1902890 | 41.649 | Indiana | Dearborn | Group | INDOT | Various IDIQ | Seymour District | District Wide Bridge Maintenance | Bridge, Culvert and Small Structure Preservation | Exempt | 2022 | CO | 2 | State | $200,000.00 | |
| 2000090 | 41.650 | Indiana | Dearborn | Individual | INDOT | US 52 | 1.4 mile W of the junction with SR 46 | Slide Correction | maintenance/reconstruction | Exempt | 2023 | PE | 1 | STBG | $163,760.00 | $3,291,503.00 |
| 2000090 | 41.651 | Indiana | Dearborn | Individual | INDOT | US 52 | 1.4 mile W of the junction with SR 46 | Slide Correction | maintenance/reconstruction | Exempt | 2023 | PE | 2 | State | $40,940.00 | $3,291,503.00 |
| 2000090 | 41.652 | Indiana | Dearborn | Individual | INDOT | US 52 | 1.4 mile W of the junction with SR 46 | Slide Correction | maintenance/reconstruction | Exempt | 2026 | RW | 3 | NH | $18,000.00 | $3,291,503.00 |
| 2000090 | 41.653 | Indiana | Dearborn | Individual | INDOT | US 52 | 1.4 mile W of the junction with SR 46 | Slide Correction | maintenance/reconstruction | Exempt | 2026 | RW | 4 | State | $2,000.00 | $3,291,503.00 |
| 2000090 | 41.654 | Indiana | Dearborn | Individual | INDOT | US 52 | 1.4 mile W of the junction with SR 46 | Slide Correction | maintenance/reconstruction | Exempt | 2026 | CO | 5 | NH | $40,000.00 | $3,291,503.00 |
| 2000090 | 41.655 | Indiana | Dearborn | Individual | INDOT | US 52 | 1.4 mile W of the junction with SR 46 | Slide Correction | maintenance/reconstruction | Exempt | 2027 | CO | 5 | NH | $2,413,442.00 | $3,291,503.00 |
| 2000090 | 41.656 | Indiana | Dearborn | Individual | INDOT | US 52 | 1.4 mile W of the junction with SR 46 | Slide Correction | maintenance/reconstruction | Exempt | 2026 | CO | 6 | State | $10,000.00 | $3,291,503.00 |
| 2000090 | 41.657 | Indiana | Dearborn | Individual | INDOT | US 52 | 1.4 mile W of the junction with SR 46 | Slide Correction | maintenance/reconstruction | Exempt | 2027 | CO | 6 | State | $603,361.00 | $3,291,503.00 |
| 2000313 | 41.658 | Indiana | Dearborn | Group | INDOT | I-74 | WB Bridge over Johnson Fork/Johnson Fork Road, 1.23 mile E. of US 52 | Bridge Thin Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2021 | PE | 1 | NHPP | $72,000.00 | |
| 2000313 | 41.659 | Indiana | Dearborn | Group | INDOT | I-74 | WB Bridge over Johnson Fork/Johnson Fork Road, 1.23 mile E. of US 52 | Bridge Thin Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2021 | PE | 2 | State | $8,000.00 | |
| 2000313 | 41.660 | Indiana | Dearborn | Group | INDOT | I-74 | WB Bridge over Johnson Fork/Johnson Fork Road, 1.23 mile E. of US 52 | Bridge Thin Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2024 | CO | 3 | NHPP | $377,152.00 | |
| 2000313 | 41.661 | Indiana | Dearborn | Group | INDOT | I-74 | WB Bridge over Johnson Fork/Johnson Fork Road, 1.23 mile E. of US 52 | Bridge Thin Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2024 | CO | 4 | State | $41,906.00 | |
| 2000314 | 41.662 | Indiana | Dearborn | Group | INDOT | I-74 | EB Bridge over Johnson Fork/Johnson Fork Road, 1.23 mile E. of US 52 | Bridge Thin Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2021 | PE | 1 | NHPP | $72,000.00 | |
| 2000314 | 41.663 | Indiana | Dearborn | Group | INDOT | I-74 | EB Bridge over Johnson Fork/Johnson Fork Road, 1.23 mile E. of US 52 | Bridge Thin Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2021 | PE | 2 | State | $8,000.00 | |
| 2000314 | 41.664 | Indiana | Dearborn | Group | INDOT | I-74 | EB Bridge over Johnson Fork/Johnson Fork Road, 1.23 mile E. of US 52 | Bridge Thin Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2024 | CO | 3 | NHPP | $377,152.00 | |
| 2000314 | 41.665 | Indiana | Dearborn | Group | INDOT | I-74 | EB Bridge over Johnson Fork/Johnson Fork Road, 1.23 mile E. of US 52 | Bridge Thin Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2024 | CO | 4 | State | $41,906.00 | |
| 2000410 | 41.666 | Indiana | Dearborn | Group | INDOT | SR 62 | N. Juntion of SR 129 to 1.53 miles W of SR 262 | HMA Overlay, Preventative Maintenance | Pavement Preservation | Exempt | 2023 | CO | 6 | STBG | $3,044,262.00 | |
| 2000410 | 41.667 | Indiana | Dearborn | Group | INDOT | SR 62 | N. Juntion of SR 129 to 1.53 miles W of SR 262 | HMA Overlay, Preventative Maintenance | Pavement Preservation | Exempt | 2023 | CO | 7 | State | $761,066.00 | |
| 2000464 | 41.668 | Indiana | Dearborn | Group | INDOT | SR 1 | SR 46 to US 52 | HMA Overlay, Preventative Maintenance | Pavement Preservation | Exempt | 2024 | CO | 1 | STBG | $3,631,586.00 | |
| 2000464 | 41.669 | Indiana | Dearborn | Group | INDOT | SR 1 | SR 46 to US 52 | HMA Overlay, Preventative Maintenance | Pavement Preservation | Exempt | 2024 | CO | 2 | State | $907,897.00 | |
| 2000516 | 41.670 | Indiana | Dearborn | Group | INDOT | SR 350 and SR 62 | Various locations on SR 350 and SR 62 in Ripley and Dearborn Counties | Small structures & drains construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2021 | PE | 1 | STBG | $1,644,000.00 | |
| 2000516 | 41.671 | Indiana | Dearborn | Group | INDOT | SR 350 and SR 62 | Various locations on SR 350 and SR 62 in Ripley and Dearborn Counties | Small structures & drains construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2021 | PE | 2 | State | $411,000.00 | |
| 2000516 | 41.672 | Indiana | Dearborn | Group | INDOT | SR 350 and SR 62 | Various locations on SR 350 and SR 62 in Ripley and Dearborn Counties | Small structures & drains construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2023 | RW | 3 | STBG | $96,000.00 | |
| 2000516 | 41.673 | Indiana | Dearborn | Group | INDOT | SR 350 and SR 62 | Various locations on SR 350 and SR 62 in Ripley and Dearborn Counties | Small structures & drains construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2023 | RW | 4 | State | $24,000.00 | |
| 2000516 | 41.674 | Indiana | Dearborn | Group | INDOT | SR 350 and SR 62 | Various locations on SR 350 and SR 62 in Ripley and Dearborn Counties | Small structures & drains construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2024 | CO | 5 | STBG | $2,199,200.00 | |
| 2000516 | 41.675 | Indiana | Dearborn | Group | INDOT | SR 350 and SR 62 | Various locations on SR 350 and SR 62 in Ripley and Dearborn Counties | Small structures & drains construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2024 | CO | 6 | State | $549,800.00 | |
| 2001561 | 41.676 | Indiana | Dearborn | Group | INDOT | Various | Statewide Various locations - Conflict Warning Systems | Intersection Improvement | Statewide and non-construction activities | Exempt | 2026 | CN | 1 | STBG | $1,230,187.00 | |
| 2001561 | 41.677 | Indiana | Dearborn | Group | INDOT | Various | Statewide Various locations - Conflict Warning Systems | Intersection Improvement | Statewide and non-construction activities | Exempt | 2026 | CN | 2 | State | $307,547.00 | |
| 2001788 | 41.678 | Indiana | Dearborn | Group | INDOT | MS MIS | Geotechnical on call - multiple locations throughout the state | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2026 | PE | 1 | STBG | $2,400,000.00 | |
| 2001788 | 41.679 | Indiana | Dearborn | Group | INDOT | MS MIS | Geotechnical on call - multiple locations throughout the state | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2026 | PE | 2 | State | $600,000.00 | |
| 2001906 | 41.680 | Indiana | Dearborn | Individual | INDOT | SR 46 | SR 101 to SR 1 | HMA Overlay, Preventive Maintenance | maintenance/reconstruction | Exempt | 2022 | PE | 1 | STBG | $200,000.00 | $4,240,356.00 |
| 2001906 | 41.681 | Indiana | Dearborn | Individual | INDOT | SR 46 | SR 101 to SR 1 | HMA Overlay, Preventive Maintenance | maintenance/reconstruction | Exempt | 2022 | PE | 2 | State | $50,000.00 | $4,240,356.00 |
| 2001906 | 41.682 | Indiana | Dearborn | Individual | INDOT | SR 46 | SR 101 to SR 1 | HMA Overlay, Preventive Maintenance | maintenance/reconstruction | Exempt | 2025 | CO | 5 | STBG | $3,192,285.00 | $4,240,356.00 |
| 2001906 | 41.683 | Indiana | Dearborn | Individual | INDOT | SR 46 | SR 101 to SR 1 | HMA Overlay, Preventive Maintenance | maintenance/reconstruction | Exempt | 2025 | CO | 6 | State | $798,071.00 | $4,240,356.00 |
| 2001911 | 41.684 | Indiana | Dearborn | Group | INDOT | SR 148 | 0.51 mile W of US 50 (near Maple St) to US 50 | Pavement Replacement | Pavement Preservation | Exempt | 2022 | PE | 1 | STBG | $76,000.00 | |
| 2001911 | 41.685 | Indiana | Dearborn | Group | INDOT | SR 148 | 0.51 mile W of US 50 (near Maple St) to US 50 | Pavement Replacement | Pavement Preservation | Exempt | 2022 | PE | 2 | State | $19,000.00 | |
| 2001911 | 41.686 | Indiana | Dearborn | Group | INDOT | SR 148 | 0.51 mile W of US 50 (near Maple St) to US 50 | Pavement Replacement | Pavement Preservation | Exempt | 2028 | CO | 5 | STBG | $2,611,930.00 | |
| 2001911 | 41.687 | Indiana | Dearborn | Group | INDOT | SR 148 | 0.51 mile W of US 50 (near Maple St) to US 50 | Pavement Replacement | Pavement Preservation | Exempt | 2028 | CO | 6 | State | $652,983.00 | |
| 2001948 | 41.688 | Indiana | Dearborn | Group | INDOT | US 52 | 6.75 mile E of SR 1 E Junction | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2023 | PE | 1 | STBG | $140,000.00 | |
| 2001948 | 41.689 | Indiana | Dearborn | Group | INDOT | US 52 | 6.75 mile E of SR 1 E Junction | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2023 | PE | 2 | State | $35,000.00 | |
| 2001948 | 41.690 | Indiana | Dearborn | Group | INDOT | US 52 | 6.75 mile E of SR 1 E Junction | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2024 | RW | 3 | STBG | $8,000.00 | |
| 2001948 | 41.691 | Indiana | Dearborn | Group | INDOT | US 52 | 6.75 mile E of SR 1 E Junction | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2024 | RW | 4 | State | $2,000.00 | |
| 2001948 | 41.692 | Indiana | Dearborn | Group | INDOT | US 52 | 6.75 mile E of SR 1 E Junction | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CO | 6 | STBG | $429,722.00 | |
| 2001948 | 41.693 | Indiana | Dearborn | Group | INDOT | US 52 | 6.75 mile E of SR 1 E Junction | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | CO | 6 | STBG | $24,000.00 | |
| 2001948 | 41.694 | Indiana | Dearborn | Group | INDOT | US 52 | 6.75 mile E of SR 1 E Junction | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CO | 7 | State | $107,430.00 | |
| 2001948 | 41.695 | Indiana | Dearborn | Group | INDOT | US 52 | 6.75 mile E of SR 1 E Junction | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | CO | 7 | State | $6,000.00 | |
| 2002036 | 41.696 | Indiana | Dearborn | Group | INDOT | SR 46 | Over Logan Creek, 2.93 mile E of SR 1 | Bridge Painting | Bridge, Culvert and Small Structure Preservation | Exempt | 2022 | PE | 1 | STBG | $40,000.00 | |
| 2002036 | 41.697 | Indiana | Dearborn | Group | INDOT | SR 46 | Over Logan Creek, 2.93 mile E of SR 1 | Bridge Painting | Bridge, Culvert and Small Structure Preservation | Exempt | 2022 | PE | 2 | State | $10,000.00 | |
| 2002036 | 41.698 | Indiana | Dearborn | Group | INDOT | SR 46 | Over Logan Creek, 2.93 mile E of SR 1 | Bridge Painting | Bridge, Culvert and Small Structure Preservation | Exempt | 2025 | CO | 5 | STBG | $310,508.00 | |
| 2002036 | 41.699 | Indiana | Dearborn | Group | INDOT | SR 46 | Over Logan Creek, 2.93 mile E of SR 1 | Bridge Painting | Bridge, Culvert and Small Structure Preservation | Exempt | 2025 | CO | 6 | State | $77,627.00 | |
| 2002517 | 41.700 | Indiana | Dearborn | Group | INDOT | I-74, I-65 and I-64 | Various locations | ITS Program Equipment | Statewide and non-construction activities | Exempt | 2022 | CO | 1 | HSIP | $1,168,200.00 | |
| 2002517 | 41.701 | Indiana | Dearborn | Group | INDOT | I-74, I-65 and I-64 | Various locations | ITS Program Equipment | Statewide and non-construction activities | Exempt | 2022 | CO | 2 | State | $129,800.00 | |
| 2002952 | 41.702 | Indiana | Dearborn | Group | INDOT | Various | Software License for Statewide ATMS for FY 26 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2026 | PE | 1 | NH | $450,000.00 | |
| 2002952 | 41.703 | Indiana | Dearborn | Group | INDOT | Various | Software License for Statewide ATMS for FY 26 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2026 | PE | 2 | State | $50,000.00 | |
| 2002953 | 41.704 | Indiana | Dearborn | Group | INDOT | Various | Statewide TMC Dispatcher Operations Contract for FY 26 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2026 | PE | 1 | NH | $1,620,000.00 | |
| 2002953 | 41.705 | Indiana | Dearborn | Group | INDOT | Various | Statewide TMC Dispatcher Operations Contract for FY 26 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2026 | PE | 2 | State | $180,000.00 | |
| 2002955 | 41.706 | Indiana | Dearborn | Group | INDOT | Various | Statewide O&M fee for CARS (Condition Acquisition & Reporting System) for FY 26 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2026 | PE | 1 | STBG | $400,000.00 | |
| 2002955 | 41.707 | Indiana | Dearborn | Group | INDOT | Various | Statewide O&M fee for CARS (Condition Acquisition & Reporting System) for FY 26 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2026 | PE | 2 | State | $100,000.00 | |
| 2002956 | 41.708 | Indiana | Dearborn | Group | INDOT | Various | Statewide INRIX Traffic Data for FY 26 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2026 | PE | 1 | NH | $1,080,000.00 | |
| 2002956 | 41.709 | Indiana | Dearborn | Group | INDOT | Various | Statewide INRIX Traffic Data for FY 26 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2026 | PE | 2 | State | $120,000.00 | |
| 2021 RTP-1 | 41.710 | Kentucky | Campbell | Individual | City of Dayton | Sargeant Park Trail | Sargeant Park in the City of Dayton | Construction of new trails, trailside and trailhead facilities and maintenance of existing trails at Sargeant Park | bicycle/pedestrian/other | Exempt | 2021 | CO | 1 | Rec Trail Funds | $91,043.00 | $93,319.00 |
| 2021 RTP-1 | 41.711 | Kentucky | Campbell | Individual | City of Dayton | Sargeant Park Trail | Sargeant Park in the City of Dayton | Construction of new trails, trailside and trailhead facilities and maintenance of existing trails at Sargeant Park | bicycle/pedestrian/other | Exempt | 2021 | CO | 2 | Local | $2,276.00 | $93,319.00 |
| 2100015 | 41.712 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Traffic Signals Modernization | Traffic signal system and lighting improvements | Exempt | 2025 | CO | 5 | STBG | $1,104,000.00 | |
| 2100015 | 41.713 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Traffic Signals Modernization | Traffic signal system and lighting improvements | Exempt | 2025 | CO | 6 | State | $276,000.00 | |
| 2100157 | 41.714 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Traffic Signals Modernization | Traffic signal system and lighting improvements | Exempt | 2026 | CN | 1 | STBG | $1,104,000.00 | |
| 2100157 | 41.715 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Traffic Signals Modernization | Traffic signal system and lighting improvements | Exempt | 2026 | CN | 2 | State | $276,000.00 | |
| 2100189 | 41.716 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Raised Pavement Markings, Refurbished | Signing, marking, striping and rumble strips | Exempt | 2026 | CO | 5 | STBG | $600,000.00 | |
| 2100189 | 41.717 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Raised Pavement Markings, Refurbished | Signing, marking, striping and rumble strips | Exempt | 2026 | CO | 6 | State | $150,000.00 | |
| 2100195 | 41.718 | Indiana | Dearborn | Group | INDOT | Various | From SR 445 to SR 37 | Install New Cable Rail Barriers | Statewide and non-construction activities | Exempt | 2026 | CN | 1 | STBG | $1,600,000.00 | |
| 2100195 | 41.719 | Indiana | Dearborn | Group | INDOT | Various | From SR 445 to SR 37 | Install New Cable Rail Barriers | Statewide and non-construction activities | Exempt | 2026 | CN | 2 | State | $400,000.00 | |
| 2100287 | 41.720 | Indiana | Dearborn | Group | INDOT | Highway/Rail Grade Crossing Safety Action Plan | Statewide various | Statewide Highway/Rail Grade Crossing Safety Action Plan | Statewide and non-construction activities | Exempt | 2022 | PE | 1 | HSIP | $6,430.00 | |
| 2100287 | 41.721 | Indiana | Dearborn | Group | INDOT | Highway/Rail Grade Crossing Safety Action Plan | Statewide various | Statewide Highway/Rail Grade Crossing Safety Action Plan | Statewide and non-construction activities | Exempt | 2022 | PE | 2 | State | $700.00 | |
| 2100556 | 41.722 | Indiana | Dearborn | Group | INDOT | SR 1 | From 2.6 miles South of SR 46 to 2.5 miles South of SR 46 | Small Structure Maintenance and Repair | Bridge, Culvert and Small Structure Preservation | Exempt | 2023 | PE | 1 | STBG | $280,000.00 | |
| 2100556 | 41.723 | Indiana | Dearborn | Group | INDOT | SR 1 | From 2.6 miles South of SR 46 to 2.5 miles South of SR 46 | Small Structure Maintenance and Repair | Bridge, Culvert and Small Structure Preservation | Exempt | 2023 | PE | 2 | State | $70,000.00 | |
| 2100556 | 41.724 | Indiana | Dearborn | Group | INDOT | SR 1 | From 2.6 miles South of SR 46 to 2.5 miles South of SR 46 | Small Structure Maintenance and Repair | Bridge, Culvert and Small Structure Preservation | Exempt | 2025 | RW | 3 | STBG | $24,000.00 | |
| 2100556 | 41.725 | Indiana | Dearborn | Group | INDOT | SR 1 | From 2.6 miles South of SR 46 to 2.5 miles South of SR 46 | Small Structure Maintenance and Repair | Bridge, Culvert and Small Structure Preservation | Exempt | 2025 | RW | 4 | State | $6,000.00 | |
| 2100556 | 41.726 | Indiana | Dearborn | Group | INDOT | SR 1 | From 2.6 miles South of SR 46 to 2.5 miles South of SR 46 | Small Structure Maintenance and Repair | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | CO | 5 | STBG | $532,558.00 | |
| 2100556 | 41.727 | Indiana | Dearborn | Group | INDOT | SR 1 | From 2.6 miles South of SR 46 to 2.5 miles South of SR 46 | Small Structure Maintenance and Repair | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | CO | 6 | State | $133,139.00 | |
| 2100585 | 41.728 | Indiana | Dearborn | Group | INDOT | US 50 | over Hogan Creek, 0.09 E SR 56 | Bridge Painting | Bridge, Culvert and Small Structure Preservation | Exempt | 2023 | PE | 1 | NHPP | $186,240.00 | |
| 2100585 | 41.729 | Indiana | Dearborn | Group | INDOT | US 50 | over Hogan Creek, 0.09 E SR 56 | Bridge Painting | Bridge, Culvert and Small Structure Preservation | Exempt | 2023 | PE | 2 | State | $46,560.00 | |
| 2100585 | 41.730 | Indiana | Dearborn | Group | INDOT | US 50 | over Hogan Creek, 0.09 E SR 56 | Bridge Painting | Bridge, Culvert and Small Structure Preservation | Exempt | 2024 | CO | 3 | NHPP | $12,000.00 | |
| 2100585 | 41.731 | Indiana | Dearborn | Group | INDOT | US 50 | over Hogan Creek, 0.09 E SR 56 | Bridge Painting | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | CO | 3 | NH | $1,253,600.00 | |
| 2100585 | 41.732 | Indiana | Dearborn | Group | INDOT | US 50 | over Hogan Creek, 0.09 E SR 56 | Bridge Painting | Bridge, Culvert and Small Structure Preservation | Exempt | 2024 | CO | 4 | State | $3,000.00 | |
| 2100585 | 41.733 | Indiana | Dearborn | Group | INDOT | US 50 | over Hogan Creek, 0.09 E SR 56 | Bridge Painting | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | CO | 4 | State | $313,400.00 | |
| 2101257 | 41.734 | Indiana | Dearborn | Group | INDOT | Various | Seymour District Discretionary Placeholder for FY 2026 | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2026 | PE | 1 | STBG | $400,000.00 | |
| 2101257 | 41.735 | Indiana | Dearborn | Group | INDOT | Various | Seymour District Discretionary Placeholder for FY 2026 | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2026 | PE | 2 | State | $100,000.00 | |
| 2101257 | 41.736 | Indiana | Dearborn | Group | INDOT | Various | Seymour District Discretionary Placeholder for FY 2026 | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2026 | CN | 5 | STBG | $879,834.00 | |
| 2101257 | 41.737 | Indiana | Dearborn | Group | INDOT | Various | Seymour District Discretionary Placeholder for FY 2026 | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2026 | CN | 6 | State | $219,959.00 | |
| 2101627 | 41.738 | Indiana | Dearborn | Group | INDOT | Various | Seymour District Discretionary Placeholder for FY2027 | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2027 | PE | 1 | STBG | $400,000.00 | |
| 2101627 | 41.739 | Indiana | Dearborn | Group | INDOT | Various | Seymour District Discretionary Placeholder for FY2027 | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2027 | PE | 2 | State | $100,000.00 | |
| 2101627 | 41.740 | Indiana | Dearborn | Group | INDOT | Various | Seymour District Discretionary Placeholder for FY2027 | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2027 | CN | 5 | STBG | $1,085,982.00 | |
| 2101627 | 41.741 | Indiana | Dearborn | Group | INDOT | Various | Seymour District Discretionary Placeholder for FY2027 | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2027 | CN | 6 | State | $271,495.00 | |
| 2101642 | 41.742 | Indiana | Dearborn | Group | INDOT | MS MIS | Post-Construction BMP Program Implementation / MS4 MCM5 – Various Locations | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2026 | PE | 1 | STBG | $885,840.00 | |
| 2101642 | 41.743 | Indiana | Dearborn | Group | INDOT | MS MIS | Post-Construction BMP Program Implementation / MS4 MCM5 – Various Locations | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2026 | PE | 2 | State | $221,460.00 | |
| 2101783 | 41.744 | Indiana | Dearborn | Individual | Dearborn County | County Bridge Inspections | Countywide Bridge Inspection and Inventory Program for Cycle Years 2023-2026 | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | Exempt | 2025 | PE | 1 | Local Bridge | $78,814.00 | |
| 2101783 | 41.745 | Indiana | Dearborn | Individual | Dearborn County | County Bridge Inspections | Countywide Bridge Inspection and Inventory Program for Cycle Years 2023-2026 | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | Exempt | 2023 | PE | 1 | Local Bridge | $101,965.00 | |
| 2101783 | 41.746 | Indiana | Dearborn | Individual | Dearborn County | County Bridge Inspections | Countywide Bridge Inspection and Inventory Program for Cycle Years 2023-2026 | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | Exempt | 2026 | PE | 1 | Local Bridge | $74,731.00 | |
| 2101783 | 41.747 | Indiana | Dearborn | Individual | Dearborn County | County Bridge Inspections | Countywide Bridge Inspection and Inventory Program for Cycle Years 2023-2026 | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | Exempt | 2024 | PE | 1 | Local Bridge | $24,565.00 | |
| 2101783 | 41.748 | Indiana | Dearborn | Individual | Dearborn County | County Bridge Inspections | Countywide Bridge Inspection and Inventory Program for Cycle Years 2023-2026 | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | Exempt | 2026 | PE | 2 | Local | $18,683.00 | |
| 2101783 | 41.749 | Indiana | Dearborn | Individual | Dearborn County | County Bridge Inspections | Countywide Bridge Inspection and Inventory Program for Cycle Years 2023-2026 | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | Exempt | 2024 | PE | 2 | Local | $6,141.00 | |
| 2101783 | 41.750 | Indiana | Dearborn | Individual | Dearborn County | County Bridge Inspections | Countywide Bridge Inspection and Inventory Program for Cycle Years 2023-2026 | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | Exempt | 2023 | PE | 2 | Local | $25,491.00 | |
| 2101783 | 41.751 | Indiana | Dearborn | Individual | Dearborn County | County Bridge Inspections | Countywide Bridge Inspection and Inventory Program for Cycle Years 2023-2026 | Countywide bridge inspections in Dearborn County | maintenance/reconstruction | Exempt | 2025 | PE | 2 | Local | $19,703.00 | |
| 2101785 | 41.752 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Repair of Replace Lighting | Traffic signal system and lighting improvements | Exempt | 2025 | CO | 1 | STBG | $2,080,000.00 | |
| 2101785 | 41.753 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Repair of Replace Lighting | Traffic signal system and lighting improvements | Exempt | 2025 | CO | 2 | State | $520,000.00 | |
| 2200005 | 41.754 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Signing Installation / Repair | Signing, marking, striping and rumble strips | Exempt | 2027 | CO | 5 | Federal | $1,010,339.00 | |
| 2200005 | 41.755 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Signing Installation / Repair | Signing, marking, striping and rumble strips | Exempt | 2027 | CO | 6 | State | $252,585.00 | |
| 2200475 | 41.756 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Pavement Patching | Pavement Preservation | Exempt | 2024 | CO | 5 | STBG | $800,000.00 | |
| 2200475 | 41.757 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Pavement Patching | Pavement Preservation | Exempt | 2024 | CO | 6 | State | $200,000.00 | |
| 2200487 | 41.758 | Indiana | Dearborn | Group | INDOT | I-74 | 3 locations on I-74 (PK 50023) at RP 164.20, 169.09, and 160.10 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2024 | PE | 1 | NHPP | $405,000.00 | |
| 2200487 | 41.759 | Indiana | Dearborn | Group | INDOT | I-74 | 3 locations on I-74 (PK 50023) at RP 164.20, 169.09, and 160.10 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2024 | PE | 2 | State | $45,000.00 | |
| 2200487 | 41.760 | Indiana | Dearborn | Group | INDOT | I-74 | 3 locations on I-74 (PK 50023) at RP 164.20, 169.09, and 160.10 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2025 | RW | 5 | NHPP | $27,000.00 | |
| 2200487 | 41.761 | Indiana | Dearborn | Group | INDOT | I-74 | 3 locations on I-74 (PK 50023) at RP 164.20, 169.09, and 160.10 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2025 | RW | 6 | State | $3,000.00 | |
| 2200487 | 41.762 | Indiana | Dearborn | Group | INDOT | I-74 | 3 locations on I-74 (PK 50023) at RP 164.20, 169.09, and 160.10 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CO | 7 | NH | $1,616,667.00 | |
| 2200487 | 41.763 | Indiana | Dearborn | Group | INDOT | I-74 | 3 locations on I-74 (PK 50023) at RP 164.20, 169.09, and 160.10 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2025 | CO | 7 | NHPP | $18,000.00 | |
| 2200487 | 41.764 | Indiana | Dearborn | Group | INDOT | I-74 | 3 locations on I-74 (PK 50023) at RP 164.20, 169.09, and 160.10 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2025 | CO | 8 | State | $2,000.00 | |
| 2200487 | 41.765 | Indiana | Dearborn | Group | INDOT | I-74 | 3 locations on I-74 (PK 50023) at RP 164.20, 169.09, and 160.10 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CO | 8 | State | $179,630.00 | |
| 2200671 | 41.766 | Indiana | Dearborn | Group | INDOT | US 50 | over Tanners Creek & Service Road, 0.08 mile E of SR 48 | Bridge Thin Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2024 | PE | 1 | NHS | $80,000.00 | |
| 2200671 | 41.767 | Indiana | Dearborn | Group | INDOT | US 50 | over Tanners Creek & Service Road, 0.08 mile E of SR 48 | Bridge Thin Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2024 | PE | 2 | State | $20,000.00 | |
| 2200671 | 41.768 | Indiana | Dearborn | Group | INDOT | US 50 | over Tanners Creek & Service Road, 0.08 mile E of SR 48 | Bridge Thin Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CO | 5 | NH | $384,368.00 | |
| 2200671 | 41.769 | Indiana | Dearborn | Group | INDOT | US 50 | over Tanners Creek & Service Road, 0.08 mile E of SR 48 | Bridge Thin Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CO | 6 | State | $96,092.00 | |
| 2200757 | 41.770 | Indiana | Dearborn | Group | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miels E of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2024 | PE | 1 | NHPP | $162,000.00 | |
| 2200757 | 41.771 | Indiana | Dearborn | Group | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miels E of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2024 | PE | 2 | State | $18,000.00 | |
| 2200757 | 41.772 | Indiana | Dearborn | Group | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miels E of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | CN | 3 | NHPP | $9,000.00 | |
| 2200757 | 41.773 | Indiana | Dearborn | Group | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miels E of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CN | 3 | NHPP | $4,908,683.00 | |
| 2200757 | 41.774 | Indiana | Dearborn | Group | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miels E of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | CN | 4 | State | $1,000.00 | |
| 2200757 | 41.775 | Indiana | Dearborn | Group | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miels E of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CN | 4 | State | $545,410.00 | |
| 2200758 | 41.776 | Indiana | Dearborn | Group | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miles E of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2024 | PE | 1 | NHPP | $162,000.00 | |
| 2200758 | 41.777 | Indiana | Dearborn | Group | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miles E of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2024 | PE | 2 | State | $18,000.00 | |
| 2200758 | 41.778 | Indiana | Dearborn | Group | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miles E of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | CN | 5 | NHPP | $9,000.00 | |
| 2200758 | 41.779 | Indiana | Dearborn | Group | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miles E of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CN | 5 | NHPP | $3,082,285.00 | |
| 2200758 | 41.780 | Indiana | Dearborn | Group | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miles E of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | CN | 6 | State | $1,000.00 | |
| 2200758 | 41.781 | Indiana | Dearborn | Group | INDOT | I-74 | under US 52/IN & OH RR, 5.44 miles E of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CN | 6 | State | $342,476.00 | |
| 2200838 | 41.782 | Indiana | Dearborn | Group | INDOT | US 50 | 0.25 miles W of SR 101 (near S 675 E) to 1.85 miles E of SR 262 | Concrete Pavement Restoration (CPR) | Pavement Preservation | Exempt | 2024 | PE | 1 | NHPP | $416,000.00 | |
| 2200838 | 41.783 | Indiana | Dearborn | Group | INDOT | US 50 | 0.25 miles W of SR 101 (near S 675 E) to 1.85 miles E of SR 262 | Concrete Pavement Restoration (CPR) | Pavement Preservation | Exempt | 2024 | PE | 2 | State | $104,000.00 | |
| 2200838 | 41.784 | Indiana | Dearborn | Group | INDOT | US 50 | 0.25 miles W of SR 101 (near S 675 E) to 1.85 miles E of SR 262 | Concrete Pavement Restoration (CPR) | Pavement Preservation | Exempt | 2027 | CO | 5 | NH | $9,731,540.00 | |
| 2200838 | 41.785 | Indiana | Dearborn | Group | INDOT | US 50 | 0.25 miles W of SR 101 (near S 675 E) to 1.85 miles E of SR 262 | Concrete Pavement Restoration (CPR) | Pavement Preservation | Exempt | 2027 | CO | 6 | State | $2,432,885.00 | |
| 2200839 | 41.786 | Indiana | Dearborn | Group | INDOT | US 50 | 1.85 miles E of SR 262 to 2.46 miles W of SR 350 (near Dutch Hollow Road) | Concrete Pavement Restoration (CPR) | Pavement Preservation | Exempt | 2024 | PE | 1 | NHPP | $324,000.00 | |
| 2200839 | 41.787 | Indiana | Dearborn | Group | INDOT | US 50 | 1.85 miles E of SR 262 to 2.46 miles W of SR 350 (near Dutch Hollow Road) | Concrete Pavement Restoration (CPR) | Pavement Preservation | Exempt | 2024 | PE | 2 | State | $36,000.00 | |
| 2200839 | 41.788 | Indiana | Dearborn | Group | INDOT | US 50 | 1.85 miles E of SR 262 to 2.46 miles W of SR 350 (near Dutch Hollow Road) | Concrete Pavement Restoration (CPR) | Pavement Preservation | Exempt | 2027 | CO | 5 | NH | $4,068,000.00 | |
| 2200839 | 41.789 | Indiana | Dearborn | Group | INDOT | US 50 | 1.85 miles E of SR 262 to 2.46 miles W of SR 350 (near Dutch Hollow Road) | Concrete Pavement Restoration (CPR) | Pavement Preservation | Exempt | 2027 | CO | 6 | State | $452,000.00 | |
| 2200877 | 41.790 | Indiana | Dearborn | Group | INDOT | SR 350 | over South Hogan Creek, 0.10 miles W of US 50 | Substructure Repair And Rehabilitation | Bridge, Culvert and Small Structure Preservation | Exempt | 2023 | D | 1 | STBG | $80,000.00 | |
| 2200877 | 41.791 | Indiana | Dearborn | Group | INDOT | SR 350 | over South Hogan Creek, 0.10 miles W of US 50 | Substructure Repair And Rehabilitation | Bridge, Culvert and Small Structure Preservation | Exempt | 2023 | D | 2 | State | $20,000.00 | |
| 2200877 | 41.792 | Indiana | Dearborn | Group | INDOT | SR 350 | over South Hogan Creek, 0.10 miles W of US 50 | Substructure Repair And Rehabilitation | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | CO | 5 | STBG | $347,909.00 | |
| 2200877 | 41.793 | Indiana | Dearborn | Group | INDOT | SR 350 | over South Hogan Creek, 0.10 miles W of US 50 | Substructure Repair And Rehabilitation | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | CO | 6 | State | $86,977.00 | |
| 2200935 | 41.794 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Raised Pavement Markings, Refurbished | Signing, marking, striping and rumble strips | Exempt | 2027 | CN | 5 | STBG | $600,000.00 | |
| 2200935 | 41.795 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Raised Pavement Markings, Refurbished | Signing, marking, striping and rumble strips | Exempt | 2027 | CN | 6 | State | $150,000.00 | |
| 2200936 | 41.796 | Indiana | Dearborn | Group | INDOT | Various | High Mast Tower Replacement at various locations in Seymour District | Other Type Project (Miscellaneous) | Traffic signal system and lighting improvements | Exempt | 2024 | PE | 1 | STBG | $60,000.00 | |
| 2200936 | 41.797 | Indiana | Dearborn | Group | INDOT | Various | High Mast Tower Replacement at various locations in Seymour District | Other Type Project (Miscellaneous) | Traffic signal system and lighting improvements | Exempt | 2024 | PE | 2 | State | $15,000.00 | |
| 2200936 | 41.798 | Indiana | Dearborn | Group | INDOT | Various | High Mast Tower Replacement at various locations in Seymour District | Other Type Project (Miscellaneous) | Traffic signal system and lighting improvements | Exempt | 2027 | CO | 5 | STBG | $168,000.00 | |
| 2200936 | 41.799 | Indiana | Dearborn | Group | INDOT | Various | High Mast Tower Replacement at various locations in Seymour District | Other Type Project (Miscellaneous) | Traffic signal system and lighting improvements | Exempt | 2027 | CO | 6 | State | $42,000.00 | |
| 2200937 | 41.800 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Traffic Signals Modernization | Traffic signal system and lighting improvements | Exempt | 2027 | CN | 1 | STBG | $2,045,240.00 | |
| 2200937 | 41.801 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Traffic Signals Modernization | Traffic signal system and lighting improvements | Exempt | 2027 | CN | 2 | State | $511,310.00 | |
| 2200939 | 41.802 | Indiana | Dearborn | Group | INDOT | I-275 | I-275 from 1.9 miles N of Exit 17 to 3500' S of Exit 17, from the Ohio SL to the Kentucky SL | Install New Cable Rail Barriers | Median guardrail/cable projects (no change to access) | Exempt | 2024 | PE | 1 | HSIP | $315,000.00 | |
| 2200939 | 41.803 | Indiana | Dearborn | Group | INDOT | I-275 | I-275 from 1.9 miles N of Exit 17 to 3500' S of Exit 17, from the Ohio SL to the Kentucky SL | Install New Cable Rail Barriers | Median guardrail/cable projects (no change to access) | Exempt | 2024 | PE | 2 | State | $35,000.00 | |
| 2200939 | 41.804 | Indiana | Dearborn | Group | INDOT | I-275 | I-275 from 1.9 miles N of Exit 17 to 3500' S of Exit 17, from the Ohio SL to the Kentucky SL | Install New Cable Rail Barriers | Median guardrail/cable projects (no change to access) | Exempt | 2027 | CN | 5 | STBG | $600,000.00 | |
| 2200939 | 41.805 | Indiana | Dearborn | Group | INDOT | I-275 | I-275 from 1.9 miles N of Exit 17 to 3500' S of Exit 17, from the Ohio SL to the Kentucky SL | Install New Cable Rail Barriers | Median guardrail/cable projects (no change to access) | Exempt | 2027 | CN | 6 | State | $150,000.00 | |
| 2200940 | 41.806 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2024 | PE | 1 | STBG | $400,000.00 | |
| 2200940 | 41.807 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2024 | PE | 2 | State | $100,000.00 | |
| 2200940 | 41.808 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2027 | CN | 5 | STBG | $2,592,000.00 | |
| 2200940 | 41.809 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2027 | CN | 6 | State | $648,000.00 | |
| 2201149 | 41.810 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Traffic Signals Modernization | Traffic signal system and lighting improvements | Exempt | 2027 | CN | 5 | STBG | $760,000.00 | |
| 2201149 | 41.811 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Traffic Signals Modernization | Traffic signal system and lighting improvements | Exempt | 2027 | CN | 6 | State | $190,000.00 | |
| 2201179 | 41.812 | Indiana | Dearborn | Group | INDOT | Various | Statewide Cell Service for Communications for Signals and ITS Devices for FY 26 | ITS Operations And Maintenance Contracts | Traffic signal system and lighting improvements | Exempt | 2026 | PE | 1 | STBG | $1,000,000.00 | |
| 2201179 | 41.813 | Indiana | Dearborn | Group | INDOT | Various | Statewide Cell Service for Communications for Signals and ITS Devices for FY 26 | ITS Operations And Maintenance Contracts | Traffic signal system and lighting improvements | Exempt | 2026 | PE | 2 | State | $250,000.00 | |
| 2201180 | 41.814 | Indiana | Dearborn | Group | INDOT | Various | Statewide ITS Field Device Cell Hardware (Modem) Upgrades for FY 26 | ITS Program Equipment | Traffic signal system and lighting improvements | Exempt | 2026 | CN | 1 | STBG | $280,000.00 | |
| 2201180 | 41.815 | Indiana | Dearborn | Group | INDOT | Various | Statewide ITS Field Device Cell Hardware (Modem) Upgrades for FY 26 | ITS Program Equipment | Traffic signal system and lighting improvements | Exempt | 2026 | CN | 2 | State | $70,000.00 | |
| 2201216 | 41.816 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Raised Pavement Markings, Refurbished | Signing, marking, striping and rumble strips | Exempt | 2025 | CO | 5 | STBG | $702,594.00 | |
| 2201216 | 41.817 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Raised Pavement Markings, Refurbished | Signing, marking, striping and rumble strips | Exempt | 2025 | CO | 6 | State | $175,649.00 | |
| 2201247 | 41.818 | Indiana | Dearborn | Group | INDOT | Various | Statewide High Mast Tower Lighting Replacement at various interchanges | Repair Or Replace Lighting | Traffic signal system and lighting improvements | Exempt | 2027 | CN | 1 | STBG | $3,113,272.00 | |
| 2201247 | 41.819 | Indiana | Dearborn | Group | INDOT | Various | Statewide High Mast Tower Lighting Replacement at various interchanges | Repair Or Replace Lighting | Traffic signal system and lighting improvements | Exempt | 2027 | CN | 2 | State | $778,318.00 | |
| 2201627 | 41.820 | Indiana | Dearborn | Individual | Dearborn County | IR 9503 Konradi Rd Bridge #47 | Bridge over Ziegler Creek appox. 0.60 miles east of Platt Road along Konradi Road in Dearborn Co. | Replacement of bridge over Ziegler Creek | bridge/culvert replacement | Exempt | 2027 | RW | 1 | Federal | $20,000.00 | $2,440,000.00 |
| 2201627 | 41.821 | Indiana | Dearborn | Individual | Dearborn County | IR 9503 Konradi Rd Bridge #47 | Bridge over Ziegler Creek appox. 0.60 miles east of Platt Road along Konradi Road in Dearborn Co. | Replacement of bridge over Ziegler Creek | bridge/culvert replacement | Exempt | 2027 | RW | 2 | Local | $5,000.00 | $2,440,000.00 |
| 2201627 | 41.822 | Indiana | Dearborn | Individual | Dearborn County | IR 9503 Konradi Rd Bridge #47 | Bridge over Ziegler Creek appox. 0.60 miles east of Platt Road along Konradi Road in Dearborn Co. | Replacement of bridge over Ziegler Creek | bridge/culvert replacement | Exempt | 2029 | CO | 3 | Federal | $1,932,000.00 | $2,440,000.00 |
| 2201627 | 41.823 | Indiana | Dearborn | Individual | Dearborn County | IR 9503 Konradi Rd Bridge #47 | Bridge over Ziegler Creek appox. 0.60 miles east of Platt Road along Konradi Road in Dearborn Co. | Replacement of bridge over Ziegler Creek | bridge/culvert replacement | Exempt | 2029 | CO | 4 | Local | $483,000.00 | $2,440,000.00 |
| 2201711 | 41.824 | Indiana | Dearborn | Group | INDOT | Various | Seymour & Vincennes DR[-43]:Ristrict ITS & Signal Maintenance Contract - FY 26 | ITS Devices Maintenance Contracts | Traffic signal system and lighting improvements | Exempt | 2026 | CN | 1 | STBG | $266,830.00 | |
| 2201711 | 41.825 | Indiana | Dearborn | Group | INDOT | Various | Seymour & Vincennes DR[-43]:Ristrict ITS & Signal Maintenance Contract - FY 26 | ITS Devices Maintenance Contracts | Traffic signal system and lighting improvements | Exempt | 2026 | CN | 2 | State | $66,708.00 | |
| 2300013 | 41.826 | Indiana | Dearborn | Group | INDOT | Various | IDIQ, various locations throughout the Seymour District | District Wide Bridge Maintenance | Bridge, Culvert and Small Structure Preservation | Exempt | 2024 | CO | 1 | STBG | $800,000.00 | |
| 2300013 | 41.827 | Indiana | Dearborn | Group | INDOT | Various | IDIQ, various locations throughout the Seymour District | District Wide Bridge Maintenance | Bridge, Culvert and Small Structure Preservation | Exempt | 2024 | CO | 2 | State | $200,000.00 | |
| 2300076 | 41.828 | Indiana | Dearborn | Group | INDOT | Various | Statewide Underwater Bridge Inspection FY-24 through FY-27 | Bridge Inspections | Statewide and non-construction activities | Exempt | 2027 | PE | 1 | STBG | $320,000.00 | |
| 2300076 | 41.829 | Indiana | Dearborn | Group | INDOT | Various | Statewide Underwater Bridge Inspection FY-24 through FY-27 | Bridge Inspections | Statewide and non-construction activities | Exempt | 2026 | PE | 1 | STBG | $320,000.00 | |
| 2300076 | 41.830 | Indiana | Dearborn | Group | INDOT | Various | Statewide Underwater Bridge Inspection FY-24 through FY-27 | Bridge Inspections | Statewide and non-construction activities | Exempt | 2027 | PE | 2 | State | $80,000.00 | |
| 2300076 | 41.831 | Indiana | Dearborn | Group | INDOT | Various | Statewide Underwater Bridge Inspection FY-24 through FY-27 | Bridge Inspections | Statewide and non-construction activities | Exempt | 2026 | PE | 2 | State | $80,000.00 | |
| 2300077 | 41.832 | Indiana | Dearborn | Group | INDOT | Various | Statewide Vertical Clearance measuring over/under bridges. FY-2024 through FY-2027 | Bridge Inspections | Statewide and non-construction activities | Exempt | 2028 | PE | 1 | STBG | $80,000.00 | |
| 2300077 | 41.833 | Indiana | Dearborn | Group | INDOT | Various | Statewide Vertical Clearance measuring over/under bridges. FY-2024 through FY-2027 | Bridge Inspections | Statewide and non-construction activities | Exempt | 2027 | PE | 1 | STBG | $80,000.00 | |
| 2300077 | 41.834 | Indiana | Dearborn | Group | INDOT | Various | Statewide Vertical Clearance measuring over/under bridges. FY-2024 through FY-2027 | Bridge Inspections | Statewide and non-construction activities | Exempt | 2026 | PE | 1 | STBG | $160,000.00 | |
| 2300077 | 41.835 | Indiana | Dearborn | Group | INDOT | Various | Statewide Vertical Clearance measuring over/under bridges. FY-2024 through FY-2027 | Bridge Inspections | Statewide and non-construction activities | Exempt | 2028 | PE | 2 | State | $20,000.00 | |
| 2300077 | 41.836 | Indiana | Dearborn | Group | INDOT | Various | Statewide Vertical Clearance measuring over/under bridges. FY-2024 through FY-2027 | Bridge Inspections | Statewide and non-construction activities | Exempt | 2026 | PE | 2 | State | $40,000.00 | |
| 2300077 | 41.837 | Indiana | Dearborn | Group | INDOT | Various | Statewide Vertical Clearance measuring over/under bridges. FY-2024 through FY-2027 | Bridge Inspections | Statewide and non-construction activities | Exempt | 2027 | PE | 2 | State | $20,000.00 | |
| 2300098 | 41.838 | Indiana | Dearborn | Individual | Dearborn County | County Bridge Inspections | Local Bridge Inspection and Inventory Program for FY 2027-2030 | Bridge Inspections | other | Exempt | 2029 | PE | 1 | Local Bridge | $186,772.00 | $326,000.00 |
| 2300098 | 41.839 | Indiana | Dearborn | Individual | Dearborn County | County Bridge Inspections | Local Bridge Inspection and Inventory Program for FY 2027-2030 | Bridge Inspections | other | Exempt | 2027 | PE | 1 | Local Bridge | $180,291.00 | $326,000.00 |
| 2300098 | 41.840 | Indiana | Dearborn | Individual | Dearborn County | County Bridge Inspections | Local Bridge Inspection and Inventory Program for FY 2027-2030 | Bridge Inspections | other | Exempt | 2028 | PE | 1 | Local Bridge | $89,220.00 | $326,000.00 |
| 2300098 | 41.841 | Indiana | Dearborn | Individual | Dearborn County | County Bridge Inspections | Local Bridge Inspection and Inventory Program for FY 2027-2030 | Bridge Inspections | other | Exempt | 2030 | PE | 1 | Local Bridge | $95,288.00 | $326,000.00 |
| 2300098 | 41.842 | Indiana | Dearborn | Individual | Dearborn County | County Bridge Inspections | Local Bridge Inspection and Inventory Program for FY 2027-2030 | Bridge Inspections | other | Exempt | 2028 | PE | 2 | Local | $22,305.00 | $326,000.00 |
| 2300098 | 41.843 | Indiana | Dearborn | Individual | Dearborn County | County Bridge Inspections | Local Bridge Inspection and Inventory Program for FY 2027-2030 | Bridge Inspections | other | Exempt | 2027 | PE | 2 | Local | $45,073.00 | $326,000.00 |
| 2300098 | 41.844 | Indiana | Dearborn | Individual | Dearborn County | County Bridge Inspections | Local Bridge Inspection and Inventory Program for FY 2027-2030 | Bridge Inspections | other | Exempt | 2029 | PE | 2 | Local | $46,693.00 | $326,000.00 |
| 2300098 | 41.845 | Indiana | Dearborn | Individual | Dearborn County | County Bridge Inspections | Local Bridge Inspection and Inventory Program for FY 2027-2030 | Bridge Inspections | other | Exempt | 2030 | PE | 2 | Local | $23,822.00 | $326,000.00 |
| 2300274 | 41.846 | Indiana | Dearborn | Group | INDOT | NEVI EV Charging | Various | Electric vehicle charging infrastructure at various locations along Indiana interstates | Statewide and non-construction activities | Exempt | 2024 | CO | 1 | STBG | $16,972,585.00 | |
| 2300274 | 41.847 | Indiana | Dearborn | Group | INDOT | NEVI EV Charging | Various | Electric vehicle charging infrastructure at various locations along Indiana interstates | Statewide and non-construction activities | Exempt | 2025 | CO | 1 | STBG | $16,972,550.00 | |
| 2300274 | 41.848 | Indiana | Dearborn | Group | INDOT | NEVI EV Charging | Various | Electric vehicle charging infrastructure at various locations along Indiana interstates | Statewide and non-construction activities | Exempt | 2026 | CO | 1 | STBG | $16,972,536.00 | |
| 2300274 | 41.849 | Indiana | Dearborn | Group | INDOT | NEVI EV Charging | Various | Electric vehicle charging infrastructure at various locations along Indiana interstates | Statewide and non-construction activities | Exempt | 2024 | CO | 2 | State | $4,243,134.00 | |
| 2300274 | 41.850 | Indiana | Dearborn | Group | INDOT | NEVI EV Charging | Various | Electric vehicle charging infrastructure at various locations along Indiana interstates | Statewide and non-construction activities | Exempt | 2025 | CO | 2 | State | $4,243,137.00 | |
| 2300274 | 41.851 | Indiana | Dearborn | Group | INDOT | NEVI EV Charging | Various | Electric vehicle charging infrastructure at various locations along Indiana interstates | Statewide and non-construction activities | Exempt | 2026 | CO | 2 | State | $4,243,146.00 | |
| 2300290 | 41.852 | Indiana | Dearborn | Group | INDOT | Various | Tunnels throughout the State | Bridge Inspections | Statewide and non-construction activities | Exempt | 2026 | PE | 1 | STBG | $400,000.00 | |
| 2300290 | 41.853 | Indiana | Dearborn | Group | INDOT | Various | Tunnels throughout the State | Bridge Inspections | Statewide and non-construction activities | Exempt | 2027 | PE | 1 | STBG | $310,400.00 | |
| 2300290 | 41.854 | Indiana | Dearborn | Group | INDOT | Various | Tunnels throughout the State | Bridge Inspections | Statewide and non-construction activities | Exempt | 2026 | PE | 2 | State | $100,000.00 | |
| 2300290 | 41.855 | Indiana | Dearborn | Group | INDOT | Various | Tunnels throughout the State | Bridge Inspections | Statewide and non-construction activities | Exempt | 2027 | PE | 2 | State | $77,600.00 | |
| 2300671 | 41.856 | Indiana | Dearborn | Group | INDOT | Statewide Protect Program Development | Various | Protect Program Development for Infrastructure Investment & Jobs Act | Statewide and non-construction activities | Exempt | 2024 | PE | 1 | STBG | $400,000.00 | |
| 2300671 | 41.857 | Indiana | Dearborn | Group | INDOT | Statewide Protect Program Development | Various | Protect Program Development for Infrastructure Investment & Jobs Act | Statewide and non-construction activities | Exempt | 2024 | PE | 2 | State | $100,000.00 | |
| 2300791 | 41.858 | Indiana | Dearborn | Group | INDOT | SR 46 | SR 46 Bridge over I-74, 0.74 mi W SR 1 | Bridge Thin Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2025 | PE | 1 | STP | $120,000.00 | |
| 2300791 | 41.859 | Indiana | Dearborn | Group | INDOT | SR 46 | SR 46 Bridge over I-74, 0.74 mi W SR 1 | Bridge Thin Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2025 | PE | 2 | State | $30,000.00 | |
| 2300791 | 41.860 | Indiana | Dearborn | Group | INDOT | SR 46 | SR 46 Bridge over I-74, 0.74 mi W SR 1 | Bridge Thin Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2028 | CO | 5 | STP | $178,501.00 | |
| 2300791 | 41.861 | Indiana | Dearborn | Group | INDOT | SR 46 | SR 46 Bridge over I-74, 0.74 mi W SR 1 | Bridge Thin Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2028 | CO | 6 | State | $44,625.00 | |
| 2300990 | 41.862 | Indiana | Dearborn | Group | INDOT | SR 1 | At 8.74 mile N US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2025 | PE | 1 | NHPP | $0.00 | |
| 2300990 | 41.863 | Indiana | Dearborn | Group | INDOT | SR 1 | At 8.74 mile N US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2025 | PE | 2 | State | $0.00 | |
| 2300990 | 41.864 | Indiana | Dearborn | Group | INDOT | SR 1 | At 8.74 mile N US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | RW | 3 | NHPP | $24,000.00 | |
| 2300990 | 41.865 | Indiana | Dearborn | Group | INDOT | SR 1 | At 8.74 mile N US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | RW | 4 | State | $6,000.00 | |
| 2300990 | 41.866 | Indiana | Dearborn | Group | INDOT | SR 1 | At 8.74 mile N US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2028 | CO | 5 | NHPP | $772,800.00 | |
| 2300990 | 41.867 | Indiana | Dearborn | Group | INDOT | SR 1 | At 8.74 mile N US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CO | 5 | NHPP | $48,000.00 | |
| 2300990 | 41.868 | Indiana | Dearborn | Group | INDOT | SR 1 | At 8.74 mile N US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2028 | CO | 6 | State | $193,200.00 | |
| 2300990 | 41.869 | Indiana | Dearborn | Group | INDOT | SR 1 | At 8.74 mile N US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CO | 6 | State | $12,000.00 | |
| 2300991 | 41.870 | Indiana | Dearborn | Group | INDOT | SR 1 | SR 1 Bridge 8.74 mi N of US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2025 | PE | 1 | NHPP | $593,524.00 | |
| 2300991 | 41.871 | Indiana | Dearborn | Group | INDOT | SR 1 | SR 1 Bridge 8.74 mi N of US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2025 | PE | 2 | State | $148,381.00 | |
| 2300991 | 41.872 | Indiana | Dearborn | Group | INDOT | SR 1 | SR 1 Bridge 8.74 mi N of US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | RW | 3 | NHPP | $24,000.00 | |
| 2300991 | 41.873 | Indiana | Dearborn | Group | INDOT | SR 1 | SR 1 Bridge 8.74 mi N of US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | RW | 4 | State | $6,000.00 | |
| 2300991 | 41.874 | Indiana | Dearborn | Group | INDOT | SR 1 | SR 1 Bridge 8.74 mi N of US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2028 | CO | 5 | NHPP | $429,647.00 | |
| 2300991 | 41.875 | Indiana | Dearborn | Group | INDOT | SR 1 | SR 1 Bridge 8.74 mi N of US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CO | 5 | NHPP | $32,000.00 | |
| 2300991 | 41.876 | Indiana | Dearborn | Group | INDOT | SR 1 | SR 1 Bridge 8.74 mi N of US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CO | 6 | State | $8,000.00 | |
| 2300991 | 41.877 | Indiana | Dearborn | Group | INDOT | SR 1 | SR 1 Bridge 8.74 mi N of US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2028 | CO | 6 | State | $107,412.00 | |
| 2301163 | 41.878 | Indiana | Dearborn | Group | INDOT | US 50 | From 0.25 miles W of SR 101 (near S 675 E) to 1.85 miles E of SR 262 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2025 | PE | 1 | NHPP | $240,000.00 | |
| 2301163 | 41.879 | Indiana | Dearborn | Group | INDOT | US 50 | From 0.25 miles W of SR 101 (near S 675 E) to 1.85 miles E of SR 262 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2025 | PE | 2 | State | $60,000.00 | |
| 2301163 | 41.880 | Indiana | Dearborn | Group | INDOT | US 50 | From 0.25 miles W of SR 101 (near S 675 E) to 1.85 miles E of SR 262 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | RW | 3 | NH | $16,000.00 | |
| 2301163 | 41.881 | Indiana | Dearborn | Group | INDOT | US 50 | From 0.25 miles W of SR 101 (near S 675 E) to 1.85 miles E of SR 262 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | RW | 4 | State | $4,000.00 | |
| 2301163 | 41.882 | Indiana | Dearborn | Group | INDOT | US 50 | From 0.25 miles W of SR 101 (near S 675 E) to 1.85 miles E of SR 262 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2028 | CO | 5 | NH | $353,859.00 | |
| 2301163 | 41.883 | Indiana | Dearborn | Group | INDOT | US 50 | From 0.25 miles W of SR 101 (near S 675 E) to 1.85 miles E of SR 262 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2028 | CO | 6 | State | $88,465.00 | |
| 2301236 | 41.884 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Traffic Signals Modernization | Traffic signal system and lighting improvements | Exempt | 2028 | CO | 1 | HSIP | $2,805,240.00 | |
| 2301236 | 41.885 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Traffic Signals Modernization | Traffic signal system and lighting improvements | Exempt | 2028 | CO | 2 | State | $701,310.00 | |
| 2301237 | 41.886 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Raised Pavement Markings | Signing, marking, striping and rumble strips | Exempt | 2028 | CO | 1 | STBG | $600,000.00 | |
| 2301237 | 41.887 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Raised Pavement Markings | Signing, marking, striping and rumble strips | Exempt | 2028 | CO | 2 | State | $150,000.00 | |
| 2301238 | 41.888 | Indiana | Dearborn | Group | INDOT | Various | Placeholder Seymour District; HSIP Systemic treatments FY28 | Traffic, Other | Pavement Preservation | Exempt | 2028 | CN | 1 | STBG | $2,297,600.00 | |
| 2301238 | 41.889 | Indiana | Dearborn | Group | INDOT | Various | Placeholder Seymour District; HSIP Systemic treatments FY28 | Traffic, Other | Pavement Preservation | Exempt | 2028 | CN | 2 | State | $574,400.00 | |
| 2301597 | 41.890 | Indiana | Dearborn | Individual | Dearborn County | Bells Branch Road Bridge #14 | Location is approximately 0.2 miles north of Clay Miller Rd. on Bells Branch Rd. | Bridge Replacement | bridge/culvert replacement | Exempt | 2025 | PE | 1 | Local Bridge | $380,000.00 | $2,445,000.00 |
| 2301597 | 41.891 | Indiana | Dearborn | Individual | Dearborn County | Bells Branch Road Bridge #14 | Location is approximately 0.2 miles north of Clay Miller Rd. on Bells Branch Rd. | Bridge Replacement | bridge/culvert replacement | Exempt | 2025 | PE | 2 | Local | $115,000.00 | $2,445,000.00 |
| 2301597 | 41.892 | Indiana | Dearborn | Individual | Dearborn County | Bells Branch Road Bridge #14 | Location is approximately 0.2 miles north of Clay Miller Rd. on Bells Branch Rd. | Bridge Replacement | bridge/culvert replacement | Exempt | 2028 | RW | 3 | Local Bridge | $28,000.00 | $2,445,000.00 |
| 2301597 | 41.893 | Indiana | Dearborn | Individual | Dearborn County | Bells Branch Road Bridge #14 | Location is approximately 0.2 miles north of Clay Miller Rd. on Bells Branch Rd. | Bridge Replacement | bridge/culvert replacement | Exempt | 2028 | RW | 4 | Local | $7,000.00 | $2,445,000.00 |
| 2301597 | 41.894 | Indiana | Dearborn | Individual | Dearborn County | Bells Branch Road Bridge #14 | Location is approximately 0.2 miles north of Clay Miller Rd. on Bells Branch Rd. | Bridge Replacement | bridge/culvert replacement | Exempt | 2030 | UT | 5 | Local Bridge | $60,000.00 | $2,445,000.00 |
| 2301597 | 41.895 | Indiana | Dearborn | Individual | Dearborn County | Bells Branch Road Bridge #14 | Location is approximately 0.2 miles north of Clay Miller Rd. on Bells Branch Rd. | Bridge Replacement | bridge/culvert replacement | Exempt | 2030 | UT | 6 | Local | $15,000.00 | $2,445,000.00 |
| 2301597 | 41.896 | Indiana | Dearborn | Individual | Dearborn County | Bells Branch Road Bridge #14 | Location is approximately 0.2 miles north of Clay Miller Rd. on Bells Branch Rd. | Bridge Replacement | bridge/culvert replacement | Exempt | 2030 | CO | 7 | Local Bridge | $1,280,000.00 | $2,445,000.00 |
| 2301597 | 41.897 | Indiana | Dearborn | Individual | Dearborn County | Bells Branch Road Bridge #14 | Location is approximately 0.2 miles north of Clay Miller Rd. on Bells Branch Rd. | Bridge Replacement | bridge/culvert replacement | Exempt | 2030 | CO | 8 | Local | $320,000.00 | $2,445,000.00 |
| 2301597 | 41.898 | Indiana | Dearborn | Individual | Dearborn County | Bells Branch Road Bridge #14 | Location is approximately 0.2 miles north of Clay Miller Rd. on Bells Branch Rd. | Bridge Replacement | bridge/culvert replacement | Exempt | 2030 | CE | 9 | Local Bridge | $192,000.00 | $2,445,000.00 |
| 2301597 | 41.899 | Indiana | Dearborn | Individual | Dearborn County | Bells Branch Road Bridge #14 | Location is approximately 0.2 miles north of Clay Miller Rd. on Bells Branch Rd. | Bridge Replacement | bridge/culvert replacement | Exempt | 2030 | CE | 10 | Local | $48,000.00 | $2,445,000.00 |
| 2301653 | 41.900 | Indiana | Dearborn | Group | INDOT | I-275 | I-275 Carroll Cropper Bridge | Bridge maintenance and repair | Bridge, Culvert and Small Structure Preservation | Exempt | 2025 | CO | 1 | STBG | $2,000,000.00 | |
| 2301653 | 41.901 | Indiana | Dearborn | Group | INDOT | I-275 | I-275 Carroll Cropper Bridge | Bridge maintenance and repair | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CO | 1 | STBG | $1,680,000.00 | |
| 2301653 | 41.902 | Indiana | Dearborn | Group | INDOT | I-275 | I-275 Carroll Cropper Bridge | Bridge maintenance and repair | Bridge, Culvert and Small Structure Preservation | Exempt | 2025 | CO | 2 | State | $500,000.00 | |
| 2301653 | 41.903 | Indiana | Dearborn | Group | INDOT | I-275 | I-275 Carroll Cropper Bridge | Bridge maintenance and repair | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CO | 2 | State | $420,000.00 | |
| 2400032 | 41.904 | Indiana | Dearborn | Group | INDOT | Signing Installation/Repari | Scenic Byway Corridor in 13 Counties along Ohio River | Signing Installation and Repair | Signing, marking, striping and rumble strips | Exempt | 2025 | CN | 1 | NHS | $720,000.00 | |
| 2400032 | 41.905 | Indiana | Dearborn | Group | INDOT | Signing Installation/Repari | Scenic Byway Corridor in 13 Counties along Ohio River | Signing Installation and Repair | Signing, marking, striping and rumble strips | Exempt | 2025 | CN | 2 | State | $80,000.00 | |
| 2400077 | 41.906 | Indiana | Dearborn | Group | INDOT | Various | HELPERS Program for Local Roads and Streets - Statewide LPA Training, Planning and Local Assist. | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2026 | PE | 1 | STBG | $806,794.00 | |
| 2400077 | 41.907 | Indiana | Dearborn | Group | INDOT | Various | HELPERS Program for Local Roads and Streets - Statewide LPA Training, Planning and Local Assist. | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2026 | PE | 2 | State | $201,699.00 | |
| 2400095 | 41.908 | Indiana | Dearborn | Group | INDOT | MS MIS | Noise Analysis Technical Review Support - Small Purchase Contract - Statewide | Other Intersection Improvement | Statewide and non-construction activities | Exempt | 2026 | PE | 1 | STBG | $200,000.00 | |
| 2400095 | 41.909 | Indiana | Dearborn | Group | INDOT | MS MIS | Noise Analysis Technical Review Support - Small Purchase Contract - Statewide | Other Intersection Improvement | Statewide and non-construction activities | Exempt | 2026 | PE | 2 | State | $50,000.00 | |
| 2400543 | 41.910 | Indiana | Dearborn | Group | INDOT | Various | Various bridges around the state. | Bridge Inspections | Statewide and non-construction activities | Exempt | 2026 | PE | 1 | STBG | $400,000.00 | |
| 2400543 | 41.911 | Indiana | Dearborn | Group | INDOT | Various | Various bridges around the state. | Bridge Inspections | Statewide and non-construction activities | Exempt | 2026 | PE | 2 | State | $100,000.00 | |
| 2400565 | 41.912 | Indiana | Dearborn | Group | INDOT | I 275 | Carroll Cropper Bridge over the Ohio River FY 2029. KYTC will assist in FY28 | Bridge Maintenance And Repair | Bridge, Culvert and Small Structure Preservation | Exempt | 2029 | CN | 1 | NH | $11,250,000.00 | |
| 2400565 | 41.913 | Indiana | Dearborn | Group | INDOT | I 275 | Carroll Cropper Bridge over the Ohio River FY 2029. KYTC will assist in FY28 | Bridge Maintenance And Repair | Bridge, Culvert and Small Structure Preservation | Exempt | 2029 | CN | 2 | State | $1,250,000.00 | |
| 2400591 | 41.914 | Indiana | Dearborn | Group | INDOT | Various | Soil nail repair on MSE failures - South Districts | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2026 | CN | 1 | STP | $1,600,000.00 | |
| 2400591 | 41.915 | Indiana | Dearborn | Group | INDOT | Various | Soil nail repair on MSE failures - South Districts | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2026 | CN | 2 | State | $400,000.00 | |
| 2400748 | 41.916 | Indiana | Dearborn | Group | INDOT | Various | Seymour District Discretionary Placeholder for FY2029 | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2029 | PE | 1 | STBG | $400,000.00 | |
| 2400748 | 41.917 | Indiana | Dearborn | Group | INDOT | Various | Seymour District Discretionary Placeholder for FY2029 | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2029 | PE | 2 | State | $100,000.00 | |
| 2400748 | 41.918 | Indiana | Dearborn | Group | INDOT | Various | Seymour District Discretionary Placeholder for FY2029 | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2029 | CN | 5 | STBG | $792,000.00 | |
| 2400748 | 41.919 | Indiana | Dearborn | Group | INDOT | Various | Seymour District Discretionary Placeholder for FY2029 | Other Type Project (Miscellaneous) | Statewide and non-construction activities | Exempt | 2029 | CN | 6 | State | $198,000.00 | |
| 2400803 | 41.920 | Indiana | Dearborn | Group | INDOT | Various | Statewide ATMS Camera / Communications / Detection / DMS Replacements - FY 27 | ITS Traffic Management Systems | Statewide and non-construction activities | Exempt | 2027 | CN | 1 | NH | $270,000.00 | |
| 2400803 | 41.921 | Indiana | Dearborn | Group | INDOT | Various | Statewide ATMS Camera / Communications / Detection / DMS Replacements - FY 27 | ITS Traffic Management Systems | Statewide and non-construction activities | Exempt | 2027 | CN | 2 | State | $30,000.00 | |
| 2400804 | 41.922 | Indiana | Dearborn | Group | INDOT | Various | Software License for Statewide ATMS for FY 27 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2027 | PE | 1 | NH | $450,000.00 | |
| 2400804 | 41.923 | Indiana | Dearborn | Group | INDOT | Various | Software License for Statewide ATMS for FY 27 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2027 | PE | 2 | State | $50,000.00 | |
| 2400806 | 41.924 | Indiana | Dearborn | Group | INDOT | Various | Statewide TMC Dispatcher Operations & Engineering Support Contract for FY 27 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2027 | PE | 1 | NH | $1,620,000.00 | |
| 2400806 | 41.925 | Indiana | Dearborn | Group | INDOT | Various | Statewide TMC Dispatcher Operations & Engineering Support Contract for FY 27 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2027 | PE | 2 | State | $180,000.00 | |
| 2400807 | 41.926 | Indiana | Dearborn | Group | INDOT | Various | Statewide O&M fee for CARS (Condition Acquisition & Reporting System) for FY 27 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2027 | PE | 1 | STBG | $400,000.00 | |
| 2400807 | 41.927 | Indiana | Dearborn | Group | INDOT | Various | Statewide O&M fee for CARS (Condition Acquisition & Reporting System) for FY 27 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2027 | PE | 2 | State | $100,000.00 | |
| 2400808 | 41.928 | Indiana | Dearborn | Group | INDOT | Various | Statewide INRIX Traffic Data for FY 27 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2027 | PE | 1 | NH | $1,080,000.00 | |
| 2400808 | 41.929 | Indiana | Dearborn | Group | INDOT | Various | Statewide INRIX Traffic Data for FY 27 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2027 | PE | 2 | State | $120,000.00 | |
| 2400809 | 41.930 | Indiana | Dearborn | Group | INDOT | Various | Statewide Cell Service for Communications for Signals and ITS Devices for FY 27 | ITS Operations And Maintenance Contracts | Statewide and non-construction activities | Exempt | 2027 | PE | 1 | STBG | $1,000,000.00 | |
| 2400809 | 41.931 | Indiana | Dearborn | Group | INDOT | Various | Statewide Cell Service for Communications for Signals and ITS Devices for FY 27 | ITS Operations And Maintenance Contracts | Statewide and non-construction activities | Exempt | 2027 | PE | 2 | State | $250,000.00 | |
| 2400810 | 41.932 | Indiana | Dearborn | Group | INDOT | Various | Statewide ITS Field Device Cell Hardware (Modem) Upgrades for FY 27 | ITS Program Equipment | Statewide and non-construction activities | Exempt | 2027 | CN | 1 | STBG | $280,000.00 | |
| 2400810 | 41.933 | Indiana | Dearborn | Group | INDOT | Various | Statewide ITS Field Device Cell Hardware (Modem) Upgrades for FY 27 | ITS Program Equipment | Statewide and non-construction activities | Exempt | 2027 | CN | 2 | State | $70,000.00 | |
| 2400816 | 41.934 | Indiana | Dearborn | Group | INDOT | Various | Seymour & Vincennes District ITS & Signal Maintenance Contract - FY 27 | ITS Devices Maintenance Contracts | Statewide and non-construction activities | Exempt | 2027 | CN | 1 | STBG | $419,200.00 | |
| 2400816 | 41.935 | Indiana | Dearborn | Group | INDOT | Various | Seymour & Vincennes District ITS & Signal Maintenance Contract - FY 27 | ITS Devices Maintenance Contracts | Statewide and non-construction activities | Exempt | 2027 | CN | 2 | State | $104,800.00 | |
| 2400818 | 41.936 | Indiana | Dearborn | Group | INDOT | Various | Statewide INRIX Traffic Data for FY 28 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2028 | PE | 1 | NH | $1,080,000.00 | |
| 2400818 | 41.937 | Indiana | Dearborn | Group | INDOT | Various | Statewide INRIX Traffic Data for FY 28 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2028 | PE | 2 | State | $120,000.00 | |
| 2400819 | 41.938 | Indiana | Dearborn | Group | INDOT | Various | Software License for Statewide ATMS for FY 28 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2028 | PE | 1 | NH | $675,000.00 | |
| 2400819 | 41.939 | Indiana | Dearborn | Group | INDOT | Various | Software License for Statewide ATMS for FY 28 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2028 | PE | 2 | State | $75,000.00 | |
| 2400820 | 41.940 | Indiana | Dearborn | Group | INDOT | Various | Statewide O&M fee for CARS (Condition Acquisition & Reporting System) for FY 28 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2028 | PE | 1 | STBG | $400,000.00 | |
| 2400820 | 41.941 | Indiana | Dearborn | Group | INDOT | Various | Statewide O&M fee for CARS (Condition Acquisition & Reporting System) for FY 28 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2028 | PE | 2 | State | $100,000.00 | |
| 2400821 | 41.942 | Indiana | Dearborn | Group | INDOT | Various | Statewide TMC Dispatcher Operations & Engineering Support Contract for FY 28 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2028 | PE | 1 | NH | $1,620,000.00 | |
| 2400821 | 41.943 | Indiana | Dearborn | Group | INDOT | Various | Statewide TMC Dispatcher Operations & Engineering Support Contract for FY 28 | ITS Program Contracted Services | Statewide and non-construction activities | Exempt | 2028 | PE | 2 | State | $180,000.00 | |
| 2400823 | 41.944 | Indiana | Dearborn | Group | INDOT | Various | Statewide ATMS Camera / Communications / Detection / DMS Replacements - FY 28 | ITS Traffic Management Systems | Statewide and non-construction activities | Exempt | 2028 | CN | 1 | NH | $450,000.00 | |
| 2400823 | 41.945 | Indiana | Dearborn | Group | INDOT | Various | Statewide ATMS Camera / Communications / Detection / DMS Replacements - FY 28 | ITS Traffic Management Systems | Statewide and non-construction activities | Exempt | 2028 | CN | 2 | State | $50,000.00 | |
| 2400824 | 41.946 | Indiana | Dearborn | Group | INDOT | Various | Statewide Cell Service for Communications for Signals and ITS Devices for FY 28 | ITS Operations And Maintenance Contracts | Statewide and non-construction activities | Exempt | 2028 | PE | 1 | STBG | $1,000,000.00 | |
| 2400824 | 41.947 | Indiana | Dearborn | Group | INDOT | Various | Statewide Cell Service for Communications for Signals and ITS Devices for FY 28 | ITS Operations And Maintenance Contracts | Statewide and non-construction activities | Exempt | 2028 | PE | 2 | State | $250,000.00 | |
| 2400825 | 41.948 | Indiana | Dearborn | Group | INDOT | Various | Statewide ITS Field Device Cell Hardware (Modem) Upgrades for FY 28 | ITS Program Equipment | Statewide and non-construction activities | Exempt | 2028 | CN | 5 | STBG | $400,000.00 | |
| 2400825 | 41.949 | Indiana | Dearborn | Group | INDOT | Various | Statewide ITS Field Device Cell Hardware (Modem) Upgrades for FY 28 | ITS Program Equipment | Statewide and non-construction activities | Exempt | 2028 | CN | 6 | State | $100,000.00 | |
| 2400831 | 41.950 | Indiana | Dearborn | Group | INDOT | Various | Seymour & Vincennes District ITS & Signal Maintenance Contract - FY 28 | ITS Devices Maintenance Contracts | Statewide and non-construction activities | Exempt | 2028 | CN | 5 | STBG | $856,800.00 | |
| 2400831 | 41.951 | Indiana | Dearborn | Group | INDOT | Various | Seymour & Vincennes District ITS & Signal Maintenance Contract - FY 28 | ITS Devices Maintenance Contracts | Statewide and non-construction activities | Exempt | 2028 | CN | 6 | State | $214,200.00 | |
| 2401298 | 41.952 | Indiana | Dearborn | Group | INDOT | I-74 | I 74 EB bridge over CO Rd, E FK Tanners Cr, 2.07 Miles W of SR 46 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | PE | 1 | NHPP | $270,000.00 | |
| 2401298 | 41.953 | Indiana | Dearborn | Group | INDOT | I-74 | I 74 EB bridge over CO Rd, E FK Tanners Cr, 2.07 Miles W of SR 46 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | PE | 2 | State | $3,000.00 | |
| 2401298 | 41.954 | Indiana | Dearborn | Group | INDOT | I-74 | I 74 EB bridge over CO Rd, E FK Tanners Cr, 2.07 Miles W of SR 46 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2028 | UT | 3 | NHPP | $9,000.00 | |
| 2401298 | 41.955 | Indiana | Dearborn | Group | INDOT | I-74 | I 74 EB bridge over CO Rd, E FK Tanners Cr, 2.07 Miles W of SR 46 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2028 | UT | 4 | State | $1,000.00 | |
| 2401298 | 41.956 | Indiana | Dearborn | Group | INDOT | I-74 | I 74 EB bridge over CO Rd, E FK Tanners Cr, 2.07 Miles W of SR 46 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2029 | CN | 5 | NHPP | $2,340,000.00 | |
| 2401298 | 41.957 | Indiana | Dearborn | Group | INDOT | I-74 | I 74 EB bridge over CO Rd, E FK Tanners Cr, 2.07 Miles W of SR 46 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2029 | CN | 6 | State | $260,000.00 | |
| 2401299 | 41.958 | Indiana | Dearborn | Group | INDOT | I-74 | I 74 WB bridge over CO Rd, E FK Tanners Cr, 2.07 Miles W of SR 46 | Bridge Deck Overly | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | PE | 1 | NHPP | $270,000.00 | |
| 2401299 | 41.959 | Indiana | Dearborn | Group | INDOT | I-74 | I 74 WB bridge over CO Rd, E FK Tanners Cr, 2.07 Miles W of SR 46 | Bridge Deck Overly | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | PE | 2 | State | $30,000.00 | |
| 2401299 | 41.960 | Indiana | Dearborn | Group | INDOT | I-74 | I 74 WB bridge over CO Rd, E FK Tanners Cr, 2.07 Miles W of SR 46 | Bridge Deck Overly | Bridge, Culvert and Small Structure Preservation | Exempt | 2028 | UT | 3 | NHPP | $9,000.00 | |
| 2401299 | 41.961 | Indiana | Dearborn | Group | INDOT | I-74 | I 74 WB bridge over CO Rd, E FK Tanners Cr, 2.07 Miles W of SR 46 | Bridge Deck Overly | Bridge, Culvert and Small Structure Preservation | Exempt | 2028 | UT | 4 | State | $1,000.00 | |
| 2401299 | 41.962 | Indiana | Dearborn | Group | INDOT | I-74 | I 74 WB bridge over CO Rd, E FK Tanners Cr, 2.07 Miles W of SR 46 | Bridge Deck Overly | Bridge, Culvert and Small Structure Preservation | Exempt | 2029 | CN | 5 | NHPP | $2,340,000.00 | |
| 2401299 | 41.963 | Indiana | Dearborn | Group | INDOT | I-74 | I 74 WB bridge over CO Rd, E FK Tanners Cr, 2.07 Miles W of SR 46 | Bridge Deck Overly | Bridge, Culvert and Small Structure Preservation | Exempt | 2029 | CN | 6 | State | $260,000.00 | |
| 2401451 | 41.964 | Indiana | Dearborn | Individual | INDOT | I-74 | 2.21 Miles E of SR 1 along WB lanes | Slide correction | maintenance/reconstruction | Exempt | 2026 | PE | 1 | Federal | $240,000.00 | $1,317,339.00 |
| 2401451 | 41.965 | Indiana | Dearborn | Individual | INDOT | I-74 | 2.21 Miles E of SR 1 along WB lanes | Slide correction | maintenance/reconstruction | Exempt | 2026 | PE | 2 | State | $60,000.00 | $1,317,339.00 |
| 2401451 | 41.966 | Indiana | Dearborn | Individual | INDOT | I-74 | 2.21 Miles E of SR 1 along WB lanes | Slide correction | maintenance/reconstruction | Exempt | 2029 | CN | 5 | Federal | $805,871.00 | $1,317,339.00 |
| 2401451 | 41.967 | Indiana | Dearborn | Individual | INDOT | I-74 | 2.21 Miles E of SR 1 along WB lanes | Slide correction | maintenance/reconstruction | Exempt | 2027 | CN | 5 | Federal | $8,000.00 | $1,317,339.00 |
| 2401451 | 41.968 | Indiana | Dearborn | Individual | INDOT | I-74 | 2.21 Miles E of SR 1 along WB lanes | Slide correction | maintenance/reconstruction | Exempt | 2029 | CN | 6 | State | $201,468.00 | $1,317,339.00 |
| 2401451 | 41.969 | Indiana | Dearborn | Individual | INDOT | I-74 | 2.21 Miles E of SR 1 along WB lanes | Slide correction | maintenance/reconstruction | Exempt | 2027 | CN | 6 | State | $2,000.00 | $1,317,339.00 |
| 2401475 | 41.970 | Indiana | Dearborn | Group | INDOT | I-74 | 3.25 miles E of SR 1 and .03 miles E of US 50 | Small Structure and drains | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | PE | 1 | NHPP | $800,000.00 | |
| 2401475 | 41.971 | Indiana | Dearborn | Group | INDOT | I-74 | 3.25 miles E of SR 1 and .03 miles E of US 50 | Small Structure and drains | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | PE | 2 | State | $200,000.00 | |
| 2401475 | 41.972 | Indiana | Dearborn | Group | INDOT | I-74 | 3.25 miles E of SR 1 and .03 miles E of US 50 | Small Structure and drains | Bridge, Culvert and Small Structure Preservation | Exempt | 2028 | RW | 3 | NHPP | $54,000.00 | |
| 2401475 | 41.973 | Indiana | Dearborn | Group | INDOT | I-74 | 3.25 miles E of SR 1 and .03 miles E of US 50 | Small Structure and drains | Bridge, Culvert and Small Structure Preservation | Exempt | 2028 | RW | 4 | State | $6,000.00 | |
| 2401475 | 41.974 | Indiana | Dearborn | Group | INDOT | I-74 | 3.25 miles E of SR 1 and .03 miles E of US 50 | Small Structure and drains | Bridge, Culvert and Small Structure Preservation | Exempt | 2028 | UT | 5 | NHPP | $18,000.00 | |
| 2401475 | 41.975 | Indiana | Dearborn | Group | INDOT | I-74 | 3.25 miles E of SR 1 and .03 miles E of US 50 | Small Structure and drains | Bridge, Culvert and Small Structure Preservation | Exempt | 2028 | UT | 6 | State | $2,000.00 | |
| 2401475 | 41.976 | Indiana | Dearborn | Group | INDOT | I-74 | 3.25 miles E of SR 1 and .03 miles E of US 50 | Small Structure and drains | Bridge, Culvert and Small Structure Preservation | Exempt | 2029 | CN | 7 | NHPP | $4,140,000.00 | |
| 2401475 | 41.977 | Indiana | Dearborn | Group | INDOT | I-74 | 3.25 miles E of SR 1 and .03 miles E of US 50 | Small Structure and drains | Bridge, Culvert and Small Structure Preservation | Exempt | 2029 | CN | 8 | State | $460,000.00 | |
| 2401480 | 41.978 | Indiana | Dearborn | Group | INDOT | SR 48 | 4.05 miles E of SR 101 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | PE | 1 | STBG | $0.00 | |
| 2401480 | 41.979 | Indiana | Dearborn | Group | INDOT | SR 48 | 4.05 miles E of SR 101 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | PE | 2 | State | $0.00 | |
| 2500051 | 41.980 | Indiana | Dearborn | Group | INDOT | AASHTOware Safety Software | Various | Purchase of AASHTO Safety Software | Statewide and non-construction activities | Exempt | 2028 | PE | 1 | Federal | $360,000.00 | |
| 2500051 | 41.981 | Indiana | Dearborn | Group | INDOT | AASHTOware Safety Software | Various | Purchase of AASHTO Safety Software | Statewide and non-construction activities | Exempt | 2029 | PE | 1 | Federal | $360,000.00 | |
| 2500051 | 41.982 | Indiana | Dearborn | Group | INDOT | AASHTOware Safety Software | Various | Purchase of AASHTO Safety Software | Statewide and non-construction activities | Exempt | 2026 | PE | 1 | Federal | $696,000.00 | |
| 2500051 | 41.983 | Indiana | Dearborn | Group | INDOT | AASHTOware Safety Software | Various | Purchase of AASHTO Safety Software | Statewide and non-construction activities | Exempt | 2027 | PE | 1 | Federal | $360,000.00 | |
| 2500051 | 41.984 | Indiana | Dearborn | Group | INDOT | AASHTOware Safety Software | Various | Purchase of AASHTO Safety Software | Statewide and non-construction activities | Exempt | 2029 | PE | 2 | State | $90,000.00 | |
| 2500051 | 41.985 | Indiana | Dearborn | Group | INDOT | AASHTOware Safety Software | Various | Purchase of AASHTO Safety Software | Statewide and non-construction activities | Exempt | 2027 | PE | 2 | State | $90,000.00 | |
| 2500051 | 41.986 | Indiana | Dearborn | Group | INDOT | AASHTOware Safety Software | Various | Purchase of AASHTO Safety Software | Statewide and non-construction activities | Exempt | 2026 | PE | 2 | State | $174,000.00 | |
| 2500051 | 41.987 | Indiana | Dearborn | Group | INDOT | AASHTOware Safety Software | Various | Purchase of AASHTO Safety Software | Statewide and non-construction activities | Exempt | 2028 | PE | 2 | State | $90,000.00 | |
| 2500070 | 41.988 | Indiana | Dearborn | Individual | Town of Dillsboro | SR 62 North Street | North Street from Mulford Street to Front Street | Beautification project along North Street | maintenance/reconstruction | Exempt | 2027 | PE | 1 | Local | $10,000.00 | $1,975,000.00 |
| 2500070 | 41.989 | Indiana | Dearborn | Individual | Town of Dillsboro | SR 62 North Street | North Street from Mulford Street to Front Street | Beautification project along North Street | maintenance/reconstruction | Exempt | 2026 | PE | 1 | Local | $60,000.00 | $1,975,000.00 |
| 2500070 | 41.990 | Indiana | Dearborn | Individual | Town of Dillsboro | SR 62 North Street | North Street from Mulford Street to Front Street | Beautification project along North Street | maintenance/reconstruction | Exempt | 2026 | RW | 2 | Local | $10,000.00 | $1,975,000.00 |
| 2500070 | 41.991 | Indiana | Dearborn | Individual | Town of Dillsboro | SR 62 North Street | North Street from Mulford Street to Front Street | Beautification project along North Street | maintenance/reconstruction | Exempt | 2027 | RW | 2 | Local | $20,000.00 | $1,975,000.00 |
| 2500070 | 41.992 | Indiana | Dearborn | Individual | Town of Dillsboro | SR 62 North Street | North Street from Mulford Street to Front Street | Beautification project along North Street | maintenance/reconstruction | Exempt | 2029 | CN | 5 | TAP | $700,000.00 | $1,975,000.00 |
| 2500070 | 41.993 | Indiana | Dearborn | Individual | Town of Dillsboro | SR 62 North Street | North Street from Mulford Street to Front Street | Beautification project along North Street | maintenance/reconstruction | Exempt | 2028 | CN | 5 | TAP | $800,000.00 | $1,975,000.00 |
| 2500070 | 41.994 | Indiana | Dearborn | Individual | Town of Dillsboro | SR 62 North Street | North Street from Mulford Street to Front Street | Beautification project along North Street | maintenance/reconstruction | Exempt | 2029 | CN | 6 | Local | $175,000.00 | $1,975,000.00 |
| 2500070 | 41.995 | Indiana | Dearborn | Individual | Town of Dillsboro | SR 62 North Street | North Street from Mulford Street to Front Street | Beautification project along North Street | maintenance/reconstruction | Exempt | 2028 | CN | 6 | Local | $200,000.00 | $1,975,000.00 |
| 2500889 | 41.996 | Indiana | Dearborn | Group | INDOT | I-74 | I 74, Various location from W of SR 229 to 9.21 miles E of SR 3 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | RW | 1 | NHS | $54,000.00 | |
| 2500889 | 41.997 | Indiana | Dearborn | Group | INDOT | I-74 | I 74, Various location from W of SR 229 to 9.21 miles E of SR 3 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | RW | 2 | State | $6,000.00 | |
| 2500889 | 41.998 | Indiana | Dearborn | Group | INDOT | I-74 | I 74, Various location from W of SR 229 to 9.21 miles E of SR 3 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2030 | CN | 5 | NHS | $3,916,845.00 | |
| 2500889 | 41.999 | Indiana | Dearborn | Group | INDOT | I-74 | I 74, Various location from W of SR 229 to 9.21 miles E of SR 3 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CN | 5 | NHS | $9,000.00 | |
| 2500889 | 42.000 | Indiana | Dearborn | Group | INDOT | I-74 | I 74, Various location from W of SR 229 to 9.21 miles E of SR 3 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2030 | CN | 6 | State | $435,205.00 | |
| 2500889 | 42.001 | Indiana | Dearborn | Group | INDOT | I-74 | I 74, Various location from W of SR 229 to 9.21 miles E of SR 3 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CN | 6 | State | $1,000.00 | |
| 2500891 | 42.002 | Indiana | Dearborn | Group | INDOT | SR 350 | from 3.26 miles E of SR 101 to 4.80 miles E of US 50, various location | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | PE | 1 | NHS | $456,248.00 | $2,741,751.00 |
| 2500891 | 42.003 | Indiana | Dearborn | Group | INDOT | SR 350 | from 3.26 miles E of SR 101 to 4.80 miles E of US 50, various location | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | PE | 2 | State | $114,062.00 | $2,741,751.00 |
| 2500891 | 42.004 | Indiana | Dearborn | Group | INDOT | SR 350 | from 3.26 miles E of SR 101 to 4.80 miles E of US 50, various location | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | RW | 3 | NHS | $40,000.00 | $2,741,751.00 |
| 2500891 | 42.005 | Indiana | Dearborn | Group | INDOT | SR 350 | from 3.26 miles E of SR 101 to 4.80 miles E of US 50, various location | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | RW | 4 | State | $10,000.00 | $2,741,751.00 |
| 2500891 | 42.006 | Indiana | Dearborn | Group | INDOT | SR 350 | from 3.26 miles E of SR 101 to 4.80 miles E of US 50, various location | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2030 | CN | 5 | NHS | $1,697,153.00 | $2,741,751.00 |
| 2500891 | 42.007 | Indiana | Dearborn | Group | INDOT | SR 350 | from 3.26 miles E of SR 101 to 4.80 miles E of US 50, various location | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CN | 5 | NHS | $32,000.00 | $2,741,751.00 |
| 2500891 | 42.008 | Indiana | Dearborn | Group | INDOT | SR 350 | from 3.26 miles E of SR 101 to 4.80 miles E of US 50, various location | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CN | 6 | State | $8,000.00 | $2,741,751.00 |
| 2500891 | 42.009 | Indiana | Dearborn | Group | INDOT | SR 350 | from 3.26 miles E of SR 101 to 4.80 miles E of US 50, various location | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2030 | CN | 6 | State | $424,288.00 | $2,741,751.00 |
| 2500894 | 42.010 | Indiana | Dearborn | Group | INDOT | SR 62 | 0.17 miles W of SR 262 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | PE | 1 | NHS | $60,000.00 | |
| 2500894 | 42.011 | Indiana | Dearborn | Group | INDOT | SR 62 | 0.17 miles W of SR 262 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | PE | 2 | State | $15,000.00 | |
| 2500894 | 42.012 | Indiana | Dearborn | Group | INDOT | SR 62 | 0.17 miles W of SR 262 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | RW | 3 | NHS | $8,000.00 | |
| 2500894 | 42.013 | Indiana | Dearborn | Group | INDOT | SR 62 | 0.17 miles W of SR 262 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | RW | 4 | State | $2,000.00 | |
| 2500894 | 42.014 | Indiana | Dearborn | Group | INDOT | SR 62 | 0.17 miles W of SR 262 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2030 | CN | 5 | NHS | $241,801.00 | |
| 2500894 | 42.015 | Indiana | Dearborn | Group | INDOT | SR 62 | 0.17 miles W of SR 262 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CN | 5 | NHS | $8,000.00 | |
| 2500894 | 42.016 | Indiana | Dearborn | Group | INDOT | SR 62 | 0.17 miles W of SR 262 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2030 | CN | 6 | State | $60,323.00 | |
| 2500894 | 42.017 | Indiana | Dearborn | Group | INDOT | SR 62 | 0.17 miles W of SR 262 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CN | 6 | State | $2,000.00 | |
| 2500896 | 42.018 | Indiana | Dearborn | Group | INDOT | SR 46 | 4.46 miles W of SR1 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | PE | 1 | NHS | $45,000.00 | |
| 2500896 | 42.019 | Indiana | Dearborn | Group | INDOT | SR 46 | 4.46 miles W of SR1 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2026 | PE | 2 | State | $5,000.00 | |
| 2500896 | 42.020 | Indiana | Dearborn | Group | INDOT | SR 46 | 4.46 miles W of SR1 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | RW | 3 | NHS | $9,000.00 | |
| 2500896 | 42.021 | Indiana | Dearborn | Group | INDOT | SR 46 | 4.46 miles W of SR1 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | RW | 4 | State | $1,000.00 | |
| 2500896 | 42.022 | Indiana | Dearborn | Group | INDOT | SR 46 | 4.46 miles W of SR1 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CN | 5 | NHS | $36,000.00 | |
| 2500896 | 42.023 | Indiana | Dearborn | Group | INDOT | SR 46 | 4.46 miles W of SR1 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2030 | CN | 5 | NHS | $206,629.00 | |
| 2500896 | 42.024 | Indiana | Dearborn | Group | INDOT | SR 46 | 4.46 miles W of SR1 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2030 | CN | 6 | State | $22,959.00 | |
| 2500896 | 42.025 | Indiana | Dearborn | Group | INDOT | SR 46 | 4.46 miles W of SR1 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CN | 6 | State | $4,000.00 | |
| 2500916 | 42.026 | Indiana | Dearborn | Individual | INDOT | I-74 | 0.35 miles W of SR 1 to 2.29 miles E of US 52 | Slide Correction | maintenance/reconstruction | Exempt | 2026 | PE | 1 | NHS | $360,000.00 | $1,274,899.00 |
| 2500916 | 42.027 | Indiana | Dearborn | Individual | INDOT | I-74 | 0.35 miles W of SR 1 to 2.29 miles E of US 52 | Slide Correction | maintenance/reconstruction | Exempt | 2026 | PE | 2 | State | $40,000.00 | $1,274,899.00 |
| 2500916 | 42.028 | Indiana | Dearborn | Individual | INDOT | I-74 | 0.35 miles W of SR 1 to 2.29 miles E of US 52 | Slide Correction | maintenance/reconstruction | Exempt | 2030 | CN | 4 | NHS | $778,409.00 | $1,274,899.00 |
| 2500916 | 42.029 | Indiana | Dearborn | Individual | INDOT | I-74 | 0.35 miles W of SR 1 to 2.29 miles E of US 52 | Slide Correction | maintenance/reconstruction | Exempt | 2027 | CN | 4 | NHS | $9,000.00 | $1,274,899.00 |
| 2500916 | 42.030 | Indiana | Dearborn | Individual | INDOT | I-74 | 0.35 miles W of SR 1 to 2.29 miles E of US 52 | Slide Correction | maintenance/reconstruction | Exempt | 2028 | CN | 4 | NHS | $0.00 | $1,274,899.00 |
| 2500916 | 42.031 | Indiana | Dearborn | Individual | INDOT | I-74 | 0.35 miles W of SR 1 to 2.29 miles E of US 52 | Slide Correction | maintenance/reconstruction | Exempt | 2027 | CN | 5 | State | $1,000.00 | $1,274,899.00 |
| 2500916 | 42.032 | Indiana | Dearborn | Individual | INDOT | I-74 | 0.35 miles W of SR 1 to 2.29 miles E of US 52 | Slide Correction | maintenance/reconstruction | Exempt | 2028 | CN | 5 | State | $0.00 | $1,274,899.00 |
| 2500916 | 42.033 | Indiana | Dearborn | Individual | INDOT | I-74 | 0.35 miles W of SR 1 to 2.29 miles E of US 52 | Slide Correction | maintenance/reconstruction | Exempt | 2030 | CN | 5 | State | $86,490.00 | $1,274,899.00 |
| 2500955 | 42.034 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Traffic Signal Visibility Improvements | Traffic signal system and lighting improvements | Exempt | 2030 | CN | 5 | STP | $3,200,000.00 | |
| 2500955 | 42.035 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Traffic Signal Visibility Improvements | Traffic signal system and lighting improvements | Exempt | 2030 | CN | 6 | State | $800,000.00 | |
| 2500956 | 42.036 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Traffic Signal Visibility Improvements | Traffic signal system and lighting improvements | Exempt | 2030 | CN | 5 | STP | $800,000.00 | |
| 2500956 | 42.037 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Traffic Signal Visibility Improvements | Traffic signal system and lighting improvements | Exempt | 2030 | CN | 6 | State | $200,000.00 | |
| 2500957 | 42.038 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Traffic Signal Visibility Improvements | Traffic signal system and lighting improvements | Exempt | 2030 | CN | 5 | STP | $2,892,000.00 | |
| 2500957 | 42.039 | Indiana | Dearborn | Group | INDOT | Various | Various locations in Seymour District | Traffic Signal Visibility Improvements | Traffic signal system and lighting improvements | Exempt | 2030 | CN | 6 | State | $723,000.00 | |
| 2501445 | 42.040 | Indiana | Dearborn | Individual | Dearborn County | Lower Dillsboro Rd Bridge #218 | Location is approximately 1.5 miles northeast of the intersection with US 50 | Bridge Replacement | bridge/culvert replacement | Exempt | 2027 | PE | 1 | Local Bridge Program | $440,000.00 | $2,647,000.00 |
| 2501445 | 42.041 | Indiana | Dearborn | Individual | Dearborn County | Lower Dillsboro Rd Bridge #218 | Location is approximately 1.5 miles northeast of the intersection with US 50 | Bridge Replacement | bridge/culvert replacement | Exempt | 2027 | PE | 2 | Local | $110,000.00 | $2,647,000.00 |
| 2501445 | 42.042 | Indiana | Dearborn | Individual | Dearborn County | Lower Dillsboro Rd Bridge #218 | Location is approximately 1.5 miles northeast of the intersection with US 50 | Bridge Replacement | bridge/culvert replacement | Exempt | 2029 | RW | 3 | Local Bridge Program | $24,000.00 | $2,647,000.00 |
| 2501445 | 42.043 | Indiana | Dearborn | Individual | Dearborn County | Lower Dillsboro Rd Bridge #218 | Location is approximately 1.5 miles northeast of the intersection with US 50 | Bridge Replacement | bridge/culvert replacement | Exempt | 2029 | RW | 4 | Local | $6,000.00 | $2,647,000.00 |
| 2501445 | 42.044 | Indiana | Dearborn | Individual | Dearborn County | Lower Dillsboro Rd Bridge #218 | Location is approximately 1.5 miles northeast of the intersection with US 50 | Bridge Replacement | bridge/culvert replacement | Exempt | 2031 | UT | 5 | Local Bridge Program | $60,000.00 | $2,647,000.00 |
| 2501445 | 42.045 | Indiana | Dearborn | Individual | Dearborn County | Lower Dillsboro Rd Bridge #218 | Location is approximately 1.5 miles northeast of the intersection with US 50 | Bridge Replacement | bridge/culvert replacement | Exempt | 2031 | UT | 6 | Local | $15,000.00 | $2,647,000.00 |
| 2501445 | 42.046 | Indiana | Dearborn | Individual | Dearborn County | Lower Dillsboro Rd Bridge #218 | Location is approximately 1.5 miles northeast of the intersection with US 50 | Bridge Replacement | bridge/culvert replacement | Exempt | 2031 | CN | 7 | Local Bridge Program | $1,425,600.00 | $2,647,000.00 |
| 2501445 | 42.047 | Indiana | Dearborn | Individual | Dearborn County | Lower Dillsboro Rd Bridge #218 | Location is approximately 1.5 miles northeast of the intersection with US 50 | Bridge Replacement | bridge/culvert replacement | Exempt | 2031 | CN | 8 | Local | $356,400.00 | $2,647,000.00 |
| 2501445 | 42.048 | Indiana | Dearborn | Individual | Dearborn County | Lower Dillsboro Rd Bridge #218 | Location is approximately 1.5 miles northeast of the intersection with US 50 | Bridge Replacement | bridge/culvert replacement | Exempt | 2031 | CE | 9 | Local Bridge Program | $168,000.00 | $2,647,000.00 |
| 2501445 | 42.049 | Indiana | Dearborn | Individual | Dearborn County | Lower Dillsboro Rd Bridge #218 | Location is approximately 1.5 miles northeast of the intersection with US 50 | Bridge Replacement | bridge/culvert replacement | Exempt | 2031 | CE | 10 | Local | $42,000.00 | $2,647,000.00 |
| 2501447 | 42.050 | Indiana | Dearborn | Individual | Dearborn County | St Peters Road Bridge #73 | Location is approximately 0.2 miles north SR 46 on St Peters Road | Bridge Replacement | bridge/culvert replacement | Exempt | 2027 | PE | 1 | Local Bridge Program | $440,000.00 | $2,445,000.00 |
| 2501447 | 42.051 | Indiana | Dearborn | Individual | Dearborn County | St Peters Road Bridge #73 | Location is approximately 0.2 miles north SR 46 on St Peters Road | Bridge Replacement | bridge/culvert replacement | Exempt | 2027 | PE | 2 | Local | $110,000.00 | $2,445,000.00 |
| 2501447 | 42.052 | Indiana | Dearborn | Individual | Dearborn County | St Peters Road Bridge #73 | Location is approximately 0.2 miles north SR 46 on St Peters Road | Bridge Replacement | bridge/culvert replacement | Exempt | 2029 | RW | 3 | Local Bridge Program | $32,000.00 | $2,445,000.00 |
| 2501447 | 42.053 | Indiana | Dearborn | Individual | Dearborn County | St Peters Road Bridge #73 | Location is approximately 0.2 miles north SR 46 on St Peters Road | Bridge Replacement | bridge/culvert replacement | Exempt | 2029 | RW | 4 | Local | $8,000.00 | $2,445,000.00 |
| 2501447 | 42.054 | Indiana | Dearborn | Individual | Dearborn County | St Peters Road Bridge #73 | Location is approximately 0.2 miles north SR 46 on St Peters Road | Bridge Replacement | bridge/culvert replacement | Exempt | 2031 | UT | 5 | Local Bridge Program | $60,000.00 | $2,445,000.00 |
| 2501447 | 42.055 | Indiana | Dearborn | Individual | Dearborn County | St Peters Road Bridge #73 | Location is approximately 0.2 miles north SR 46 on St Peters Road | Bridge Replacement | bridge/culvert replacement | Exempt | 2031 | UT | 6 | Local | $15,000.00 | $2,445,000.00 |
| 2501447 | 42.056 | Indiana | Dearborn | Individual | Dearborn County | St Peters Road Bridge #73 | Location is approximately 0.2 miles north SR 46 on St Peters Road | Bridge Replacement | bridge/culvert replacement | Exempt | 2031 | CN | 7 | Local Bridge Program | $1,984,800.00 | $2,445,000.00 |
| 2501447 | 42.057 | Indiana | Dearborn | Individual | Dearborn County | St Peters Road Bridge #73 | Location is approximately 0.2 miles north SR 46 on St Peters Road | Bridge Replacement | bridge/culvert replacement | Exempt | 2031 | CN | 8 | Local | $496,200.00 | $2,445,000.00 |
| 2501447 | 42.058 | Indiana | Dearborn | Individual | Dearborn County | St Peters Road Bridge #73 | Location is approximately 0.2 miles north SR 46 on St Peters Road | Bridge Replacement | bridge/culvert replacement | Exempt | 2031 | CE | 9 | Local Bridge Program | $238,400.00 | $2,445,000.00 |
| 2501447 | 42.059 | Indiana | Dearborn | Individual | Dearborn County | St Peters Road Bridge #73 | Location is approximately 0.2 miles north SR 46 on St Peters Road | Bridge Replacement | bridge/culvert replacement | Exempt | 2031 | CE | 10 | Local | $59,600.00 | $2,445,000.00 |
| 25352 | 35.815 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE/HAM SR 126 2.11/22.86 | FROM 4.14 MILES EAST OF US 22 TO 4.24 EAST OF US 22, OVER LMR AT COUNTY LINE | Rehabilitate bridges CLE-126-0211 and HAM-126-2286 (SFN's 1306146 and 31056261 respectively) that both carry SR 126 over the Little Miami River. These bridges will receive new barriers, joints, deck edges, and overlays including other minor rehabilitation | Bridge Preservation | Exempt | 2028 | CO | 0 | Preservation | $4,920,754.40 | $6,747,909.00 |
| 25352 | 35.816 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE/HAM SR 126 2.11/22.86 | FROM 4.14 MILES EAST OF US 22 TO 4.24 EAST OF US 22, OVER LMR AT COUNTY LINE | Rehabilitate bridges CLE-126-0211 and HAM-126-2286 (SFN's 1306146 and 31056261 respectively) that both carry SR 126 over the Little Miami River. These bridges will receive new barriers, joints, deck edges, and overlays including other minor rehabilitation | Bridge Preservation | Exempt | 2028 | CO | 0 | State | $1,230,188.60 | $6,747,909.00 |
| 25352 | 35.817 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE/HAM SR 126 2.11/22.86 | FROM 4.14 MILES EAST OF US 22 TO 4.24 EAST OF US 22, OVER LMR AT COUNTY LINE | Rehabilitate bridges CLE-126-0211 and HAM-126-2286 (SFN's 1306146 and 31056261 respectively) that both carry SR 126 over the Little Miami River. These bridges will receive new barriers, joints, deck edges, and overlays including other minor rehabilitation | Bridge Preservation | Exempt | 2028 | CO | 0 | Labor | $430,566.00 | $6,747,909.00 |
| 2600095 | 42.060 | Indiana | Dearborn | Group | INDOT | Various locations | Various locations in Seymour District | District Wide Bridge Maintenance | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CN | 5 | Federal Bridge | $900,000.00 | |
| 2600095 | 42.061 | Indiana | Dearborn | Group | INDOT | Various locations | Various locations in Seymour District | District Wide Bridge Maintenance | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | CN | 6 | State | $100,000.00 | |
| 2600156 | 42.062 | Indiana | Dearborn | Group | INDOT | I-74 | From MM 123-171 | Tree Removal/Clearing | Statewide and non-construction activities | Exempt | 2028 | CN | 5 | Safey | $1,035,000.00 | $1,292,738.00 |
| 2600156 | 42.063 | Indiana | Dearborn | Group | INDOT | I-74 | From MM 123-171 | Tree Removal/Clearing | Statewide and non-construction activities | Exempt | 2028 | CN | 6 | State | $115,000.00 | $1,292,738.00 |
| 2600166 | 42.064 | Indiana | Dearborn | Group | INDOT | SR 1 | Over Slab Camp Creek, 5.70 miles S of I-74 | Scour Protection | Bridge, Culvert and Small Structure Preservation | Exempt | 2028 | CN | 5 | Federal Bridge | $327,103.00 | $408,879.00 |
| 2600166 | 42.065 | Indiana | Dearborn | Group | INDOT | SR 1 | Over Slab Camp Creek, 5.70 miles S of I-74 | Scour Protection | Bridge, Culvert and Small Structure Preservation | Exempt | 2028 | CN | 6 | State | $81,776.00 | $408,879.00 |
| 2600367 | 42.066 | Indiana | Dearborn | Group | INDOT | SR 46 | Bridge over E. Fork Tanners Creek, 2.81 miles W of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | PE | 1 | NH | $120,000.00 | $486,801.00 |
| 2600367 | 42.067 | Indiana | Dearborn | Group | INDOT | SR 46 | Bridge over E. Fork Tanners Creek, 2.81 miles W of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | PE | 2 | State | $30,000.00 | $486,801.00 |
| 2600367 | 42.068 | Indiana | Dearborn | Group | INDOT | SR 46 | Bridge over E. Fork Tanners Creek, 2.81 miles W of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2031 | CN | 5 | NH | $269,448.00 | $486,801.00 |
| 2600367 | 42.069 | Indiana | Dearborn | Group | INDOT | SR 46 | Bridge over E. Fork Tanners Creek, 2.81 miles W of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2031 | CN | 6 | State | $67,360.00 | $486,801.00 |
| 2600368 | 42.070 | Indiana | Dearborn | Group | INDOT | SR 46 | Bridge over Logan Creek, 1.28 miles E of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | PE | 1 | NH | $120,000.00 | $430,667.00 |
| 2600368 | 42.071 | Indiana | Dearborn | Group | INDOT | SR 46 | Bridge over Logan Creek, 1.28 miles E of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | PE | 2 | State | $30,000.00 | $430,667.00 |
| 2600368 | 42.072 | Indiana | Dearborn | Group | INDOT | SR 46 | Bridge over Logan Creek, 1.28 miles E of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2031 | CN | 5 | NH | $224,534.00 | $430,667.00 |
| 2600368 | 42.073 | Indiana | Dearborn | Group | INDOT | SR 46 | Bridge over Logan Creek, 1.28 miles E of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2031 | CN | 6 | State | $56,133.00 | $430,667.00 |
| 2600369 | 42.074 | Indiana | Dearborn | Group | INDOT | SR 46 | Bridge over Logan Creek, 2.35 miles E of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | PE | 1 | NH | $120,000.00 | $453,121.00 |
| 2600369 | 42.075 | Indiana | Dearborn | Group | INDOT | SR 46 | Bridge over Logan Creek, 2.35 miles E of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | PE | 2 | State | $30,000.00 | $453,121.00 |
| 2600369 | 42.076 | Indiana | Dearborn | Group | INDOT | SR 46 | Bridge over Logan Creek, 2.35 miles E of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2031 | CN | 5 | NH | $242,497.00 | $453,121.00 |
| 2600369 | 42.077 | Indiana | Dearborn | Group | INDOT | SR 46 | Bridge over Logan Creek, 2.35 miles E of SR 1 | Bridge Deck Overlay | Bridge, Culvert and Small Structure Preservation | Exempt | 2031 | CN | 6 | State | $60,624.00 | $453,121.00 |
| 2600558 | 42.078 | Indiana | Dearborn | Group | INDOT | SR 56 | 1.76 Miles W of US 50 to US 50 | HMA Overlay, Preventative Maintenance | Pavement Preservation | Exempt | 2027 | PE | 1 | NH | $360,000.00 | $3,871,049.00 |
| 2600558 | 42.079 | Indiana | Dearborn | Group | INDOT | SR 56 | 1.76 Miles W of US 50 to US 50 | HMA Overlay, Preventative Maintenance | Pavement Preservation | Exempt | 2027 | PE | 2 | State | $90,000.00 | $3,871,049.00 |
| 2600558 | 42.080 | Indiana | Dearborn | Group | INDOT | SR 56 | 1.76 Miles W of US 50 to US 50 | HMA Overlay, Preventative Maintenance | Pavement Preservation | Exempt | 2029 | RW | 3 | NH | $20,000.00 | $3,871,049.00 |
| 2600558 | 42.081 | Indiana | Dearborn | Group | INDOT | SR 56 | 1.76 Miles W of US 50 to US 50 | HMA Overlay, Preventative Maintenance | Pavement Preservation | Exempt | 2029 | RW | 4 | State | $5,000.00 | $3,871,049.00 |
| 2600558 | 42.082 | Indiana | Dearborn | Group | INDOT | SR 56 | 1.76 Miles W of US 50 to US 50 | HMA Overlay, Preventative Maintenance | Pavement Preservation | Exempt | 2031 | CN | 5 | NH | $2,716,840.00 | $3,871,049.00 |
| 2600558 | 42.083 | Indiana | Dearborn | Group | INDOT | SR 56 | 1.76 Miles W of US 50 to US 50 | HMA Overlay, Preventative Maintenance | Pavement Preservation | Exempt | 2031 | CN | 6 | State | $679,209.00 | $3,871,049.00 |
| 2600559 | 42.084 | Indiana | Dearborn | Individual | INDOT | US 50 | 2.6 Miles East of SR 262 | Slide Correction | maintenance/reconstruction | Exempt | 2027 | PE | 1 | NH | $360,000.00 | $2,718,425.00 |
| 2600559 | 42.085 | Indiana | Dearborn | Individual | INDOT | US 50 | 2.6 Miles East of SR 262 | Slide Correction | maintenance/reconstruction | Exempt | 2027 | PE | 2 | State | $90,000.00 | $2,718,425.00 |
| 2600559 | 42.086 | Indiana | Dearborn | Individual | INDOT | US 50 | 2.6 Miles East of SR 262 | Slide Correction | maintenance/reconstruction | Exempt | 2029 | RW | 3 | NH | $8,000.00 | $2,718,425.00 |
| 2600559 | 42.087 | Indiana | Dearborn | Individual | INDOT | US 50 | 2.6 Miles East of SR 262 | Slide Correction | maintenance/reconstruction | Exempt | 2029 | RW | 4 | State | $2,000.00 | $2,718,425.00 |
| 2600559 | 42.088 | Indiana | Dearborn | Individual | INDOT | US 50 | 2.6 Miles East of SR 262 | Slide Correction | maintenance/reconstruction | Exempt | 2031 | CN | 5 | NH | $1,806,740.00 | $2,718,425.00 |
| 2600559 | 42.089 | Indiana | Dearborn | Individual | INDOT | US 50 | 2.6 Miles East of SR 262 | Slide Correction | maintenance/reconstruction | Exempt | 2031 | CN | 6 | State | $451,685.00 | $2,718,425.00 |
| 2600563 | 42.090 | Indiana | Dearborn | Individual | INDOT | SR 262 | 3.16 Miles East of US 50 | Slide Correction | maintenance/reconstruction | Exempt | 2027 | PE | 1 | NH | $280,000.00 | $3,608,746.00 |
| 2600563 | 42.091 | Indiana | Dearborn | Individual | INDOT | SR 262 | 3.16 Miles East of US 50 | Slide Correction | maintenance/reconstruction | Exempt | 2027 | PE | 2 | State | $70,000.00 | $3,608,746.00 |
| 2600563 | 42.092 | Indiana | Dearborn | Individual | INDOT | SR 262 | 3.16 Miles East of US 50 | Slide Correction | maintenance/reconstruction | Exempt | 2029 | RW | 3 | NH | $24,000.00 | $3,608,746.00 |
| 2600563 | 42.093 | Indiana | Dearborn | Individual | INDOT | SR 262 | 3.16 Miles East of US 50 | Slide Correction | maintenance/reconstruction | Exempt | 2029 | RW | 4 | State | $6,000.00 | $3,608,746.00 |
| 2600563 | 42.094 | Indiana | Dearborn | Individual | INDOT | SR 262 | 3.16 Miles East of US 50 | Slide Correction | maintenance/reconstruction | Exempt | 2031 | CN | 5 | NH | $2,582,997.00 | $3,608,746.00 |
| 2600563 | 42.095 | Indiana | Dearborn | Individual | INDOT | SR 262 | 3.16 Miles East of US 50 | Slide Correction | maintenance/reconstruction | Exempt | 2031 | CN | 6 | State | $645,749.00 | $3,608,746.00 |
| 2600591 | 42.096 | Indiana | Dearborn | Group | INDOT | SR 56 | 1.76 Miles W of US 50 to US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | PE | 1 | NH | $692,000.00 | $2,841,930.00 |
| 2600591 | 42.097 | Indiana | Dearborn | Group | INDOT | SR 56 | 1.76 Miles W of US 50 to US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | PE | 2 | State | $173,000.00 | $2,841,930.00 |
| 2600591 | 42.098 | Indiana | Dearborn | Group | INDOT | SR 56 | 1.76 Miles W of US 50 to US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2029 | RW | 3 | NH | $56,000.00 | $2,841,930.00 |
| 2600591 | 42.099 | Indiana | Dearborn | Group | INDOT | SR 56 | 1.76 Miles W of US 50 to US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2029 | RW | 4 | State | $14,000.00 | $2,841,930.00 |
| 2600591 | 42.100 | Indiana | Dearborn | Group | INDOT | SR 56 | 1.76 Miles W of US 50 to US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2031 | CN | 5 | NH | $1,525,544.00 | $2,841,930.00 |
| 2600591 | 42.101 | Indiana | Dearborn | Group | INDOT | SR 56 | 1.76 Miles W of US 50 to US 50 | Small Structure Replacement | Bridge, Culvert and Small Structure Preservation | Exempt | 2031 | CN | 6 | State | $381,386.00 | $2,841,930.00 |
| 2600616 | 43.002 | Indiana | Dearborn | Group | INDOT | SR 350 | 1.11 miles W of US 50 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | PE | 1 | NH | $160,000.00 | $603,000.00 |
| 2600616 | 43.003 | Indiana | Dearborn | Group | INDOT | SR 350 | 1.11 miles W of US 50 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | PE | 2 | State | $40,000.00 | $603,000.00 |
| 2600616 | 43.004 | Indiana | Dearborn | Group | INDOT | SR 350 | 1.11 miles W of US 50 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2029 | RW | 3 | NH | $8,000.00 | $603,000.00 |
| 2600616 | 43.005 | Indiana | Dearborn | Group | INDOT | SR 350 | 1.11 miles W of US 50 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2029 | RW | 4 | State | $2,000.00 | $603,000.00 |
| 2600616 | 43.006 | Indiana | Dearborn | Group | INDOT | SR 350 | 1.11 miles W of US 50 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2031 | CN | 5 | NH | $314,400.00 | $603,000.00 |
| 2600616 | 43.007 | Indiana | Dearborn | Group | INDOT | SR 350 | 1.11 miles W of US 50 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2031 | CN | 6 | State | $78,600.00 | $603,000.00 |
| 2600663 | 43.008 | Indiana | Dearborn | Group | INDOT | US 50 | 2.39 miles E of SR 2662 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | PE | 1 | NH | $40,000.00 | $179,762.00 |
| 2600663 | 43.009 | Indiana | Dearborn | Group | INDOT | US 50 | 2.39 miles E of SR 2662 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2027 | PE | 2 | State | $10,000.00 | $179,762.00 |
| 2600663 | 43.010 | Indiana | Dearborn | Group | INDOT | US 50 | 2.39 miles E of SR 2662 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2031 | CN | 5 | NH | $103,810.00 | $179,762.00 |
| 2600663 | 43.011 | Indiana | Dearborn | Group | INDOT | US 50 | 2.39 miles E of SR 2662 | Small Structures & Drains Construction | Bridge, Culvert and Small Structure Preservation | Exempt | 2031 | CN | 6 | State | $25,952.00 | $179,762.00 |
| 6-10028.00 | 42.102 | Kentucky | Boone | Individual | KYTC | I-275 | I-275 Carroll Cropper Bridge over the Ohio River | Bridge project in Boone County on I-275 at Ohio River | bridge/culvert replacement | Exempt | 2026 | D | 1 | FBP | $320,000.00 | $4,400,000.00 |
| 6-10028.00 | 42.103 | Kentucky | Boone | Individual | KYTC | I-275 | I-275 Carroll Cropper Bridge over the Ohio River | Bridge project in Boone County on I-275 at Ohio River | bridge/culvert replacement | Exempt | 2026 | D | 2 | State | $80,000.00 | $4,400,000.00 |
| 6-10028.00 | 42.104 | Kentucky | Boone | Individual | KYTC | I-275 | I-275 Carroll Cropper Bridge over the Ohio River | Bridge project in Boone County on I-275 at Ohio River | bridge/culvert replacement | Exempt | 2028 | CO | 5 | FBP | $3,200,000.00 | $4,400,000.00 |
| 6-10028.00 | 42.105 | Kentucky | Boone | Individual | KYTC | I-275 | I-275 Carroll Cropper Bridge over the Ohio River | Bridge project in Boone County on I-275 at Ohio River | bridge/culvert replacement | Exempt | 2028 | CO | 6 | State | $800,000.00 | $4,400,000.00 |
| 6-10043.00 | 42.106 | Kentucky | Kenton | Individual | KYTC | I-75 | MP 191.134 to 191.360 | Bridge project in Kenton County on I-75 NC at 3rd-4th-5th Sts Covington | bridge/culvert replacement | Exempt | 2028 | D | 1 | FBP | $2,985,400.00 | $41,062,000.00 |
| 6-10043.00 | 42.107 | Kentucky | Kenton | Individual | KYTC | I-75 | MP 191.134 to 191.360 | Bridge project in Kenton County on I-75 NC at 3rd-4th-5th Sts Covington | bridge/culvert replacement | Exempt | 2028 | D | 2 | State | $746,600.00 | $41,062,000.00 |
| 6-10043.00 | 42.108 | Kentucky | Kenton | Individual | KYTC | I-75 | MP 191.134 to 191.360 | Bridge project in Kenton County on I-75 NC at 3rd-4th-5th Sts Covington | bridge/culvert replacement | Exempt | 2028 | CO | 5 | FBP | $29,864,000.00 | $41,062,000.00 |
| 6-10043.00 | 42.109 | Kentucky | Kenton | Individual | KYTC | I-75 | MP 191.134 to 191.360 | Bridge project in Kenton County on I-75 NC at 3rd-4th-5th Sts Covington | bridge/culvert replacement | Exempt | 2028 | CO | 6 | State | $7,466,000.00 | $41,062,000.00 |
| 6-10044 | 42.110 | Kentucky | Kenton | Group | KYTC | KY 17 Roebling Bridge | KY 17 Roebling Bridge over the Ohio River | Bridge maintenance | Bridge maintenance | Exempt | 2025 | D | 1 | Federal Bridge | $1,280,000.00 | |
| 6-10044 | 42.111 | Kentucky | Kenton | Group | KYTC | KY 17 Roebling Bridge | KY 17 Roebling Bridge over the Ohio River | Bridge maintenance | Bridge maintenance | Exempt | 2025 | D | 2 | State | $320,000.00 | |
| 6-10044 | 42.112 | Kentucky | Kenton | Group | KYTC | KY 17 Roebling Bridge | KY 17 Roebling Bridge over the Ohio River | Bridge maintenance | Bridge maintenance | Exempt | 2025 | CO | 5 | Federal Bridge | $8,480,000.00 | |
| 6-10044 | 42.113 | Kentucky | Kenton | Group | KYTC | KY 17 Roebling Bridge | KY 17 Roebling Bridge over the Ohio River | Bridge maintenance | Bridge maintenance | Exempt | 2025 | CO | 6 | State | $2,120,000.00 | |
| 6-10045.00 | 42.114 | Kentucky | Kenton | Group | KYTC | I-75 | MP 0.117 to 0.147 | Bridge project in Kenton County on I-75 Ramp at 9th St Covington | Bridge maintenance | Exempt | 2029 | D | 1 | BRO | $270,400.00 | |
| 6-10045.00 | 42.115 | Kentucky | Kenton | Group | KYTC | I-75 | MP 0.117 to 0.147 | Bridge project in Kenton County on I-75 Ramp at 9th St Covington | Bridge maintenance | Exempt | 2029 | D | 2 | State | $67,600.00 | |
| 6-10045.00 | 42.116 | Kentucky | Kenton | Group | KYTC | I-75 | MP 0.117 to 0.147 | Bridge project in Kenton County on I-75 Ramp at 9th St Covington | Bridge maintenance | Exempt | 2029 | CO | 5 | BRO | $2,704,000.00 | |
| 6-10045.00 | 42.117 | Kentucky | Kenton | Group | KYTC | I-75 | MP 0.117 to 0.147 | Bridge project in Kenton County on I-75 Ramp at 9th St Covington | Bridge maintenance | Exempt | 2029 | CO | 6 | State | $676,000.00 | |
| 6-10051 | 42.118 | Kentucky | Campbell | Group | KYTC | IR 275 | I-275 over Ohio River from BMP 73.061 to EMP 73.333 | Address deficiencies of bridge (includes item # 6-10053) | Bridge maintenance | Exempt | 2025 | CO | 5 | Federal Bridge | $3,080,000.00 | |
| 6-10051 | 42.119 | Kentucky | Campbell | Group | KYTC | IR 275 | I-275 over Ohio River from BMP 73.061 to EMP 73.333 | Address deficiencies of bridge (includes item # 6-10053) | Bridge maintenance | Exempt | 2025 | CO | 6 | State | $770,000.00 | |
| 6-10060 | 42.120 | Kentucky | Campbell | Group | KYTC | KY 1936 | KY 1936 at Branch of Phillips Creek (019B00021N) | Address scour with countermeasures | Bridge maintenance | Exempt | 2024 | D | 1 | Federal Bridge Program | $40,000.00 | |
| 6-10060 | 42.121 | Kentucky | Campbell | Group | KYTC | KY 1936 | KY 1936 at Branch of Phillips Creek (019B00021N) | Address scour with countermeasures | Bridge maintenance | Exempt | 2024 | D | 2 | State | $10,000.00 | |
| 6-10060 | 42.122 | Kentucky | Campbell | Group | KYTC | KY 1936 | KY 1936 at Branch of Phillips Creek (019B00021N) | Address scour with countermeasures | Bridge maintenance | Exempt | 2024 | CO | 5 | State | $100,000.00 | |
| 6-10060 | 42.123 | Kentucky | Campbell | Group | KYTC | KY 1936 | KY 1936 at Branch of Phillips Creek (019B00021N) | Address scour with countermeasures | Bridge maintenance | Exempt | 2024 | CO | 5 | Federal Bridge Program | $400,000.00 | |
| 6-1070 | 42.124 | Kentucky | Kenton | Individual | KYTC | West 15th Street (CS 2097) | MP 0.144 to 0.223--Bridge over CSX RR and approaches in Covington | Address deficiences of bridge and approaches over CSX RR. Pedestrian only structure. | bridge/culvert replacement | Exempt | 2025 | D | 1 | FBP | $280,000.00 | $2,950,000.00 |
| 6-1070 | 42.125 | Kentucky | Kenton | Individual | KYTC | West 15th Street (CS 2097) | MP 0.144 to 0.223--Bridge over CSX RR and approaches in Covington | Address deficiences of bridge and approaches over CSX RR. Pedestrian only structure. | bridge/culvert replacement | Exempt | 2025 | D | 2 | State | $70,000.00 | $2,950,000.00 |
| 6-1070 | 42.126 | Kentucky | Kenton | Individual | KYTC | West 15th Street (CS 2097) | MP 0.144 to 0.223--Bridge over CSX RR and approaches in Covington | Address deficiences of bridge and approaches over CSX RR. Pedestrian only structure. | bridge/culvert replacement | Exempt | 2026 | RW | 3 | FBP | $160,000.00 | $2,950,000.00 |
| 6-1070 | 42.127 | Kentucky | Kenton | Individual | KYTC | West 15th Street (CS 2097) | MP 0.144 to 0.223--Bridge over CSX RR and approaches in Covington | Address deficiences of bridge and approaches over CSX RR. Pedestrian only structure. | bridge/culvert replacement | Exempt | 2026 | RW | 4 | State | $40,000.00 | $2,950,000.00 |
| 6-1070 | 42.128 | Kentucky | Kenton | Individual | KYTC | West 15th Street (CS 2097) | MP 0.144 to 0.223--Bridge over CSX RR and approaches in Covington | Address deficiences of bridge and approaches over CSX RR. Pedestrian only structure. | bridge/culvert replacement | Exempt | 2026 | UT | 5 | FBP | $320,000.00 | $2,950,000.00 |
| 6-1070 | 42.129 | Kentucky | Kenton | Individual | KYTC | West 15th Street (CS 2097) | MP 0.144 to 0.223--Bridge over CSX RR and approaches in Covington | Address deficiences of bridge and approaches over CSX RR. Pedestrian only structure. | bridge/culvert replacement | Exempt | 2026 | UT | 6 | State | $80,000.00 | $2,950,000.00 |
| 6-1070 | 42.130 | Kentucky | Kenton | Individual | KYTC | West 15th Street (CS 2097) | MP 0.144 to 0.223--Bridge over CSX RR and approaches in Covington | Address deficiences of bridge and approaches over CSX RR. Pedestrian only structure. | bridge/culvert replacement | Exempt | 2026 | CO | 7 | FBP | $1,600,000.00 | $2,950,000.00 |
| 6-1070 | 42.131 | Kentucky | Kenton | Individual | KYTC | West 15th Street (CS 2097) | MP 0.144 to 0.223--Bridge over CSX RR and approaches in Covington | Address deficiences of bridge and approaches over CSX RR. Pedestrian only structure. | bridge/culvert replacement | Exempt | 2026 | CO | 8 | State | $400,000.00 | $2,950,000.00 |
| 6-1086 | 42.132 | Kentucky | Kenton | Individual | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB, and multi-use path on both sides of bridge | bridge/culvert replacement | Non-exempt | 2021 | D | 1 | NHPP | $3,271,200.00 | $119,109,200.00 |
| 6-1086 | 42.133 | Kentucky | Kenton | Individual | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB, and multi-use path on both sides of bridge | bridge/culvert replacement | Non-exempt | 2021 | D | 2 | State | $878,000.00 | $119,109,200.00 |
| 6-1086 | 42.134 | Kentucky | Kenton | Individual | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB, and multi-use path on both sides of bridge | bridge/culvert replacement | Non-exempt | 2025 | RW | 3 | BRO | $2,152,000.00 | $119,109,200.00 |
| 6-1086 | 42.135 | Kentucky | Kenton | Individual | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB, and multi-use path on both sides of bridge | bridge/culvert replacement | Non-exempt | 2025 | RW | 4 | State | $538,000.00 | $119,109,200.00 |
| 6-1086 | 42.136 | Kentucky | Kenton | Individual | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB, and multi-use path on both sides of bridge | bridge/culvert replacement | Non-exempt | 2025 | UT | 5 | BRO | $1,016,000.00 | $119,109,200.00 |
| 6-1086 | 42.137 | Kentucky | Kenton | Individual | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB, and multi-use path on both sides of bridge | bridge/culvert replacement | Non-exempt | 2025 | UT | 6 | BRO | $254,000.00 | $119,109,200.00 |
| 6-1086 | 42.138 | Kentucky | Kenton | Individual | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB, and multi-use path on both sides of bridge | bridge/culvert replacement | Non-exempt | 2029 | CO | 7 | BRO | $12,800,000.00 | $119,109,200.00 |
| 6-1086 | 42.139 | Kentucky | Kenton | Individual | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB, and multi-use path on both sides of bridge | bridge/culvert replacement | Non-exempt | 2028 | CO | 7 | BRO | $28,000,000.00 | $119,109,200.00 |
| 6-1086 | 42.140 | Kentucky | Kenton | Individual | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB, and multi-use path on both sides of bridge | bridge/culvert replacement | Non-exempt | 2026 | CO | 7 | BRO | $24,000,000.00 | $119,109,200.00 |
| 6-1086 | 42.141 | Kentucky | Kenton | Individual | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB, and multi-use path on both sides of bridge | bridge/culvert replacement | Non-exempt | 2027 | CO | 7 | BRO | $24,000,000.00 | $119,109,200.00 |
| 6-1086 | 42.142 | Kentucky | Kenton | Individual | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB, and multi-use path on both sides of bridge | bridge/culvert replacement | Non-exempt | 2028 | CO | 8 | State | $7,000,000.00 | $119,109,200.00 |
| 6-1086 | 42.143 | Kentucky | Kenton | Individual | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB, and multi-use path on both sides of bridge | bridge/culvert replacement | Non-exempt | 2027 | CO | 8 | State | $6,000,000.00 | $119,109,200.00 |
| 6-1086 | 42.144 | Kentucky | Kenton | Individual | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB, and multi-use path on both sides of bridge | bridge/culvert replacement | Non-exempt | 2029 | CO | 8 | State | $3,200,000.00 | $119,109,200.00 |
| 6-1086 | 42.145 | Kentucky | Kenton | Individual | KYTC | 4th Street Bridge (KY 8) | Over Licking River on West 4th Street in Covington/Newport at Kenton/Campbell line | Address deficiencies of bridge, additional lane WB, and multi-use path on both sides of bridge | bridge/culvert replacement | Non-exempt | 2026 | CO | 8 | State | $6,000,000.00 | $119,109,200.00 |
| 6-1087 | 42.146 | Kentucky | Boone | Individual | KYTC | KY 842 | Bridge over the NS RR on Richardson Rd. (KY 842), 0.14 miles east of US 25 near Independence | Bridge Replacement | bridge/culvert replacement | Exempt | 2027 | D | 1 | FBP | $372,000.00 | $5,200,000.00 |
| 6-1087 | 42.147 | Kentucky | Boone | Individual | KYTC | KY 842 | Bridge over the NS RR on Richardson Rd. (KY 842), 0.14 miles east of US 25 near Independence | Bridge Replacement | bridge/culvert replacement | Exempt | 2027 | D | 2 | State | $93,000.00 | $5,200,000.00 |
| 6-1087 | 42.148 | Kentucky | Boone | Individual | KYTC | KY 842 | Bridge over the NS RR on Richardson Rd. (KY 842), 0.14 miles east of US 25 near Independence | Bridge Replacement | bridge/culvert replacement | Exempt | 2027 | CO | 7 | BRX | $3,788,000.00 | $5,200,000.00 |
| 6-1087 | 42.149 | Kentucky | Boone | Individual | KYTC | KY 842 | Bridge over the NS RR on Richardson Rd. (KY 842), 0.14 miles east of US 25 near Independence | Bridge Replacement | bridge/culvert replacement | Exempt | 2027 | CO | 8 | State | $947,000.00 | $5,200,000.00 |
| 6-115 | 42.150 | Kentucky | Campbell | Individual | City of Bellevue | Donnermeyer Drive | Between Riviera Drive and Berry Avenue | Improve roadway, consolidate access points, and replace sidewalks | maintenance/reconstruction | Exempt | 2021 | D | 1 | OKI-SNK | $86,400.00 | $992,400.00 |
| 6-115 | 42.151 | Kentucky | Campbell | Individual | City of Bellevue | Donnermeyer Drive | Between Riviera Drive and Berry Avenue | Improve roadway, consolidate access points, and replace sidewalks | maintenance/reconstruction | Exempt | 2021 | D | 2 | Local | $21,600.00 | $992,400.00 |
| 6-115 | 42.152 | Kentucky | Campbell | Individual | City of Bellevue | Donnermeyer Drive | Between Riviera Drive and Berry Avenue | Improve roadway, consolidate access points, and replace sidewalks | maintenance/reconstruction | Exempt | 2021 | D-SF | 3 | OKI-SNK | $12,000.00 | $992,400.00 |
| 6-115 | 42.153 | Kentucky | Campbell | Individual | City of Bellevue | Donnermeyer Drive | Between Riviera Drive and Berry Avenue | Improve roadway, consolidate access points, and replace sidewalks | maintenance/reconstruction | Exempt | 2021 | D-SF | 4 | State | $2,400.00 | $992,400.00 |
| 6-115 | 42.154 | Kentucky | Campbell | Individual | City of Bellevue | Donnermeyer Drive | Between Riviera Drive and Berry Avenue | Improve roadway, consolidate access points, and replace sidewalks | maintenance/reconstruction | Exempt | 2026 | CO | 9 | OKI-SNK | $696,000.00 | $992,400.00 |
| 6-115 | 42.155 | Kentucky | Campbell | Individual | City of Bellevue | Donnermeyer Drive | Between Riviera Drive and Berry Avenue | Improve roadway, consolidate access points, and replace sidewalks | maintenance/reconstruction | Exempt | 2026 | CO | 10 | Local | $174,000.00 | $992,400.00 |
| 6-123 | 42.156 | Kentucky | Kenton | Individual | City of Erlanger | KY 236 | Commonwealth Avenue (KY 236) between Baker Street and Dixie Hwy | Add sidewalks, new curbing, signs and streetscape elements | maintenance/reconstruction | Exempt | 2024 | D | 1 | OKI-SNK | $98,198.00 | $1,157,389.00 |
| 6-123 | 42.157 | Kentucky | Kenton | Individual | City of Erlanger | KY 236 | Commonwealth Avenue (KY 236) between Baker Street and Dixie Hwy | Add sidewalks, new curbing, signs and streetscape elements | maintenance/reconstruction | Exempt | 2024 | D | 2 | Local | $24,550.00 | $1,157,389.00 |
| 6-123 | 42.158 | Kentucky | Kenton | Individual | City of Erlanger | KY 236 | Commonwealth Avenue (KY 236) between Baker Street and Dixie Hwy | Add sidewalks, new curbing, signs and streetscape elements | maintenance/reconstruction | Exempt | 2024 | D-SF | 3 | OKI-SNK | $26,500.00 | $1,157,389.00 |
| 6-123 | 42.159 | Kentucky | Kenton | Individual | City of Erlanger | KY 236 | Commonwealth Avenue (KY 236) between Baker Street and Dixie Hwy | Add sidewalks, new curbing, signs and streetscape elements | maintenance/reconstruction | Exempt | 2024 | D-SF | 4 | State | $8,500.00 | $1,157,389.00 |
| 6-123 | 42.160 | Kentucky | Kenton | Individual | City of Erlanger | KY 236 | Commonwealth Avenue (KY 236) between Baker Street and Dixie Hwy | Add sidewalks, new curbing, signs and streetscape elements | maintenance/reconstruction | Exempt | 2026 | RW | 5 | OKI-SNK | $150,400.00 | $1,157,389.00 |
| 6-123 | 42.161 | Kentucky | Kenton | Individual | City of Erlanger | KY 236 | Commonwealth Avenue (KY 236) between Baker Street and Dixie Hwy | Add sidewalks, new curbing, signs and streetscape elements | maintenance/reconstruction | Exempt | 2026 | RW | 6 | Local | $37,600.00 | $1,157,389.00 |
| 6-123 | 42.162 | Kentucky | Kenton | Individual | City of Erlanger | KY 236 | Commonwealth Avenue (KY 236) between Baker Street and Dixie Hwy | Add sidewalks, new curbing, signs and streetscape elements | maintenance/reconstruction | Exempt | 2026 | UT | 7 | Local | $1,000.00 | $1,157,389.00 |
| 6-123 | 42.163 | Kentucky | Kenton | Individual | City of Erlanger | KY 236 | Commonwealth Avenue (KY 236) between Baker Street and Dixie Hwy | Add sidewalks, new curbing, signs and streetscape elements | maintenance/reconstruction | Exempt | 2028 | CO | 8 | OKI-SNK | $0.00 | $1,157,389.00 |
| 6-123 | 42.164 | Kentucky | Kenton | Individual | City of Erlanger | KY 236 | Commonwealth Avenue (KY 236) between Baker Street and Dixie Hwy | Add sidewalks, new curbing, signs and streetscape elements | maintenance/reconstruction | Exempt | 2027 | CO | 8 | OKI-SNK | $0.00 | $1,157,389.00 |
| 6-123 | 42.165 | Kentucky | Kenton | Individual | City of Erlanger | KY 236 | Commonwealth Avenue (KY 236) between Baker Street and Dixie Hwy | Add sidewalks, new curbing, signs and streetscape elements | maintenance/reconstruction | Exempt | 2026 | CO | 8 | OKI-SNK | $648,513.00 | $1,157,389.00 |
| 6-123 | 42.166 | Kentucky | Kenton | Individual | City of Erlanger | KY 236 | Commonwealth Avenue (KY 236) between Baker Street and Dixie Hwy | Add sidewalks, new curbing, signs and streetscape elements | maintenance/reconstruction | Exempt | 2026 | CO | 9 | Local | $162,128.00 | $1,157,389.00 |
| 6-124 | 42.167 | Kentucky | Campbell | Individual | City of Newport | Riverfront Commons Trail at Newport Festival Park | Between Taylor Southgate Bridge and Purple People Bridge in Newport | Construction of a new multi-use path Portion of 11.5 mile Regional Riverfront Commons Bicycle/Pedestrial Trail | bicycle/pedestrian/other | Exempt | 2023 | D-SF | 1 | OKI-SNK | $10,000.00 | $3,035,535.00 |
| 6-124 | 42.168 | Kentucky | Campbell | Individual | City of Newport | Riverfront Commons Trail at Newport Festival Park | Between Taylor Southgate Bridge and Purple People Bridge in Newport | Construction of a new multi-use path Portion of 11.5 mile Regional Riverfront Commons Bicycle/Pedestrial Trail | bicycle/pedestrian/other | Exempt | 2023 | D-SF | 2 | State | $2,500.00 | $3,035,535.00 |
| 6-124 | 42.169 | Kentucky | Campbell | Individual | City of Newport | Riverfront Commons Trail at Newport Festival Park | Between Taylor Southgate Bridge and Purple People Bridge in Newport | Construction of a new multi-use path Portion of 11.5 mile Regional Riverfront Commons Bicycle/Pedestrial Trail | bicycle/pedestrian/other | Exempt | 2026 | CO | 5 | OKI-SNK | $2,418,428.00 | $3,035,535.00 |
| 6-124 | 42.170 | Kentucky | Campbell | Individual | City of Newport | Riverfront Commons Trail at Newport Festival Park | Between Taylor Southgate Bridge and Purple People Bridge in Newport | Construction of a new multi-use path Portion of 11.5 mile Regional Riverfront Commons Bicycle/Pedestrial Trail | bicycle/pedestrian/other | Exempt | 2027 | CO | 5 | OKI-SNK | $0.00 | $3,035,535.00 |
| 6-124 | 42.171 | Kentucky | Campbell | Individual | City of Newport | Riverfront Commons Trail at Newport Festival Park | Between Taylor Southgate Bridge and Purple People Bridge in Newport | Construction of a new multi-use path Portion of 11.5 mile Regional Riverfront Commons Bicycle/Pedestrial Trail | bicycle/pedestrian/other | Exempt | 2026 | CO | 6 | Local | $604,607.00 | $3,035,535.00 |
| 6-127 | 42.172 | Kentucky | Campbell | Individual | City of Bellevue | Bellevue Riverfront Commons | 1200' between Patchen Drive and Lafayette | Construction of a new multi-use path. Portion of 11.5 mile Regional Riverfront Commons Bicycle/Pedestrial Trail | bicycle/pedestrian/other | Exempt | 2022 | D | 2 | OKI-SNK | $128,000.00 | $950,000.00 |
| 6-127 | 42.173 | Kentucky | Campbell | Individual | City of Bellevue | Bellevue Riverfront Commons | 1200' between Patchen Drive and Lafayette | Construction of a new multi-use path. Portion of 11.5 mile Regional Riverfront Commons Bicycle/Pedestrial Trail | bicycle/pedestrian/other | Exempt | 2022 | D | 3 | Local | $32,000.00 | $950,000.00 |
| 6-127 | 42.174 | Kentucky | Campbell | Individual | City of Bellevue | Bellevue Riverfront Commons | 1200' between Patchen Drive and Lafayette | Construction of a new multi-use path. Portion of 11.5 mile Regional Riverfront Commons Bicycle/Pedestrial Trail | bicycle/pedestrian/other | Exempt | 2022 | D-SF | 4 | OKI-SNK | $10,000.00 | $950,000.00 |
| 6-127 | 42.175 | Kentucky | Campbell | Individual | City of Bellevue | Bellevue Riverfront Commons | 1200' between Patchen Drive and Lafayette | Construction of a new multi-use path. Portion of 11.5 mile Regional Riverfront Commons Bicycle/Pedestrial Trail | bicycle/pedestrian/other | Exempt | 2022 | D-SF | 5 | State | $2,500.00 | $950,000.00 |
| 6-127 | 42.176 | Kentucky | Campbell | Individual | City of Bellevue | Bellevue Riverfront Commons | 1200' between Patchen Drive and Lafayette | Construction of a new multi-use path. Portion of 11.5 mile Regional Riverfront Commons Bicycle/Pedestrial Trail | bicycle/pedestrian/other | Exempt | 2026 | CO | 7 | OKI-SNK | $622,000.00 | $950,000.00 |
| 6-127 | 42.177 | Kentucky | Campbell | Individual | City of Bellevue | Bellevue Riverfront Commons | 1200' between Patchen Drive and Lafayette | Construction of a new multi-use path. Portion of 11.5 mile Regional Riverfront Commons Bicycle/Pedestrial Trail | bicycle/pedestrian/other | Exempt | 2026 | CO | 8 | Local | $155,500.00 | $950,000.00 |
| 6-17.00 | 42.178 | Kentucky | Kenton | Individual | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | Non-exempt | 2022 | D | 1 | NH | $4,000,000.00 | $236,920,000.00 |
| 6-17.00 | 42.179 | Kentucky | Kenton | Individual | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | Non-exempt | 2022 | D | 2 | State | $1,000,000.00 | $236,920,000.00 |
| 6-17.00 | 42.180 | Kentucky | Kenton | Individual | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | Non-exempt | 2022 | RW | 3 | NH | $4,000,000.00 | $236,920,000.00 |
| 6-17.00 | 42.181 | Kentucky | Kenton | Individual | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | Non-exempt | 2023 | RW | 3 | NH | $12,000,000.00 | $236,920,000.00 |
| 6-17.00 | 42.182 | Kentucky | Kenton | Individual | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | Non-exempt | 2022 | RW | 4 | State | $1,000,000.00 | $236,920,000.00 |
| 6-17.00 | 42.183 | Kentucky | Kenton | Individual | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | Non-exempt | 2023 | RW | 4 | State | $3,000,000.00 | $236,920,000.00 |
| 6-17.00 | 42.184 | Kentucky | Kenton | Individual | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | Non-exempt | 2029 | CO | 6 | NH | $51,464,000.00 | $236,920,000.00 |
| 6-17.00 | 42.185 | Kentucky | Kenton | Individual | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | Non-exempt | 2028 | CO | 6 | NH | $4,000,000.00 | $236,920,000.00 |
| 6-17.00 | 42.186 | Kentucky | Kenton | Individual | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | Non-exempt | 2030 | CO | 6 | NH | $114,072,000.00 | $236,920,000.00 |
| 6-17.00 | 42.187 | Kentucky | Kenton | Individual | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | Non-exempt | 2028 | CO | 7 | State | $1,000,000.00 | $236,920,000.00 |
| 6-17.00 | 42.188 | Kentucky | Kenton | Individual | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | Non-exempt | 2030 | CO | 7 | State | $28,518,000.00 | $236,920,000.00 |
| 6-17.00 | 42.189 | Kentucky | Kenton | Individual | KYTC | IR 75 | Brent Spence Bridge Corridor Project | Initiate Preliminary Engineering, environmental studies and other preconstruction activities to upgrade the I-75/71 Brent Spence Bridge Corridor. Construction under PID 116649 | widening/relocation | Non-exempt | 2029 | CO | 7 | State | $12,866,000.00 | $236,920,000.00 |
| 6-17.30 | 42.190 | Kentucky | Kenton | Individual | KYTC | I-71/75 | Bridge over the Ohio River | Construct a companion bridge to the existing I-71/75 Brent Spence Bridge over the Ohio River between Covington, KY and Cincinnati, OH (Federal Grant Funding) | widening/relocation | Non-exempt | 2026 | CO | 5 | KYD | $230,400,000.00 | |
| 6-17.30 | 42.191 | Kentucky | Kenton | Individual | KYTC | I-71/75 | Bridge over the Ohio River | Construct a companion bridge to the existing I-71/75 Brent Spence Bridge over the Ohio River between Covington, KY and Cincinnati, OH (Federal Grant Funding) | widening/relocation | Non-exempt | 2027 | CO | 5 | KYD | $172,000,000.00 | |
| 6-17.30 | 42.192 | Kentucky | Kenton | Individual | KYTC | I-71/75 | Bridge over the Ohio River | Construct a companion bridge to the existing I-71/75 Brent Spence Bridge over the Ohio River between Covington, KY and Cincinnati, OH (Federal Grant Funding) | widening/relocation | Non-exempt | 2030 | CO | 5 | KYD | $82,410,000.00 | |
| 6-17.30 | 42.193 | Kentucky | Kenton | Individual | KYTC | I-71/75 | Bridge over the Ohio River | Construct a companion bridge to the existing I-71/75 Brent Spence Bridge over the Ohio River between Covington, KY and Cincinnati, OH (Federal Grant Funding) | widening/relocation | Non-exempt | 2029 | CO | 5 | KYD | $158,270,000.00 | |
| 6-17.30 | 42.194 | Kentucky | Kenton | Individual | KYTC | I-71/75 | Bridge over the Ohio River | Construct a companion bridge to the existing I-71/75 Brent Spence Bridge over the Ohio River between Covington, KY and Cincinnati, OH (Federal Grant Funding) | widening/relocation | Non-exempt | 2028 | CO | 5 | KYD | $172,000,000.00 | |
| 6-17.31 | 42.195 | Kentucky | Kenton | Individual | KYTC | I-71/75 | Bridge over the Ohio River | Construct a companion bridge to the existing I-71/75 Brent Spence Bridge over the Ohio River between Covington, KY and Cincinnati, OH (Dedicated State General Funds) | widening/relocation | Non-exempt | 2026 | CO | 5 | SGF | $74,600,000.00 | |
| 6-17.31 | 42.196 | Kentucky | Kenton | Individual | KYTC | I-71/75 | Bridge over the Ohio River | Construct a companion bridge to the existing I-71/75 Brent Spence Bridge over the Ohio River between Covington, KY and Cincinnati, OH (Dedicated State General Funds) | widening/relocation | Non-exempt | 2029 | CO | 5 | SGF | $2,400,000.00 | |
| 6-17.31 | 42.197 | Kentucky | Kenton | Individual | KYTC | I-71/75 | Bridge over the Ohio River | Construct a companion bridge to the existing I-71/75 Brent Spence Bridge over the Ohio River between Covington, KY and Cincinnati, OH (Dedicated State General Funds) | widening/relocation | Non-exempt | 2027 | CO | 5 | SGF | $53,000,000.00 | |
| 6-17.31 | 42.198 | Kentucky | Kenton | Individual | KYTC | I-71/75 | Bridge over the Ohio River | Construct a companion bridge to the existing I-71/75 Brent Spence Bridge over the Ohio River between Covington, KY and Cincinnati, OH (Dedicated State General Funds) | widening/relocation | Non-exempt | 2028 | CO | 5 | SGF | $48,000,000.00 | |
| 6-17.32 | 42.199 | Kentucky | Kenton | Individual | KYTC | I-71/75 | Bridge over the Ohio River | Construct a companion bridge to the existing I-71/75 Brent Spence Bridge over the Ohio River between Covington, KY and Cincinnati, OH (Garvee Bonds) | widening/relocation | Non-exempt | 2026 | OTH | 5 | Debt Service (Garvee) | $150,000,000.00 | |
| 6-178 | 42.200 | Kentucky | Kenton | Individual | City of Elsmere | New Buffington Road | Bridge over Norfolk Southern RR | Bridge replacement and new sidewalk connection | bridge/culvert replacement | Exempt | 2021 | D | 1 | OKI-SNK | $105,994.00 | $843,509.00 |
| 6-178 | 42.201 | Kentucky | Kenton | Individual | City of Elsmere | New Buffington Road | Bridge over Norfolk Southern RR | Bridge replacement and new sidewalk connection | bridge/culvert replacement | Exempt | 2021 | D | 2 | Local | $25,000.00 | $843,509.00 |
| 6-178 | 42.202 | Kentucky | Kenton | Individual | City of Elsmere | New Buffington Road | Bridge over Norfolk Southern RR | Bridge replacement and new sidewalk connection | bridge/culvert replacement | Exempt | 2021 | D-SF | 3 | OKI-SNK | $4,006.00 | $843,509.00 |
| 6-178 | 42.203 | Kentucky | Kenton | Individual | City of Elsmere | New Buffington Road | Bridge over Norfolk Southern RR | Bridge replacement and new sidewalk connection | bridge/culvert replacement | Exempt | 2021 | D-SF | 4 | State | $2,500.00 | $843,509.00 |
| 6-178 | 42.204 | Kentucky | Kenton | Individual | City of Elsmere | New Buffington Road | Bridge over Norfolk Southern RR | Bridge replacement and new sidewalk connection | bridge/culvert replacement | Exempt | 2026 | RW | 5 | OKI-SNK | $40,000.00 | $843,509.00 |
| 6-178 | 42.205 | Kentucky | Kenton | Individual | City of Elsmere | New Buffington Road | Bridge over Norfolk Southern RR | Bridge replacement and new sidewalk connection | bridge/culvert replacement | Exempt | 2026 | RW | 6 | Local | $10,000.00 | $843,509.00 |
| 6-178 | 42.206 | Kentucky | Kenton | Individual | City of Elsmere | New Buffington Road | Bridge over Norfolk Southern RR | Bridge replacement and new sidewalk connection | bridge/culvert replacement | Exempt | 2026 | UT | 7 | OKI-SNK | $40,000.00 | $843,509.00 |
| 6-178 | 42.207 | Kentucky | Kenton | Individual | City of Elsmere | New Buffington Road | Bridge over Norfolk Southern RR | Bridge replacement and new sidewalk connection | bridge/culvert replacement | Exempt | 2026 | UT | 8 | Local | $10,000.00 | $843,509.00 |
| 6-178 | 42.208 | Kentucky | Kenton | Individual | City of Elsmere | New Buffington Road | Bridge over Norfolk Southern RR | Bridge replacement and new sidewalk connection | bridge/culvert replacement | Exempt | 2026 | CO | 9 | OKI-SNK | $482,000.00 | $843,509.00 |
| 6-178 | 42.209 | Kentucky | Kenton | Individual | City of Elsmere | New Buffington Road | Bridge over Norfolk Southern RR | Bridge replacement and new sidewalk connection | bridge/culvert replacement | Exempt | 2026 | CO | 10 | Local | $120,500.00 | $843,509.00 |
| 6-179 | 42.210 | Kentucky | Kenton | Individual | City of Elsmere | Garvey Avenue | from Florence Court to past Comanche Trail | Resurfacing and correct drainage issues. Replace existing multi-use path. | maintenance/reconstruction | Exempt | 2022 | D | 1 | OKI-SNK | $12,000.00 | $300,000.00 |
| 6-179 | 42.211 | Kentucky | Kenton | Individual | City of Elsmere | Garvey Avenue | from Florence Court to past Comanche Trail | Resurfacing and correct drainage issues. Replace existing multi-use path. | maintenance/reconstruction | Exempt | 2022 | D | 2 | Local | $3,000.00 | $300,000.00 |
| 6-179 | 42.212 | Kentucky | Kenton | Individual | City of Elsmere | Garvey Avenue | from Florence Court to past Comanche Trail | Resurfacing and correct drainage issues. Replace existing multi-use path. | maintenance/reconstruction | Exempt | 2022 | D-SF | 3 | OKI-SNK | $5,000.00 | $300,000.00 |
| 6-179 | 42.213 | Kentucky | Kenton | Individual | City of Elsmere | Garvey Avenue | from Florence Court to past Comanche Trail | Resurfacing and correct drainage issues. Replace existing multi-use path. | maintenance/reconstruction | Exempt | 2022 | D-SF | 4 | State | $1,250.00 | $300,000.00 |
| 6-179 | 42.214 | Kentucky | Kenton | Individual | City of Elsmere | Garvey Avenue | from Florence Court to past Comanche Trail | Resurfacing and correct drainage issues. Replace existing multi-use path. | maintenance/reconstruction | Exempt | 2026 | CO | 5 | OKI-SNK | $223,000.00 | $300,000.00 |
| 6-179 | 42.215 | Kentucky | Kenton | Individual | City of Elsmere | Garvey Avenue | from Florence Court to past Comanche Trail | Resurfacing and correct drainage issues. Replace existing multi-use path. | maintenance/reconstruction | Exempt | 2026 | CO | 6 | Local | $55,750.00 | $300,000.00 |
| 6-185 | 42.216 | Kentucky | Boone | Individual | Boone County | CVG Trail North and East Segments | Along KY 20 and KY 236 from Conner Road to Mineola Pike | Construct 10' wide multi-use path | bicycle/pedestrian/other | Exempt | 2022 | D-SF | 1 | OKI-SNK | $30,000.00 | $4,854,474.00 |
| 6-185 | 42.217 | Kentucky | Boone | Individual | Boone County | CVG Trail North and East Segments | Along KY 20 and KY 236 from Conner Road to Mineola Pike | Construct 10' wide multi-use path | bicycle/pedestrian/other | Exempt | 2022 | D-SF | 2 | State | $7,500.00 | $4,854,474.00 |
| 6-185 | 42.218 | Kentucky | Boone | Individual | Boone County | CVG Trail North and East Segments | Along KY 20 and KY 236 from Conner Road to Mineola Pike | Construct 10' wide multi-use path | bicycle/pedestrian/other | Exempt | 2022 | D | 3 | OKI-SNK | $280,000.00 | $4,854,474.00 |
| 6-185 | 42.219 | Kentucky | Boone | Individual | Boone County | CVG Trail North and East Segments | Along KY 20 and KY 236 from Conner Road to Mineola Pike | Construct 10' wide multi-use path | bicycle/pedestrian/other | Exempt | 2022 | D | 4 | Local | $280,000.00 | $4,854,474.00 |
| 6-185 | 42.220 | Kentucky | Boone | Individual | Boone County | CVG Trail North and East Segments | Along KY 20 and KY 236 from Conner Road to Mineola Pike | Construct 10' wide multi-use path | bicycle/pedestrian/other | Exempt | 2026 | RW | 5 | OKI-SNK | $100,000.00 | $4,854,474.00 |
| 6-185 | 42.221 | Kentucky | Boone | Individual | Boone County | CVG Trail North and East Segments | Along KY 20 and KY 236 from Conner Road to Mineola Pike | Construct 10' wide multi-use path | bicycle/pedestrian/other | Exempt | 2026 | RW | 6 | Local | $100,000.00 | $4,854,474.00 |
| 6-185 | 42.222 | Kentucky | Boone | Individual | Boone County | CVG Trail North and East Segments | Along KY 20 and KY 236 from Conner Road to Mineola Pike | Construct 10' wide multi-use path | bicycle/pedestrian/other | Exempt | 2026 | CO | 7 | OKI-SNK | $2,028,487.00 | $4,854,474.00 |
| 6-185 | 42.223 | Kentucky | Boone | Individual | Boone County | CVG Trail North and East Segments | Along KY 20 and KY 236 from Conner Road to Mineola Pike | Construct 10' wide multi-use path | bicycle/pedestrian/other | Exempt | 2026 | CO | 8 | Local | $2,028,487.00 | $4,854,474.00 |
| 6-20001 | 42.224 | Kentucky | Boone | Group | KYTC | IR 71 | from MP 69.890 to 77.724 | Address pavement condition | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2025 | D | 1 | NHPM | $3,217,857.00 | |
| 6-20001 | 42.225 | Kentucky | Boone | Group | KYTC | IR 71 | from MP 69.890 to 77.724 | Address pavement condition | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2025 | D | 2 | State | $804,464.00 | |
| 6-20001 | 42.226 | Kentucky | Boone | Group | KYTC | IR 71 | from MP 69.890 to 77.724 | Address pavement condition | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2025 | CO | 3 | STBG | $12,960,711.00 | |
| 6-20001 | 42.227 | Kentucky | Boone | Group | KYTC | IR 71 | from MP 69.890 to 77.724 | Address pavement condition | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2027 | CO | 3 | STBG | $16,000,000.00 | |
| 6-20001 | 42.228 | Kentucky | Boone | Group | KYTC | IR 71 | from MP 69.890 to 77.724 | Address pavement condition | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2025 | CO | 4 | State | $3,240,178.00 | |
| 6-20001 | 42.229 | Kentucky | Boone | Group | KYTC | IR 71 | from MP 69.890 to 77.724 | Address pavement condition | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2027 | CO | 4 | State | $4,000,000.00 | |
| 6-20007 | 42.230 | Kentucky | Boone | Group | KYTC | IR 275 | from MP 7.25 to 13.08 | Address pavement condition | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2030 | D | 1 | NHPP | $652,000.00 | |
| 6-20007 | 42.231 | Kentucky | Boone | Group | KYTC | IR 275 | from MP 7.25 to 13.08 | Address pavement condition | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2030 | D | 2 | State | $163,000.00 | |
| 6-20007 | 42.232 | Kentucky | Boone | Group | KYTC | IR 275 | from MP 7.25 to 13.08 | Address pavement condition | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2030 | C | 3 | NHPP | $6,520,000.00 | |
| 6-20007 | 42.233 | Kentucky | Boone | Group | KYTC | IR 275 | from MP 7.25 to 13.08 | Address pavement condition | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2030 | C | 4 | State | $1,630,000.00 | |
| 6-20008 | 42.234 | Kentucky | Boone | Group | KYTC | KY 18 | Between MP 15.256 and MP 16.632 | Address pavement condtion | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2023 | D | 1 | STBG | $200,000.00 | |
| 6-20008 | 42.235 | Kentucky | Boone | Group | KYTC | KY 18 | Between MP 15.256 and MP 16.632 | Address pavement condtion | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2023 | D | 2 | State | $50,000.00 | |
| 6-20008 | 42.236 | Kentucky | Boone | Group | KYTC | KY 18 | Between MP 15.256 and MP 16.632 | Address pavement condtion | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2023 | CO | 6 | STBG | $1,800,000.00 | |
| 6-20008 | 42.237 | Kentucky | Boone | Group | KYTC | KY 18 | Between MP 15.256 and MP 16.632 | Address pavement condtion | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2023 | CO | 7 | State | $450,000.00 | |
| 6-20012 | 42.238 | Kentucky | Campbell | Group | KYTC | KY 6335 | MP 1.717 to MP 4.498 | Address pavement condition of AC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2026 | D | 1 | STBG | $120,000.00 | |
| 6-20012 | 42.239 | Kentucky | Campbell | Group | KYTC | KY 6335 | MP 1.717 to MP 4.498 | Address pavement condition of AC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2026 | D | 2 | State | $30,000.00 | |
| 6-20012 | 42.240 | Kentucky | Campbell | Group | KYTC | KY 6335 | MP 1.717 to MP 4.498 | Address pavement condition of AC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2027 | CO | 6 | STBG | $1,080,000.00 | |
| 6-20012 | 42.241 | Kentucky | Campbell | Group | KYTC | KY 6335 | MP 1.717 to MP 4.498 | Address pavement condition of AC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2027 | CO | 7 | State | $270,000.00 | |
| 6-20013 | 42.242 | Kentucky | Campbell | Group | KYTC | KY 9 | MP 20.392 to MP 21.85 | Address condition of AC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2024 | D | 1 | STBG | $180,000.00 | |
| 6-20013 | 42.243 | Kentucky | Campbell | Group | KYTC | KY 9 | MP 20.392 to MP 21.85 | Address condition of AC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2024 | D | 2 | State | $45,000.00 | |
| 6-20013 | 42.244 | Kentucky | Campbell | Group | KYTC | KY 9 | MP 20.392 to MP 21.85 | Address condition of AC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2025 | CO | 4 | STBG | $2,250,000.00 | |
| 6-20013 | 42.245 | Kentucky | Campbell | Group | KYTC | KY 9 | MP 20.392 to MP 21.85 | Address condition of AC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2025 | CO | 5 | State | $562,500.00 | |
| 6-20014 | 42.246 | Kentucky | Campbell | Group | KYTC | KY 1892 | MP 1.47 to MP 2.1 | Address condition of PCC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2026 | D | 1 | STBG | $110,000.00 | |
| 6-20014 | 42.247 | Kentucky | Campbell | Group | KYTC | KY 1892 | MP 1.47 to MP 2.1 | Address condition of PCC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2026 | D | 2 | State | $27,500.00 | |
| 6-20014 | 42.248 | Kentucky | Campbell | Group | KYTC | KY 1892 | MP 1.47 to MP 2.1 | Address condition of PCC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2026 | CO | 6 | STBG | $6,530,563.00 | |
| 6-20014 | 42.249 | Kentucky | Campbell | Group | KYTC | KY 1892 | MP 1.47 to MP 2.1 | Address condition of PCC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2026 | CO | 7 | State | $1,632,641.00 | |
| 6-20017 | 42.250 | Kentucky | Campbell | Group | KYTC | US 27 | MP 8.831 to MP 10.517 | Address condition of PCC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2030 | D | 1 | STP5 | $32,000.00 | |
| 6-20017 | 42.251 | Kentucky | Campbell | Group | KYTC | US 27 | MP 8.831 to MP 10.517 | Address condition of PCC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2030 | D | 2 | State | $8,000.00 | |
| 6-20017 | 42.252 | Kentucky | Campbell | Group | KYTC | US 27 | MP 8.831 to MP 10.517 | Address condition of PCC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2030 | CO | 6 | STP5 | $608,000.00 | |
| 6-20017 | 42.253 | Kentucky | Campbell | Group | KYTC | US 27 | MP 8.831 to MP 10.517 | Address condition of PCC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2030 | CO | 7 | State | $152,000.00 | |
| 6-20040 | 42.254 | Kentucky | Kenton | Group | KYTC | KY 16 | MP 13.9 to 14.9 | Address condition of PCC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2024 | D | 1 | NHPP | $320,000.00 | |
| 6-20040 | 42.255 | Kentucky | Kenton | Group | KYTC | KY 16 | MP 13.9 to 14.9 | Address condition of PCC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2024 | D | 2 | State | $80,000.00 | |
| 6-20040 | 42.256 | Kentucky | Kenton | Group | KYTC | KY 16 | MP 13.9 to 14.9 | Address condition of PCC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2025 | CO | 6 | PM | $2,000,000.00 | |
| 6-20040 | 42.257 | Kentucky | Kenton | Group | KYTC | KY 16 | MP 13.9 to 14.9 | Address condition of PCC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2026 | CO | 7 | PM | $2,000,000.00 | |
| 6-20044 | 42.258 | Kentucky | Kenton | Group | KYTC | KY 236 | MP 2.131 to 2.622 | Address condition of PCC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2027 | D | 1 | STP5 | $14,000.00 | |
| 6-20044 | 42.259 | Kentucky | Kenton | Group | KYTC | KY 236 | MP 2.131 to 2.622 | Address condition of PCC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2027 | D | 2 | State | $3,500.00 | |
| 6-20044 | 42.260 | Kentucky | Kenton | Group | KYTC | KY 236 | MP 2.131 to 2.622 | Address condition of PCC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2027 | CO | 6 | STP5 | $266,000.00 | |
| 6-20044 | 42.261 | Kentucky | Kenton | Group | KYTC | KY 236 | MP 2.131 to 2.622 | Address condition of PCC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2027 | CO | 7 | State | $66,500.00 | |
| 6-20045 | 42.262 | Kentucky | Kenton | Group | KYTC | KY 1072 | MP 2.489 to 2.83 | Address condition of PCC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2030 | D | 1 | STP5 | $9,000.00 | |
| 6-20045 | 42.263 | Kentucky | Kenton | Group | KYTC | KY 1072 | MP 2.489 to 2.83 | Address condition of PCC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2030 | D | 2 | State | $2,250.00 | |
| 6-20045 | 42.264 | Kentucky | Kenton | Group | KYTC | KY 1072 | MP 2.489 to 2.83 | Address condition of PCC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2030 | CO | 6 | STP5 | $160,000.00 | |
| 6-20045 | 42.265 | Kentucky | Kenton | Group | KYTC | KY 1072 | MP 2.489 to 2.83 | Address condition of PCC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2030 | CO | 7 | State | $40,000.00 | |
| 6-20046 | 42.266 | Kentucky | Kenton | Group | KYTC | US 25 | MP 8.65 to 10.85 | Address condition of AC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2024 | D | 1 | STBG | $100,000.00 | |
| 6-20046 | 42.267 | Kentucky | Kenton | Group | KYTC | US 25 | MP 8.65 to 10.85 | Address condition of AC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2024 | D | 2 | State | $25,000.00 | |
| 6-20046 | 42.268 | Kentucky | Kenton | Group | KYTC | US 25 | MP 8.65 to 10.85 | Address condition of AC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2024 | CO | 6 | STBG | $1,000,000.00 | |
| 6-20046 | 42.269 | Kentucky | Kenton | Group | KYTC | US 25 | MP 8.65 to 10.85 | Address condition of AC pavement | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2024 | CO | 7 | State | $250,000.00 | |
| 6-20047 | 42.270 | Kentucky | Boone | Group | KYTC | US 42 | MP 10.25 to MP 11.53 | Address condition | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2025 | CO | 1 | STBG | $504,000.00 | |
| 6-20047 | 42.271 | Kentucky | Boone | Group | KYTC | US 42 | MP 10.25 to MP 11.53 | Address condition | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2025 | CO | 2 | State | $126,000.00 | |
| 6-20064.00 | 42.272 | Kentucky | Kenton | Group | KYTC | I-75 | MP 190.700 to 191.122 | Address condition of I-75 non-cardinal direction from MP 190.7 to 191.122 | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2029 | D | 1 | STP5 | $40,000.00 | |
| 6-20064.00 | 42.273 | Kentucky | Kenton | Group | KYTC | I-75 | MP 190.700 to 191.122 | Address condition of I-75 non-cardinal direction from MP 190.7 to 191.122 | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2029 | D | 2 | State | $10,000.00 | |
| 6-20064.00 | 42.274 | Kentucky | Kenton | Group | KYTC | I-75 | MP 190.700 to 191.122 | Address condition of I-75 non-cardinal direction from MP 190.7 to 191.122 | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2029 | CO | 5 | STP5 | $360,000.00 | |
| 6-20064.00 | 42.275 | Kentucky | Kenton | Group | KYTC | I-75 | MP 190.700 to 191.122 | Address condition of I-75 non-cardinal direction from MP 190.7 to 191.122 | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2029 | CO | 6 | State | $90,000.00 | |
| 6-22128 | 42.276 | Kentucky | Boone | Group | KYTC | I-75 | MP 182.816 to MP 183.312 | Address condition | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2030 | D | 1 | NHPP | $80,000.00 | |
| 6-22128 | 42.277 | Kentucky | Boone | Group | KYTC | I-75 | MP 182.816 to MP 183.312 | Address condition | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2030 | D | 2 | State | $20,000.00 | |
| 6-22128 | 42.278 | Kentucky | Boone | Group | KYTC | I-75 | MP 182.816 to MP 183.312 | Address condition | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2030 | CO | 3 | NHPP | $800,000.00 | |
| 6-22128 | 42.279 | Kentucky | Boone | Group | KYTC | I-75 | MP 182.816 to MP 183.312 | Address condition | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2030 | CO | 4 | State | $200,000.00 | |
| 6-22130.00 | 42.280 | Kentucky | Kenton | Group | KYTC | I-75 | MP 184.708 to 186.950 | Address condition of I-75 non-cardinal direction from MP 184.708 to 186.95 | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2027 | D | 1 | NH | $1,557,600.00 | |
| 6-22130.00 | 42.281 | Kentucky | Kenton | Group | KYTC | I-75 | MP 184.708 to 186.950 | Address condition of I-75 non-cardinal direction from MP 184.708 to 186.95 | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2027 | D | 2 | State | $389,400.00 | |
| 6-22130.00 | 42.282 | Kentucky | Kenton | Group | KYTC | I-75 | MP 184.708 to 186.950 | Address condition of I-75 non-cardinal direction from MP 184.708 to 186.95 | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2027 | CO | 5 | NH | $14,018,400.00 | |
| 6-22130.00 | 42.283 | Kentucky | Kenton | Group | KYTC | I-75 | MP 184.708 to 186.950 | Address condition of I-75 non-cardinal direction from MP 184.708 to 186.95 | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2027 | CO | 6 | State | $3,504,600.00 | |
| 6-23 | 42.284 | Kentucky | Campbell | Individual | KYTC | I 275 | I 275 at I 471 Interchange | Add lane on ramp from eastbound I 275 to northbound I 471 | widening/relocation | Non-exempt | 2025 | PL | 1 | NH | $400,000.00 | $24,700,000.00 |
| 6-23 | 42.285 | Kentucky | Campbell | Individual | KYTC | I 275 | I 275 at I 471 Interchange | Add lane on ramp from eastbound I 275 to northbound I 471 | widening/relocation | Non-exempt | 2025 | PL | 2 | State | $100,000.00 | $24,700,000.00 |
| 6-23 | 42.286 | Kentucky | Campbell | Individual | KYTC | I 275 | I 275 at I 471 Interchange | Add lane on ramp from eastbound I 275 to northbound I 471 | widening/relocation | Non-exempt | 2027 | D | 3 | NH | $1,600,000.00 | $24,700,000.00 |
| 6-23 | 42.287 | Kentucky | Campbell | Individual | KYTC | I 275 | I 275 at I 471 Interchange | Add lane on ramp from eastbound I 275 to northbound I 471 | widening/relocation | Non-exempt | 2027 | D | 4 | State | $400,000.00 | $24,700,000.00 |
| 6-23 | 42.288 | Kentucky | Campbell | Individual | KYTC | I 275 | I 275 at I 471 Interchange | Add lane on ramp from eastbound I 275 to northbound I 471 | widening/relocation | Non-exempt | 2029 | CO | 5 | Uncommitted | $22,200,000.00 | $24,700,000.00 |
| 6-297 | 42.289 | Kentucky | Campbell | Individual | City of Bellevue | KY 8 (Fairfield Avenue) Sidewalks | Along KY 8 (Fairfield Av) from Riviera to Berry | Replace sidewalks, install full curbs and provide separation from motorists | bicycle/pedestrian/other | Exempt | 2024 | D-SF | 1 | OKI-SNK | $10,000.00 | $770,676.00 |
| 6-297 | 42.290 | Kentucky | Campbell | Individual | City of Bellevue | KY 8 (Fairfield Avenue) Sidewalks | Along KY 8 (Fairfield Av) from Riviera to Berry | Replace sidewalks, install full curbs and provide separation from motorists | bicycle/pedestrian/other | Exempt | 2024 | D-SF | 2 | State | $2,500.00 | $770,676.00 |
| 6-297 | 42.291 | Kentucky | Campbell | Individual | City of Bellevue | KY 8 (Fairfield Avenue) Sidewalks | Along KY 8 (Fairfield Av) from Riviera to Berry | Replace sidewalks, install full curbs and provide separation from motorists | bicycle/pedestrian/other | Exempt | 2024 | D | 3 | OKI-SNK | $94,000.00 | $770,676.00 |
| 6-297 | 42.292 | Kentucky | Campbell | Individual | City of Bellevue | KY 8 (Fairfield Avenue) Sidewalks | Along KY 8 (Fairfield Av) from Riviera to Berry | Replace sidewalks, install full curbs and provide separation from motorists | bicycle/pedestrian/other | Exempt | 2024 | D | 4 | Local | $23,500.00 | $770,676.00 |
| 6-297 | 42.293 | Kentucky | Campbell | Individual | City of Bellevue | KY 8 (Fairfield Avenue) Sidewalks | Along KY 8 (Fairfield Av) from Riviera to Berry | Replace sidewalks, install full curbs and provide separation from motorists | bicycle/pedestrian/other | Exempt | 2026 | RW | 5 | OKI-SNK | $100,000.00 | $770,676.00 |
| 6-297 | 42.294 | Kentucky | Campbell | Individual | City of Bellevue | KY 8 (Fairfield Avenue) Sidewalks | Along KY 8 (Fairfield Av) from Riviera to Berry | Replace sidewalks, install full curbs and provide separation from motorists | bicycle/pedestrian/other | Exempt | 2026 | RW | 6 | Local | $25,000.00 | $770,676.00 |
| 6-297 | 42.295 | Kentucky | Campbell | Individual | City of Bellevue | KY 8 (Fairfield Avenue) Sidewalks | Along KY 8 (Fairfield Av) from Riviera to Berry | Replace sidewalks, install full curbs and provide separation from motorists | bicycle/pedestrian/other | Exempt | 2026 | UT | 7 | OKI-SNK | $80,000.00 | $770,676.00 |
| 6-297 | 42.296 | Kentucky | Campbell | Individual | City of Bellevue | KY 8 (Fairfield Avenue) Sidewalks | Along KY 8 (Fairfield Av) from Riviera to Berry | Replace sidewalks, install full curbs and provide separation from motorists | bicycle/pedestrian/other | Exempt | 2026 | UT | 8 | Local | $20,000.00 | $770,676.00 |
| 6-297 | 42.297 | Kentucky | Campbell | Individual | City of Bellevue | KY 8 (Fairfield Avenue) Sidewalks | Along KY 8 (Fairfield Av) from Riviera to Berry | Replace sidewalks, install full curbs and provide separation from motorists | bicycle/pedestrian/other | Exempt | 2026 | CO | 9 | OKI-SNK | $332,541.00 | $770,676.00 |
| 6-297 | 42.298 | Kentucky | Campbell | Individual | City of Bellevue | KY 8 (Fairfield Avenue) Sidewalks | Along KY 8 (Fairfield Av) from Riviera to Berry | Replace sidewalks, install full curbs and provide separation from motorists | bicycle/pedestrian/other | Exempt | 2026 | CO | 10 | Local | $83,135.00 | $770,676.00 |
| 6-3017 | 42.299 | Kentucky | Campbell | Individual | City of Bellevue | Bellevue Van Voast Pedestrian Bridge | Van Voast Avenue over CSX Railroad | Maintenance of pedestrian bridge | bicycle/pedestrian/other | Exempt | 2022 | D | 1 | OKI-TA | $10,000.00 | $964,750.00 |
| 6-3017 | 42.300 | Kentucky | Campbell | Individual | City of Bellevue | Bellevue Van Voast Pedestrian Bridge | Van Voast Avenue over CSX Railroad | Maintenance of pedestrian bridge | bicycle/pedestrian/other | Exempt | 2022 | D | 2 | Local | $2,500.00 | $964,750.00 |
| 6-3017 | 42.301 | Kentucky | Campbell | Individual | City of Bellevue | Bellevue Van Voast Pedestrian Bridge | Van Voast Avenue over CSX Railroad | Maintenance of pedestrian bridge | bicycle/pedestrian/other | Exempt | 2022 | D-SF | 3 | OKI-TA | $5,000.00 | $964,750.00 |
| 6-3017 | 42.302 | Kentucky | Campbell | Individual | City of Bellevue | Bellevue Van Voast Pedestrian Bridge | Van Voast Avenue over CSX Railroad | Maintenance of pedestrian bridge | bicycle/pedestrian/other | Exempt | 2022 | D-SF | 4 | State | $1,000.00 | $964,750.00 |
| 6-3017 | 42.303 | Kentucky | Campbell | Individual | City of Bellevue | Bellevue Van Voast Pedestrian Bridge | Van Voast Avenue over CSX Railroad | Maintenance of pedestrian bridge | bicycle/pedestrian/other | Exempt | 2026 | CO | 5 | OKI-TAP | $757,000.00 | $964,750.00 |
| 6-3017 | 42.304 | Kentucky | Campbell | Individual | City of Bellevue | Bellevue Van Voast Pedestrian Bridge | Van Voast Avenue over CSX Railroad | Maintenance of pedestrian bridge | bicycle/pedestrian/other | Exempt | 2026 | CO | 6 | Local | $189,250.00 | $964,750.00 |
| 6-3027 | 42.305 | Kentucky | Boone | Individual | Boone County | Sam Neace Drive Sidewalk | Along Sam Neace Drive from Mt. Zion Road to Weaver Road and along Technology Way | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2023 | D | 1 | OKI-TA | $60,000.00 | $521,000.00 |
| 6-3027 | 42.306 | Kentucky | Boone | Individual | Boone County | Sam Neace Drive Sidewalk | Along Sam Neace Drive from Mt. Zion Road to Weaver Road and along Technology Way | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2023 | D | 2 | Local | $15,000.00 | $521,000.00 |
| 6-3027 | 42.307 | Kentucky | Boone | Individual | Boone County | Sam Neace Drive Sidewalk | Along Sam Neace Drive from Mt. Zion Road to Weaver Road and along Technology Way | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2024 | D-SF | 3 | OKI-TAP | $5,000.00 | $521,000.00 |
| 6-3027 | 42.308 | Kentucky | Boone | Individual | Boone County | Sam Neace Drive Sidewalk | Along Sam Neace Drive from Mt. Zion Road to Weaver Road and along Technology Way | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2024 | D-SF | 4 | State | $2,500.00 | $521,000.00 |
| 6-3027 | 42.309 | Kentucky | Boone | Individual | Boone County | Sam Neace Drive Sidewalk | Along Sam Neace Drive from Mt. Zion Road to Weaver Road and along Technology Way | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2025 | RW | 5 | OKI-TAP | $46,000.00 | $521,000.00 |
| 6-3027 | 42.310 | Kentucky | Boone | Individual | Boone County | Sam Neace Drive Sidewalk | Along Sam Neace Drive from Mt. Zion Road to Weaver Road and along Technology Way | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2025 | RW | 6 | Local | $12,500.00 | $521,000.00 |
| 6-3027 | 42.311 | Kentucky | Boone | Individual | Boone County | Sam Neace Drive Sidewalk | Along Sam Neace Drive from Mt. Zion Road to Weaver Road and along Technology Way | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2025 | RW-SF | 7 | OKI-TAP | $4,000.00 | $521,000.00 |
| 6-3027 | 42.312 | Kentucky | Boone | Individual | Boone County | Sam Neace Drive Sidewalk | Along Sam Neace Drive from Mt. Zion Road to Weaver Road and along Technology Way | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2025 | RW-SF | 8 | State | $1,000.00 | $521,000.00 |
| 6-3027 | 42.313 | Kentucky | Boone | Individual | Boone County | Sam Neace Drive Sidewalk | Along Sam Neace Drive from Mt. Zion Road to Weaver Road and along Technology Way | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2026 | CO | 9 | OKI-TAP | $300,000.00 | $521,000.00 |
| 6-3027 | 42.314 | Kentucky | Boone | Individual | Boone County | Sam Neace Drive Sidewalk | Along Sam Neace Drive from Mt. Zion Road to Weaver Road and along Technology Way | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2026 | CO | 10 | Local | $75,000.00 | $521,000.00 |
| 6-3031.00 | 42.315 | Kentucky | Kenton | Individual | City of Edgewood | Elmwood Drive Sidewalk | Along Elmwood Drive from 3120 Elmwood to Lyndale Road | Add missing sidewalk to improve pedestrian connections to Caywood Elementary/Turkeyfoot Middle/Tichenor Middle Schools | bicycle/pedestrian/other | Exempt | 2022 | D | 1 | OKI-TA | $80,000.00 | $447,714.00 |
| 6-3031.00 | 42.316 | Kentucky | Kenton | Individual | City of Edgewood | Elmwood Drive Sidewalk | Along Elmwood Drive from 3120 Elmwood to Lyndale Road | Add missing sidewalk to improve pedestrian connections to Caywood Elementary/Turkeyfoot Middle/Tichenor Middle Schools | bicycle/pedestrian/other | Exempt | 2022 | D | 2 | Local | $20,000.00 | $447,714.00 |
| 6-3031.00 | 42.317 | Kentucky | Kenton | Individual | City of Edgewood | Elmwood Drive Sidewalk | Along Elmwood Drive from 3120 Elmwood to Lyndale Road | Add missing sidewalk to improve pedestrian connections to Caywood Elementary/Turkeyfoot Middle/Tichenor Middle Schools | bicycle/pedestrian/other | Exempt | 2022 | D-SF | 3 | OKI-TA | $8,000.00 | $447,714.00 |
| 6-3031.00 | 42.318 | Kentucky | Kenton | Individual | City of Edgewood | Elmwood Drive Sidewalk | Along Elmwood Drive from 3120 Elmwood to Lyndale Road | Add missing sidewalk to improve pedestrian connections to Caywood Elementary/Turkeyfoot Middle/Tichenor Middle Schools | bicycle/pedestrian/other | Exempt | 2022 | D-SF | 4 | State | $2,000.00 | $447,714.00 |
| 6-3031.00 | 42.319 | Kentucky | Kenton | Individual | City of Edgewood | Elmwood Drive Sidewalk | Along Elmwood Drive from 3120 Elmwood to Lyndale Road | Add missing sidewalk to improve pedestrian connections to Caywood Elementary/Turkeyfoot Middle/Tichenor Middle Schools | bicycle/pedestrian/other | Exempt | 2024 | RW | 5 | OKI-TAP | $54,000.00 | $447,714.00 |
| 6-3031.00 | 42.320 | Kentucky | Kenton | Individual | City of Edgewood | Elmwood Drive Sidewalk | Along Elmwood Drive from 3120 Elmwood to Lyndale Road | Add missing sidewalk to improve pedestrian connections to Caywood Elementary/Turkeyfoot Middle/Tichenor Middle Schools | bicycle/pedestrian/other | Exempt | 2024 | RW | 6 | Local | $13,112.00 | $447,714.00 |
| 6-3031.00 | 42.321 | Kentucky | Kenton | Individual | City of Edgewood | Elmwood Drive Sidewalk | Along Elmwood Drive from 3120 Elmwood to Lyndale Road | Add missing sidewalk to improve pedestrian connections to Caywood Elementary/Turkeyfoot Middle/Tichenor Middle Schools | bicycle/pedestrian/other | Exempt | 2026 | UT | 7 | OKI-TAP | $20,000.00 | $447,714.00 |
| 6-3031.00 | 42.322 | Kentucky | Kenton | Individual | City of Edgewood | Elmwood Drive Sidewalk | Along Elmwood Drive from 3120 Elmwood to Lyndale Road | Add missing sidewalk to improve pedestrian connections to Caywood Elementary/Turkeyfoot Middle/Tichenor Middle Schools | bicycle/pedestrian/other | Exempt | 2026 | UT | 8 | Local | $5,000.00 | $447,714.00 |
| 6-3031.00 | 42.323 | Kentucky | Kenton | Individual | City of Edgewood | Elmwood Drive Sidewalk | Along Elmwood Drive from 3120 Elmwood to Lyndale Road | Add missing sidewalk to improve pedestrian connections to Caywood Elementary/Turkeyfoot Middle/Tichenor Middle Schools | bicycle/pedestrian/other | Exempt | 2026 | CO | 9 | OKI-TAP | $196,482.00 | $447,714.00 |
| 6-3031.00 | 42.324 | Kentucky | Kenton | Individual | City of Edgewood | Elmwood Drive Sidewalk | Along Elmwood Drive from 3120 Elmwood to Lyndale Road | Add missing sidewalk to improve pedestrian connections to Caywood Elementary/Turkeyfoot Middle/Tichenor Middle Schools | bicycle/pedestrian/other | Exempt | 2026 | CO | 10 | Local | $49,120.00 | $447,714.00 |
| 6-3033 | 42.325 | Kentucky | Campbell | Individual | City of Bellevue | Frank Benke Way Sidewalk | Between Van Voast Avenue and Washington Avenue | Add missing sidewalk, update pedestrain crossings and replace curb and gutter | bicycle/pedestrian/other | Exempt | 2024 | D | 1 | OKI-TAP | $72,000.00 | $544,993.00 |
| 6-3033 | 42.326 | Kentucky | Campbell | Individual | City of Bellevue | Frank Benke Way Sidewalk | Between Van Voast Avenue and Washington Avenue | Add missing sidewalk, update pedestrain crossings and replace curb and gutter | bicycle/pedestrian/other | Exempt | 2024 | D | 2 | Local | $18,000.00 | $544,993.00 |
| 6-3033 | 42.327 | Kentucky | Campbell | Individual | City of Bellevue | Frank Benke Way Sidewalk | Between Van Voast Avenue and Washington Avenue | Add missing sidewalk, update pedestrain crossings and replace curb and gutter | bicycle/pedestrian/other | Exempt | 2024 | D-SF | 3 | OKI-TAP | $8,000.00 | $544,993.00 |
| 6-3033 | 42.328 | Kentucky | Campbell | Individual | City of Bellevue | Frank Benke Way Sidewalk | Between Van Voast Avenue and Washington Avenue | Add missing sidewalk, update pedestrain crossings and replace curb and gutter | bicycle/pedestrian/other | Exempt | 2024 | D-SF | 4 | State | $2,000.00 | $544,993.00 |
| 6-3033 | 42.329 | Kentucky | Campbell | Individual | City of Bellevue | Frank Benke Way Sidewalk | Between Van Voast Avenue and Washington Avenue | Add missing sidewalk, update pedestrain crossings and replace curb and gutter | bicycle/pedestrian/other | Exempt | 2026 | UT | 5 | OKI-TAP | $48,000.00 | $544,993.00 |
| 6-3033 | 42.330 | Kentucky | Campbell | Individual | City of Bellevue | Frank Benke Way Sidewalk | Between Van Voast Avenue and Washington Avenue | Add missing sidewalk, update pedestrain crossings and replace curb and gutter | bicycle/pedestrian/other | Exempt | 2026 | UT | 6 | Local | $12,000.00 | $544,993.00 |
| 6-3033 | 42.331 | Kentucky | Campbell | Individual | City of Bellevue | Frank Benke Way Sidewalk | Between Van Voast Avenue and Washington Avenue | Add missing sidewalk, update pedestrain crossings and replace curb and gutter | bicycle/pedestrian/other | Exempt | 2027 | CO | 7 | OKI-TAP | $0.00 | $544,993.00 |
| 6-3033 | 42.332 | Kentucky | Campbell | Individual | City of Bellevue | Frank Benke Way Sidewalk | Between Van Voast Avenue and Washington Avenue | Add missing sidewalk, update pedestrain crossings and replace curb and gutter | bicycle/pedestrian/other | Exempt | 2029 | CO | 7 | OKI-TAP | $0.00 | $544,993.00 |
| 6-3033 | 42.333 | Kentucky | Campbell | Individual | City of Bellevue | Frank Benke Way Sidewalk | Between Van Voast Avenue and Washington Avenue | Add missing sidewalk, update pedestrain crossings and replace curb and gutter | bicycle/pedestrian/other | Exempt | 2028 | CO | 7 | OKI-TAP | $0.00 | $544,993.00 |
| 6-3033 | 42.334 | Kentucky | Campbell | Individual | City of Bellevue | Frank Benke Way Sidewalk | Between Van Voast Avenue and Washington Avenue | Add missing sidewalk, update pedestrain crossings and replace curb and gutter | bicycle/pedestrian/other | Exempt | 2026 | CO | 7 | OKI-TAP | $307,994.00 | $544,993.00 |
| 6-3033 | 42.335 | Kentucky | Campbell | Individual | City of Bellevue | Frank Benke Way Sidewalk | Between Van Voast Avenue and Washington Avenue | Add missing sidewalk, update pedestrain crossings and replace curb and gutter | bicycle/pedestrian/other | Exempt | 2026 | CO | 8 | Local | $76,999.00 | $544,993.00 |
| 6-3034 | 42.336 | Kentucky | Boone | Individual | Boone County | Cherry Hills Subdivision Sidewalks | within the Boone County portion of the Cherry Hills Subdivision | Replace all sidewalks | bicycle/pedestrian/other | Exempt | 2023 | D | 1 | OKI-TAP | $40,000.00 | $1,122,162.00 |
| 6-3034 | 42.337 | Kentucky | Boone | Individual | Boone County | Cherry Hills Subdivision Sidewalks | within the Boone County portion of the Cherry Hills Subdivision | Replace all sidewalks | bicycle/pedestrian/other | Exempt | 2023 | D | 2 | Local | $40,000.00 | $1,122,162.00 |
| 6-3034 | 42.338 | Kentucky | Boone | Individual | Boone County | Cherry Hills Subdivision Sidewalks | within the Boone County portion of the Cherry Hills Subdivision | Replace all sidewalks | bicycle/pedestrian/other | Exempt | 2023 | D-SF | 3 | OKI-TAP | $10,000.00 | $1,122,162.00 |
| 6-3034 | 42.339 | Kentucky | Boone | Individual | Boone County | Cherry Hills Subdivision Sidewalks | within the Boone County portion of the Cherry Hills Subdivision | Replace all sidewalks | bicycle/pedestrian/other | Exempt | 2023 | D-SF | 4 | State | $2,500.00 | $1,122,162.00 |
| 6-3034 | 42.340 | Kentucky | Boone | Individual | Boone County | Cherry Hills Subdivision Sidewalks | within the Boone County portion of the Cherry Hills Subdivision | Replace all sidewalks | bicycle/pedestrian/other | Exempt | 2026 | CO | 5 | OKI-TAP | $514,831.00 | $1,122,162.00 |
| 6-3034 | 42.341 | Kentucky | Boone | Individual | Boone County | Cherry Hills Subdivision Sidewalks | within the Boone County portion of the Cherry Hills Subdivision | Replace all sidewalks | bicycle/pedestrian/other | Exempt | 2026 | CO | 6 | Local | $514,831.00 | $1,122,162.00 |
| 6-3035 | 42.342 | Kentucky | Kenton | Individual | City of Crestview Hills | US 25 (Dixie Highway) | South side of Dixie Highway from Carran Drive to Whitehouse Drive | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2025 | D | 1 | OKI-TAP | $17,920.00 | $198,099.00 |
| 6-3035 | 42.343 | Kentucky | Kenton | Individual | City of Crestview Hills | US 25 (Dixie Highway) | South side of Dixie Highway from Carran Drive to Whitehouse Drive | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2025 | D | 2 | Local | $4,480.00 | $198,099.00 |
| 6-3035 | 42.344 | Kentucky | Kenton | Individual | City of Crestview Hills | US 25 (Dixie Highway) | South side of Dixie Highway from Carran Drive to Whitehouse Drive | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2026 | D-SF | 3 | OKI-TAP | $5,000.00 | $198,099.00 |
| 6-3035 | 42.345 | Kentucky | Kenton | Individual | City of Crestview Hills | US 25 (Dixie Highway) | South side of Dixie Highway from Carran Drive to Whitehouse Drive | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2026 | D-SF | 4 | State | $1,250.00 | $198,099.00 |
| 6-3035 | 42.346 | Kentucky | Kenton | Individual | City of Crestview Hills | US 25 (Dixie Highway) | South side of Dixie Highway from Carran Drive to Whitehouse Drive | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2026 | RW | 5 | OKI-TAP | $8,400.00 | $198,099.00 |
| 6-3035 | 42.347 | Kentucky | Kenton | Individual | City of Crestview Hills | US 25 (Dixie Highway) | South side of Dixie Highway from Carran Drive to Whitehouse Drive | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2026 | RW | 6 | Local | $2,100.00 | $198,099.00 |
| 6-3035 | 42.348 | Kentucky | Kenton | Individual | City of Crestview Hills | US 25 (Dixie Highway) | South side of Dixie Highway from Carran Drive to Whitehouse Drive | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2026 | CO | 7 | OKI-TAP | $127,159.00 | $198,099.00 |
| 6-3035 | 42.349 | Kentucky | Kenton | Individual | City of Crestview Hills | US 25 (Dixie Highway) | South side of Dixie Highway from Carran Drive to Whitehouse Drive | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2026 | CO | 8 | Local | $31,790.00 | $198,099.00 |
| 6-3036 | 42.350 | Kentucky | Kenton | Individual | City of Elsmere | Edwards Road Sidewalks | along Edwards Road from Central Row Rd to existing sidewalk in vicinity of Howell Elementary School | Install new sidewalks | bicycle/pedestrian/other | Exempt | 2024 | D | 1 | OKI-TAP | $63,000.00 | $346,240.00 |
| 6-3036 | 42.351 | Kentucky | Kenton | Individual | City of Elsmere | Edwards Road Sidewalks | along Edwards Road from Central Row Rd to existing sidewalk in vicinity of Howell Elementary School | Install new sidewalks | bicycle/pedestrian/other | Exempt | 2024 | D | 2 | Local | $15,750.00 | $346,240.00 |
| 6-3036 | 42.352 | Kentucky | Kenton | Individual | City of Elsmere | Edwards Road Sidewalks | along Edwards Road from Central Row Rd to existing sidewalk in vicinity of Howell Elementary School | Install new sidewalks | bicycle/pedestrian/other | Exempt | 2024 | D-SF | 3 | OKI-TAP | $9,000.00 | $346,240.00 |
| 6-3036 | 42.353 | Kentucky | Kenton | Individual | City of Elsmere | Edwards Road Sidewalks | along Edwards Road from Central Row Rd to existing sidewalk in vicinity of Howell Elementary School | Install new sidewalks | bicycle/pedestrian/other | Exempt | 2024 | D-SF | 4 | State | $2,250.00 | $346,240.00 |
| 6-3036 | 42.354 | Kentucky | Kenton | Individual | City of Elsmere | Edwards Road Sidewalks | along Edwards Road from Central Row Rd to existing sidewalk in vicinity of Howell Elementary School | Install new sidewalks | bicycle/pedestrian/other | Exempt | 2026 | RW | 5 | OKI-TAP | $20,000.00 | $346,240.00 |
| 6-3036 | 42.355 | Kentucky | Kenton | Individual | City of Elsmere | Edwards Road Sidewalks | along Edwards Road from Central Row Rd to existing sidewalk in vicinity of Howell Elementary School | Install new sidewalks | bicycle/pedestrian/other | Exempt | 2026 | RW | 6 | Local | $5,000.00 | $346,240.00 |
| 6-3036 | 42.356 | Kentucky | Kenton | Individual | City of Elsmere | Edwards Road Sidewalks | along Edwards Road from Central Row Rd to existing sidewalk in vicinity of Howell Elementary School | Install new sidewalks | bicycle/pedestrian/other | Exempt | 2026 | UT | 7 | OKI-TAP | $16,000.00 | $346,240.00 |
| 6-3036 | 42.357 | Kentucky | Kenton | Individual | City of Elsmere | Edwards Road Sidewalks | along Edwards Road from Central Row Rd to existing sidewalk in vicinity of Howell Elementary School | Install new sidewalks | bicycle/pedestrian/other | Exempt | 2026 | UT | 8 | Local | $4,000.00 | $346,240.00 |
| 6-3036 | 42.358 | Kentucky | Kenton | Individual | City of Elsmere | Edwards Road Sidewalks | along Edwards Road from Central Row Rd to existing sidewalk in vicinity of Howell Elementary School | Install new sidewalks | bicycle/pedestrian/other | Exempt | 2026 | CO | 9 | OKI-TAP | $168,992.00 | $346,240.00 |
| 6-3036 | 42.359 | Kentucky | Kenton | Individual | City of Elsmere | Edwards Road Sidewalks | along Edwards Road from Central Row Rd to existing sidewalk in vicinity of Howell Elementary School | Install new sidewalks | bicycle/pedestrian/other | Exempt | 2026 | CO | 10 | Local | $42,248.00 | $346,240.00 |
| 6-3038 | 42.360 | Kentucky | Boone | Individual | Boone County | Southpark Drive at KY 237 Intersection Improvement | Intersection of Southpark Drive and KY 237 (North Bend Road) | Widen to add dual left turn lanes and a right turn lane at KY 237. Improve access to the businesses at Southpark Drive and KY 237. | traffic operations/safety | Exempt | 2023 | D | 1 | CMAQ | $80,000.00 | $837,500.00 |
| 6-3038 | 42.361 | Kentucky | Boone | Individual | Boone County | Southpark Drive at KY 237 Intersection Improvement | Intersection of Southpark Drive and KY 237 (North Bend Road) | Widen to add dual left turn lanes and a right turn lane at KY 237. Improve access to the businesses at Southpark Drive and KY 237. | traffic operations/safety | Exempt | 2023 | D | 2 | Local | $20,000.00 | $837,500.00 |
| 6-3038 | 42.362 | Kentucky | Boone | Individual | Boone County | Southpark Drive at KY 237 Intersection Improvement | Intersection of Southpark Drive and KY 237 (North Bend Road) | Widen to add dual left turn lanes and a right turn lane at KY 237. Improve access to the businesses at Southpark Drive and KY 237. | traffic operations/safety | Exempt | 2023 | D-SF | 3 | CMAQ | $10,000.00 | $837,500.00 |
| 6-3038 | 42.363 | Kentucky | Boone | Individual | Boone County | Southpark Drive at KY 237 Intersection Improvement | Intersection of Southpark Drive and KY 237 (North Bend Road) | Widen to add dual left turn lanes and a right turn lane at KY 237. Improve access to the businesses at Southpark Drive and KY 237. | traffic operations/safety | Exempt | 2023 | D-SF | 4 | State | $2,500.00 | $837,500.00 |
| 6-3038 | 42.364 | Kentucky | Boone | Individual | Boone County | Southpark Drive at KY 237 Intersection Improvement | Intersection of Southpark Drive and KY 237 (North Bend Road) | Widen to add dual left turn lanes and a right turn lane at KY 237. Improve access to the businesses at Southpark Drive and KY 237. | traffic operations/safety | Exempt | 2025 | RW | 5 | CMAQ | $100,000.00 | $837,500.00 |
| 6-3038 | 42.365 | Kentucky | Boone | Individual | Boone County | Southpark Drive at KY 237 Intersection Improvement | Intersection of Southpark Drive and KY 237 (North Bend Road) | Widen to add dual left turn lanes and a right turn lane at KY 237. Improve access to the businesses at Southpark Drive and KY 237. | traffic operations/safety | Exempt | 2025 | RW | 6 | Local | $25,000.00 | $837,500.00 |
| 6-3038 | 42.366 | Kentucky | Boone | Individual | Boone County | Southpark Drive at KY 237 Intersection Improvement | Intersection of Southpark Drive and KY 237 (North Bend Road) | Widen to add dual left turn lanes and a right turn lane at KY 237. Improve access to the businesses at Southpark Drive and KY 237. | traffic operations/safety | Exempt | 2026 | CO | 7 | CMAQ | $480,000.00 | $837,500.00 |
| 6-3038 | 42.367 | Kentucky | Boone | Individual | Boone County | Southpark Drive at KY 237 Intersection Improvement | Intersection of Southpark Drive and KY 237 (North Bend Road) | Widen to add dual left turn lanes and a right turn lane at KY 237. Improve access to the businesses at Southpark Drive and KY 237. | traffic operations/safety | Exempt | 2026 | CO | 8 | Local | $120,000.00 | $837,500.00 |
| 6-3040 | 42.368 | Kentucky | Campbell | Individual | City of Alexandria | East Main Street Sidewalk | NE Side of East Main St. from 8431 E. Main through curve onto Stillwater Drive | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2026 | D | 1 | OKI-TAP | $48,160.00 | $613,879.00 |
| 6-3040 | 42.369 | Kentucky | Campbell | Individual | City of Alexandria | East Main Street Sidewalk | NE Side of East Main St. from 8431 E. Main through curve onto Stillwater Drive | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2026 | D | 2 | Local | $14,832.00 | $613,879.00 |
| 6-3040 | 42.370 | Kentucky | Campbell | Individual | City of Alexandria | East Main Street Sidewalk | NE Side of East Main St. from 8431 E. Main through curve onto Stillwater Drive | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2026 | D-SF | 3 | OKI-TAP | $10,000.00 | $613,879.00 |
| 6-3040 | 42.371 | Kentucky | Campbell | Individual | City of Alexandria | East Main Street Sidewalk | NE Side of East Main St. from 8431 E. Main through curve onto Stillwater Drive | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2026 | D-SF | 4 | State | $11,841.00 | $613,879.00 |
| 6-3040 | 42.372 | Kentucky | Campbell | Individual | City of Alexandria | East Main Street Sidewalk | NE Side of East Main St. from 8431 E. Main through curve onto Stillwater Drive | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2026 | RW | 5 | OKI-TAP | $56,000.00 | $613,879.00 |
| 6-3040 | 42.373 | Kentucky | Campbell | Individual | City of Alexandria | East Main Street Sidewalk | NE Side of East Main St. from 8431 E. Main through curve onto Stillwater Drive | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2026 | RW | 6 | Local | $14,000.00 | $613,879.00 |
| 6-3040 | 42.374 | Kentucky | Campbell | Individual | City of Alexandria | East Main Street Sidewalk | NE Side of East Main St. from 8431 E. Main through curve onto Stillwater Drive | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2027 | CO | 7 | OKI-TAP | $358,303.00 | $613,879.00 |
| 6-3040 | 42.375 | Kentucky | Campbell | Individual | City of Alexandria | East Main Street Sidewalk | NE Side of East Main St. from 8431 E. Main through curve onto Stillwater Drive | Install new sidewalk | bicycle/pedestrian/other | Exempt | 2027 | CO | 8 | Local | $89,576.00 | $613,879.00 |
| 6-3041 | 42.376 | Kentucky | Boone | Individual | Boone County | Weaver Road (KY 842) Sidewalk | Sam Neace Drive (KY 3503) to Dixie Highway (US 25) | Construct new sidewalk | bicycle/pedestrian | Exempt | 2025 | D | 1 | OKI-TAP | $60,000.00 | $612,500.00 |
| 6-3041 | 42.377 | Kentucky | Boone | Individual | Boone County | Weaver Road (KY 842) Sidewalk | Sam Neace Drive (KY 3503) to Dixie Highway (US 25) | Construct new sidewalk | bicycle/pedestrian | Exempt | 2025 | D | 2 | Local | $20,000.00 | $612,500.00 |
| 6-3041 | 42.378 | Kentucky | Boone | Individual | Boone County | Weaver Road (KY 842) Sidewalk | Sam Neace Drive (KY 3503) to Dixie Highway (US 25) | Construct new sidewalk | bicycle/pedestrian | Exempt | 2025 | D-SF | 3 | OKI-TAP | $42,000.00 | $612,500.00 |
| 6-3041 | 42.379 | Kentucky | Boone | Individual | Boone County | Weaver Road (KY 842) Sidewalk | Sam Neace Drive (KY 3503) to Dixie Highway (US 25) | Construct new sidewalk | bicycle/pedestrian | Exempt | 2025 | D-SF | 4 | State | $10,500.00 | $612,500.00 |
| 6-3041 | 42.380 | Kentucky | Boone | Individual | Boone County | Weaver Road (KY 842) Sidewalk | Sam Neace Drive (KY 3503) to Dixie Highway (US 25) | Construct new sidewalk | bicycle/pedestrian | Exempt | 2028 | CO | 5 | OKI-TAP | $360,000.00 | $612,500.00 |
| 6-3041 | 42.381 | Kentucky | Boone | Individual | Boone County | Weaver Road (KY 842) Sidewalk | Sam Neace Drive (KY 3503) to Dixie Highway (US 25) | Construct new sidewalk | bicycle/pedestrian | Exempt | 2029 | CO | 5 | OKI-TAP | $0.00 | $612,500.00 |
| 6-3041 | 42.382 | Kentucky | Boone | Individual | Boone County | Weaver Road (KY 842) Sidewalk | Sam Neace Drive (KY 3503) to Dixie Highway (US 25) | Construct new sidewalk | bicycle/pedestrian | Exempt | 2028 | CO | 6 | Local | $120,000.00 | $612,500.00 |
| 6-3042 | 42.383 | Kentucky | Kenton | Individual | City of Ft. Wright | Dixie Hwy (US 25/42/127) Sidewalk | in front of Christ Hospital outpatient center | Construct new sidewalk | bicycle/pedestrian | Exempt | 2026 | D | 1 | OKI-TAP | $83,383.00 | $1,107,466.00 |
| 6-3042 | 42.384 | Kentucky | Kenton | Individual | City of Ft. Wright | Dixie Hwy (US 25/42/127) Sidewalk | in front of Christ Hospital outpatient center | Construct new sidewalk | bicycle/pedestrian | Exempt | 2026 | D | 2 | Local | $55,589.00 | $1,107,466.00 |
| 6-3042 | 42.385 | Kentucky | Kenton | Individual | City of Ft. Wright | Dixie Hwy (US 25/42/127) Sidewalk | in front of Christ Hospital outpatient center | Construct new sidewalk | bicycle/pedestrian | Exempt | 2026 | D-SF | 3 | OKI-TAP | $61,812.00 | $1,107,466.00 |
| 6-3042 | 42.386 | Kentucky | Kenton | Individual | City of Ft. Wright | Dixie Hwy (US 25/42/127) Sidewalk | in front of Christ Hospital outpatient center | Construct new sidewalk | bicycle/pedestrian | Exempt | 2026 | D-SF | 4 | State | $15,453.00 | $1,107,466.00 |
| 6-3042 | 42.387 | Kentucky | Kenton | Individual | City of Ft. Wright | Dixie Hwy (US 25/42/127) Sidewalk | in front of Christ Hospital outpatient center | Construct new sidewalk | bicycle/pedestrian | Exempt | 2026 | RW | 5 | OKI-TAP | $34,438.00 | $1,107,466.00 |
| 6-3042 | 42.388 | Kentucky | Kenton | Individual | City of Ft. Wright | Dixie Hwy (US 25/42/127) Sidewalk | in front of Christ Hospital outpatient center | Construct new sidewalk | bicycle/pedestrian | Exempt | 2026 | RW | 6 | Local | $22,959.00 | $1,107,466.00 |
| 6-3042 | 42.389 | Kentucky | Kenton | Individual | City of Ft. Wright | Dixie Hwy (US 25/42/127) Sidewalk | in front of Christ Hospital outpatient center | Construct new sidewalk | bicycle/pedestrian | Exempt | 2028 | CO | 7 | OKI-TAP | $500,299.00 | $1,107,466.00 |
| 6-3042 | 42.390 | Kentucky | Kenton | Individual | City of Ft. Wright | Dixie Hwy (US 25/42/127) Sidewalk | in front of Christ Hospital outpatient center | Construct new sidewalk | bicycle/pedestrian | Exempt | 2028 | CO | 8 | Local | $333,533.00 | $1,107,466.00 |
| 6-3043 | 42.391 | Kentucky | Kenton | Individual | City of Villa Hills | Rogers Road Pedestrian Bridge | Rogers Road in Villa Hills, approximately 400' | Construct new pedestrian bridge connecting two segments of sidewalk that currently terminate in the roadway | bicycle/pedestrian | Exempt | 2026 | D | 1 | OKI-TAP | $84,000.00 | $893,750.00 |
| 6-3043 | 42.392 | Kentucky | Kenton | Individual | City of Villa Hills | Rogers Road Pedestrian Bridge | Rogers Road in Villa Hills, approximately 400' | Construct new pedestrian bridge connecting two segments of sidewalk that currently terminate in the roadway | bicycle/pedestrian | Exempt | 2026 | D | 2 | Local | $21,000.00 | $893,750.00 |
| 6-3043 | 42.393 | Kentucky | Kenton | Individual | City of Villa Hills | Rogers Road Pedestrian Bridge | Rogers Road in Villa Hills, approximately 400' | Construct new pedestrian bridge connecting two segments of sidewalk that currently terminate in the roadway | bicycle/pedestrian | Exempt | 2026 | D-SF | 3 | OKI-TAP | $10,000.00 | $893,750.00 |
| 6-3043 | 42.394 | Kentucky | Kenton | Individual | City of Villa Hills | Rogers Road Pedestrian Bridge | Rogers Road in Villa Hills, approximately 400' | Construct new pedestrian bridge connecting two segments of sidewalk that currently terminate in the roadway | bicycle/pedestrian | Exempt | 2026 | D-SF | 4 | State | $16,250.00 | $893,750.00 |
| 6-3043 | 42.395 | Kentucky | Kenton | Individual | City of Villa Hills | Rogers Road Pedestrian Bridge | Rogers Road in Villa Hills, approximately 400' | Construct new pedestrian bridge connecting two segments of sidewalk that currently terminate in the roadway | bicycle/pedestrian | Exempt | 2028 | CO | 7 | OKI-TAP | $566,000.00 | $893,750.00 |
| 6-3043 | 42.396 | Kentucky | Kenton | Individual | City of Villa Hills | Rogers Road Pedestrian Bridge | Rogers Road in Villa Hills, approximately 400' | Construct new pedestrian bridge connecting two segments of sidewalk that currently terminate in the roadway | bicycle/pedestrian | Exempt | 2028 | CO | 8 | Local | $141,500.00 | $893,750.00 |
| 6-3044 | 42.397 | Kentucky | Kenton | Individual | City of Villa Hills | Highwater Road New Sidewalk | from Amsterdam Rd to Colina Dr | Install new sidewalk | bicycle/pedestrian | Exempt | 2026 | D | 1 | OKI-TAP | $80,000.00 | |
| 6-3044 | 42.398 | Kentucky | Kenton | Individual | City of Villa Hills | Highwater Road New Sidewalk | from Amsterdam Rd to Colina Dr | Install new sidewalk | bicycle/pedestrian | Exempt | 2026 | D | 2 | Local | $20,000.00 | |
| 6-3044 | 42.399 | Kentucky | Kenton | Individual | City of Villa Hills | Highwater Road New Sidewalk | from Amsterdam Rd to Colina Dr | Install new sidewalk | bicycle/pedestrian | Exempt | 2026 | D-SF | 3 | OKI-TAP | $20,000.00 | |
| 6-3044 | 42.400 | Kentucky | Kenton | Individual | City of Villa Hills | Highwater Road New Sidewalk | from Amsterdam Rd to Colina Dr | Install new sidewalk | bicycle/pedestrian | Exempt | 2026 | D-SF | 4 | State | $5,000.00 | |
| 6-3044 | 42.401 | Kentucky | Kenton | Individual | City of Villa Hills | Highwater Road New Sidewalk | from Amsterdam Rd to Colina Dr | Install new sidewalk | bicycle/pedestrian | Exempt | 2028 | RW | 5 | OKI-TAP | $48,000.00 | |
| 6-3044 | 42.402 | Kentucky | Kenton | Individual | City of Villa Hills | Highwater Road New Sidewalk | from Amsterdam Rd to Colina Dr | Install new sidewalk | bicycle/pedestrian | Exempt | 2028 | RW | 6 | Local | $12,000.00 | |
| 6-3044 | 42.403 | Kentucky | Kenton | Individual | City of Villa Hills | Highwater Road New Sidewalk | from Amsterdam Rd to Colina Dr | Install new sidewalk | bicycle/pedestrian | Exempt | 2028 | UT | 7 | OKI-TAP | $26,000.00 | |
| 6-3044 | 42.404 | Kentucky | Kenton | Individual | City of Villa Hills | Highwater Road New Sidewalk | from Amsterdam Rd to Colina Dr | Install new sidewalk | bicycle/pedestrian | Exempt | 2028 | UT | 8 | Local | $6,500.00 | |
| 6-3044 | 42.405 | Kentucky | Kenton | Individual | City of Villa Hills | Highwater Road New Sidewalk | from Amsterdam Rd to Colina Dr | Install new sidewalk | bicycle/pedestrian | Exempt | 2029 | CO | 9 | OKI-TAP | $406,362.00 | |
| 6-3044 | 42.406 | Kentucky | Kenton | Individual | City of Villa Hills | Highwater Road New Sidewalk | from Amsterdam Rd to Colina Dr | Install new sidewalk | bicycle/pedestrian | Exempt | 2030 | CO | 9 | OKI-TAP | $0.00 | |
| 6-3044 | 42.407 | Kentucky | Kenton | Individual | City of Villa Hills | Highwater Road New Sidewalk | from Amsterdam Rd to Colina Dr | Install new sidewalk | bicycle/pedestrian | Exempt | 2029 | CO | 10 | Local | $101,591.00 | |
| 6-321 | 42.408 | Kentucky | Kenton | Individual | City of Elsmere | KY 1829 (Industrial Road) | Intersection of Industrial Road and Foundation Drive | Capacity improvements at intersection, including additional EB through lane, WB RTL, SB LTL and traffic signal rebuild | traffic operations/safety | Exempt | 2022 | D-SF | 1 | OKI-SNK | $12,000.00 | $1,373,890.00 |
| 6-321 | 42.409 | Kentucky | Kenton | Individual | City of Elsmere | KY 1829 (Industrial Road) | Intersection of Industrial Road and Foundation Drive | Capacity improvements at intersection, including additional EB through lane, WB RTL, SB LTL and traffic signal rebuild | traffic operations/safety | Exempt | 2022 | D-SF | 2 | State | $3,000.00 | $1,373,890.00 |
| 6-321 | 42.410 | Kentucky | Kenton | Individual | City of Elsmere | KY 1829 (Industrial Road) | Intersection of Industrial Road and Foundation Drive | Capacity improvements at intersection, including additional EB through lane, WB RTL, SB LTL and traffic signal rebuild | traffic operations/safety | Exempt | 2022 | D | 3 | OKI-SNK | $84,000.00 | $1,373,890.00 |
| 6-321 | 42.411 | Kentucky | Kenton | Individual | City of Elsmere | KY 1829 (Industrial Road) | Intersection of Industrial Road and Foundation Drive | Capacity improvements at intersection, including additional EB through lane, WB RTL, SB LTL and traffic signal rebuild | traffic operations/safety | Exempt | 2022 | D | 4 | Local | $21,000.00 | $1,373,890.00 |
| 6-321 | 42.412 | Kentucky | Kenton | Individual | City of Elsmere | KY 1829 (Industrial Road) | Intersection of Industrial Road and Foundation Drive | Capacity improvements at intersection, including additional EB through lane, WB RTL, SB LTL and traffic signal rebuild | traffic operations/safety | Exempt | 2026 | RW | 5 | OKI-SNK | $116,000.00 | $1,373,890.00 |
| 6-321 | 42.413 | Kentucky | Kenton | Individual | City of Elsmere | KY 1829 (Industrial Road) | Intersection of Industrial Road and Foundation Drive | Capacity improvements at intersection, including additional EB through lane, WB RTL, SB LTL and traffic signal rebuild | traffic operations/safety | Exempt | 2026 | RW | 6 | Local | $29,000.00 | $1,373,890.00 |
| 6-321 | 42.414 | Kentucky | Kenton | Individual | City of Elsmere | KY 1829 (Industrial Road) | Intersection of Industrial Road and Foundation Drive | Capacity improvements at intersection, including additional EB through lane, WB RTL, SB LTL and traffic signal rebuild | traffic operations/safety | Exempt | 2026 | UT | 7 | OKI-SNK | $80,000.00 | $1,373,890.00 |
| 6-321 | 42.415 | Kentucky | Kenton | Individual | City of Elsmere | KY 1829 (Industrial Road) | Intersection of Industrial Road and Foundation Drive | Capacity improvements at intersection, including additional EB through lane, WB RTL, SB LTL and traffic signal rebuild | traffic operations/safety | Exempt | 2026 | UT | 8 | Local | $20,000.00 | $1,373,890.00 |
| 6-321 | 42.416 | Kentucky | Kenton | Individual | City of Elsmere | KY 1829 (Industrial Road) | Intersection of Industrial Road and Foundation Drive | Capacity improvements at intersection, including additional EB through lane, WB RTL, SB LTL and traffic signal rebuild | traffic operations/safety | Exempt | 2026 | CO | 9 | OKI-SNK | $807,112.00 | $1,373,890.00 |
| 6-321 | 42.417 | Kentucky | Kenton | Individual | City of Elsmere | KY 1829 (Industrial Road) | Intersection of Industrial Road and Foundation Drive | Capacity improvements at intersection, including additional EB through lane, WB RTL, SB LTL and traffic signal rebuild | traffic operations/safety | Exempt | 2026 | CO | 10 | Local | $201,778.00 | $1,373,890.00 |
| 6-3213 | 42.418 | Kentucky | Kenton | Individual | City of Crescent Springs | Amsterdam Road (KY 371) Connector | South side of Amsterdam Rd from Highwater to Bromley-Cresecent Springs & Villa Hills | New sidewalk | bicycle/pedestrian/other | Exempt | 2018 | D | 1 | TAP | $85,000.00 | $1,232,799.00 |
| 6-3213 | 42.419 | Kentucky | Kenton | Individual | City of Crescent Springs | Amsterdam Road (KY 371) Connector | South side of Amsterdam Rd from Highwater to Bromley-Cresecent Springs & Villa Hills | New sidewalk | bicycle/pedestrian/other | Exempt | 2018 | D-SF | 2 | TAP | $8,500.00 | $1,232,799.00 |
| 6-3213 | 42.420 | Kentucky | Kenton | Individual | City of Crescent Springs | Amsterdam Road (KY 371) Connector | South side of Amsterdam Rd from Highwater to Bromley-Cresecent Springs & Villa Hills | New sidewalk | bicycle/pedestrian/other | Exempt | 2022 | RW | 3 | TAP | $431,200.00 | $1,232,799.00 |
| 6-3213 | 42.421 | Kentucky | Kenton | Individual | City of Crescent Springs | Amsterdam Road (KY 371) Connector | South side of Amsterdam Rd from Highwater to Bromley-Cresecent Springs & Villa Hills | New sidewalk | bicycle/pedestrian/other | Exempt | 2022 | RW | 4 | Local | $107,800.00 | $1,232,799.00 |
| 6-3213 | 42.422 | Kentucky | Kenton | Individual | City of Crescent Springs | Amsterdam Road (KY 371) Connector | South side of Amsterdam Rd from Highwater to Bromley-Cresecent Springs & Villa Hills | New sidewalk | bicycle/pedestrian/other | Exempt | 2022 | UT | 5 | TAP | $16,000.00 | $1,232,799.00 |
| 6-3213 | 42.423 | Kentucky | Kenton | Individual | City of Crescent Springs | Amsterdam Road (KY 371) Connector | South side of Amsterdam Rd from Highwater to Bromley-Cresecent Springs & Villa Hills | New sidewalk | bicycle/pedestrian/other | Exempt | 2022 | UT | 6 | Local | $4,000.00 | $1,232,799.00 |
| 6-3213 | 42.424 | Kentucky | Kenton | Individual | City of Crescent Springs | Amsterdam Road (KY 371) Connector | South side of Amsterdam Rd from Highwater to Bromley-Cresecent Springs & Villa Hills | New sidewalk | bicycle/pedestrian/other | Exempt | 2023 | CO | 7 | TAP | $464,239.00 | $1,232,799.00 |
| 6-3213 | 42.425 | Kentucky | Kenton | Individual | City of Crescent Springs | Amsterdam Road (KY 371) Connector | South side of Amsterdam Rd from Highwater to Bromley-Cresecent Springs & Villa Hills | New sidewalk | bicycle/pedestrian/other | Exempt | 2023 | CO | 8 | Local | $116,060.00 | $1,232,799.00 |
| 6-3220 | 42.426 | Kentucky | Boone | Individual | City of Walton | Walton Pedestrian Bridge | Walton- High Street over CSX RR | Install a pedestrian bridge/multi-modal pathway connecting two sections of High Street | bicycle/pedestrian/other | Exempt | 2026 | D-SF | 1 | OKI-TAP | $8,000.00 | $542,139.00 |
| 6-3220 | 42.427 | Kentucky | Boone | Individual | City of Walton | Walton Pedestrian Bridge | Walton- High Street over CSX RR | Install a pedestrian bridge/multi-modal pathway connecting two sections of High Street | bicycle/pedestrian/other | Exempt | 2026 | D-SF | 2 | State | $2,000.00 | $542,139.00 |
| 6-3220 | 42.428 | Kentucky | Boone | Individual | City of Walton | Walton Pedestrian Bridge | Walton- High Street over CSX RR | Install a pedestrian bridge/multi-modal pathway connecting two sections of High Street | bicycle/pedestrian/other | Exempt | 2026 | CO | 5 | OKI-TAP | $425,711.00 | $542,139.00 |
| 6-3220 | 42.429 | Kentucky | Boone | Individual | City of Walton | Walton Pedestrian Bridge | Walton- High Street over CSX RR | Install a pedestrian bridge/multi-modal pathway connecting two sections of High Street | bicycle/pedestrian/other | Exempt | 2026 | CO | 6 | Local | $106,428.00 | $542,139.00 |
| 6-3221 | 42.430 | Kentucky | Campbell | Individual | City of Dayton | Dayton KY8/TANK Rt 12 Upgrade Project | KY 8 from O'Fallon Av to Clark St. | Adds sharrows, improve amenities and increase bus usage along KY 8 from O'Fallon Av to Clark St, following TANK #12 bus route. | bicycle/pedestrian/other | Exempt | 2023 | D-SF | 1 | TAP | $5,000.00 | |
| 6-3221 | 42.431 | Kentucky | Campbell | Individual | City of Dayton | Dayton KY8/TANK Rt 12 Upgrade Project | KY 8 from O'Fallon Av to Clark St. | Adds sharrows, improve amenities and increase bus usage along KY 8 from O'Fallon Av to Clark St, following TANK #12 bus route. | bicycle/pedestrian/other | Exempt | 2023 | UT | 3 | TAP | $82,828.00 | |
| 6-3221 | 42.432 | Kentucky | Campbell | Individual | City of Dayton | Dayton KY8/TANK Rt 12 Upgrade Project | KY 8 from O'Fallon Av to Clark St. | Adds sharrows, improve amenities and increase bus usage along KY 8 from O'Fallon Av to Clark St, following TANK #12 bus route. | bicycle/pedestrian/other | Exempt | 2023 | UT | 4 | Local | $18,825.00 | |
| 6-3221 | 42.433 | Kentucky | Campbell | Individual | City of Dayton | Dayton KY8/TANK Rt 12 Upgrade Project | KY 8 from O'Fallon Av to Clark St. | Adds sharrows, improve amenities and increase bus usage along KY 8 from O'Fallon Av to Clark St, following TANK #12 bus route. | bicycle/pedestrian/other | Exempt | 2023 | CO | 5 | TAP | $66,721.00 | |
| 6-3221 | 42.434 | Kentucky | Campbell | Individual | City of Dayton | Dayton KY8/TANK Rt 12 Upgrade Project | KY 8 from O'Fallon Av to Clark St. | Adds sharrows, improve amenities and increase bus usage along KY 8 from O'Fallon Av to Clark St, following TANK #12 bus route. | bicycle/pedestrian/other | Exempt | 2023 | CO | 6 | Local | $15,164.00 | |
| 6-3228 | 42.435 | Kentucky | Campbell | Individual | City of Dayton | Dayton Pike Sidewalk Connector | Along west side of Dayton Pike | New 1500' of 5' sidewalk | bicycle/pedestrian/other | Exempt | 2020 | D | 1 | TAP | $100,000.00 | $270,720.00 |
| 6-3228 | 42.436 | Kentucky | Campbell | Individual | City of Dayton | Dayton Pike Sidewalk Connector | Along west side of Dayton Pike | New 1500' of 5' sidewalk | bicycle/pedestrian/other | Exempt | 2020 | D-SF | 2 | TAP | $10,000.00 | $270,720.00 |
| 6-3228 | 42.437 | Kentucky | Campbell | Individual | City of Dayton | Dayton Pike Sidewalk Connector | Along west side of Dayton Pike | New 1500' of 5' sidewalk | bicycle/pedestrian/other | Exempt | 2021 | RW | 3 | TAP | $4,000.00 | $270,720.00 |
| 6-3228 | 42.438 | Kentucky | Campbell | Individual | City of Dayton | Dayton Pike Sidewalk Connector | Along west side of Dayton Pike | New 1500' of 5' sidewalk | bicycle/pedestrian/other | Exempt | 2021 | RW | 4 | Local | $1,000.00 | $270,720.00 |
| 6-3228 | 42.439 | Kentucky | Campbell | Individual | City of Dayton | Dayton Pike Sidewalk Connector | Along west side of Dayton Pike | New 1500' of 5' sidewalk | bicycle/pedestrian/other | Exempt | 2021 | CO | 5 | TAP | $124,576.00 | $270,720.00 |
| 6-3228 | 42.440 | Kentucky | Campbell | Individual | City of Dayton | Dayton Pike Sidewalk Connector | Along west side of Dayton Pike | New 1500' of 5' sidewalk | bicycle/pedestrian/other | Exempt | 2021 | CO | 6 | Local | $31,144.00 | $270,720.00 |
| 6-3229 | 42.441 | Kentucky | Boone | Individual | Boone County | Burlington KY 18 Sidewalks | South side of KY 18 from Ethan Drive to exisiting sidewalk east of SouthPointe Drive. | New sidewalk on southside of KY 8 | bicycle/pedestrian/other | Exempt | 2021 | D | 1 | OKI-TA | $59,800.00 | $621,000.00 |
| 6-3229 | 42.442 | Kentucky | Boone | Individual | Boone County | Burlington KY 18 Sidewalks | South side of KY 18 from Ethan Drive to exisiting sidewalk east of SouthPointe Drive. | New sidewalk on southside of KY 8 | bicycle/pedestrian/other | Exempt | 2021 | D-SF | 2 | OKI-TA | $5,000.00 | $621,000.00 |
| 6-3229 | 42.443 | Kentucky | Boone | Individual | Boone County | Burlington KY 18 Sidewalks | South side of KY 18 from Ethan Drive to exisiting sidewalk east of SouthPointe Drive. | New sidewalk on southside of KY 8 | bicycle/pedestrian/other | Exempt | 2021 | D | 3 | Local | $14,950.00 | $621,000.00 |
| 6-3229 | 42.444 | Kentucky | Boone | Individual | Boone County | Burlington KY 18 Sidewalks | South side of KY 18 from Ethan Drive to exisiting sidewalk east of SouthPointe Drive. | New sidewalk on southside of KY 8 | bicycle/pedestrian/other | Exempt | 2026 | CO | 4 | OKI-TAP | $432,000.00 | $621,000.00 |
| 6-3229 | 42.445 | Kentucky | Boone | Individual | Boone County | Burlington KY 18 Sidewalks | South side of KY 18 from Ethan Drive to exisiting sidewalk east of SouthPointe Drive. | New sidewalk on southside of KY 8 | bicycle/pedestrian/other | Exempt | 2026 | CO | 5 | Local | $108,000.00 | $621,000.00 |
| 6-3231 | 42.446 | Kentucky | Boone | Individual | City of Florence | Center and Russell Street sidewalk | South side of Center St from the existing sidewalk on Shelby St and terminating at Liberty Ct | New sidewalk on south side of Center Street | bicycle/pedestrian/other | Exempt | 2021 | D | 1 | OKI-TA | $43,000.00 | $487,080.00 |
| 6-3231 | 42.447 | Kentucky | Boone | Individual | City of Florence | Center and Russell Street sidewalk | South side of Center St from the existing sidewalk on Shelby St and terminating at Liberty Ct | New sidewalk on south side of Center Street | bicycle/pedestrian/other | Exempt | 2021 | D-SF | 2 | OKI-TA | $5,000.00 | $487,080.00 |
| 6-3231 | 42.448 | Kentucky | Boone | Individual | City of Florence | Center and Russell Street sidewalk | South side of Center St from the existing sidewalk on Shelby St and terminating at Liberty Ct | New sidewalk on south side of Center Street | bicycle/pedestrian/other | Exempt | 2021 | D | 3 | Local | $10,750.00 | $487,080.00 |
| 6-3231 | 42.449 | Kentucky | Boone | Individual | City of Florence | Center and Russell Street sidewalk | South side of Center St from the existing sidewalk on Shelby St and terminating at Liberty Ct | New sidewalk on south side of Center Street | bicycle/pedestrian/other | Exempt | 2026 | UT | 4 | OKI-TAP | $78,080.00 | $487,080.00 |
| 6-3231 | 42.450 | Kentucky | Boone | Individual | City of Florence | Center and Russell Street sidewalk | South side of Center St from the existing sidewalk on Shelby St and terminating at Liberty Ct | New sidewalk on south side of Center Street | bicycle/pedestrian/other | Exempt | 2026 | UT | 5 | Local | $19,520.00 | $487,080.00 |
| 6-3231 | 42.451 | Kentucky | Boone | Individual | City of Florence | Center and Russell Street sidewalk | South side of Center St from the existing sidewalk on Shelby St and terminating at Liberty Ct | New sidewalk on south side of Center Street | bicycle/pedestrian/other | Exempt | 2026 | CO | 6 | OKI-TAP | $264,584.00 | $487,080.00 |
| 6-3231 | 42.452 | Kentucky | Boone | Individual | City of Florence | Center and Russell Street sidewalk | South side of Center St from the existing sidewalk on Shelby St and terminating at Liberty Ct | New sidewalk on south side of Center Street | bicycle/pedestrian/other | Exempt | 2026 | CO | 7 | Local | $66,146.00 | $487,080.00 |
| 6-3232 | 42.453 | Kentucky | Campbell | Individual | City of Silver Grove | SilverGrove KY 8 Sidewalks Phases 3&4 | South side of KY 8 from the corner of KY 8 and Kay Wright Lane to east corp. limit | Asphalt multi use path on south side of KY 8 | bicycle/pedestrian/other | Exempt | 2026 | D | 1 | OKI-TAP | $55,590.00 | $641,446.00 |
| 6-3232 | 42.454 | Kentucky | Campbell | Individual | City of Silver Grove | SilverGrove KY 8 Sidewalks Phases 3&4 | South side of KY 8 from the corner of KY 8 and Kay Wright Lane to east corp. limit | Asphalt multi use path on south side of KY 8 | bicycle/pedestrian/other | Exempt | 2026 | D | 2 | Local | $13,898.00 | $641,446.00 |
| 6-3232 | 42.455 | Kentucky | Campbell | Individual | City of Silver Grove | SilverGrove KY 8 Sidewalks Phases 3&4 | South side of KY 8 from the corner of KY 8 and Kay Wright Lane to east corp. limit | Asphalt multi use path on south side of KY 8 | bicycle/pedestrian/other | Exempt | 2026 | D-SF | 3 | OKI-TAP | $5,000.00 | $641,446.00 |
| 6-3232 | 42.456 | Kentucky | Campbell | Individual | City of Silver Grove | SilverGrove KY 8 Sidewalks Phases 3&4 | South side of KY 8 from the corner of KY 8 and Kay Wright Lane to east corp. limit | Asphalt multi use path on south side of KY 8 | bicycle/pedestrian/other | Exempt | 2026 | RW | 4 | OKI-TAP | $60,800.00 | $641,446.00 |
| 6-3232 | 42.457 | Kentucky | Campbell | Individual | City of Silver Grove | SilverGrove KY 8 Sidewalks Phases 3&4 | South side of KY 8 from the corner of KY 8 and Kay Wright Lane to east corp. limit | Asphalt multi use path on south side of KY 8 | bicycle/pedestrian/other | Exempt | 2026 | RW | 5 | Local | $15,200.00 | $641,446.00 |
| 6-3232 | 42.458 | Kentucky | Campbell | Individual | City of Silver Grove | SilverGrove KY 8 Sidewalks Phases 3&4 | South side of KY 8 from the corner of KY 8 and Kay Wright Lane to east corp. limit | Asphalt multi use path on south side of KY 8 | bicycle/pedestrian/other | Exempt | 2026 | CO | 6 | OKI-TAP | $392,766.00 | $641,446.00 |
| 6-3232 | 42.459 | Kentucky | Campbell | Individual | City of Silver Grove | SilverGrove KY 8 Sidewalks Phases 3&4 | South side of KY 8 from the corner of KY 8 and Kay Wright Lane to east corp. limit | Asphalt multi use path on south side of KY 8 | bicycle/pedestrian/other | Exempt | 2026 | CO | 7 | Local | $98,192.00 | $641,446.00 |
| 6-340 | 42.460 | Kentucky | Campbell | Individual | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | Exempt | 2024 | D-SF | 1 | OKI-SNK | $24,000.00 | $1,803,441.00 |
| 6-340 | 42.461 | Kentucky | Campbell | Individual | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | Exempt | 2024 | D-SF | 2 | State | $6,000.00 | $1,803,441.00 |
| 6-340 | 42.462 | Kentucky | Campbell | Individual | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | Exempt | 2024 | D | 3 | OKI-SNK | $132,000.00 | $1,803,441.00 |
| 6-340 | 42.463 | Kentucky | Campbell | Individual | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | Exempt | 2026 | D | 3 | OKI-SNK | $131,159.00 | $1,803,441.00 |
| 6-340 | 42.464 | Kentucky | Campbell | Individual | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | Exempt | 2026 | D | 4 | Local | $32,790.00 | $1,803,441.00 |
| 6-340 | 42.465 | Kentucky | Campbell | Individual | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | Exempt | 2024 | D | 4 | Local | $33,000.00 | $1,803,441.00 |
| 6-340 | 42.466 | Kentucky | Campbell | Individual | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | Exempt | 2026 | RW | 7 | OKI-SNK | $340,000.00 | $1,803,441.00 |
| 6-340 | 42.467 | Kentucky | Campbell | Individual | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | Exempt | 2026 | RW | 8 | Local | $85,000.00 | $1,803,441.00 |
| 6-340 | 42.468 | Kentucky | Campbell | Individual | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | Exempt | 2026 | UT | 9 | OKI-SNK | $194,000.00 | $1,803,441.00 |
| 6-340 | 42.469 | Kentucky | Campbell | Individual | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | Exempt | 2026 | UT | 10 | Local | $48,500.00 | $1,803,441.00 |
| 6-340 | 42.470 | Kentucky | Campbell | Individual | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | Exempt | 2026 | CO | 11 | OKI-SNK | $621,594.00 | $1,803,441.00 |
| 6-340 | 42.471 | Kentucky | Campbell | Individual | City of Highland Heights | Sunset Drive | Near South Mller Avenue to US27 | Reconstruction, eliminate 90 degree turns, provide better traffic flow and improve overall safety | traffic operations/safety | Exempt | 2026 | CO | 12 | Local | $155,398.00 | $1,803,441.00 |
| 6-352 | 42.472 | Kentucky | Campbell | Individual | KYTC | KY 536 | US 27 to AA Highway (KY 9) | Extension of existing roadway | widening/relocation | Non-exempt | 2015 | D | 1 | SPP | $2,550,000.00 | $7,050,000.00 |
| 6-352 | 42.473 | Kentucky | Campbell | Individual | KYTC | KY 536 | US 27 to AA Highway (KY 9) | Extension of existing roadway | widening/relocation | Non-exempt | 2022 | RW | 3 | SPP | $1,500,000.00 | $7,050,000.00 |
| 6-352 | 42.474 | Kentucky | Campbell | Individual | KYTC | KY 536 | US 27 to AA Highway (KY 9) | Extension of existing roadway | widening/relocation | Non-exempt | 2023 | UT | 3 | SPP | $1,500,000.00 | $7,050,000.00 |
| 6-352 | 42.475 | Kentucky | Campbell | Individual | KYTC | KY 536 | US 27 to AA Highway (KY 9) | Extension of existing roadway | widening/relocation | Non-exempt | 2024 | CO | 6 | SPP | $1,500,000.00 | $7,050,000.00 |
| 6-372 | 42.476 | Kentucky | Campbell | Individual | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along south side of Covert Run and add crosswalk at S. Foote Avenue | maintenance/reconstruction | Exempt | 2024 | D | 1 | OKI-SNK | $148,000.00 | $2,208,483.00 |
| 6-372 | 42.477 | Kentucky | Campbell | Individual | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along south side of Covert Run and add crosswalk at S. Foote Avenue | maintenance/reconstruction | Exempt | 2024 | D | 2 | Local | $37,000.00 | $2,208,483.00 |
| 6-372 | 42.478 | Kentucky | Campbell | Individual | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along south side of Covert Run and add crosswalk at S. Foote Avenue | maintenance/reconstruction | Exempt | 2024 | D-SF | 3 | OKI-SNK | $16,000.00 | $2,208,483.00 |
| 6-372 | 42.479 | Kentucky | Campbell | Individual | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along south side of Covert Run and add crosswalk at S. Foote Avenue | maintenance/reconstruction | Exempt | 2024 | D-SF | 4 | State | $4,000.00 | $2,208,483.00 |
| 6-372 | 42.480 | Kentucky | Campbell | Individual | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along south side of Covert Run and add crosswalk at S. Foote Avenue | maintenance/reconstruction | Exempt | 2026 | RW | 5 | OKI-SNK | $120,000.00 | $2,208,483.00 |
| 6-372 | 42.481 | Kentucky | Campbell | Individual | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along south side of Covert Run and add crosswalk at S. Foote Avenue | maintenance/reconstruction | Exempt | 2026 | RW | 6 | Local | $30,000.00 | $2,208,483.00 |
| 6-372 | 42.482 | Kentucky | Campbell | Individual | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along south side of Covert Run and add crosswalk at S. Foote Avenue | maintenance/reconstruction | Exempt | 2026 | UT | 7 | OKI-SNK | $120,000.00 | $2,208,483.00 |
| 6-372 | 42.483 | Kentucky | Campbell | Individual | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along south side of Covert Run and add crosswalk at S. Foote Avenue | maintenance/reconstruction | Exempt | 2026 | UT | 8 | Local | $30,000.00 | $2,208,483.00 |
| 6-372 | 42.484 | Kentucky | Campbell | Individual | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along south side of Covert Run and add crosswalk at S. Foote Avenue | maintenance/reconstruction | Exempt | 2026 | CO | 9 | OKI-SNK | $1,362,786.00 | $2,208,483.00 |
| 6-372 | 42.485 | Kentucky | Campbell | Individual | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along south side of Covert Run and add crosswalk at S. Foote Avenue | maintenance/reconstruction | Exempt | 2027 | CO | 9 | OKI-SNK | $0.00 | $2,208,483.00 |
| 6-372 | 42.486 | Kentucky | Campbell | Individual | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along south side of Covert Run and add crosswalk at S. Foote Avenue | maintenance/reconstruction | Exempt | 2028 | CO | 9 | OKI-SNK | $0.00 | $2,208,483.00 |
| 6-372 | 42.487 | Kentucky | Campbell | Individual | City of Bellevue | Covert Run | from existing sidewalk to the New Reserves subdivision | Construct new sidewalk and curb and gutter along south side of Covert Run and add crosswalk at S. Foote Avenue | maintenance/reconstruction | Exempt | 2026 | CO | 10 | Local | $340,697.00 | $2,208,483.00 |
| 6-373 | 42.488 | Kentucky | Boone | Individual | Boone County | KY 237 | Conrad Ln, Cougar Path, Limaburg Rd, Barbara Dr, Coral Dr | Build right turn lanes multiple intersections along KY 237 | traffic operations/safety | Exempt | 2024 | D | 1 | OKI-SNK | $58,000.00 | $1,280,070.00 |
| 6-373 | 42.489 | Kentucky | Boone | Individual | Boone County | KY 237 | Conrad Ln, Cougar Path, Limaburg Rd, Barbara Dr, Coral Dr | Build right turn lanes multiple intersections along KY 237 | traffic operations/safety | Exempt | 2024 | D | 2 | Local | $58,000.00 | $1,280,070.00 |
| 6-373 | 42.490 | Kentucky | Boone | Individual | Boone County | KY 237 | Conrad Ln, Cougar Path, Limaburg Rd, Barbara Dr, Coral Dr | Build right turn lanes multiple intersections along KY 237 | traffic operations/safety | Exempt | 2024 | D-SF | 3 | OKI-SNK | $16,000.00 | $1,280,070.00 |
| 6-373 | 42.491 | Kentucky | Boone | Individual | Boone County | KY 237 | Conrad Ln, Cougar Path, Limaburg Rd, Barbara Dr, Coral Dr | Build right turn lanes multiple intersections along KY 237 | traffic operations/safety | Exempt | 2024 | D-SF | 4 | State | $4,000.00 | $1,280,070.00 |
| 6-373 | 42.492 | Kentucky | Boone | Individual | Boone County | KY 237 | Conrad Ln, Cougar Path, Limaburg Rd, Barbara Dr, Coral Dr | Build right turn lanes multiple intersections along KY 237 | traffic operations/safety | Exempt | 2026 | CO | 5 | OKI-SNK | $572,035.00 | $1,280,070.00 |
| 6-373 | 42.493 | Kentucky | Boone | Individual | Boone County | KY 237 | Conrad Ln, Cougar Path, Limaburg Rd, Barbara Dr, Coral Dr | Build right turn lanes multiple intersections along KY 237 | traffic operations/safety | Exempt | 2026 | CO | 6 | Local | $572,035.00 | $1,280,070.00 |
| 6-374 | 42.494 | Kentucky | Kenton | Individual | City of Covington | Madison Avenue | along Madison Av between 6th Street and Robbins Street | Reconstruct signals at Madison/6th and Madison/Pike, interconnect signals | traffic operations/safety | Exempt | 2024 | D | 1 | OKI-SNK | $191,858.00 | $1,168,647.00 |
| 6-374 | 42.495 | Kentucky | Kenton | Individual | City of Covington | Madison Avenue | along Madison Av between 6th Street and Robbins Street | Reconstruct signals at Madison/6th and Madison/Pike, interconnect signals | traffic operations/safety | Exempt | 2024 | D | 2 | Local | $47,965.00 | $1,168,647.00 |
| 6-374 | 42.496 | Kentucky | Kenton | Individual | City of Covington | Madison Avenue | along Madison Av between 6th Street and Robbins Street | Reconstruct signals at Madison/6th and Madison/Pike, interconnect signals | traffic operations/safety | Exempt | 2024 | D-SF | 3 | OKI-SNK | $21,000.00 | $1,168,647.00 |
| 6-374 | 42.497 | Kentucky | Kenton | Individual | City of Covington | Madison Avenue | along Madison Av between 6th Street and Robbins Street | Reconstruct signals at Madison/6th and Madison/Pike, interconnect signals | traffic operations/safety | Exempt | 2024 | D-SF | 4 | State | $5,250.00 | $1,168,647.00 |
| 6-374 | 42.498 | Kentucky | Kenton | Individual | City of Covington | Madison Avenue | along Madison Av between 6th Street and Robbins Street | Reconstruct signals at Madison/6th and Madison/Pike, interconnect signals | traffic operations/safety | Exempt | 2026 | CO | 5 | OKI-SNK | $722,059.00 | $1,168,647.00 |
| 6-374 | 42.499 | Kentucky | Kenton | Individual | City of Covington | Madison Avenue | along Madison Av between 6th Street and Robbins Street | Reconstruct signals at Madison/6th and Madison/Pike, interconnect signals | traffic operations/safety | Exempt | 2026 | CO | 6 | Local | $180,515.00 | $1,168,647.00 |
| 6-375 | 42.500 | Kentucky | Campbell | Individual | City of Newport | Monmouth Street Sidewalks | along both sides of Monmouth St. and south side of 3rd St | Replace sidewalks, including removal of brick pavers and replace with stamped concrete | bicycle/pedestrian/other | Exempt | 2024 | D | 1 | OKI-SNK | $8,000.00 | $744,343.00 |
| 6-375 | 42.501 | Kentucky | Campbell | Individual | City of Newport | Monmouth Street Sidewalks | along both sides of Monmouth St. and south side of 3rd St | Replace sidewalks, including removal of brick pavers and replace with stamped concrete | bicycle/pedestrian/other | Exempt | 2024 | D | 2 | Local | $2,000.00 | $744,343.00 |
| 6-375 | 42.502 | Kentucky | Campbell | Individual | City of Newport | Monmouth Street Sidewalks | along both sides of Monmouth St. and south side of 3rd St | Replace sidewalks, including removal of brick pavers and replace with stamped concrete | bicycle/pedestrian/other | Exempt | 2024 | D-SF | 3 | OKI-SNK | $5,000.00 | $744,343.00 |
| 6-375 | 42.503 | Kentucky | Campbell | Individual | City of Newport | Monmouth Street Sidewalks | along both sides of Monmouth St. and south side of 3rd St | Replace sidewalks, including removal of brick pavers and replace with stamped concrete | bicycle/pedestrian/other | Exempt | 2024 | D-SF | 4 | State | $1,250.00 | $744,343.00 |
| 6-375 | 42.504 | Kentucky | Campbell | Individual | City of Newport | Monmouth Street Sidewalks | along both sides of Monmouth St. and south side of 3rd St | Replace sidewalks, including removal of brick pavers and replace with stamped concrete | bicycle/pedestrian/other | Exempt | 2026 | CO | 5 | OKI-SNK | $582,474.00 | $744,343.00 |
| 6-375 | 42.505 | Kentucky | Campbell | Individual | City of Newport | Monmouth Street Sidewalks | along both sides of Monmouth St. and south side of 3rd St | Replace sidewalks, including removal of brick pavers and replace with stamped concrete | bicycle/pedestrian/other | Exempt | 2026 | CO | 6 | Local | $145,619.00 | $744,343.00 |
| 6-376 | 42.506 | Kentucky | Kenton | Individual | City of Villa Hills | KY 371 (Amsterdam Rd) | Amsterdam/Collins Road Intersection | Conversion to fully signalized intersection with new turn lanes, pedestrian crossing, new sidewalks and stormwater improvements | traffic operations/safety | Exempt | 2026 | D | 1 | OKI-SNK | $62,474.00 | $4,747,717.00 |
| 6-376 | 42.507 | Kentucky | Kenton | Individual | City of Villa Hills | KY 371 (Amsterdam Rd) | Amsterdam/Collins Road Intersection | Conversion to fully signalized intersection with new turn lanes, pedestrian crossing, new sidewalks and stormwater improvements | traffic operations/safety | Exempt | 2026 | D | 2 | Local | $15,619.00 | $4,747,717.00 |
| 6-376 | 42.508 | Kentucky | Kenton | Individual | City of Villa Hills | KY 371 (Amsterdam Rd) | Amsterdam/Collins Road Intersection | Conversion to fully signalized intersection with new turn lanes, pedestrian crossing, new sidewalks and stormwater improvements | traffic operations/safety | Exempt | 2026 | D-SF | 3 | OKI-SNK | $30,000.00 | $4,747,717.00 |
| 6-376 | 42.509 | Kentucky | Kenton | Individual | City of Villa Hills | KY 371 (Amsterdam Rd) | Amsterdam/Collins Road Intersection | Conversion to fully signalized intersection with new turn lanes, pedestrian crossing, new sidewalks and stormwater improvements | traffic operations/safety | Exempt | 2026 | D-SF | 4 | State | $7,500.00 | $4,747,717.00 |
| 6-376 | 42.510 | Kentucky | Kenton | Individual | City of Villa Hills | KY 371 (Amsterdam Rd) | Amsterdam/Collins Road Intersection | Conversion to fully signalized intersection with new turn lanes, pedestrian crossing, new sidewalks and stormwater improvements | traffic operations/safety | Exempt | 2026 | RW | 5 | OKI-SNK | $212,000.00 | $4,747,717.00 |
| 6-376 | 42.511 | Kentucky | Kenton | Individual | City of Villa Hills | KY 371 (Amsterdam Rd) | Amsterdam/Collins Road Intersection | Conversion to fully signalized intersection with new turn lanes, pedestrian crossing, new sidewalks and stormwater improvements | traffic operations/safety | Exempt | 2026 | RW | 6 | Local | $53,000.00 | $4,747,717.00 |
| 6-376 | 42.512 | Kentucky | Kenton | Individual | City of Villa Hills | KY 371 (Amsterdam Rd) | Amsterdam/Collins Road Intersection | Conversion to fully signalized intersection with new turn lanes, pedestrian crossing, new sidewalks and stormwater improvements | traffic operations/safety | Exempt | 2026 | UT | 7 | OKI-SNK | $437,526.00 | $4,747,717.00 |
| 6-376 | 42.513 | Kentucky | Kenton | Individual | City of Villa Hills | KY 371 (Amsterdam Rd) | Amsterdam/Collins Road Intersection | Conversion to fully signalized intersection with new turn lanes, pedestrian crossing, new sidewalks and stormwater improvements | traffic operations/safety | Exempt | 2026 | UT | 8 | Local | $109,382.00 | $4,747,717.00 |
| 6-376 | 42.514 | Kentucky | Kenton | Individual | City of Villa Hills | KY 371 (Amsterdam Rd) | Amsterdam/Collins Road Intersection | Conversion to fully signalized intersection with new turn lanes, pedestrian crossing, new sidewalks and stormwater improvements | traffic operations/safety | Exempt | 2026 | CO | 9 | OKI-SNK | $3,056,173.00 | $4,747,717.00 |
| 6-376 | 42.515 | Kentucky | Kenton | Individual | City of Villa Hills | KY 371 (Amsterdam Rd) | Amsterdam/Collins Road Intersection | Conversion to fully signalized intersection with new turn lanes, pedestrian crossing, new sidewalks and stormwater improvements | traffic operations/safety | Exempt | 2026 | CO | 10 | Local | $764,043.00 | $4,747,717.00 |
| 6-379 | 42.516 | Kentucky | Boone | Individual | CVG Airport | CVG EV Charging | CVG TNC parking lot | Install Level 3 EV Chargers at CVG TNC parking lot | other | Exempt | 2024 | D | 1 | OKI-CRP | $100,000.00 | |
| 6-379 | 42.517 | Kentucky | Boone | Individual | CVG Airport | CVG EV Charging | CVG TNC parking lot | Install Level 3 EV Chargers at CVG TNC parking lot | other | Exempt | 2024 | D | 2 | Local | $25,000.00 | |
| 6-379 | 42.518 | Kentucky | Boone | Individual | CVG Airport | CVG EV Charging | CVG TNC parking lot | Install Level 3 EV Chargers at CVG TNC parking lot | other | Exempt | 2024 | D-SF | 3 | OKI-CRP | $10,000.00 | |
| 6-379 | 42.519 | Kentucky | Boone | Individual | CVG Airport | CVG EV Charging | CVG TNC parking lot | Install Level 3 EV Chargers at CVG TNC parking lot | other | Exempt | 2024 | D-SF | 4 | State | $2,500.00 | |
| 6-379 | 42.520 | Kentucky | Boone | Individual | CVG Airport | CVG EV Charging | CVG TNC parking lot | Install Level 3 EV Chargers at CVG TNC parking lot | other | Exempt | 2026 | CO | 5 | OKI-CRP | $715,000.00 | |
| 6-379 | 42.521 | Kentucky | Boone | Individual | CVG Airport | CVG EV Charging | CVG TNC parking lot | Install Level 3 EV Chargers at CVG TNC parking lot | other | Exempt | 2026 | CO | 6 | Local | $178,750.00 | |
| 6-380 | 42.522 | Kentucky | Kenton | Individual | City of Covington | Covington EV Charging | Four parking facilities in Covington CBD | Install Level 2 and 3 EV Chargers at 4 parking facilities in Covington CBD | other | Exempt | 2024 | D | 1 | OKI-CRP | $100,000.00 | |
| 6-380 | 42.523 | Kentucky | Kenton | Individual | City of Covington | Covington EV Charging | Four parking facilities in Covington CBD | Install Level 2 and 3 EV Chargers at 4 parking facilities in Covington CBD | other | Exempt | 2024 | D | 2 | Local | $25,000.00 | |
| 6-380 | 42.524 | Kentucky | Kenton | Individual | City of Covington | Covington EV Charging | Four parking facilities in Covington CBD | Install Level 2 and 3 EV Chargers at 4 parking facilities in Covington CBD | other | Exempt | 2024 | D-SF | 3 | OKI-CRP | $10,000.00 | |
| 6-380 | 42.525 | Kentucky | Kenton | Individual | City of Covington | Covington EV Charging | Four parking facilities in Covington CBD | Install Level 2 and 3 EV Chargers at 4 parking facilities in Covington CBD | other | Exempt | 2024 | D-SF | 4 | State | $2,500.00 | |
| 6-380 | 42.526 | Kentucky | Kenton | Individual | City of Covington | Covington EV Charging | Four parking facilities in Covington CBD | Install Level 2 and 3 EV Chargers at 4 parking facilities in Covington CBD | other | Exempt | 2027 | CO | 5 | OKI-CRP | $0.00 | |
| 6-380 | 42.527 | Kentucky | Kenton | Individual | City of Covington | Covington EV Charging | Four parking facilities in Covington CBD | Install Level 2 and 3 EV Chargers at 4 parking facilities in Covington CBD | other | Exempt | 2025 | CO | 5 | OKI-CRP | $500,000.00 | |
| 6-380 | 42.528 | Kentucky | Kenton | Individual | City of Covington | Covington EV Charging | Four parking facilities in Covington CBD | Install Level 2 and 3 EV Chargers at 4 parking facilities in Covington CBD | other | Exempt | 2026 | CO | 5 | OKI-CRP | $0.00 | |
| 6-380 | 42.529 | Kentucky | Kenton | Individual | City of Covington | Covington EV Charging | Four parking facilities in Covington CBD | Install Level 2 and 3 EV Chargers at 4 parking facilities in Covington CBD | other | Exempt | 2025 | CO | 6 | Local | $125,000.00 | |
| 6-381 | 42.530 | Kentucky | Kenton | Individual | City of Crestview Hills | Horsebranch Road | Thomas More Pkwy to Orphanage Rd | Resurfacing with some full-depth replacement, curb and gutter, slide repair | maintenance/reconstruction | Exempt | 2024 | D | 1 | OKI-SNK | $51,000.00 | $2,338,250.00 |
| 6-381 | 42.531 | Kentucky | Kenton | Individual | City of Crestview Hills | Horsebranch Road | Thomas More Pkwy to Orphanage Rd | Resurfacing with some full-depth replacement, curb and gutter, slide repair | maintenance/reconstruction | Exempt | 2024 | D | 2 | Local | $34,000.00 | $2,338,250.00 |
| 6-381 | 42.532 | Kentucky | Kenton | Individual | City of Crestview Hills | Horsebranch Road | Thomas More Pkwy to Orphanage Rd | Resurfacing with some full-depth replacement, curb and gutter, slide repair | maintenance/reconstruction | Exempt | 2024 | D-SF | 3 | OKI-SNK | $9,000.00 | $2,338,250.00 |
| 6-381 | 42.533 | Kentucky | Kenton | Individual | City of Crestview Hills | Horsebranch Road | Thomas More Pkwy to Orphanage Rd | Resurfacing with some full-depth replacement, curb and gutter, slide repair | maintenance/reconstruction | Exempt | 2024 | D-SF | 4 | State | $2,250.00 | $2,338,250.00 |
| 6-381 | 42.534 | Kentucky | Kenton | Individual | City of Crestview Hills | Horsebranch Road | Thomas More Pkwy to Orphanage Rd | Resurfacing with some full-depth replacement, curb and gutter, slide repair | maintenance/reconstruction | Exempt | 2026 | RW | 5 | OKI-SNK | $33,000.00 | $2,338,250.00 |
| 6-381 | 42.535 | Kentucky | Kenton | Individual | City of Crestview Hills | Horsebranch Road | Thomas More Pkwy to Orphanage Rd | Resurfacing with some full-depth replacement, curb and gutter, slide repair | maintenance/reconstruction | Exempt | 2026 | RW | 6 | Local | $22,000.00 | $2,338,250.00 |
| 6-381 | 42.536 | Kentucky | Kenton | Individual | City of Crestview Hills | Horsebranch Road | Thomas More Pkwy to Orphanage Rd | Resurfacing with some full-depth replacement, curb and gutter, slide repair | maintenance/reconstruction | Exempt | 2026 | UT | 7 | OKI-SNK | $27,000.00 | $2,338,250.00 |
| 6-381 | 42.537 | Kentucky | Kenton | Individual | City of Crestview Hills | Horsebranch Road | Thomas More Pkwy to Orphanage Rd | Resurfacing with some full-depth replacement, curb and gutter, slide repair | maintenance/reconstruction | Exempt | 2026 | UT | 8 | Local | $18,000.00 | $2,338,250.00 |
| 6-381 | 42.538 | Kentucky | Kenton | Individual | City of Crestview Hills | Horsebranch Road | Thomas More Pkwy to Orphanage Rd | Resurfacing with some full-depth replacement, curb and gutter, slide repair | maintenance/reconstruction | Exempt | 2027 | CO | 9 | OKI-SNK | $1,285,200.00 | $2,338,250.00 |
| 6-381 | 42.539 | Kentucky | Kenton | Individual | City of Crestview Hills | Horsebranch Road | Thomas More Pkwy to Orphanage Rd | Resurfacing with some full-depth replacement, curb and gutter, slide repair | maintenance/reconstruction | Exempt | 2027 | CO | 10 | Local | $856,800.00 | $2,338,250.00 |
| 6-382 | 42.540 | Kentucky | Kenton | Individual | City of Park Hills | Amsterdam Road | Sleepy Hollow Road to Hamilton Road | Reconstruction, improve roadway geometry, relocate utility poles and replace sidewalks | maintenance/reconstruction | Exempt | 2026 | D | 1 | OKI-SNK | $142,319.00 | $2,947,704.00 |
| 6-382 | 42.541 | Kentucky | Kenton | Individual | City of Park Hills | Amsterdam Road | Sleepy Hollow Road to Hamilton Road | Reconstruction, improve roadway geometry, relocate utility poles and replace sidewalks | maintenance/reconstruction | Exempt | 2026 | D | 2 | Local | $87,378.00 | $2,947,704.00 |
| 6-382 | 42.542 | Kentucky | Kenton | Individual | City of Park Hills | Amsterdam Road | Sleepy Hollow Road to Hamilton Road | Reconstruction, improve roadway geometry, relocate utility poles and replace sidewalks | maintenance/reconstruction | Exempt | 2024 | D-SF | 3 | OKI-SNK | $22,000.00 | $2,947,704.00 |
| 6-382 | 42.543 | Kentucky | Kenton | Individual | City of Park Hills | Amsterdam Road | Sleepy Hollow Road to Hamilton Road | Reconstruction, improve roadway geometry, relocate utility poles and replace sidewalks | maintenance/reconstruction | Exempt | 2024 | D-SF | 4 | State | $5,500.00 | $2,947,704.00 |
| 6-382 | 42.544 | Kentucky | Kenton | Individual | City of Park Hills | Amsterdam Road | Sleepy Hollow Road to Hamilton Road | Reconstruction, improve roadway geometry, relocate utility poles and replace sidewalks | maintenance/reconstruction | Exempt | 2026 | UT | 5 | OKI-SNK | $559,747.00 | $2,947,704.00 |
| 6-382 | 42.545 | Kentucky | Kenton | Individual | City of Park Hills | Amsterdam Road | Sleepy Hollow Road to Hamilton Road | Reconstruction, improve roadway geometry, relocate utility poles and replace sidewalks | maintenance/reconstruction | Exempt | 2026 | UT | 6 | Local | $301,403.00 | $2,947,704.00 |
| 6-382 | 42.546 | Kentucky | Kenton | Individual | City of Park Hills | Amsterdam Road | Sleepy Hollow Road to Hamilton Road | Reconstruction, improve roadway geometry, relocate utility poles and replace sidewalks | maintenance/reconstruction | Exempt | 2027 | CO | 7 | OKI-SNK | $1,176,111.00 | $2,947,704.00 |
| 6-382 | 42.547 | Kentucky | Kenton | Individual | City of Park Hills | Amsterdam Road | Sleepy Hollow Road to Hamilton Road | Reconstruction, improve roadway geometry, relocate utility poles and replace sidewalks | maintenance/reconstruction | Exempt | 2027 | CO | 8 | Local | $633,291.00 | $2,947,704.00 |
| 6-386 | 42.548 | Kentucky | Boone | Individual | CVG Airport | CVG Airport EV Chargers | 3 locations (CVG Centre 77 Comair Blvd, CONRAC Valet, Terminal 2 Garage) | Install total of 26 level 2 chargers and 5 DC Fast Chargers | other | Exempt | 2025 | D | 1 | OKI-CRP | $87,500.00 | $3,673,214.00 |
| 6-386 | 42.549 | Kentucky | Boone | Individual | CVG Airport | CVG Airport EV Chargers | 3 locations (CVG Centre 77 Comair Blvd, CONRAC Valet, Terminal 2 Garage) | Install total of 26 level 2 chargers and 5 DC Fast Chargers | other | Exempt | 2025 | D | 2 | Local | $37,500.00 | $3,673,214.00 |
| 6-386 | 42.550 | Kentucky | Boone | Individual | CVG Airport | CVG Airport EV Chargers | 3 locations (CVG Centre 77 Comair Blvd, CONRAC Valet, Terminal 2 Garage) | Install total of 26 level 2 chargers and 5 DC Fast Chargers | other | Exempt | 2025 | D-SF | 3 | OKI-CRP | $10,000.00 | $3,673,214.00 |
| 6-386 | 42.551 | Kentucky | Boone | Individual | CVG Airport | CVG Airport EV Chargers | 3 locations (CVG Centre 77 Comair Blvd, CONRAC Valet, Terminal 2 Garage) | Install total of 26 level 2 chargers and 5 DC Fast Chargers | other | Exempt | 2025 | D-SF | 4 | State | $2,500.00 | $3,673,214.00 |
| 6-386 | 42.552 | Kentucky | Boone | Individual | CVG Airport | CVG Airport EV Chargers | 3 locations (CVG Centre 77 Comair Blvd, CONRAC Valet, Terminal 2 Garage) | Install total of 26 level 2 chargers and 5 DC Fast Chargers | other | Exempt | 2026 | CO | 5 | OKI-CRP | $2,475,000.00 | $3,673,214.00 |
| 6-386 | 42.553 | Kentucky | Boone | Individual | CVG Airport | CVG Airport EV Chargers | 3 locations (CVG Centre 77 Comair Blvd, CONRAC Valet, Terminal 2 Garage) | Install total of 26 level 2 chargers and 5 DC Fast Chargers | other | Exempt | 2026 | CO | 6 | Local | $1,060,714.00 | $3,673,214.00 |
| 6-389 | 42.554 | Kentucky | Boone | Individual | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | Exempt | 2024 | D | 1 | OKI-SNK | $0.00 | $2,733,218.00 |
| 6-389 | 42.555 | Kentucky | Boone | Individual | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | Exempt | 2025 | D | 1 | OKI-SNK | $150,000.00 | $2,733,218.00 |
| 6-389 | 42.556 | Kentucky | Boone | Individual | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | Exempt | 2025 | D | 2 | Local | $150,000.00 | $2,733,218.00 |
| 6-389 | 42.557 | Kentucky | Boone | Individual | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | Exempt | 2025 | D-SF | 3 | OKI-SNK | $30,000.00 | $2,733,218.00 |
| 6-389 | 42.558 | Kentucky | Boone | Individual | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | Exempt | 2025 | D-SF | 4 | State | $7,500.00 | $2,733,218.00 |
| 6-389 | 42.559 | Kentucky | Boone | Individual | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | Exempt | 2027 | RW | 5 | OKI-SNK | $150,000.00 | $2,733,218.00 |
| 6-389 | 42.560 | Kentucky | Boone | Individual | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | Exempt | 2027 | RW | 6 | Local | $150,000.00 | $2,733,218.00 |
| 6-389 | 42.561 | Kentucky | Boone | Individual | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | Exempt | 2027 | UT | 7 | OKI-SNK | $150,000.00 | $2,733,218.00 |
| 6-389 | 42.562 | Kentucky | Boone | Individual | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | Exempt | 2027 | UT | 8 | Local | $150,000.00 | $2,733,218.00 |
| 6-389 | 42.563 | Kentucky | Boone | Individual | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | Exempt | 2029 | CO | 9 | OKI-SNK | $0.00 | $2,733,218.00 |
| 6-389 | 42.564 | Kentucky | Boone | Individual | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | Exempt | 2028 | CO | 9 | OKI-SNK | $897,859.00 | $2,733,218.00 |
| 6-389 | 42.565 | Kentucky | Boone | Individual | Boone County | Conrad Lane Multi-Use Path | along Conrad Lane from Bullittsville Road to KY 237 | Construct multi-use path | bicycle/pedestrian | Exempt | 2028 | CO | 10 | Local | $897,859.00 | $2,733,218.00 |
| 6-390 | 42.566 | Kentucky | Kenton | Individual | City of Crestview Hills | Thomas More Parkway | from Renaissance Dr to Legends Way | Resurfacing including base repairs, curb and gutter replacement, and upgrades to storm water system | maintenance/reconstruction | Exempt | 2025 | D | 1 | OKI-SNK | $72,000.00 | $1,488,482.00 |
| 6-390 | 42.567 | Kentucky | Kenton | Individual | City of Crestview Hills | Thomas More Parkway | from Renaissance Dr to Legends Way | Resurfacing including base repairs, curb and gutter replacement, and upgrades to storm water system | maintenance/reconstruction | Exempt | 2025 | D | 2 | Local | $48,000.00 | $1,488,482.00 |
| 6-390 | 42.568 | Kentucky | Kenton | Individual | City of Crestview Hills | Thomas More Parkway | from Renaissance Dr to Legends Way | Resurfacing including base repairs, curb and gutter replacement, and upgrades to storm water system | maintenance/reconstruction | Exempt | 2025 | D-SF | 3 | OKI-SNK | $15,000.00 | $1,488,482.00 |
| 6-390 | 42.569 | Kentucky | Kenton | Individual | City of Crestview Hills | Thomas More Parkway | from Renaissance Dr to Legends Way | Resurfacing including base repairs, curb and gutter replacement, and upgrades to storm water system | maintenance/reconstruction | Exempt | 2025 | D-SF | 4 | State | $3,750.00 | $1,488,482.00 |
| 6-390 | 42.570 | Kentucky | Kenton | Individual | City of Crestview Hills | Thomas More Parkway | from Renaissance Dr to Legends Way | Resurfacing including base repairs, curb and gutter replacement, and upgrades to storm water system | maintenance/reconstruction | Exempt | 2027 | RW | 5 | OKI-SNK | $9,000.00 | $1,488,482.00 |
| 6-390 | 42.571 | Kentucky | Kenton | Individual | City of Crestview Hills | Thomas More Parkway | from Renaissance Dr to Legends Way | Resurfacing including base repairs, curb and gutter replacement, and upgrades to storm water system | maintenance/reconstruction | Exempt | 2027 | RW | 6 | Local | $6,000.00 | $1,488,482.00 |
| 6-390 | 42.572 | Kentucky | Kenton | Individual | City of Crestview Hills | Thomas More Parkway | from Renaissance Dr to Legends Way | Resurfacing including base repairs, curb and gutter replacement, and upgrades to storm water system | maintenance/reconstruction | Exempt | 2027 | UT | 7 | OKI-SNK | $30,000.00 | $1,488,482.00 |
| 6-390 | 42.573 | Kentucky | Kenton | Individual | City of Crestview Hills | Thomas More Parkway | from Renaissance Dr to Legends Way | Resurfacing including base repairs, curb and gutter replacement, and upgrades to storm water system | maintenance/reconstruction | Exempt | 2027 | UT | 8 | Local | $20,000.00 | $1,488,482.00 |
| 6-390 | 42.574 | Kentucky | Kenton | Individual | City of Crestview Hills | Thomas More Parkway | from Renaissance Dr to Legends Way | Resurfacing including base repairs, curb and gutter replacement, and upgrades to storm water system | maintenance/reconstruction | Exempt | 2028 | CO | 9 | OKI-SNK | $770,839.00 | $1,488,482.00 |
| 6-390 | 42.575 | Kentucky | Kenton | Individual | City of Crestview Hills | Thomas More Parkway | from Renaissance Dr to Legends Way | Resurfacing including base repairs, curb and gutter replacement, and upgrades to storm water system | maintenance/reconstruction | Exempt | 2028 | CO | 10 | Local | $513,893.00 | $1,488,482.00 |
| 6-391 | 42.576 | Kentucky | Campbell | Individual | City of Highland Heights | US27 Sidewalk and Pedestrian Improvements | I-471 to Renshaw Road | Replace and repair existing sidewalk and construct wide sidewalk on north/west side | bicycle/pedestrian | Exempt | 2025 | D | 1 | OKI-SNK | $625,829.00 | $4,188,150.00 |
| 6-391 | 42.577 | Kentucky | Campbell | Individual | City of Highland Heights | US27 Sidewalk and Pedestrian Improvements | I-471 to Renshaw Road | Replace and repair existing sidewalk and construct wide sidewalk on north/west side | bicycle/pedestrian | Exempt | 2025 | D | 2 | Local | $156,457.00 | $4,188,150.00 |
| 6-391 | 42.578 | Kentucky | Campbell | Individual | City of Highland Heights | US27 Sidewalk and Pedestrian Improvements | I-471 to Renshaw Road | Replace and repair existing sidewalk and construct wide sidewalk on north/west side | bicycle/pedestrian | Exempt | 2025 | D-SF | 3 | OKI-SNK | $30,000.00 | $4,188,150.00 |
| 6-391 | 42.579 | Kentucky | Campbell | Individual | City of Highland Heights | US27 Sidewalk and Pedestrian Improvements | I-471 to Renshaw Road | Replace and repair existing sidewalk and construct wide sidewalk on north/west side | bicycle/pedestrian | Exempt | 2025 | D-SF | 4 | State | $7,500.00 | $4,188,150.00 |
| 6-391 | 42.580 | Kentucky | Campbell | Individual | City of Highland Heights | US27 Sidewalk and Pedestrian Improvements | I-471 to Renshaw Road | Replace and repair existing sidewalk and construct wide sidewalk on north/west side | bicycle/pedestrian | Exempt | 2027 | RW | 5 | OKI-SNK | $225,600.00 | $4,188,150.00 |
| 6-391 | 42.581 | Kentucky | Campbell | Individual | City of Highland Heights | US27 Sidewalk and Pedestrian Improvements | I-471 to Renshaw Road | Replace and repair existing sidewalk and construct wide sidewalk on north/west side | bicycle/pedestrian | Exempt | 2027 | RW | 6 | Local | $56,400.00 | $4,188,150.00 |
| 6-391 | 42.582 | Kentucky | Campbell | Individual | City of Highland Heights | US27 Sidewalk and Pedestrian Improvements | I-471 to Renshaw Road | Replace and repair existing sidewalk and construct wide sidewalk on north/west side | bicycle/pedestrian | Exempt | 2027 | UT | 7 | OKI-SNK | $200,000.00 | $4,188,150.00 |
| 6-391 | 42.583 | Kentucky | Campbell | Individual | City of Highland Heights | US27 Sidewalk and Pedestrian Improvements | I-471 to Renshaw Road | Replace and repair existing sidewalk and construct wide sidewalk on north/west side | bicycle/pedestrian | Exempt | 2027 | UT | 8 | Local | $50,000.00 | $4,188,150.00 |
| 6-391 | 42.584 | Kentucky | Campbell | Individual | City of Highland Heights | US27 Sidewalk and Pedestrian Improvements | I-471 to Renshaw Road | Replace and repair existing sidewalk and construct wide sidewalk on north/west side | bicycle/pedestrian | Exempt | 2028 | CO | 9 | OKI-SNK | $2,269,091.00 | $4,188,150.00 |
| 6-391 | 42.585 | Kentucky | Campbell | Individual | City of Highland Heights | US27 Sidewalk and Pedestrian Improvements | I-471 to Renshaw Road | Replace and repair existing sidewalk and construct wide sidewalk on north/west side | bicycle/pedestrian | Exempt | 2028 | CO | 10 | Local | $567,273.00 | $4,188,150.00 |
| 6-393 | 42.586 | Kentucky | Kenton | Group | KYTC | KY 16 | MP 14.90 to 15.00 | JPC Intersection Repairs on KY 16 in Kenton County Kentucky | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2026 | CO | 5 | NHPM | $240,000.00 | |
| 6-393 | 42.587 | Kentucky | Kenton | Group | KYTC | KY 16 | MP 14.90 to 15.00 | JPC Intersection Repairs on KY 16 in Kenton County Kentucky | Pavement resurfacing, restoration, and rehabilitation projects | Exempt | 2026 | CO | 6 | State | $60,000.00 | |
| 6-394 | 42.588 | Kentucky | Boone | Individual | Boone County | Cayton Road Resurfacing | From Hopeful Church Road (KY 842) to Connector Drive | Mill and pave Cayton Road from Hopeful Church Road to Connector Drive | maintenance/reconstruction | Exempt | 2026 | D-SF | 1 | OKI-SNK | $5,000.00 | $266,150.00 |
| 6-394 | 42.589 | Kentucky | Boone | Individual | Boone County | Cayton Road Resurfacing | From Hopeful Church Road (KY 842) to Connector Drive | Mill and pave Cayton Road from Hopeful Church Road to Connector Drive | maintenance/reconstruction | Exempt | 2026 | D-SF | 2 | State | $1,250.00 | $266,150.00 |
| 6-394 | 42.590 | Kentucky | Boone | Individual | Boone County | Cayton Road Resurfacing | From Hopeful Church Road (KY 842) to Connector Drive | Mill and pave Cayton Road from Hopeful Church Road to Connector Drive | maintenance/reconstruction | Exempt | 2027 | CO | 5 | OKI-SNK | $207,920.00 | $266,150.00 |
| 6-394 | 42.591 | Kentucky | Boone | Individual | Boone County | Cayton Road Resurfacing | From Hopeful Church Road (KY 842) to Connector Drive | Mill and pave Cayton Road from Hopeful Church Road to Connector Drive | maintenance/reconstruction | Exempt | 2027 | CO | 6 | Local | $51,980.00 | $266,150.00 |
| 6-395 | 42.592 | Kentucky | Campbell | Individual | City of Fort Thomas | North Fort Thomas Repaving Project | From Memorial Parkway to Holly Road | Repaving of North Fort Thomas Avenue from Memorial Pkwy to Holly Road | maintenance/reconstruction | Exempt | 2026 | D-SF | 1 | OKI-SNK | $5,000.00 | $462,431.00 |
| 6-395 | 42.593 | Kentucky | Campbell | Individual | City of Fort Thomas | North Fort Thomas Repaving Project | From Memorial Parkway to Holly Road | Repaving of North Fort Thomas Avenue from Memorial Pkwy to Holly Road | maintenance/reconstruction | Exempt | 2026 | D-SF | 2 | State | $1,250.00 | $462,431.00 |
| 6-395 | 42.594 | Kentucky | Campbell | Individual | City of Fort Thomas | North Fort Thomas Repaving Project | From Memorial Parkway to Holly Road | Repaving of North Fort Thomas Avenue from Memorial Pkwy to Holly Road | maintenance/reconstruction | Exempt | 2027 | CO | 5 | OKI-SNK | $364,945.00 | $462,431.00 |
| 6-395 | 42.595 | Kentucky | Campbell | Individual | City of Fort Thomas | North Fort Thomas Repaving Project | From Memorial Parkway to Holly Road | Repaving of North Fort Thomas Avenue from Memorial Pkwy to Holly Road | maintenance/reconstruction | Exempt | 2027 | CO | 6 | Local | $91,236.00 | $462,431.00 |
| 6-396 | 42.596 | Kentucky | Kenton | Individual | City of Covington | Covington Pike St. Repaving Project | From Main Street to 7th Street | Repaving of Pike Street from Main to 7th Street | maintenance/reconstruction | Exempt | 2026 | D-SF | 1 | OKI-SNK | $5,000.00 | $305,858.00 |
| 6-396 | 42.597 | Kentucky | Kenton | Individual | City of Covington | Covington Pike St. Repaving Project | From Main Street to 7th Street | Repaving of Pike Street from Main to 7th Street | maintenance/reconstruction | Exempt | 2026 | D-SF | 2 | State | $1,250.00 | $305,858.00 |
| 6-396 | 42.598 | Kentucky | Kenton | Individual | City of Covington | Covington Pike St. Repaving Project | From Main Street to 7th Street | Repaving of Pike Street from Main to 7th Street | maintenance/reconstruction | Exempt | 2027 | CO | 5 | OKI-SNK | $239,686.00 | $305,858.00 |
| 6-396 | 42.599 | Kentucky | Kenton | Individual | City of Covington | Covington Pike St. Repaving Project | From Main Street to 7th Street | Repaving of Pike Street from Main to 7th Street | maintenance/reconstruction | Exempt | 2027 | CO | 6 | Local | $59,922.00 | $305,858.00 |
| 6-397 | 42.600 | Kentucky | Kenton | Individual | City of Crestview Hills | Centre View Boulevard Roadway Repaving | From Thomas More Pkwy to Rhine Valley Ln. | Install an asphalt interlayer and asphalt surface | maintenance/reconstruction | Exempt | 2026 | D-SF | 1 | OKI-SNK | $5,000.00 | $504,799.00 |
| 6-397 | 42.601 | Kentucky | Kenton | Individual | City of Crestview Hills | Centre View Boulevard Roadway Repaving | From Thomas More Pkwy to Rhine Valley Ln. | Install an asphalt interlayer and asphalt surface | maintenance/reconstruction | Exempt | 2026 | D-SF | 2 | State | $1,250.00 | $504,799.00 |
| 6-397 | 42.602 | Kentucky | Kenton | Individual | City of Crestview Hills | Centre View Boulevard Roadway Repaving | From Thomas More Pkwy to Rhine Valley Ln. | Install an asphalt interlayer and asphalt surface | maintenance/reconstruction | Exempt | 2027 | CO | 5 | OKI-SNK | $398,839.00 | $504,799.00 |
| 6-397 | 42.603 | Kentucky | Kenton | Individual | City of Crestview Hills | Centre View Boulevard Roadway Repaving | From Thomas More Pkwy to Rhine Valley Ln. | Install an asphalt interlayer and asphalt surface | maintenance/reconstruction | Exempt | 2027 | CO | 6 | Local | $99,710.00 | $504,799.00 |
| 6-398 | 42.604 | Kentucky | Kenton | Individual | City of Edgewood | Edgewood Thomas More Pkwy Repaving | From Dudley Road to city line near Legends Way | Repaving of Thomas More Pkwy from Dudley Road to city line near Legends Way | maintenance/reconstruction | Exempt | 2026 | D-SF | 1 | OKI-SNK | $5,000.00 | $564,138.00 |
| 6-398 | 42.605 | Kentucky | Kenton | Individual | City of Edgewood | Edgewood Thomas More Pkwy Repaving | From Dudley Road to city line near Legends Way | Repaving of Thomas More Pkwy from Dudley Road to city line near Legends Way | maintenance/reconstruction | Exempt | 2026 | D-SF | 2 | State | $1,250.00 | $564,138.00 |
| 6-398 | 42.606 | Kentucky | Kenton | Individual | City of Edgewood | Edgewood Thomas More Pkwy Repaving | From Dudley Road to city line near Legends Way | Repaving of Thomas More Pkwy from Dudley Road to city line near Legends Way | maintenance/reconstruction | Exempt | 2027 | CO | 5 | OKI-SNK | $446,310.00 | $564,138.00 |
| 6-398 | 42.607 | Kentucky | Kenton | Individual | City of Edgewood | Edgewood Thomas More Pkwy Repaving | From Dudley Road to city line near Legends Way | Repaving of Thomas More Pkwy from Dudley Road to city line near Legends Way | maintenance/reconstruction | Exempt | 2027 | CO | 6 | Local | $111,578.00 | $564,138.00 |
| 6-399 | 42.608 | Kentucky | Kenton | Individual | City of Fort Wright | Fort Wright Highland Avenue Repaving | From Kyles Lane to city line near Cityscape Drive | Repaving of Highland Avenue from Kyles Lane to city line near Cityscape Drive | maintenance/reconstruction | Exempt | 2026 | D-SF | 1 | OKI-SNK | $5,000.00 | $284,058.00 |
| 6-399 | 42.609 | Kentucky | Kenton | Individual | City of Fort Wright | Fort Wright Highland Avenue Repaving | From Kyles Lane to city line near Cityscape Drive | Repaving of Highland Avenue from Kyles Lane to city line near Cityscape Drive | maintenance/reconstruction | Exempt | 2026 | D-SF | 2 | State | $1,250.00 | $284,058.00 |
| 6-399 | 42.610 | Kentucky | Kenton | Individual | City of Fort Wright | Fort Wright Highland Avenue Repaving | From Kyles Lane to city line near Cityscape Drive | Repaving of Highland Avenue from Kyles Lane to city line near Cityscape Drive | maintenance/reconstruction | Exempt | 2027 | CO | 5 | OKI-SNK | $222,246.00 | $284,058.00 |
| 6-399 | 42.611 | Kentucky | Kenton | Individual | City of Fort Wright | Fort Wright Highland Avenue Repaving | From Kyles Lane to city line near Cityscape Drive | Repaving of Highland Avenue from Kyles Lane to city line near Cityscape Drive | maintenance/reconstruction | Exempt | 2027 | CO | 6 | Local | $55,562.00 | $284,058.00 |
| 6-401.26 | 42.612 | Kentucky | Boone | Individual | OKI | NKY Planning FY26 AQ, FIAM, Land Use, Rideshare | Boone, Campbell and Kenton | N KY Planning FY 26 Air Quality, FIAM, Land Use, Rideshare | studies | Exempt | 2026 | PL | 1 | OKI-SNK | $231,200.00 | |
| 6-401.26 | 42.613 | Kentucky | Boone | Individual | OKI | NKY Planning FY26 AQ, FIAM, Land Use, Rideshare | Boone, Campbell and Kenton | N KY Planning FY 26 Air Quality, FIAM, Land Use, Rideshare | studies | Exempt | 2026 | PL | 2 | Local | $35,825.00 | |
| 6-401.26 | 42.614 | Kentucky | Boone | Individual | OKI | NKY Planning FY26 AQ, FIAM, Land Use, Rideshare | Boone, Campbell and Kenton | N KY Planning FY 26 Air Quality, FIAM, Land Use, Rideshare | studies | Exempt | 2026 | PL | 3 | Contrib Svcs | $21,975.00 | |
| 6-401.27 | 42.615 | Kentucky | Boone | Individual | OKI | NKY Planning FY27 AQ, FIAM, Land Use, Rideshare | Boone, Campbell and Kenton | N KY Planning FY 27 Air Quality, FIAM, Land Use, Rideshare | studies | Exempt | 2027 | PL | 1 | OKI-SNK | $236,700.00 | |
| 6-401.27 | 42.616 | Kentucky | Boone | Individual | OKI | NKY Planning FY27 AQ, FIAM, Land Use, Rideshare | Boone, Campbell and Kenton | N KY Planning FY 27 Air Quality, FIAM, Land Use, Rideshare | studies | Exempt | 2027 | PL | 2 | Local | $37,050.00 | |
| 6-401.27 | 42.617 | Kentucky | Boone | Individual | OKI | NKY Planning FY27 AQ, FIAM, Land Use, Rideshare | Boone, Campbell and Kenton | N KY Planning FY 27 Air Quality, FIAM, Land Use, Rideshare | studies | Exempt | 2027 | PL | 3 | Contrib Svcs | $22,125.00 | |
| 6-401.28 | 42.618 | Kentucky | Boone | Individual | OKI | NKY Planning FY28 AQ, FIAM, Land Use, Rideshare | Boone, Campbell and Kenton | N KY Planning FY 28 Air Quality, FIAM, Land Use, Rideshare | studies | Exempt | 2028 | OTH | 1 | OKI-SNK | $236,700.00 | |
| 6-401.28 | 42.619 | Kentucky | Boone | Individual | OKI | NKY Planning FY28 AQ, FIAM, Land Use, Rideshare | Boone, Campbell and Kenton | N KY Planning FY 28 Air Quality, FIAM, Land Use, Rideshare | studies | Exempt | 2028 | OTH | 2 | Local | $37,050.00 | |
| 6-401.28 | 42.620 | Kentucky | Boone | Individual | OKI | NKY Planning FY28 AQ, FIAM, Land Use, Rideshare | Boone, Campbell and Kenton | N KY Planning FY 28 Air Quality, FIAM, Land Use, Rideshare | studies | Exempt | 2028 | OTH | 3 | Contrib Svcs | $22,125.00 | |
| 6-401.29 | 42.621 | Kentucky | Boone | Individual | OKI | NKY Planning FY29 AQ, FIAM, Land Use, Rideshare | Boone, Campbell and Kenton | N KY Planning FY 29 Air Quality, FIAM, Land Use, Rideshare | studies | Exempt | 2029 | OTH | 1 | OKI-SNK | $236,700.00 | |
| 6-401.29 | 42.622 | Kentucky | Boone | Individual | OKI | NKY Planning FY29 AQ, FIAM, Land Use, Rideshare | Boone, Campbell and Kenton | N KY Planning FY 29 Air Quality, FIAM, Land Use, Rideshare | studies | Exempt | 2029 | OTH | 2 | Local | $37,050.00 | |
| 6-401.29 | 42.623 | Kentucky | Boone | Individual | OKI | NKY Planning FY29 AQ, FIAM, Land Use, Rideshare | Boone, Campbell and Kenton | N KY Planning FY 29 Air Quality, FIAM, Land Use, Rideshare | studies | Exempt | 2029 | OTH | 3 | Contrib Svcs | $22,125.00 | |
| 6-408 | 42.624 | Kentucky | Kenton | Individual | City of Independence | Independence Troopers Xing Repaving | From Calvary Road to Cody Road | Repaving of Troopers Crossing from Calvary Road to Cody Road | maintenance/reconstruction | Exempt | 2026 | D-SF | 1 | OKI-SNK | $5,000.00 | $208,036.00 |
| 6-408 | 42.625 | Kentucky | Kenton | Individual | City of Independence | Independence Troopers Xing Repaving | From Calvary Road to Cody Road | Repaving of Troopers Crossing from Calvary Road to Cody Road | maintenance/reconstruction | Exempt | 2026 | D-SF | 2 | State | $1,250.00 | $208,036.00 |
| 6-408 | 42.626 | Kentucky | Kenton | Individual | City of Independence | Independence Troopers Xing Repaving | From Calvary Road to Cody Road | Repaving of Troopers Crossing from Calvary Road to Cody Road | maintenance/reconstruction | Exempt | 2027 | CO | 5 | OKI-SNK | $161,429.00 | $208,036.00 |
| 6-408 | 42.627 | Kentucky | Kenton | Individual | City of Independence | Independence Troopers Xing Repaving | From Calvary Road to Cody Road | Repaving of Troopers Crossing from Calvary Road to Cody Road | maintenance/reconstruction | Exempt | 2027 | CO | 6 | Local | $40,357.00 | $208,036.00 |
| 6-410 | 42.628 | Kentucky | Campbell | Individual | City of Cold Spring | US 27 (Alexandria Pk) Downing Street Realignment | Intersection of US27 and Downing Street | Shift current offset intersection of Downing Street to align with Bunning Lane. Existing Downing St. to be modified to right-in/right-out | traffic operations/safety | Exempt | 2026 | D | 1 | OKI-SNK | $116,160.00 | |
| 6-410 | 42.629 | Kentucky | Campbell | Individual | City of Cold Spring | US 27 (Alexandria Pk) Downing Street Realignment | Intersection of US27 and Downing Street | Shift current offset intersection of Downing Street to align with Bunning Lane. Existing Downing St. to be modified to right-in/right-out | traffic operations/safety | Exempt | 2026 | D | 2 | Local | $29,040.00 | |
| 6-410 | 42.630 | Kentucky | Campbell | Individual | City of Cold Spring | US 27 (Alexandria Pk) Downing Street Realignment | Intersection of US27 and Downing Street | Shift current offset intersection of Downing Street to align with Bunning Lane. Existing Downing St. to be modified to right-in/right-out | traffic operations/safety | Exempt | 2026 | D-SF | 3 | OKI-SNK | $14,520.00 | |
| 6-410 | 42.631 | Kentucky | Campbell | Individual | City of Cold Spring | US 27 (Alexandria Pk) Downing Street Realignment | Intersection of US27 and Downing Street | Shift current offset intersection of Downing Street to align with Bunning Lane. Existing Downing St. to be modified to right-in/right-out | traffic operations/safety | Exempt | 2026 | D-SF | 4 | State | $3,630.00 | |
| 6-410 | 42.632 | Kentucky | Campbell | Individual | City of Cold Spring | US 27 (Alexandria Pk) Downing Street Realignment | Intersection of US27 and Downing Street | Shift current offset intersection of Downing Street to align with Bunning Lane. Existing Downing St. to be modified to right-in/right-out | traffic operations/safety | Exempt | 2028 | RW | 5 | OKI-SNK | $56,000.00 | |
| 6-410 | 42.633 | Kentucky | Campbell | Individual | City of Cold Spring | US 27 (Alexandria Pk) Downing Street Realignment | Intersection of US27 and Downing Street | Shift current offset intersection of Downing Street to align with Bunning Lane. Existing Downing St. to be modified to right-in/right-out | traffic operations/safety | Exempt | 2028 | RW | 6 | Local | $14,000.00 | |
| 6-410 | 42.634 | Kentucky | Campbell | Individual | City of Cold Spring | US 27 (Alexandria Pk) Downing Street Realignment | Intersection of US27 and Downing Street | Shift current offset intersection of Downing Street to align with Bunning Lane. Existing Downing St. to be modified to right-in/right-out | traffic operations/safety | Exempt | 2028 | UT | 7 | OKI-SNK | $40,000.00 | |
| 6-410 | 42.635 | Kentucky | Campbell | Individual | City of Cold Spring | US 27 (Alexandria Pk) Downing Street Realignment | Intersection of US27 and Downing Street | Shift current offset intersection of Downing Street to align with Bunning Lane. Existing Downing St. to be modified to right-in/right-out | traffic operations/safety | Exempt | 2028 | UT | 8 | Local | $10,000.00 | |
| 6-410 | 42.636 | Kentucky | Campbell | Individual | City of Cold Spring | US 27 (Alexandria Pk) Downing Street Realignment | Intersection of US27 and Downing Street | Shift current offset intersection of Downing Street to align with Bunning Lane. Existing Downing St. to be modified to right-in/right-out | traffic operations/safety | Exempt | 2029 | CO | 9 | OKI-SNK | $1,269,600.00 | |
| 6-410 | 42.637 | Kentucky | Campbell | Individual | City of Cold Spring | US 27 (Alexandria Pk) Downing Street Realignment | Intersection of US27 and Downing Street | Shift current offset intersection of Downing Street to align with Bunning Lane. Existing Downing St. to be modified to right-in/right-out | traffic operations/safety | Exempt | 2029 | CO | 10 | Local | $317,400.00 | |
| 6-427 | 42.638 | Kentucky | Campbell | Individual | City of Newport | Carothers Road | Monmouth Street to right turn lane into Newport Shopping Center | Roadway rehabilitation | maintenance/reconstruction | Exempt | 2016 | D | 1 | OKI-SNK | $95,000.00 | $1,398,270.00 |
| 6-427 | 42.639 | Kentucky | Campbell | Individual | City of Newport | Carothers Road | Monmouth Street to right turn lane into Newport Shopping Center | Roadway rehabilitation | maintenance/reconstruction | Exempt | 2022 | D | 1 | OKI-SNK | $10,880.00 | $1,398,270.00 |
| 6-427 | 42.640 | Kentucky | Campbell | Individual | City of Newport | Carothers Road | Monmouth Street to right turn lane into Newport Shopping Center | Roadway rehabilitation | maintenance/reconstruction | Exempt | 2022 | D | 2 | Local | $2,720.00 | $1,398,270.00 |
| 6-427 | 42.641 | Kentucky | Campbell | Individual | City of Newport | Carothers Road | Monmouth Street to right turn lane into Newport Shopping Center | Roadway rehabilitation | maintenance/reconstruction | Exempt | 2016 | D | 2 | Local | $23,750.00 | $1,398,270.00 |
| 6-427 | 42.642 | Kentucky | Campbell | Individual | City of Newport | Carothers Road | Monmouth Street to right turn lane into Newport Shopping Center | Roadway rehabilitation | maintenance/reconstruction | Exempt | 2022 | D-SF | 3 | OKI-SNK | $9,874.00 | $1,398,270.00 |
| 6-427 | 42.643 | Kentucky | Campbell | Individual | City of Newport | Carothers Road | Monmouth Street to right turn lane into Newport Shopping Center | Roadway rehabilitation | maintenance/reconstruction | Exempt | 2022 | RW | 5 | OKI-SNK | $28,720.00 | $1,398,270.00 |
| 6-427 | 42.644 | Kentucky | Campbell | Individual | City of Newport | Carothers Road | Monmouth Street to right turn lane into Newport Shopping Center | Roadway rehabilitation | maintenance/reconstruction | Exempt | 2022 | RW | 6 | Local | $7,180.00 | $1,398,270.00 |
| 6-427 | 42.645 | Kentucky | Campbell | Individual | City of Newport | Carothers Road | Monmouth Street to right turn lane into Newport Shopping Center | Roadway rehabilitation | maintenance/reconstruction | Exempt | 2026 | CO | 7 | OKI-SNK | $976,117.00 | $1,398,270.00 |
| 6-427 | 42.646 | Kentucky | Campbell | Individual | City of Newport | Carothers Road | Monmouth Street to right turn lane into Newport Shopping Center | Roadway rehabilitation | maintenance/reconstruction | Exempt | 2026 | CO | 8 | Local | $244,029.00 | $1,398,270.00 |
| 6-428.30 | 42.647 | Kentucky | Kenton | Individual | City of Edgewood | Dudley Road Phase 3&4 | Catherine Drive to Dixie Highway | Roadway resurfacing and stabilization. Construct consistent 11' travel lane in each direction. | maintenance/reconstruction | Exempt | 2019 | D | 1 | OKI-SNK | $449,000.00 | $5,838,866.00 |
| 6-428.30 | 42.648 | Kentucky | Kenton | Individual | City of Edgewood | Dudley Road Phase 3&4 | Catherine Drive to Dixie Highway | Roadway resurfacing and stabilization. Construct consistent 11' travel lane in each direction. | maintenance/reconstruction | Exempt | 2019 | D | 2 | Local | $299,333.00 | $5,838,866.00 |
| 6-428.30 | 42.649 | Kentucky | Kenton | Individual | City of Edgewood | Dudley Road Phase 3&4 | Catherine Drive to Dixie Highway | Roadway resurfacing and stabilization. Construct consistent 11' travel lane in each direction. | maintenance/reconstruction | Exempt | 2019 | D-SF | 3 | OKI-SNK | $44,900.00 | $5,838,866.00 |
| 6-428.30 | 42.650 | Kentucky | Kenton | Individual | City of Edgewood | Dudley Road Phase 3&4 | Catherine Drive to Dixie Highway | Roadway resurfacing and stabilization. Construct consistent 11' travel lane in each direction. | maintenance/reconstruction | Exempt | 2026 | CO | 6 | OKI-SNK | $3,027,380.00 | $5,838,866.00 |
| 6-428.30 | 42.651 | Kentucky | Kenton | Individual | City of Edgewood | Dudley Road Phase 3&4 | Catherine Drive to Dixie Highway | Roadway resurfacing and stabilization. Construct consistent 11' travel lane in each direction. | maintenance/reconstruction | Exempt | 2026 | CO | 7 | Local | $2,018,253.00 | $5,838,866.00 |
| 6-4308 | 42.652 | Kentucky | Campbell | Group | KYTC | KY 547 | from 6.120 to 6.270 | Install guardrail on KY 547 | Highway Safety Improvement Program Projects | Exempt | 2023 | CO | 1 | STBG | $25,600.00 | |
| 6-4308 | 42.653 | Kentucky | Campbell | Group | KYTC | KY 547 | from 6.120 to 6.270 | Install guardrail on KY 547 | Highway Safety Improvement Program Projects | Exempt | 2023 | CO | 2 | State | $6,400.00 | |
| 6-4313 | 42.654 | Kentucky | Kenton | Individual | KYTC | KY 3716 | from MP 2.25 to 2.30 | Install guardrail on KY 3716 | traffic operations/safety | Exempt | 2024 | CO | 1 | STBG | $8,800.00 | $11,000.00 |
| 6-4313 | 42.655 | Kentucky | Kenton | Individual | KYTC | KY 3716 | from MP 2.25 to 2.30 | Install guardrail on KY 3716 | traffic operations/safety | Exempt | 2024 | CO | 2 | State | $2,200.00 | $11,000.00 |
| 6-4316 | 42.656 | Kentucky | Kenton | Individual | KYTC | KY 8 | from MP 2.37 to 2.61 | Install guardrails on KY 8 | traffic operations/safety | Exempt | 2026 | CO | 1 | GR | $51,000.00 | $51,000.00 |
| 6-4318 | 42.657 | Kentucky | Boone | Group | KYTC | KY 338 | KY 338 | Install guardrails | Highway Safety Improvement Program Projects | Exempt | 2026 | CO | 1 | HSIP | $4,800.00 | |
| 6-4318 | 42.658 | Kentucky | Boone | Group | KYTC | KY 338 | KY 338 | Install guardrails | Highway Safety Improvement Program Projects | Exempt | 2026 | CO | 2 | State | $1,200.00 | |
| 6-435 | 42.659 | Kentucky | Kenton | Individual | City of Ludlow | Ludlow Riverfront Commons | Hooper to Ash Streets | Construct a one-mile section of the Riverfront Commons project in the City of Ludlow | bicycle/pedestrian/other | Exempt | 2018 | D | 1 | OKI-SNK | $5,000.00 | $336,432.00 |
| 6-435 | 42.660 | Kentucky | Kenton | Individual | City of Ludlow | Ludlow Riverfront Commons | Hooper to Ash Streets | Construct a one-mile section of the Riverfront Commons project in the City of Ludlow | bicycle/pedestrian/other | Exempt | 2025 | RW | 2 | OKI-SNK | $0.00 | $336,432.00 |
| 6-435 | 42.661 | Kentucky | Kenton | Individual | City of Ludlow | Ludlow Riverfront Commons | Hooper to Ash Streets | Construct a one-mile section of the Riverfront Commons project in the City of Ludlow | bicycle/pedestrian/other | Exempt | 2025 | RW | 3 | Local | $0.00 | $336,432.00 |
| 6-435 | 42.662 | Kentucky | Kenton | Individual | City of Ludlow | Ludlow Riverfront Commons | Hooper to Ash Streets | Construct a one-mile section of the Riverfront Commons project in the City of Ludlow | bicycle/pedestrian/other | Exempt | 2026 | CO | 4 | OKI-SNK | $269,146.00 | $336,432.00 |
| 6-435 | 42.663 | Kentucky | Kenton | Individual | City of Ludlow | Ludlow Riverfront Commons | Hooper to Ash Streets | Construct a one-mile section of the Riverfront Commons project in the City of Ludlow | bicycle/pedestrian/other | Exempt | 2025 | CO | 5 | Local | $67,286.00 | $336,432.00 |
| 6-441 | 42.664 | Kentucky | Kenton | Individual | City of Erlanger | Dolwick Connector | Dolwick Road to Mineola Pike | Construct new sidewalks, dedicated bicycle lanes and retaining walls | bicycle/pedestrian/other | Exempt | 2017 | D | 1 | OKI-SNK | $264,000.00 | $1,992,313.00 |
| 6-441 | 42.665 | Kentucky | Kenton | Individual | City of Erlanger | Dolwick Connector | Dolwick Road to Mineola Pike | Construct new sidewalks, dedicated bicycle lanes and retaining walls | bicycle/pedestrian/other | Exempt | 2017 | D | 2 | Local | $46,875.00 | $1,992,313.00 |
| 6-441 | 42.666 | Kentucky | Kenton | Individual | City of Erlanger | Dolwick Connector | Dolwick Road to Mineola Pike | Construct new sidewalks, dedicated bicycle lanes and retaining walls | bicycle/pedestrian/other | Exempt | 2019 | RW | 3 | OKI-SNK | $48,000.00 | $1,992,313.00 |
| 6-441 | 42.667 | Kentucky | Kenton | Individual | City of Erlanger | Dolwick Connector | Dolwick Road to Mineola Pike | Construct new sidewalks, dedicated bicycle lanes and retaining walls | bicycle/pedestrian/other | Exempt | 2019 | RW | 4 | Local | $12,500.00 | $1,992,313.00 |
| 6-441 | 42.668 | Kentucky | Kenton | Individual | City of Erlanger | Dolwick Connector | Dolwick Road to Mineola Pike | Construct new sidewalks, dedicated bicycle lanes and retaining walls | bicycle/pedestrian/other | Exempt | 2026 | UT | 5 | OKI-SNK | $125,000.00 | $1,992,313.00 |
| 6-441 | 42.669 | Kentucky | Kenton | Individual | City of Erlanger | Dolwick Connector | Dolwick Road to Mineola Pike | Construct new sidewalks, dedicated bicycle lanes and retaining walls | bicycle/pedestrian/other | Exempt | 2026 | UT | 6 | Local | $31,250.00 | $1,992,313.00 |
| 6-441 | 42.670 | Kentucky | Kenton | Individual | City of Erlanger | Dolwick Connector | Dolwick Road to Mineola Pike | Construct new sidewalks, dedicated bicycle lanes and retaining walls | bicycle/pedestrian/other | Exempt | 2026 | CO | 7 | OKI-SNK | $1,171,750.00 | $1,992,313.00 |
| 6-441 | 42.671 | Kentucky | Kenton | Individual | City of Erlanger | Dolwick Connector | Dolwick Road to Mineola Pike | Construct new sidewalks, dedicated bicycle lanes and retaining walls | bicycle/pedestrian/other | Exempt | 2026 | CO | 8 | Local | $292,938.00 | $1,992,313.00 |
| 6-446 | 42.672 | Kentucky | Boone | Individual | KYTC | Mall Road Connector Ph 1&2 | Between KY 237 (Pleasant Valley Rd) and KY 3157 (Mall Rd)/I-75 Interchange | Provide east-west connectivity and improved mobility | widening/relocation | Non-exempt | 2021 | D | 1 | NH | $1,500,000.00 | $59,225,000.00 |
| 6-446 | 42.673 | Kentucky | Boone | Individual | KYTC | Mall Road Connector Ph 1&2 | Between KY 237 (Pleasant Valley Rd) and KY 3157 (Mall Rd)/I-75 Interchange | Provide east-west connectivity and improved mobility | widening/relocation | Non-exempt | 2021 | D | 2 | State | $375,000.00 | $59,225,000.00 |
| 6-446 | 42.674 | Kentucky | Boone | Individual | KYTC | Mall Road Connector Ph 1&2 | Between KY 237 (Pleasant Valley Rd) and KY 3157 (Mall Rd)/I-75 Interchange | Provide east-west connectivity and improved mobility | widening/relocation | Non-exempt | 2027 | RW | 6 | NH | $20,000,000.00 | $59,225,000.00 |
| 6-446 | 42.675 | Kentucky | Boone | Individual | KYTC | Mall Road Connector Ph 1&2 | Between KY 237 (Pleasant Valley Rd) and KY 3157 (Mall Rd)/I-75 Interchange | Provide east-west connectivity and improved mobility | widening/relocation | Non-exempt | 2027 | RW | 6 | NH | $12,000,000.00 | $59,225,000.00 |
| 6-446 | 42.676 | Kentucky | Boone | Individual | KYTC | Mall Road Connector Ph 1&2 | Between KY 237 (Pleasant Valley Rd) and KY 3157 (Mall Rd)/I-75 Interchange | Provide east-west connectivity and improved mobility | widening/relocation | Non-exempt | 2027 | RW | 7 | State | $5,000,000.00 | $59,225,000.00 |
| 6-446 | 42.677 | Kentucky | Boone | Individual | KYTC | Mall Road Connector Ph 1&2 | Between KY 237 (Pleasant Valley Rd) and KY 3157 (Mall Rd)/I-75 Interchange | Provide east-west connectivity and improved mobility | widening/relocation | Non-exempt | 2027 | RW | 7 | State | $3,000,000.00 | $59,225,000.00 |
| 6-446 | 42.678 | Kentucky | Boone | Individual | KYTC | Mall Road Connector Ph 1&2 | Between KY 237 (Pleasant Valley Rd) and KY 3157 (Mall Rd)/I-75 Interchange | Provide east-west connectivity and improved mobility | widening/relocation | Non-exempt | 2030 | UT | 8 | NH | $3,480,000.00 | $59,225,000.00 |
| 6-446 | 42.679 | Kentucky | Boone | Individual | KYTC | Mall Road Connector Ph 1&2 | Between KY 237 (Pleasant Valley Rd) and KY 3157 (Mall Rd)/I-75 Interchange | Provide east-west connectivity and improved mobility | widening/relocation | Non-exempt | 2030 | UT | 9 | State | $870,000.00 | $59,225,000.00 |
| 6-446 | 42.680 | Kentucky | Boone | Individual | KYTC | Mall Road Connector Ph 1&2 | Between KY 237 (Pleasant Valley Rd) and KY 3157 (Mall Rd)/I-75 Interchange | Provide east-west connectivity and improved mobility | widening/relocation | Non-exempt | 2031 | CO | 10 | Uncommitted | $13,000,000.00 | $59,225,000.00 |
| 6-447 | 42.681 | Kentucky | Boone | Individual | KYTC | US 25 | Winning Colors Drive to the Norfolk Southern RR x-ing south of KY 1829 | Improve mobility and reduce congestion on US 25 from Winning Colors Drive to the Norfolk Southern Railroad Crossing south of KY 1829 (Industrial Road); excludes grade separation at KY 536 | widening/relocation | Non-exempt | 2022 | D | 1 | STBG | $2,976,000.00 | $38,220,000.00 |
| 6-447 | 42.682 | Kentucky | Boone | Individual | KYTC | US 25 | Winning Colors Drive to the Norfolk Southern RR x-ing south of KY 1829 | Improve mobility and reduce congestion on US 25 from Winning Colors Drive to the Norfolk Southern Railroad Crossing south of KY 1829 (Industrial Road); excludes grade separation at KY 536 | widening/relocation | Non-exempt | 2022 | D | 2 | State | $744,000.00 | $38,220,000.00 |
| 6-447 | 42.683 | Kentucky | Boone | Individual | KYTC | US 25 | Winning Colors Drive to the Norfolk Southern RR x-ing south of KY 1829 | Improve mobility and reduce congestion on US 25 from Winning Colors Drive to the Norfolk Southern Railroad Crossing south of KY 1829 (Industrial Road); excludes grade separation at KY 536 | widening/relocation | Non-exempt | 2025 | RW | 6 | STBG | $17,600,000.00 | $38,220,000.00 |
| 6-447 | 42.684 | Kentucky | Boone | Individual | KYTC | US 25 | Winning Colors Drive to the Norfolk Southern RR x-ing south of KY 1829 | Improve mobility and reduce congestion on US 25 from Winning Colors Drive to the Norfolk Southern Railroad Crossing south of KY 1829 (Industrial Road); excludes grade separation at KY 536 | widening/relocation | Non-exempt | 2025 | RW | 7 | State | $4,400,000.00 | $38,220,000.00 |
| 6-447 | 42.685 | Kentucky | Boone | Individual | KYTC | US 25 | Winning Colors Drive to the Norfolk Southern RR x-ing south of KY 1829 | Improve mobility and reduce congestion on US 25 from Winning Colors Drive to the Norfolk Southern Railroad Crossing south of KY 1829 (Industrial Road); excludes grade separation at KY 536 | widening/relocation | Non-exempt | 2025 | UT | 8 | STBG | $7,600,000.00 | $38,220,000.00 |
| 6-447 | 42.686 | Kentucky | Boone | Individual | KYTC | US 25 | Winning Colors Drive to the Norfolk Southern RR x-ing south of KY 1829 | Improve mobility and reduce congestion on US 25 from Winning Colors Drive to the Norfolk Southern Railroad Crossing south of KY 1829 (Industrial Road); excludes grade separation at KY 536 | widening/relocation | Non-exempt | 2025 | UT | 9 | State | $1,900,000.00 | $38,220,000.00 |
| 6-447 | 42.687 | Kentucky | Boone | Individual | KYTC | US 25 | Winning Colors Drive to the Norfolk Southern RR x-ing south of KY 1829 | Improve mobility and reduce congestion on US 25 from Winning Colors Drive to the Norfolk Southern Railroad Crossing south of KY 1829 (Industrial Road); excludes grade separation at KY 536 | widening/relocation | Non-exempt | 2029 | CO | 10 | SPP | $3,000,000.00 | $38,220,000.00 |
| 6-449 | 42.688 | Kentucky | Kenton | Individual | KYTC | KY 17 | At the I-275 Interchange | Improve safety and reduce congestion at the KY 17/I-275 interchange | traffic operations/safety | Exempt | 2023 | D | 2 | STP | $120,000.00 | $23,120,000.00 |
| 6-449 | 42.689 | Kentucky | Kenton | Individual | KYTC | KY 17 | At the I-275 Interchange | Improve safety and reduce congestion at the KY 17/I-275 interchange | traffic operations/safety | Exempt | 2024 | RW | 3 | STBG | $8,400,000.00 | $23,120,000.00 |
| 6-449 | 42.690 | Kentucky | Kenton | Individual | KYTC | KY 17 | At the I-275 Interchange | Improve safety and reduce congestion at the KY 17/I-275 interchange | traffic operations/safety | Exempt | 2024 | RW | 4 | State | $2,100,000.00 | $23,120,000.00 |
| 6-449 | 42.691 | Kentucky | Kenton | Individual | KYTC | KY 17 | At the I-275 Interchange | Improve safety and reduce congestion at the KY 17/I-275 interchange | traffic operations/safety | Exempt | 2025 | UT | 5 | STBG | $1,600,000.00 | $23,120,000.00 |
| 6-449 | 42.692 | Kentucky | Kenton | Individual | KYTC | KY 17 | At the I-275 Interchange | Improve safety and reduce congestion at the KY 17/I-275 interchange | traffic operations/safety | Exempt | 2025 | UT | 6 | State | $400,000.00 | $23,120,000.00 |
| 6-449 | 42.693 | Kentucky | Kenton | Individual | KYTC | KY 17 | At the I-275 Interchange | Improve safety and reduce congestion at the KY 17/I-275 interchange | traffic operations/safety | Exempt | 2027 | CO | 7 | STBG | $8,400,000.00 | $23,120,000.00 |
| 6-449 | 42.694 | Kentucky | Kenton | Individual | KYTC | KY 17 | At the I-275 Interchange | Improve safety and reduce congestion at the KY 17/I-275 interchange | traffic operations/safety | Exempt | 2027 | CO | 8 | State | $2,100,000.00 | $23,120,000.00 |
| 6-450 | 42.695 | Kentucky | Kenton | Individual | KYTC | KY 1303 (Turkeyfoot Rd) | Between Dudley Rd and US 25 (Dixie Hwy) | Improve safety and reduce congestion along Turkeyfoot Road | traffic operations/safety | Exempt | 2023 | D | 1 | STPF | $2,800,000.00 | $39,180,000.00 |
| 6-450 | 42.696 | Kentucky | Kenton | Individual | KYTC | KY 1303 (Turkeyfoot Rd) | Between Dudley Rd and US 25 (Dixie Hwy) | Improve safety and reduce congestion along Turkeyfoot Road | traffic operations/safety | Exempt | 2023 | D | 2 | State | $700,000.00 | $39,180,000.00 |
| 6-450 | 42.697 | Kentucky | Kenton | Individual | KYTC | KY 1303 (Turkeyfoot Rd) | Between Dudley Rd and US 25 (Dixie Hwy) | Improve safety and reduce congestion along Turkeyfoot Road | traffic operations/safety | Exempt | 2027 | RW | 3 | STPF | $3,744,000.00 | $39,180,000.00 |
| 6-450 | 42.698 | Kentucky | Kenton | Individual | KYTC | KY 1303 (Turkeyfoot Rd) | Between Dudley Rd and US 25 (Dixie Hwy) | Improve safety and reduce congestion along Turkeyfoot Road | traffic operations/safety | Exempt | 2027 | RW | 4 | State | $936,000.00 | $39,180,000.00 |
| 6-450 | 42.699 | Kentucky | Kenton | Individual | KYTC | KY 1303 (Turkeyfoot Rd) | Between Dudley Rd and US 25 (Dixie Hwy) | Improve safety and reduce congestion along Turkeyfoot Road | traffic operations/safety | Exempt | 2027 | UT | 5 | STPF | $2,400,000.00 | $39,180,000.00 |
| 6-450 | 42.700 | Kentucky | Kenton | Individual | KYTC | KY 1303 (Turkeyfoot Rd) | Between Dudley Rd and US 25 (Dixie Hwy) | Improve safety and reduce congestion along Turkeyfoot Road | traffic operations/safety | Exempt | 2027 | UT | 6 | State | $600,000.00 | $39,180,000.00 |
| 6-450 | 42.701 | Kentucky | Kenton | Individual | KYTC | KY 1303 (Turkeyfoot Rd) | Between Dudley Rd and US 25 (Dixie Hwy) | Improve safety and reduce congestion along Turkeyfoot Road | traffic operations/safety | Exempt | 2028 | CO | 7 | STPF | $22,400,000.00 | $39,180,000.00 |
| 6-450 | 42.702 | Kentucky | Kenton | Individual | KYTC | KY 1303 (Turkeyfoot Rd) | Between Dudley Rd and US 25 (Dixie Hwy) | Improve safety and reduce congestion along Turkeyfoot Road | traffic operations/safety | Exempt | 2028 | CO | 8 | State | $5,600,000.00 | $39,180,000.00 |
| 6-451 | 42.703 | Kentucky | Campbell | Individual | City of Newport | US 27 (South Monmouth Phase 1 &2) | Newport/Southgate city limits to 11th St includes underpass of CSX bridge. Restriping to Highland Av | South Monmouth Phase 1 & 2. Improve/add sidewalks, access management, street lighting, improve safety, replace obsolete stairs/walkway at underpass with sidewalk, lighting bus stops | access management | Exempt | 2019 | D | 1 | OKI-SNK | $833,360.00 | $7,963,700.00 |
| 6-451 | 42.704 | Kentucky | Campbell | Individual | City of Newport | US 27 (South Monmouth Phase 1 &2) | Newport/Southgate city limits to 11th St includes underpass of CSX bridge. Restriping to Highland Av | South Monmouth Phase 1 & 2. Improve/add sidewalks, access management, street lighting, improve safety, replace obsolete stairs/walkway at underpass with sidewalk, lighting bus stops | access management | Exempt | 2019 | D | 2 | Local | $208,340.00 | $7,963,700.00 |
| 6-451 | 42.705 | Kentucky | Campbell | Individual | City of Newport | US 27 (South Monmouth Phase 1 &2) | Newport/Southgate city limits to 11th St includes underpass of CSX bridge. Restriping to Highland Av | South Monmouth Phase 1 & 2. Improve/add sidewalks, access management, street lighting, improve safety, replace obsolete stairs/walkway at underpass with sidewalk, lighting bus stops | access management | Exempt | 2019 | D-SF | 3 | OKI-SNK | $105,000.00 | $7,963,700.00 |
| 6-451 | 42.706 | Kentucky | Campbell | Individual | City of Newport | US 27 (South Monmouth Phase 1 &2) | Newport/Southgate city limits to 11th St includes underpass of CSX bridge. Restriping to Highland Av | South Monmouth Phase 1 & 2. Improve/add sidewalks, access management, street lighting, improve safety, replace obsolete stairs/walkway at underpass with sidewalk, lighting bus stops | access management | Exempt | 2026 | RW | 4 | OKI-SNK | $93,600.00 | $7,963,700.00 |
| 6-451 | 42.707 | Kentucky | Campbell | Individual | City of Newport | US 27 (South Monmouth Phase 1 &2) | Newport/Southgate city limits to 11th St includes underpass of CSX bridge. Restriping to Highland Av | South Monmouth Phase 1 & 2. Improve/add sidewalks, access management, street lighting, improve safety, replace obsolete stairs/walkway at underpass with sidewalk, lighting bus stops | access management | Exempt | 2026 | RW | 5 | Local | $23,400.00 | $7,963,700.00 |
| 6-451 | 42.708 | Kentucky | Campbell | Individual | City of Newport | US 27 (South Monmouth Phase 1 &2) | Newport/Southgate city limits to 11th St includes underpass of CSX bridge. Restriping to Highland Av | South Monmouth Phase 1 & 2. Improve/add sidewalks, access management, street lighting, improve safety, replace obsolete stairs/walkway at underpass with sidewalk, lighting bus stops | access management | Exempt | 2026 | UT | 6 | OKI-SNK | $1,520,000.00 | $7,963,700.00 |
| 6-451 | 42.709 | Kentucky | Campbell | Individual | City of Newport | US 27 (South Monmouth Phase 1 &2) | Newport/Southgate city limits to 11th St includes underpass of CSX bridge. Restriping to Highland Av | South Monmouth Phase 1 & 2. Improve/add sidewalks, access management, street lighting, improve safety, replace obsolete stairs/walkway at underpass with sidewalk, lighting bus stops | access management | Exempt | 2026 | UT | 7 | Local | $380,000.00 | $7,963,700.00 |
| 6-451 | 42.710 | Kentucky | Campbell | Individual | City of Newport | US 27 (South Monmouth Phase 1 &2) | Newport/Southgate city limits to 11th St includes underpass of CSX bridge. Restriping to Highland Av | South Monmouth Phase 1 & 2. Improve/add sidewalks, access management, street lighting, improve safety, replace obsolete stairs/walkway at underpass with sidewalk, lighting bus stops | access management | Exempt | 2026 | CO | 8 | OKI-SNK | $3,840,000.00 | $7,963,700.00 |
| 6-451 | 42.711 | Kentucky | Campbell | Individual | City of Newport | US 27 (South Monmouth Phase 1 &2) | Newport/Southgate city limits to 11th St includes underpass of CSX bridge. Restriping to Highland Av | South Monmouth Phase 1 & 2. Improve/add sidewalks, access management, street lighting, improve safety, replace obsolete stairs/walkway at underpass with sidewalk, lighting bus stops | access management | Exempt | 2026 | CO | 10 | Local | $960,000.00 | $7,963,700.00 |
| 6-459 | 42.712 | Kentucky | Boone | Individual | Boone County | Conner Road Multi-Use Path | Along Conner Road between KY 237 (North Bend Rd) and KY 20 (Petersburg Rd). Addt'l sidewalk connect | Construct 10' multi-use path. | bicycle/pedestrian/other | Exempt | 2020 | D | 1 | OKI-SNK | $102,500.00 | $1,985,000.00 |
| 6-459 | 42.713 | Kentucky | Boone | Individual | Boone County | Conner Road Multi-Use Path | Along Conner Road between KY 237 (North Bend Rd) and KY 20 (Petersburg Rd). Addt'l sidewalk connect | Construct 10' multi-use path. | bicycle/pedestrian/other | Exempt | 2024 | D-SF | 2 | OKI-SNK | $40,000.00 | $1,985,000.00 |
| 6-459 | 42.714 | Kentucky | Boone | Individual | Boone County | Conner Road Multi-Use Path | Along Conner Road between KY 237 (North Bend Rd) and KY 20 (Petersburg Rd). Addt'l sidewalk connect | Construct 10' multi-use path. | bicycle/pedestrian/other | Exempt | 2020 | D | 3 | Local | $102,500.00 | $1,985,000.00 |
| 6-459 | 42.715 | Kentucky | Boone | Individual | Boone County | Conner Road Multi-Use Path | Along Conner Road between KY 237 (North Bend Rd) and KY 20 (Petersburg Rd). Addt'l sidewalk connect | Construct 10' multi-use path. | bicycle/pedestrian/other | Exempt | 2026 | RW | 4 | OKI-SNK | $120,000.00 | $1,985,000.00 |
| 6-459 | 42.716 | Kentucky | Boone | Individual | Boone County | Conner Road Multi-Use Path | Along Conner Road between KY 237 (North Bend Rd) and KY 20 (Petersburg Rd). Addt'l sidewalk connect | Construct 10' multi-use path. | bicycle/pedestrian/other | Exempt | 2026 | RW | 5 | Local | $120,000.00 | $1,985,000.00 |
| 6-459 | 42.717 | Kentucky | Boone | Individual | Boone County | Conner Road Multi-Use Path | Along Conner Road between KY 237 (North Bend Rd) and KY 20 (Petersburg Rd). Addt'l sidewalk connect | Construct 10' multi-use path. | bicycle/pedestrian/other | Exempt | 2026 | CO | 7 | OKI-SNK | $750,000.00 | $1,985,000.00 |
| 6-459 | 42.718 | Kentucky | Boone | Individual | Boone County | Conner Road Multi-Use Path | Along Conner Road between KY 237 (North Bend Rd) and KY 20 (Petersburg Rd). Addt'l sidewalk connect | Construct 10' multi-use path. | bicycle/pedestrian/other | Exempt | 2026 | CO | 8 | Local | $750,000.00 | $1,985,000.00 |
| 6-461 | 42.719 | Kentucky | Kenton | Individual | City of Covington | West Covington Riverfront Commons Shared Use Path | Between River Road and existing path located on the north side of the floodwall, just west of BSB | Construct 8' wide multi-use path | bicycle/pedestrian/other | Exempt | 2023 | D | 1 | OKI-SNK | $95,560.00 | $889,913.00 |
| 6-461 | 42.720 | Kentucky | Kenton | Individual | City of Covington | West Covington Riverfront Commons Shared Use Path | Between River Road and existing path located on the north side of the floodwall, just west of BSB | Construct 8' wide multi-use path | bicycle/pedestrian/other | Exempt | 2023 | D-SF | 2 | OKI-SNK | $10,000.00 | $889,913.00 |
| 6-461 | 42.721 | Kentucky | Kenton | Individual | City of Covington | West Covington Riverfront Commons Shared Use Path | Between River Road and existing path located on the north side of the floodwall, just west of BSB | Construct 8' wide multi-use path | bicycle/pedestrian/other | Exempt | 2023 | D | 3 | Local | $23,140.00 | $889,913.00 |
| 6-461 | 42.722 | Kentucky | Kenton | Individual | City of Covington | West Covington Riverfront Commons Shared Use Path | Between River Road and existing path located on the north side of the floodwall, just west of BSB | Construct 8' wide multi-use path | bicycle/pedestrian/other | Exempt | 2026 | RW | 4 | OKI-SNK | $8,000.00 | $889,913.00 |
| 6-461 | 42.723 | Kentucky | Kenton | Individual | City of Covington | West Covington Riverfront Commons Shared Use Path | Between River Road and existing path located on the north side of the floodwall, just west of BSB | Construct 8' wide multi-use path | bicycle/pedestrian/other | Exempt | 2026 | RW | 5 | Local | $2,000.00 | $889,913.00 |
| 6-461 | 42.724 | Kentucky | Kenton | Individual | City of Covington | West Covington Riverfront Commons Shared Use Path | Between River Road and existing path located on the north side of the floodwall, just west of BSB | Construct 8' wide multi-use path | bicycle/pedestrian/other | Exempt | 2026 | CO | 6 | OKI-SNK | $600,970.00 | $889,913.00 |
| 6-461 | 42.725 | Kentucky | Kenton | Individual | City of Covington | West Covington Riverfront Commons Shared Use Path | Between River Road and existing path located on the north side of the floodwall, just west of BSB | Construct 8' wide multi-use path | bicycle/pedestrian/other | Exempt | 2026 | CO | 7 | Local | $150,243.00 | $889,913.00 |
| 6-463 | 42.726 | Kentucky | Kenton | Individual | City of Taylor Mill | Taylor Mill Sidewalk Project Phase 3 | Along north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street | Construction of new sidewalk | bicycle/pedestrian/other | Exempt | 2021 | D | 1 | OKI-SNK | $173,456.00 | $1,157,833.00 |
| 6-463 | 42.727 | Kentucky | Kenton | Individual | City of Taylor Mill | Taylor Mill Sidewalk Project Phase 3 | Along north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street | Construction of new sidewalk | bicycle/pedestrian/other | Exempt | 2021 | D-SF | 2 | OKI-SNk | $14,000.00 | $1,157,833.00 |
| 6-463 | 42.728 | Kentucky | Kenton | Individual | City of Taylor Mill | Taylor Mill Sidewalk Project Phase 3 | Along north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street | Construction of new sidewalk | bicycle/pedestrian/other | Exempt | 2021 | D | 3 | Local | $42,114.00 | $1,157,833.00 |
| 6-463 | 42.729 | Kentucky | Kenton | Individual | City of Taylor Mill | Taylor Mill Sidewalk Project Phase 3 | Along north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street | Construction of new sidewalk | bicycle/pedestrian/other | Exempt | 2024 | RW | 4 | OKI-SNK | $117,442.00 | $1,157,833.00 |
| 6-463 | 42.730 | Kentucky | Kenton | Individual | City of Taylor Mill | Taylor Mill Sidewalk Project Phase 3 | Along north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street | Construction of new sidewalk | bicycle/pedestrian/other | Exempt | 2024 | RW | 5 | Local | $29,361.00 | $1,157,833.00 |
| 6-463 | 42.731 | Kentucky | Kenton | Individual | City of Taylor Mill | Taylor Mill Sidewalk Project Phase 3 | Along north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street | Construction of new sidewalk | bicycle/pedestrian/other | Exempt | 2025 | RW-SF | 6 | OKI-SNK | $5,000.00 | $1,157,833.00 |
| 6-463 | 42.732 | Kentucky | Kenton | Individual | City of Taylor Mill | Taylor Mill Sidewalk Project Phase 3 | Along north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street | Construction of new sidewalk | bicycle/pedestrian/other | Exempt | 2028 | CO | 7 | OKI-SNK | $0.00 | $1,157,833.00 |
| 6-463 | 42.733 | Kentucky | Kenton | Individual | City of Taylor Mill | Taylor Mill Sidewalk Project Phase 3 | Along north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street | Construction of new sidewalk | bicycle/pedestrian/other | Exempt | 2024 | CO | 7 | OKI-SNK | $0.00 | $1,157,833.00 |
| 6-463 | 42.734 | Kentucky | Kenton | Individual | City of Taylor Mill | Taylor Mill Sidewalk Project Phase 3 | Along north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street | Construction of new sidewalk | bicycle/pedestrian/other | Exempt | 2026 | CO | 7 | OKI-SNK | $621,168.00 | $1,157,833.00 |
| 6-463 | 42.735 | Kentucky | Kenton | Individual | City of Taylor Mill | Taylor Mill Sidewalk Project Phase 3 | Along north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street | Construction of new sidewalk | bicycle/pedestrian/other | Exempt | 2028 | CO | 8 | Local | $0.00 | $1,157,833.00 |
| 6-463 | 42.736 | Kentucky | Kenton | Individual | City of Taylor Mill | Taylor Mill Sidewalk Project Phase 3 | Along north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street | Construction of new sidewalk | bicycle/pedestrian/other | Exempt | 2030 | CO | 8 | Local | $0.00 | $1,157,833.00 |
| 6-463 | 42.737 | Kentucky | Kenton | Individual | City of Taylor Mill | Taylor Mill Sidewalk Project Phase 3 | Along north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street | Construction of new sidewalk | bicycle/pedestrian/other | Exempt | 2026 | CO | 8 | Local | $155,292.00 | $1,157,833.00 |
| 6-463 | 42.738 | Kentucky | Kenton | Individual | City of Taylor Mill | Taylor Mill Sidewalk Project Phase 3 | Along north/east side of Taylor Mill Road (KY 3716) between Saddlebrook Drive and Walnut Street | Construction of new sidewalk | bicycle/pedestrian/other | Exempt | 2027 | CO | 8 | Local | $0.00 | $1,157,833.00 |
| 6-467 | 42.739 | Kentucky | Boone | Individual | Boone County | Oakbrook Road Multi-Use Path Phase 1 | from Oakbrook Park to KY 18 | Replace existing sidewalk with a new multi-use path | bicycle/pedestrian | Exempt | 2026 | D | 1 | OKI-SNK | $160,000.00 | |
| 6-467 | 42.740 | Kentucky | Boone | Individual | Boone County | Oakbrook Road Multi-Use Path Phase 1 | from Oakbrook Park to KY 18 | Replace existing sidewalk with a new multi-use path | bicycle/pedestrian | Exempt | 2026 | D | 2 | Local | $40,000.00 | |
| 6-467 | 42.741 | Kentucky | Boone | Individual | Boone County | Oakbrook Road Multi-Use Path Phase 1 | from Oakbrook Park to KY 18 | Replace existing sidewalk with a new multi-use path | bicycle/pedestrian | Exempt | 2026 | D-SF | 3 | OKI-SNK | $20,000.00 | |
| 6-467 | 42.742 | Kentucky | Boone | Individual | Boone County | Oakbrook Road Multi-Use Path Phase 1 | from Oakbrook Park to KY 18 | Replace existing sidewalk with a new multi-use path | bicycle/pedestrian | Exempt | 2026 | D-SF | 4 | State | $5,000.00 | |
| 6-467 | 42.743 | Kentucky | Boone | Individual | Boone County | Oakbrook Road Multi-Use Path Phase 1 | from Oakbrook Park to KY 18 | Replace existing sidewalk with a new multi-use path | bicycle/pedestrian | Exempt | 2028 | RW | 5 | OKI-SNK | $120,000.00 | |
| 6-467 | 42.744 | Kentucky | Boone | Individual | Boone County | Oakbrook Road Multi-Use Path Phase 1 | from Oakbrook Park to KY 18 | Replace existing sidewalk with a new multi-use path | bicycle/pedestrian | Exempt | 2028 | RW | 6 | Local | $30,000.00 | |
| 6-467 | 42.745 | Kentucky | Boone | Individual | Boone County | Oakbrook Road Multi-Use Path Phase 1 | from Oakbrook Park to KY 18 | Replace existing sidewalk with a new multi-use path | bicycle/pedestrian | Exempt | 2028 | UT | 7 | OKI-SNK | $80,000.00 | |
| 6-467 | 42.746 | Kentucky | Boone | Individual | Boone County | Oakbrook Road Multi-Use Path Phase 1 | from Oakbrook Park to KY 18 | Replace existing sidewalk with a new multi-use path | bicycle/pedestrian | Exempt | 2028 | UT | 8 | Local | $20,000.00 | |
| 6-467 | 42.747 | Kentucky | Boone | Individual | Boone County | Oakbrook Road Multi-Use Path Phase 1 | from Oakbrook Park to KY 18 | Replace existing sidewalk with a new multi-use path | bicycle/pedestrian | Exempt | 2030 | CO | 9 | OKI-SNK | $0.00 | |
| 6-467 | 42.748 | Kentucky | Boone | Individual | Boone County | Oakbrook Road Multi-Use Path Phase 1 | from Oakbrook Park to KY 18 | Replace existing sidewalk with a new multi-use path | bicycle/pedestrian | Exempt | 2029 | CO | 9 | OKI-SNK | $1,329,600.00 | |
| 6-467 | 42.749 | Kentucky | Boone | Individual | Boone County | Oakbrook Road Multi-Use Path Phase 1 | from Oakbrook Park to KY 18 | Replace existing sidewalk with a new multi-use path | bicycle/pedestrian | Exempt | 2029 | CO | 10 | Local | $332,400.00 | |
| 6-468 | 42.750 | Kentucky | Campbell | Individual | City of Dayton | Levee Sidewalk Widening and Improvements | along top of levee in the City of Dayton | Widen existing sidewalk to 8' and construct ADA-compliant ramp at east end of project | bicycle/pedestrian | Exempt | 2026 | D | 1 | OKI-SNK | $112,000.00 | |
| 6-468 | 42.751 | Kentucky | Campbell | Individual | City of Dayton | Levee Sidewalk Widening and Improvements | along top of levee in the City of Dayton | Widen existing sidewalk to 8' and construct ADA-compliant ramp at east end of project | bicycle/pedestrian | Exempt | 2026 | D | 2 | Local | $28,000.00 | |
| 6-468 | 42.752 | Kentucky | Campbell | Individual | City of Dayton | Levee Sidewalk Widening and Improvements | along top of levee in the City of Dayton | Widen existing sidewalk to 8' and construct ADA-compliant ramp at east end of project | bicycle/pedestrian | Exempt | 2026 | D-SF | 3 | OKI-SNK | $14,000.00 | |
| 6-468 | 42.753 | Kentucky | Campbell | Individual | City of Dayton | Levee Sidewalk Widening and Improvements | along top of levee in the City of Dayton | Widen existing sidewalk to 8' and construct ADA-compliant ramp at east end of project | bicycle/pedestrian | Exempt | 2026 | D-SF | 4 | State | $3,500.00 | |
| 6-468 | 42.754 | Kentucky | Campbell | Individual | City of Dayton | Levee Sidewalk Widening and Improvements | along top of levee in the City of Dayton | Widen existing sidewalk to 8' and construct ADA-compliant ramp at east end of project | bicycle/pedestrian | Exempt | 2028 | RW | 5 | OKI-SNK | $96,000.00 | |
| 6-468 | 42.755 | Kentucky | Campbell | Individual | City of Dayton | Levee Sidewalk Widening and Improvements | along top of levee in the City of Dayton | Widen existing sidewalk to 8' and construct ADA-compliant ramp at east end of project | bicycle/pedestrian | Exempt | 2028 | RW | 6 | Local | $24,000.00 | |
| 6-468 | 42.756 | Kentucky | Campbell | Individual | City of Dayton | Levee Sidewalk Widening and Improvements | along top of levee in the City of Dayton | Widen existing sidewalk to 8' and construct ADA-compliant ramp at east end of project | bicycle/pedestrian | Exempt | 2028 | UT | 7 | OKI-SNK | $80,000.00 | |
| 6-468 | 42.757 | Kentucky | Campbell | Individual | City of Dayton | Levee Sidewalk Widening and Improvements | along top of levee in the City of Dayton | Widen existing sidewalk to 8' and construct ADA-compliant ramp at east end of project | bicycle/pedestrian | Exempt | 2028 | UT | 8 | Local | $20,000.00 | |
| 6-468 | 42.758 | Kentucky | Campbell | Individual | City of Dayton | Levee Sidewalk Widening and Improvements | along top of levee in the City of Dayton | Widen existing sidewalk to 8' and construct ADA-compliant ramp at east end of project | bicycle/pedestrian | Exempt | 2029 | CO | 9 | OKI-SNK | $875,136.00 | |
| 6-468 | 42.759 | Kentucky | Campbell | Individual | City of Dayton | Levee Sidewalk Widening and Improvements | along top of levee in the City of Dayton | Widen existing sidewalk to 8' and construct ADA-compliant ramp at east end of project | bicycle/pedestrian | Exempt | 2029 | CO | 10 | Local | $218,784.00 | |
| 6-469 | 42.760 | Kentucky | Kenton | Individual | City of Ft. Mitchell | Beechwood Rd Sidewalk Widening & Traffic Calming | between Dixie Hwy and Page Road | Widen sidewalk, narrow driving lanes and relocate overhead utilities where needed | traffic operations/safety | Exempt | 2026 | D | 1 | OKI-SNK | $140,000.00 | |
| 6-469 | 42.761 | Kentucky | Kenton | Individual | City of Ft. Mitchell | Beechwood Rd Sidewalk Widening & Traffic Calming | between Dixie Hwy and Page Road | Widen sidewalk, narrow driving lanes and relocate overhead utilities where needed | traffic operations/safety | Exempt | 2026 | D | 2 | Local | $35,000.00 | |
| 6-469 | 42.762 | Kentucky | Kenton | Individual | City of Ft. Mitchell | Beechwood Rd Sidewalk Widening & Traffic Calming | between Dixie Hwy and Page Road | Widen sidewalk, narrow driving lanes and relocate overhead utilities where needed | traffic operations/safety | Exempt | 2026 | D-SF | 3 | OKI-SNK | $17,500.00 | |
| 6-469 | 42.763 | Kentucky | Kenton | Individual | City of Ft. Mitchell | Beechwood Rd Sidewalk Widening & Traffic Calming | between Dixie Hwy and Page Road | Widen sidewalk, narrow driving lanes and relocate overhead utilities where needed | traffic operations/safety | Exempt | 2026 | D-SF | 4 | State | $4,375.00 | |
| 6-469 | 42.764 | Kentucky | Kenton | Individual | City of Ft. Mitchell | Beechwood Rd Sidewalk Widening & Traffic Calming | between Dixie Hwy and Page Road | Widen sidewalk, narrow driving lanes and relocate overhead utilities where needed | traffic operations/safety | Exempt | 2028 | RW | 5 | OKI-SNK | $112,000.00 | |
| 6-469 | 42.765 | Kentucky | Kenton | Individual | City of Ft. Mitchell | Beechwood Rd Sidewalk Widening & Traffic Calming | between Dixie Hwy and Page Road | Widen sidewalk, narrow driving lanes and relocate overhead utilities where needed | traffic operations/safety | Exempt | 2028 | RW | 6 | Local | $28,000.00 | |
| 6-469 | 42.766 | Kentucky | Kenton | Individual | City of Ft. Mitchell | Beechwood Rd Sidewalk Widening & Traffic Calming | between Dixie Hwy and Page Road | Widen sidewalk, narrow driving lanes and relocate overhead utilities where needed | traffic operations/safety | Exempt | 2028 | UT | 7 | OKI-SNK | $332,000.00 | |
| 6-469 | 42.767 | Kentucky | Kenton | Individual | City of Ft. Mitchell | Beechwood Rd Sidewalk Widening & Traffic Calming | between Dixie Hwy and Page Road | Widen sidewalk, narrow driving lanes and relocate overhead utilities where needed | traffic operations/safety | Exempt | 2028 | UT | 8 | Local | $83,000.00 | |
| 6-469 | 42.768 | Kentucky | Kenton | Individual | City of Ft. Mitchell | Beechwood Rd Sidewalk Widening & Traffic Calming | between Dixie Hwy and Page Road | Widen sidewalk, narrow driving lanes and relocate overhead utilities where needed | traffic operations/safety | Exempt | 2029 | CO | 9 | OKI-SNK | $469,526.00 | |
| 6-469 | 42.769 | Kentucky | Kenton | Individual | City of Ft. Mitchell | Beechwood Rd Sidewalk Widening & Traffic Calming | between Dixie Hwy and Page Road | Widen sidewalk, narrow driving lanes and relocate overhead utilities where needed | traffic operations/safety | Exempt | 2029 | CO | 10 | Local | $117,382.00 | |
| 6-470 | 42.770 | Kentucky | Kenton | Individual | City of Ft. Mitchell | Dixie Hwy Sidewalk Widening | between Sunnymede and Beechwood | Widen sidewalk and relocate overhead utilities where needed | bicycle/pedestrian | Exempt | 2026 | D | 1 | OKI-SNK | $140,000.00 | |
| 6-470 | 42.771 | Kentucky | Kenton | Individual | City of Ft. Mitchell | Dixie Hwy Sidewalk Widening | between Sunnymede and Beechwood | Widen sidewalk and relocate overhead utilities where needed | bicycle/pedestrian | Exempt | 2026 | D | 2 | Local | $35,000.00 | |
| 6-470 | 42.772 | Kentucky | Kenton | Individual | City of Ft. Mitchell | Dixie Hwy Sidewalk Widening | between Sunnymede and Beechwood | Widen sidewalk and relocate overhead utilities where needed | bicycle/pedestrian | Exempt | 2026 | D-SF | 3 | OKI-SNK | $17,500.00 | |
| 6-470 | 42.773 | Kentucky | Kenton | Individual | City of Ft. Mitchell | Dixie Hwy Sidewalk Widening | between Sunnymede and Beechwood | Widen sidewalk and relocate overhead utilities where needed | bicycle/pedestrian | Exempt | 2026 | D-SF | 4 | State | $4,375.00 | |
| 6-470 | 42.774 | Kentucky | Kenton | Individual | City of Ft. Mitchell | Dixie Hwy Sidewalk Widening | between Sunnymede and Beechwood | Widen sidewalk and relocate overhead utilities where needed | bicycle/pedestrian | Exempt | 2028 | UT | 7 | OKI-SNK | $320,000.00 | |
| 6-470 | 42.775 | Kentucky | Kenton | Individual | City of Ft. Mitchell | Dixie Hwy Sidewalk Widening | between Sunnymede and Beechwood | Widen sidewalk and relocate overhead utilities where needed | bicycle/pedestrian | Exempt | 2028 | UT | 8 | Local | $80,000.00 | |
| 6-470 | 42.776 | Kentucky | Kenton | Individual | City of Ft. Mitchell | Dixie Hwy Sidewalk Widening | between Sunnymede and Beechwood | Widen sidewalk and relocate overhead utilities where needed | bicycle/pedestrian | Exempt | 2029 | CO | 9 | OKI-SNK | $913,824.00 | |
| 6-470 | 42.777 | Kentucky | Kenton | Individual | City of Ft. Mitchell | Dixie Hwy Sidewalk Widening | between Sunnymede and Beechwood | Widen sidewalk and relocate overhead utilities where needed | bicycle/pedestrian | Exempt | 2029 | CO | 10 | Local | $228,456.00 | |
| 6-79.00 | 42.778 | Kentucky | Kenton | Individual | KYTC | I-75 | At I-275 and I71/75 Junction and system-to-system ramps | Improve safety, mobility, operations and geometrics | traffic operations/safety | Exempt | 2027 | D | 1 | NH | $1,600,000.00 | $292,000,000.00 |
| 6-79.00 | 42.779 | Kentucky | Kenton | Individual | KYTC | I-75 | At I-275 and I71/75 Junction and system-to-system ramps | Improve safety, mobility, operations and geometrics | traffic operations/safety | Exempt | 2027 | D | 2 | State | $400,000.00 | $292,000,000.00 |
| 6-79.00 | 42.780 | Kentucky | Kenton | Individual | KYTC | I-75 | At I-275 and I71/75 Junction and system-to-system ramps | Improve safety, mobility, operations and geometrics | traffic operations/safety | Exempt | 2028 | RW | 4 | NH | $16,000,000.00 | $292,000,000.00 |
| 6-79.00 | 42.781 | Kentucky | Kenton | Individual | KYTC | I-75 | At I-275 and I71/75 Junction and system-to-system ramps | Improve safety, mobility, operations and geometrics | traffic operations/safety | Exempt | 2028 | RW | 5 | State | $4,000,000.00 | $292,000,000.00 |
| 6-79.00 | 42.782 | Kentucky | Kenton | Individual | KYTC | I-75 | At I-275 and I71/75 Junction and system-to-system ramps | Improve safety, mobility, operations and geometrics | traffic operations/safety | Exempt | 2028 | UT | 6 | NH | $8,000,000.00 | $292,000,000.00 |
| 6-79.00 | 42.783 | Kentucky | Kenton | Individual | KYTC | I-75 | At I-275 and I71/75 Junction and system-to-system ramps | Improve safety, mobility, operations and geometrics | traffic operations/safety | Exempt | 2028 | UT | 7 | State | $2,000,000.00 | $292,000,000.00 |
| 6-79.00 | 42.784 | Kentucky | Kenton | Individual | KYTC | I-75 | At I-275 and I71/75 Junction and system-to-system ramps | Improve safety, mobility, operations and geometrics | traffic operations/safety | Exempt | 2030 | CO | 8 | NHPP | $208,000,000.00 | $292,000,000.00 |
| 6-79.00 | 42.785 | Kentucky | Kenton | Individual | KYTC | I-75 | At I-275 and I71/75 Junction and system-to-system ramps | Improve safety, mobility, operations and geometrics | traffic operations/safety | Exempt | 2030 | CO | 9 | State | $52,000,000.00 | $292,000,000.00 |
| 6-80.00 | 42.786 | Kentucky | Kenton | Individual | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | Exempt | 2022 | Pl | 1 | NH | $872,000.00 | $117,590,000.00 |
| 6-80.00 | 42.787 | Kentucky | Kenton | Individual | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | Exempt | 2022 | Pl | 2 | State | $218,000.00 | $117,590,000.00 |
| 6-80.00 | 42.788 | Kentucky | Kenton | Individual | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | Exempt | 2025 | D | 6 | NH | $2,400,000.00 | $117,590,000.00 |
| 6-80.00 | 42.789 | Kentucky | Kenton | Individual | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | Exempt | 2025 | D | 7 | NH | $600,000.00 | $117,590,000.00 |
| 6-80.00 | 42.790 | Kentucky | Kenton | Individual | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | Exempt | 2026 | RW | 8 | NH | $1,600,000.00 | $117,590,000.00 |
| 6-80.00 | 42.791 | Kentucky | Kenton | Individual | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | Exempt | 2027 | RW | 8 | NH | $8,000,000.00 | $117,590,000.00 |
| 6-80.00 | 42.792 | Kentucky | Kenton | Individual | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | Exempt | 2027 | RW | 9 | State | $2,000,000.00 | $117,590,000.00 |
| 6-80.00 | 42.793 | Kentucky | Kenton | Individual | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | Exempt | 2026 | RW | 9 | State | $400,000.00 | $117,590,000.00 |
| 6-80.00 | 42.794 | Kentucky | Kenton | Individual | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | Exempt | 2028 | UT | 10 | NH | $1,200,000.00 | $117,590,000.00 |
| 6-80.00 | 42.795 | Kentucky | Kenton | Individual | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | Exempt | 2028 | UT | 11 | State | $300,000.00 | $117,590,000.00 |
| 6-80.00 | 42.796 | Kentucky | Kenton | Individual | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | Exempt | 2029 | CO | 12 | NH | $20,000,000.00 | $117,590,000.00 |
| 6-80.00 | 42.797 | Kentucky | Kenton | Individual | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | Exempt | 2030 | CO | 12 | Uncommitted | $75,000,000.00 | $117,590,000.00 |
| 6-80.00 | 42.798 | Kentucky | Kenton | Individual | KYTC | KY 14 @ I-75 | Interchange of I-75 and KY 14 in Walton | Reduce congestion and improve traffic mobility | traffic operations/safety | Exempt | 2029 | CO | 13 | State | $5,000,000.00 | $117,590,000.00 |
| 6-8000.2 | 42.799 | Kentucky | Boone | Individual | KYTC | I-275 | I-275/KY 212 Interchange | I-275/KY 2012 Interchange and KY 20 Reconstruction near CVG | traffic operations/safety | Exempt | 2027 | D | 1 | STP | $4,992,000.00 | $60,830,000.00 |
| 6-8000.2 | 42.800 | Kentucky | Boone | Individual | KYTC | I-275 | I-275/KY 212 Interchange | I-275/KY 2012 Interchange and KY 20 Reconstruction near CVG | traffic operations/safety | Exempt | 2027 | D | 2 | State | $1,248,000.00 | $60,830,000.00 |
| 6-8000.2 | 42.801 | Kentucky | Boone | Individual | KYTC | I-275 | I-275/KY 212 Interchange | I-275/KY 2012 Interchange and KY 20 Reconstruction near CVG | traffic operations/safety | Exempt | 2028 | RW | 3 | STP | $11,672,000.00 | $60,830,000.00 |
| 6-8000.2 | 42.802 | Kentucky | Boone | Individual | KYTC | I-275 | I-275/KY 212 Interchange | I-275/KY 2012 Interchange and KY 20 Reconstruction near CVG | traffic operations/safety | Exempt | 2028 | RW | 4 | State | $2,918,000.00 | $60,830,000.00 |
| 6-8000.2 | 42.803 | Kentucky | Boone | Individual | KYTC | I-275 | I-275/KY 212 Interchange | I-275/KY 2012 Interchange and KY 20 Reconstruction near CVG | traffic operations/safety | Exempt | 2030 | CO | 5 | Uncommitted | $40,000,000.00 | $60,830,000.00 |
| 6-80000 | 42.804 | Kentucky | Boone | Individual | KYTC | KY 237 (Gunpowder Rd) | KY 536 to US 42 | Reconstruction and major widening | maintenance/reconstruction | Non-Exempt | 2022 | D | 1 | SPP | $2,080,000.00 | $29,740,000.00 |
| 6-80000 | 42.805 | Kentucky | Boone | Individual | KYTC | KY 237 (Gunpowder Rd) | KY 536 to US 42 | Reconstruction and major widening | maintenance/reconstruction | Non-Exempt | 2027 | RW | 4 | Uncommitted | $1,500,000.00 | $29,740,000.00 |
| 6-80000 | 42.806 | Kentucky | Boone | Individual | KYTC | KY 237 (Gunpowder Rd) | KY 536 to US 42 | Reconstruction and major widening | maintenance/reconstruction | Non-Exempt | 2027 | UT | 5 | Uncommitted | $3,380,000.00 | $29,740,000.00 |
| 6-80000 | 42.807 | Kentucky | Boone | Individual | KYTC | KY 237 (Gunpowder Rd) | KY 536 to US 42 | Reconstruction and major widening | maintenance/reconstruction | Non-Exempt | 2028 | CO | 6 | Uncommitted | $22,780,000.00 | $29,740,000.00 |
| 6-80001 | 42.808 | Kentucky | Boone | Individual | KYTC | KY 237 | Cardinal Cove and Graves Rd | Expansion of roundabouts along KY 237 at Cardinal Cove and Graves Road | traffic operations/safety | Exempt | 2026 | RW | 1 | STBG | $800,000.00 | $8,400,000.00 |
| 6-80001 | 42.809 | Kentucky | Boone | Individual | KYTC | KY 237 | Cardinal Cove and Graves Rd | Expansion of roundabouts along KY 237 at Cardinal Cove and Graves Road | traffic operations/safety | Exempt | 2027 | RW | 1 | STBG | $1,200,000.00 | $8,400,000.00 |
| 6-80001 | 42.810 | Kentucky | Boone | Individual | KYTC | KY 237 | Cardinal Cove and Graves Rd | Expansion of roundabouts along KY 237 at Cardinal Cove and Graves Road | traffic operations/safety | Exempt | 2026 | RW | 2 | State | $200,000.00 | $8,400,000.00 |
| 6-80001 | 42.811 | Kentucky | Boone | Individual | KYTC | KY 237 | Cardinal Cove and Graves Rd | Expansion of roundabouts along KY 237 at Cardinal Cove and Graves Road | traffic operations/safety | Exempt | 2027 | RW | 2 | State | $300,000.00 | $8,400,000.00 |
| 6-80001 | 42.812 | Kentucky | Boone | Individual | KYTC | KY 237 | Cardinal Cove and Graves Rd | Expansion of roundabouts along KY 237 at Cardinal Cove and Graves Road | traffic operations/safety | Exempt | 2027 | UT | 3 | STBG | $1,120,000.00 | $8,400,000.00 |
| 6-80001 | 42.813 | Kentucky | Boone | Individual | KYTC | KY 237 | Cardinal Cove and Graves Rd | Expansion of roundabouts along KY 237 at Cardinal Cove and Graves Road | traffic operations/safety | Exempt | 2027 | UT | 4 | State | $280,000.00 | $8,400,000.00 |
| 6-80001 | 42.814 | Kentucky | Boone | Individual | KYTC | KY 237 | Cardinal Cove and Graves Rd | Expansion of roundabouts along KY 237 at Cardinal Cove and Graves Road | traffic operations/safety | Exempt | 2028 | CO | 5 | Uncommitted | $4,500,000.00 | $8,400,000.00 |
| 6-80002 | 42.815 | Kentucky | Kenton | Individual | KYTC | KY 236 (Stevenson Rd) | Alice Street to Jacqueline Drive | Reconstruction | maintenance/reconstruction | Exempt | 2022 | D | 1 | STBG | $1,328,000.00 | $9,740,000.00 |
| 6-80002 | 42.816 | Kentucky | Kenton | Individual | KYTC | KY 236 (Stevenson Rd) | Alice Street to Jacqueline Drive | Reconstruction | maintenance/reconstruction | Exempt | 2022 | D | 2 | State | $332,000.00 | $9,740,000.00 |
| 6-80002 | 42.817 | Kentucky | Kenton | Individual | KYTC | KY 236 (Stevenson Rd) | Alice Street to Jacqueline Drive | Reconstruction | maintenance/reconstruction | Exempt | 2023 | RW | 3 | STBG | $1,304,000.00 | $9,740,000.00 |
| 6-80002 | 42.818 | Kentucky | Kenton | Individual | KYTC | KY 236 (Stevenson Rd) | Alice Street to Jacqueline Drive | Reconstruction | maintenance/reconstruction | Exempt | 2023 | RW | 4 | State | $326,000.00 | $9,740,000.00 |
| 6-80002 | 42.819 | Kentucky | Kenton | Individual | KYTC | KY 236 (Stevenson Rd) | Alice Street to Jacqueline Drive | Reconstruction | maintenance/reconstruction | Exempt | 2024 | CO | 6 | STBG | $5,160,000.00 | $9,740,000.00 |
| 6-80002 | 42.820 | Kentucky | Kenton | Individual | KYTC | KY 236 (Stevenson Rd) | Alice Street to Jacqueline Drive | Reconstruction | maintenance/reconstruction | Exempt | 2024 | CO | 7 | State | $1,290,000.00 | $9,740,000.00 |
| 6-80100 | 42.821 | Kentucky | Boone | Individual | KYTC | KY 1017 (Turfway Rd) & KY 717 (Thoroughbred Blvd) | Turfway Rd and Thoroughbred Blvd | Convert Turfway Rd. and Thoroughbred Blvd. from 2-way to one way and modify I-71/I-75 access | traffic operations/safety | Exempt | 2025 | D | 1 | STBG | $2,000,000.00 | $40,000,000.00 |
| 6-80100 | 42.822 | Kentucky | Boone | Individual | KYTC | KY 1017 (Turfway Rd) & KY 717 (Thoroughbred Blvd) | Turfway Rd and Thoroughbred Blvd | Convert Turfway Rd. and Thoroughbred Blvd. from 2-way to one way and modify I-71/I-75 access | traffic operations/safety | Exempt | 2025 | D | 2 | State | $500,000.00 | $40,000,000.00 |
| 6-80100 | 42.823 | Kentucky | Boone | Individual | KYTC | KY 1017 (Turfway Rd) & KY 717 (Thoroughbred Blvd) | Turfway Rd and Thoroughbred Blvd | Convert Turfway Rd. and Thoroughbred Blvd. from 2-way to one way and modify I-71/I-75 access | traffic operations/safety | Exempt | 2028 | RW | 3 | STBG | $8,800,000.00 | $40,000,000.00 |
| 6-80100 | 42.824 | Kentucky | Boone | Individual | KYTC | KY 1017 (Turfway Rd) & KY 717 (Thoroughbred Blvd) | Turfway Rd and Thoroughbred Blvd | Convert Turfway Rd. and Thoroughbred Blvd. from 2-way to one way and modify I-71/I-75 access | traffic operations/safety | Exempt | 2028 | RW | 4 | State | $2,200,000.00 | $40,000,000.00 |
| 6-80100 | 42.825 | Kentucky | Boone | Individual | KYTC | KY 1017 (Turfway Rd) & KY 717 (Thoroughbred Blvd) | Turfway Rd and Thoroughbred Blvd | Convert Turfway Rd. and Thoroughbred Blvd. from 2-way to one way and modify I-71/I-75 access | traffic operations/safety | Exempt | 2029 | UT | 5 | STBG | $1,200,000.00 | $40,000,000.00 |
| 6-80100 | 42.826 | Kentucky | Boone | Individual | KYTC | KY 1017 (Turfway Rd) & KY 717 (Thoroughbred Blvd) | Turfway Rd and Thoroughbred Blvd | Convert Turfway Rd. and Thoroughbred Blvd. from 2-way to one way and modify I-71/I-75 access | traffic operations/safety | Exempt | 2029 | UT | 6 | State | $300,000.00 | $40,000,000.00 |
| 6-80100 | 42.827 | Kentucky | Boone | Individual | KYTC | KY 1017 (Turfway Rd) & KY 717 (Thoroughbred Blvd) | Turfway Rd and Thoroughbred Blvd | Convert Turfway Rd. and Thoroughbred Blvd. from 2-way to one way and modify I-71/I-75 access | traffic operations/safety | Exempt | 2030 | CO | 7 | STBG | $20,000,000.00 | $40,000,000.00 |
| 6-80100 | 42.828 | Kentucky | Boone | Individual | KYTC | KY 1017 (Turfway Rd) & KY 717 (Thoroughbred Blvd) | Turfway Rd and Thoroughbred Blvd | Convert Turfway Rd. and Thoroughbred Blvd. from 2-way to one way and modify I-71/I-75 access | traffic operations/safety | Exempt | 2030 | CO | 8 | State | $5,000,000.00 | $40,000,000.00 |
| 6-80101 | 42.829 | Kentucky | Boone | Individual | KYTC | KY 18 (Burlington Pike) | KY 237 to IR 71/75 | Convert to Super Street. Includes MUP from KY 237 to Aero Pkwy and Limaburg intersection improvements. | traffic operations/safety | Exempt | 2022 | D | 1 | SPP | $1,930,000.00 | $23,842,000.00 |
| 6-80101 | 42.830 | Kentucky | Boone | Individual | KYTC | KY 18 (Burlington Pike) | KY 237 to IR 71/75 | Convert to Super Street. Includes MUP from KY 237 to Aero Pkwy and Limaburg intersection improvements. | traffic operations/safety | Exempt | 2022 | RW | 2 | STBG | $2,700,000.00 | $23,842,000.00 |
| 6-80101 | 42.831 | Kentucky | Boone | Individual | KYTC | KY 18 (Burlington Pike) | KY 237 to IR 71/75 | Convert to Super Street. Includes MUP from KY 237 to Aero Pkwy and Limaburg intersection improvements. | traffic operations/safety | Exempt | 2022 | RW | 3 | State | $600,000.00 | $23,842,000.00 |
| 6-80101 | 42.832 | Kentucky | Boone | Individual | KYTC | KY 18 (Burlington Pike) | KY 237 to IR 71/75 | Convert to Super Street. Includes MUP from KY 237 to Aero Pkwy and Limaburg intersection improvements. | traffic operations/safety | Exempt | 2025 | UT | 5 | STBG | $2,312,000.00 | $23,842,000.00 |
| 6-80101 | 42.833 | Kentucky | Boone | Individual | KYTC | KY 18 (Burlington Pike) | KY 237 to IR 71/75 | Convert to Super Street. Includes MUP from KY 237 to Aero Pkwy and Limaburg intersection improvements. | traffic operations/safety | Exempt | 2025 | UT | 6 | State | $300,000.00 | $23,842,000.00 |
| 6-80101 | 42.834 | Kentucky | Boone | Individual | KYTC | KY 18 (Burlington Pike) | KY 237 to IR 71/75 | Convert to Super Street. Includes MUP from KY 237 to Aero Pkwy and Limaburg intersection improvements. | traffic operations/safety | Exempt | 2027 | CO | 7 | STBG | $12,800,000.00 | $23,842,000.00 |
| 6-80101 | 42.835 | Kentucky | Boone | Individual | KYTC | KY 18 (Burlington Pike) | KY 237 to IR 71/75 | Convert to Super Street. Includes MUP from KY 237 to Aero Pkwy and Limaburg intersection improvements. | traffic operations/safety | Exempt | 2027 | CO | 10 | State | $3,200,000.00 | $23,842,000.00 |
| 6-80102 | 42.836 | Kentucky | Boone | Individual | KYTC | KY 3060 (Frogtown Rd) | US 42 to US 25 | Address Safety and Congestion | maintenance/reconstruction | Exempt | 2022 | D | 1 | SPP | $3,000,000.00 | $43,200,000.00 |
| 6-80102 | 42.837 | Kentucky | Boone | Individual | KYTC | KY 3060 (Frogtown Rd) | US 42 to US 25 | Address Safety and Congestion | maintenance/reconstruction | Exempt | 2023 | RW | 4 | STBG | $10,400,000.00 | $43,200,000.00 |
| 6-80102 | 42.838 | Kentucky | Boone | Individual | KYTC | KY 3060 (Frogtown Rd) | US 42 to US 25 | Address Safety and Congestion | maintenance/reconstruction | Exempt | 2023 | RW | 5 | State | $2,600,000.00 | $43,200,000.00 |
| 6-80102 | 42.839 | Kentucky | Boone | Individual | KYTC | KY 3060 (Frogtown Rd) | US 42 to US 25 | Address Safety and Congestion | maintenance/reconstruction | Exempt | 2026 | UT | 6 | Uncommitted | $4,200,000.00 | $43,200,000.00 |
| 6-80102 | 42.840 | Kentucky | Boone | Individual | KYTC | KY 3060 (Frogtown Rd) | US 42 to US 25 | Address Safety and Congestion | maintenance/reconstruction | Exempt | 2028 | CO | 7 | Uncommitted | $23,000,000.00 | $43,200,000.00 |
| 6-80105 | 42.841 | Kentucky | Kenton | Individual | KYTC | KY 2373 | US 25 to Riggs Road | Widen Kenton Lands Road from US 25 to Riggs Road. | widening/relocation | Non-exempt | 2025 | D | 1 | NH | $2,400,000.00 | $56,430,000.00 |
| 6-80105 | 42.842 | Kentucky | Kenton | Individual | KYTC | KY 2373 | US 25 to Riggs Road | Widen Kenton Lands Road from US 25 to Riggs Road. | widening/relocation | Non-exempt | 2025 | D | 2 | State | $600,000.00 | $56,430,000.00 |
| 6-80105 | 42.843 | Kentucky | Kenton | Individual | KYTC | KY 2373 | US 25 to Riggs Road | Widen Kenton Lands Road from US 25 to Riggs Road. | widening/relocation | Non-exempt | 2028 | RW | 3 | NH | $14,264,000.00 | $56,430,000.00 |
| 6-80105 | 42.844 | Kentucky | Kenton | Individual | KYTC | KY 2373 | US 25 to Riggs Road | Widen Kenton Lands Road from US 25 to Riggs Road. | widening/relocation | Non-exempt | 2028 | RW | 4 | State | $3,566,000.00 | $56,430,000.00 |
| 6-80105 | 42.845 | Kentucky | Kenton | Individual | KYTC | KY 2373 | US 25 to Riggs Road | Widen Kenton Lands Road from US 25 to Riggs Road. | widening/relocation | Non-exempt | 2028 | UT | 5 | NH | $4,480,000.00 | $56,430,000.00 |
| 6-80105 | 42.846 | Kentucky | Kenton | Individual | KYTC | KY 2373 | US 25 to Riggs Road | Widen Kenton Lands Road from US 25 to Riggs Road. | widening/relocation | Non-exempt | 2028 | UT | 6 | State | $1,120,000.00 | $56,430,000.00 |
| 6-80105 | 42.847 | Kentucky | Kenton | Individual | KYTC | KY 2373 | US 25 to Riggs Road | Widen Kenton Lands Road from US 25 to Riggs Road. | widening/relocation | Non-exempt | 2029 | CO | 7 | NH | $24,000,000.00 | $56,430,000.00 |
| 6-80105 | 42.848 | Kentucky | Kenton | Individual | KYTC | KY 2373 | US 25 to Riggs Road | Widen Kenton Lands Road from US 25 to Riggs Road. | widening/relocation | Non-exempt | 2029 | CO | 8 | State | $6,000,000.00 | $56,430,000.00 |
| 6-80150 | 42.849 | Kentucky | Boone | Individual | KYTC | KY 717 (Turfway Rd) | KY 1017 to KY 236 | Major widening | widening/relocation | Non-exempt | 2022 | D | 1 | STBG | $800,000.00 | $17,496,000.00 |
| 6-80150 | 42.850 | Kentucky | Boone | Individual | KYTC | KY 717 (Turfway Rd) | KY 1017 to KY 236 | Major widening | widening/relocation | Non-exempt | 2022 | D | 2 | State | $200,000.00 | $17,496,000.00 |
| 6-80150 | 42.851 | Kentucky | Boone | Individual | KYTC | KY 717 (Turfway Rd) | KY 1017 to KY 236 | Major widening | widening/relocation | Non-exempt | 2025 | RW | 3 | STBG | $4,000,000.00 | $17,496,000.00 |
| 6-80150 | 42.852 | Kentucky | Boone | Individual | KYTC | KY 717 (Turfway Rd) | KY 1017 to KY 236 | Major widening | widening/relocation | Non-exempt | 2025 | RW | 4 | State | $1,000,000.00 | $17,496,000.00 |
| 6-80150 | 42.853 | Kentucky | Boone | Individual | KYTC | KY 717 (Turfway Rd) | KY 1017 to KY 236 | Major widening | widening/relocation | Non-exempt | 2026 | UT | 5 | STBG | $1,596,000.00 | $17,496,000.00 |
| 6-80150 | 42.854 | Kentucky | Boone | Individual | KYTC | KY 717 (Turfway Rd) | KY 1017 to KY 236 | Major widening | widening/relocation | Non-exempt | 2026 | UT | 6 | State | $400,000.00 | $17,496,000.00 |
| 6-80150 | 42.855 | Kentucky | Boone | Individual | KYTC | KY 717 (Turfway Rd) | KY 1017 to KY 236 | Major widening | widening/relocation | Non-exempt | 2027 | CO | 7 | STBG | $7,600,000.00 | $17,496,000.00 |
| 6-80150 | 42.856 | Kentucky | Boone | Individual | KYTC | KY 717 (Turfway Rd) | KY 1017 to KY 236 | Major widening | widening/relocation | Non-exempt | 2027 | CO | 8 | State | $1,900,000.00 | $17,496,000.00 |
| 6-80203 | 42.857 | Kentucky | Kenton | Individual | KYTC | KY 536 | KY 16 to KY 177 | Reconstruct to a 4-lane urban section | widening/relocation | Non-exempt | 2023 | D | 1 | NH | $2,400,000.00 | $141,000,000.00 |
| 6-80203 | 42.858 | Kentucky | Kenton | Individual | KYTC | KY 536 | KY 16 to KY 177 | Reconstruct to a 4-lane urban section | widening/relocation | Non-exempt | 2023 | D | 2 | State | $600,000.00 | $141,000,000.00 |
| 6-80203 | 42.859 | Kentucky | Kenton | Individual | KYTC | KY 536 | KY 16 to KY 177 | Reconstruct to a 4-lane urban section | widening/relocation | Non-exempt | 2028 | RW | 3 | STP2 | $14,400,000.00 | $141,000,000.00 |
| 6-80203 | 42.860 | Kentucky | Kenton | Individual | KYTC | KY 536 | KY 16 to KY 177 | Reconstruct to a 4-lane urban section | widening/relocation | Non-exempt | 2028 | RW | 4 | State | $3,600,000.00 | $141,000,000.00 |
| 6-80203 | 42.861 | Kentucky | Kenton | Individual | KYTC | KY 536 | KY 16 to KY 177 | Reconstruct to a 4-lane urban section | widening/relocation | Non-exempt | 2028 | UT | 5 | STP2 | $8,000,000.00 | $141,000,000.00 |
| 6-80203 | 42.862 | Kentucky | Kenton | Individual | KYTC | KY 536 | KY 16 to KY 177 | Reconstruct to a 4-lane urban section | widening/relocation | Non-exempt | 2028 | UT | 6 | State | $2,000,000.00 | $141,000,000.00 |
| 6-80203 | 42.863 | Kentucky | Kenton | Individual | KYTC | KY 536 | KY 16 to KY 177 | Reconstruct to a 4-lane urban section | widening/relocation | Non-exempt | 2030 | CO | 7 | STP2 | $88,000,000.00 | $141,000,000.00 |
| 6-80203 | 42.864 | Kentucky | Kenton | Individual | KYTC | KY 536 | KY 16 to KY 177 | Reconstruct to a 4-lane urban section | widening/relocation | Non-exempt | 2030 | CO | 8 | State | $22,000,000.00 | $141,000,000.00 |
| 6-80207 | 42.865 | Kentucky | Boone | Individual | KYTC | CR 1001 (Camp Ernst Rd) | Pleasant Valley Rd (KY 237) to Hathaway Rd (KY 536) | Improve safety and mobility, reduce congestion and address geometric deficiencies | widening/relocation | Non-exempt | 2024 | D | 1 | STP2 | $3,608,000.00 | $50,010,000.00 |
| 6-80207 | 42.866 | Kentucky | Boone | Individual | KYTC | CR 1001 (Camp Ernst Rd) | Pleasant Valley Rd (KY 237) to Hathaway Rd (KY 536) | Improve safety and mobility, reduce congestion and address geometric deficiencies | widening/relocation | Non-exempt | 2024 | D | 2 | State | $902,000.00 | $50,010,000.00 |
| 6-80207 | 42.867 | Kentucky | Boone | Individual | KYTC | CR 1001 (Camp Ernst Rd) | Pleasant Valley Rd (KY 237) to Hathaway Rd (KY 536) | Improve safety and mobility, reduce congestion and address geometric deficiencies | widening/relocation | Non-exempt | 2026 | RW | 93 | STP2 | $4,000,000.00 | $50,010,000.00 |
| 6-80207 | 42.868 | Kentucky | Boone | Individual | KYTC | CR 1001 (Camp Ernst Rd) | Pleasant Valley Rd (KY 237) to Hathaway Rd (KY 536) | Improve safety and mobility, reduce congestion and address geometric deficiencies | widening/relocation | Non-exempt | 2027 | RW | 93 | STP2 | $8,000,000.00 | $50,010,000.00 |
| 6-80207 | 42.869 | Kentucky | Boone | Individual | KYTC | CR 1001 (Camp Ernst Rd) | Pleasant Valley Rd (KY 237) to Hathaway Rd (KY 536) | Improve safety and mobility, reduce congestion and address geometric deficiencies | widening/relocation | Non-exempt | 2026 | RW | 94 | State | $1,000,000.00 | $50,010,000.00 |
| 6-80207 | 42.870 | Kentucky | Boone | Individual | KYTC | CR 1001 (Camp Ernst Rd) | Pleasant Valley Rd (KY 237) to Hathaway Rd (KY 536) | Improve safety and mobility, reduce congestion and address geometric deficiencies | widening/relocation | Non-exempt | 2027 | RW | 94 | State | $2,000,000.00 | $50,010,000.00 |
| 6-80207 | 42.871 | Kentucky | Boone | Individual | KYTC | CR 1001 (Camp Ernst Rd) | Pleasant Valley Rd (KY 237) to Hathaway Rd (KY 536) | Improve safety and mobility, reduce congestion and address geometric deficiencies | widening/relocation | Non-exempt | 2026 | UT | 95 | STP2 | $2,000,000.00 | $50,010,000.00 |
| 6-80207 | 42.872 | Kentucky | Boone | Individual | KYTC | CR 1001 (Camp Ernst Rd) | Pleasant Valley Rd (KY 237) to Hathaway Rd (KY 536) | Improve safety and mobility, reduce congestion and address geometric deficiencies | widening/relocation | Non-exempt | 2026 | UT | 96 | State | $500,000.00 | $50,010,000.00 |
| 6-80207 | 42.873 | Kentucky | Boone | Individual | KYTC | CR 1001 (Camp Ernst Rd) | Pleasant Valley Rd (KY 237) to Hathaway Rd (KY 536) | Improve safety and mobility, reduce congestion and address geometric deficiencies | widening/relocation | Non-exempt | 2027 | CO | 97 | STP2 | $22,400,000.00 | $50,010,000.00 |
| 6-80207 | 42.874 | Kentucky | Boone | Individual | KYTC | CR 1001 (Camp Ernst Rd) | Pleasant Valley Rd (KY 237) to Hathaway Rd (KY 536) | Improve safety and mobility, reduce congestion and address geometric deficiencies | widening/relocation | Non-exempt | 2028 | CO | 98 | State | $5,600,000.00 | $50,010,000.00 |
| 6-80209 | 42.875 | Kentucky | Boone | Individual | KYTC | KY 237 | Litton Lane intersection | Improve access to KY 237 for Litton Lane. | traffic operations/safety | Exempt | 2022 | D | 1 | STBG | $432,800.00 | $6,441,000.00 |
| 6-80209 | 42.876 | Kentucky | Boone | Individual | KYTC | KY 237 | Litton Lane intersection | Improve access to KY 237 for Litton Lane. | traffic operations/safety | Exempt | 2022 | D | 2 | State | $108,200.00 | $6,441,000.00 |
| 6-80209 | 42.877 | Kentucky | Boone | Individual | KYTC | KY 237 | Litton Lane intersection | Improve access to KY 237 for Litton Lane. | traffic operations/safety | Exempt | 2026 | UT | 3 | Uncommitted | $300,000.00 | $6,441,000.00 |
| 6-80209 | 42.878 | Kentucky | Boone | Individual | KYTC | KY 237 | Litton Lane intersection | Improve access to KY 237 for Litton Lane. | traffic operations/safety | Exempt | 2027 | RW | 4 | Uncommitted | $1,000,000.00 | $6,441,000.00 |
| 6-80209 | 42.879 | Kentucky | Boone | Individual | KYTC | KY 237 | Litton Lane intersection | Improve access to KY 237 for Litton Lane. | traffic operations/safety | Exempt | 2028 | CO | 5 | Uncommitted | $4,600,000.00 | $6,441,000.00 |
| 6-80212 | 42.880 | Kentucky | Boone | Individual | KYTC | IR 71 | from the interchange of I-75 to Boone-Gallatin County Line | Widen I-71 to 6 lanes | widening/relocation | Non-exempt | 2024 | D | 1 | Federal | $4,800,000.00 | $72,000,000.00 |
| 6-80212 | 42.881 | Kentucky | Boone | Individual | KYTC | IR 71 | from the interchange of I-75 to Boone-Gallatin County Line | Widen I-71 to 6 lanes | widening/relocation | Non-exempt | 2024 | D | 2 | State | $1,200,000.00 | $72,000,000.00 |
| 6-80212 | 42.882 | Kentucky | Boone | Individual | KYTC | IR 71 | from the interchange of I-75 to Boone-Gallatin County Line | Widen I-71 to 6 lanes | widening/relocation | Non-exempt | 2028 | CO | 6 | Uncommitted | $66,000,000.00 | $72,000,000.00 |
| 6-80217 | 42.883 | Kentucky | Kenton | Individual | KYTC | KY 536 | KY 16 to KY 17 | Reconstruct to a 4-lane urban section | widening/relocation | Non-exempt | 2025 | D | 1 | SPP | $1,275,000.00 | $38,775,000.00 |
| 6-80217 | 42.884 | Kentucky | Kenton | Individual | KYTC | KY 536 | KY 16 to KY 17 | Reconstruct to a 4-lane urban section | widening/relocation | Non-exempt | 2026 | RW | 2 | SPP | $6,000,000.00 | $38,775,000.00 |
| 6-80217 | 42.885 | Kentucky | Kenton | Individual | KYTC | KY 536 | KY 16 to KY 17 | Reconstruct to a 4-lane urban section | widening/relocation | Non-exempt | 2026 | UT | 3 | SPP | $1,500,000.00 | $38,775,000.00 |
| 6-80217 | 42.886 | Kentucky | Kenton | Individual | KYTC | KY 536 | KY 16 to KY 17 | Reconstruct to a 4-lane urban section | widening/relocation | Non-exempt | 2028 | CO | 7 | SPP | $30,000,000.00 | $38,775,000.00 |
| 6-80257 | 42.887 | Kentucky | Boone | Individual | KYTC | I-71/75 | MP 176.5 to 177.2 | Expand NB and SB rest areas on I-71/I-75 rest areas in Boone County to add more truck parking | Freight | Exempt | 2026 | D | 1 | NH | $500,000.00 | $7,250,000.00 |
| 6-80257 | 42.888 | Kentucky | Boone | Individual | KYTC | I-71/75 | MP 176.5 to 177.2 | Expand NB and SB rest areas on I-71/I-75 rest areas in Boone County to add more truck parking | Freight | Exempt | 2026 | RW | 3 | NH | $296,000.00 | $7,250,000.00 |
| 6-80257 | 42.889 | Kentucky | Boone | Individual | KYTC | I-71/75 | MP 176.5 to 177.2 | Expand NB and SB rest areas on I-71/I-75 rest areas in Boone County to add more truck parking | Freight | Exempt | 2026 | RW | 4 | State | $74,000.00 | $7,250,000.00 |
| 6-80257 | 42.890 | Kentucky | Boone | Individual | KYTC | I-71/75 | MP 176.5 to 177.2 | Expand NB and SB rest areas on I-71/I-75 rest areas in Boone County to add more truck parking | Freight | Exempt | 2026 | UT | 5 | NH | $128,000.00 | $7,250,000.00 |
| 6-80257 | 42.891 | Kentucky | Boone | Individual | KYTC | I-71/75 | MP 176.5 to 177.2 | Expand NB and SB rest areas on I-71/I-75 rest areas in Boone County to add more truck parking | Freight | Exempt | 2026 | UT | 6 | State | $32,000.00 | $7,250,000.00 |
| 6-80257 | 42.892 | Kentucky | Boone | Individual | KYTC | I-71/75 | MP 176.5 to 177.2 | Expand NB and SB rest areas on I-71/I-75 rest areas in Boone County to add more truck parking | Freight | Exempt | 2026 | CO | 7 | NH | $1,376,000.00 | $7,250,000.00 |
| 6-80257 | 42.893 | Kentucky | Boone | Individual | KYTC | I-71/75 | MP 176.5 to 177.2 | Expand NB and SB rest areas on I-71/I-75 rest areas in Boone County to add more truck parking | Freight | Exempt | 2027 | CO | 7 | NH | $4,000,000.00 | $7,250,000.00 |
| 6-80257 | 42.894 | Kentucky | Boone | Individual | KYTC | I-71/75 | MP 176.5 to 177.2 | Expand NB and SB rest areas on I-71/I-75 rest areas in Boone County to add more truck parking | Freight | Exempt | 2027 | CO | 8 | State | $1,000,000.00 | $7,250,000.00 |
| 6-80257 | 42.895 | Kentucky | Boone | Individual | KYTC | I-71/75 | MP 176.5 to 177.2 | Expand NB and SB rest areas on I-71/I-75 rest areas in Boone County to add more truck parking | Freight | Exempt | 2026 | CO | 8 | State | $344,000.00 | $7,250,000.00 |
| 6-80304 | 42.896 | Kentucky | Boone | Individual | KYTC | Hicks Pike Reconstruction | KY 338 (Richwood Road) to US 42 | Reconstruct Hicks Pike and provide a multi-use path | maintenance/reconstruction | Exempt | 2025 | D | 1 | STBG | $3,968,000.00 | $61,170,000.00 |
| 6-80304 | 42.897 | Kentucky | Boone | Individual | KYTC | Hicks Pike Reconstruction | KY 338 (Richwood Road) to US 42 | Reconstruct Hicks Pike and provide a multi-use path | maintenance/reconstruction | Exempt | 2025 | D | 2 | State | $992,000.00 | $61,170,000.00 |
| 6-80304 | 42.898 | Kentucky | Boone | Individual | KYTC | Hicks Pike Reconstruction | KY 338 (Richwood Road) to US 42 | Reconstruct Hicks Pike and provide a multi-use path | maintenance/reconstruction | Exempt | 2028 | RW | 3 | STBG | $12,480,000.00 | $61,170,000.00 |
| 6-80304 | 42.899 | Kentucky | Boone | Individual | KYTC | Hicks Pike Reconstruction | KY 338 (Richwood Road) to US 42 | Reconstruct Hicks Pike and provide a multi-use path | maintenance/reconstruction | Exempt | 2028 | RW | 4 | State | $3,120,000.00 | $61,170,000.00 |
| 6-80304 | 42.900 | Kentucky | Boone | Individual | KYTC | Hicks Pike Reconstruction | KY 338 (Richwood Road) to US 42 | Reconstruct Hicks Pike and provide a multi-use path | maintenance/reconstruction | Exempt | 2029 | UT | 5 | STBG | $2,728,000.00 | $61,170,000.00 |
| 6-80304 | 42.901 | Kentucky | Boone | Individual | KYTC | Hicks Pike Reconstruction | KY 338 (Richwood Road) to US 42 | Reconstruct Hicks Pike and provide a multi-use path | maintenance/reconstruction | Exempt | 2029 | UT | 6 | State | $682,000.00 | $61,170,000.00 |
| 6-80304 | 42.902 | Kentucky | Boone | Individual | KYTC | Hicks Pike Reconstruction | KY 338 (Richwood Road) to US 42 | Reconstruct Hicks Pike and provide a multi-use path | maintenance/reconstruction | Exempt | 2030 | CO | 7 | STBG | $29,760,000.00 | $61,170,000.00 |
| 6-80304 | 42.903 | Kentucky | Boone | Individual | KYTC | Hicks Pike Reconstruction | KY 338 (Richwood Road) to US 42 | Reconstruct Hicks Pike and provide a multi-use path | maintenance/reconstruction | Exempt | 2030 | CO | 8 | State | $7,440,000.00 | $61,170,000.00 |
| 6-80309 | 42.904 | Kentucky | Kenton | Individual | KYTC | I-75 | from MP 182.70 to 185.70 | Reconstruct I-75 interchange at KY 236 (Donaldson Highway) | traffic operations/safety | Exempt | 2027 | D | 1 | NH | $1,600,000.00 | $31,000,000.00 |
| 6-80309 | 42.905 | Kentucky | Kenton | Individual | KYTC | I-75 | from MP 182.70 to 185.70 | Reconstruct I-75 interchange at KY 236 (Donaldson Highway) | traffic operations/safety | Exempt | 2027 | D | 2 | State | $400,000.00 | $31,000,000.00 |
| 6-80309 | 42.906 | Kentucky | Kenton | Individual | KYTC | I-75 | from MP 182.70 to 185.70 | Reconstruct I-75 interchange at KY 236 (Donaldson Highway) | traffic operations/safety | Exempt | 2028 | RW | 3 | NH | $6,400,000.00 | $31,000,000.00 |
| 6-80309 | 42.907 | Kentucky | Kenton | Individual | KYTC | I-75 | from MP 182.70 to 185.70 | Reconstruct I-75 interchange at KY 236 (Donaldson Highway) | traffic operations/safety | Exempt | 2028 | RW | 4 | State | $1,600,000.00 | $31,000,000.00 |
| 6-80309 | 42.908 | Kentucky | Kenton | Individual | KYTC | I-75 | from MP 182.70 to 185.70 | Reconstruct I-75 interchange at KY 236 (Donaldson Highway) | traffic operations/safety | Exempt | 2029 | UT | 5 | NH | $1,600,000.00 | $31,000,000.00 |
| 6-80309 | 42.909 | Kentucky | Kenton | Individual | KYTC | I-75 | from MP 182.70 to 185.70 | Reconstruct I-75 interchange at KY 236 (Donaldson Highway) | traffic operations/safety | Exempt | 2029 | UT | 6 | State | $400,000.00 | $31,000,000.00 |
| 6-80309 | 42.910 | Kentucky | Kenton | Individual | KYTC | I-75 | from MP 182.70 to 185.70 | Reconstruct I-75 interchange at KY 236 (Donaldson Highway) | traffic operations/safety | Exempt | 2030 | CO | 7 | NH | $15,200,000.00 | $31,000,000.00 |
| 6-80309 | 42.911 | Kentucky | Kenton | Individual | KYTC | I-75 | from MP 182.70 to 185.70 | Reconstruct I-75 interchange at KY 236 (Donaldson Highway) | traffic operations/safety | Exempt | 2030 | CO | 8 | State | $3,800,000.00 | $31,000,000.00 |
| 6-80314 | 42.912 | Kentucky | Campbell | Individual | KYTC | US 27 | US 27 at KY 709 | Construct a southbound truck climbing lane on US 27 and a right turn lane on US 27 to KY 709 | traffic operations/safety | Non-exempt | 2025 | D | 1 | STPF | $600,000.00 | $10,750,000.00 |
| 6-80314 | 42.913 | Kentucky | Campbell | Individual | KYTC | US 27 | US 27 at KY 709 | Construct a southbound truck climbing lane on US 27 and a right turn lane on US 27 to KY 709 | traffic operations/safety | Non-exempt | 2025 | D | 2 | State | $150,000.00 | $10,750,000.00 |
| 6-80314 | 42.914 | Kentucky | Campbell | Individual | KYTC | US 27 | US 27 at KY 709 | Construct a southbound truck climbing lane on US 27 and a right turn lane on US 27 to KY 709 | traffic operations/safety | Non-exempt | 2027 | RW | 3 | STPF | $1,200,000.00 | $10,750,000.00 |
| 6-80314 | 42.915 | Kentucky | Campbell | Individual | KYTC | US 27 | US 27 at KY 709 | Construct a southbound truck climbing lane on US 27 and a right turn lane on US 27 to KY 709 | traffic operations/safety | Non-exempt | 2027 | RW | 4 | State | $300,000.00 | $10,750,000.00 |
| 6-80314 | 42.916 | Kentucky | Campbell | Individual | KYTC | US 27 | US 27 at KY 709 | Construct a southbound truck climbing lane on US 27 and a right turn lane on US 27 to KY 709 | traffic operations/safety | Non-exempt | 2027 | UT | 5 | STPF | $600,000.00 | $10,750,000.00 |
| 6-80314 | 42.917 | Kentucky | Campbell | Individual | KYTC | US 27 | US 27 at KY 709 | Construct a southbound truck climbing lane on US 27 and a right turn lane on US 27 to KY 709 | traffic operations/safety | Non-exempt | 2027 | UT | 6 | State | $150,000.00 | $10,750,000.00 |
| 6-80314 | 42.918 | Kentucky | Campbell | Individual | KYTC | US 27 | US 27 at KY 709 | Construct a southbound truck climbing lane on US 27 and a right turn lane on US 27 to KY 709 | traffic operations/safety | Non-exempt | 2028 | CO | 7 | STPF | $6,200,000.00 | $10,750,000.00 |
| 6-80314 | 42.919 | Kentucky | Campbell | Individual | KYTC | US 27 | US 27 at KY 709 | Construct a southbound truck climbing lane on US 27 and a right turn lane on US 27 to KY 709 | traffic operations/safety | Non-exempt | 2028 | CO | 8 | State | $1,550,000.00 | $10,750,000.00 |
| 6-80316 | 42.920 | Kentucky | Boone | Individual | KYTC | US 25 | from MP 2.250 to 4.200 | Improve safety & mobility, and address geometric deficiencies along US 25 (Dixie Hwy) between KY 16 (Mary Grubbs) and KY 338 (Richwood Rd) | widening/relocation | Non-exempt | 2027 | D | 1 | STPF | $3,456,000.00 | $60,600,000.00 |
| 6-80316 | 42.921 | Kentucky | Boone | Individual | KYTC | US 25 | from MP 2.250 to 4.200 | Improve safety & mobility, and address geometric deficiencies along US 25 (Dixie Hwy) between KY 16 (Mary Grubbs) and KY 338 (Richwood Rd) | widening/relocation | Non-exempt | 2027 | D | 2 | State | $864,000.00 | $60,600,000.00 |
| 6-80316 | 42.922 | Kentucky | Boone | Individual | KYTC | US 25 | from MP 2.250 to 4.200 | Improve safety & mobility, and address geometric deficiencies along US 25 (Dixie Hwy) between KY 16 (Mary Grubbs) and KY 338 (Richwood Rd) | widening/relocation | Non-exempt | 2029 | RW | 3 | STPF | $4,800,000.00 | $60,600,000.00 |
| 6-80316 | 42.923 | Kentucky | Boone | Individual | KYTC | US 25 | from MP 2.250 to 4.200 | Improve safety & mobility, and address geometric deficiencies along US 25 (Dixie Hwy) between KY 16 (Mary Grubbs) and KY 338 (Richwood Rd) | widening/relocation | Non-exempt | 2029 | RW | 4 | State | $1,200,000.00 | $60,600,000.00 |
| 6-80316 | 42.924 | Kentucky | Boone | Individual | KYTC | US 25 | from MP 2.250 to 4.200 | Improve safety & mobility, and address geometric deficiencies along US 25 (Dixie Hwy) between KY 16 (Mary Grubbs) and KY 338 (Richwood Rd) | widening/relocation | Non-exempt | 2029 | UT | 5 | STPF | $2,784,000.00 | $60,600,000.00 |
| 6-80316 | 42.925 | Kentucky | Boone | Individual | KYTC | US 25 | from MP 2.250 to 4.200 | Improve safety & mobility, and address geometric deficiencies along US 25 (Dixie Hwy) between KY 16 (Mary Grubbs) and KY 338 (Richwood Rd) | widening/relocation | Non-exempt | 2029 | UT | 6 | State | $696,000.00 | $60,600,000.00 |
| 6-80316 | 42.926 | Kentucky | Boone | Individual | KYTC | US 25 | from MP 2.250 to 4.200 | Improve safety & mobility, and address geometric deficiencies along US 25 (Dixie Hwy) between KY 16 (Mary Grubbs) and KY 338 (Richwood Rd) | widening/relocation | Non-exempt | 2030 | CO | 7 | STPF | $37,440,000.00 | $60,600,000.00 |
| 6-80316 | 42.927 | Kentucky | Boone | Individual | KYTC | US 25 | from MP 2.250 to 4.200 | Improve safety & mobility, and address geometric deficiencies along US 25 (Dixie Hwy) between KY 16 (Mary Grubbs) and KY 338 (Richwood Rd) | widening/relocation | Non-exempt | 2030 | CO | 8 | State | $9,360,000.00 | $60,600,000.00 |
| 6-80317 | 42.928 | Kentucky | Boone | Individual | Boone County | Limaburg Road | KY 18 to Conrad Lane | Imrpove safety and reduce congestion (Design in RAISE grant) | widening/relocation | Non-exempt | 2028 | RW | 5 | STPF | $8,000,000.00 | $36,640,000.00 |
| 6-80317 | 42.929 | Kentucky | Boone | Individual | Boone County | Limaburg Road | KY 18 to Conrad Lane | Imrpove safety and reduce congestion (Design in RAISE grant) | widening/relocation | Non-exempt | 2028 | RW | 6 | State | $2,000,000.00 | $36,640,000.00 |
| 6-80317 | 42.930 | Kentucky | Boone | Individual | Boone County | Limaburg Road | KY 18 to Conrad Lane | Imrpove safety and reduce congestion (Design in RAISE grant) | widening/relocation | Non-exempt | 2028 | UT | 7 | STPF | $2,880,000.00 | $36,640,000.00 |
| 6-80317 | 42.931 | Kentucky | Boone | Individual | Boone County | Limaburg Road | KY 18 to Conrad Lane | Imrpove safety and reduce congestion (Design in RAISE grant) | widening/relocation | Non-exempt | 2028 | UT | 8 | State | $720,000.00 | $36,640,000.00 |
| 6-80317 | 42.932 | Kentucky | Boone | Individual | Boone County | Limaburg Road | KY 18 to Conrad Lane | Imrpove safety and reduce congestion (Design in RAISE grant) | widening/relocation | Non-exempt | 2030 | CO | 9 | STPF | $18,432,000.00 | $36,640,000.00 |
| 6-80317 | 42.933 | Kentucky | Boone | Individual | Boone County | Limaburg Road | KY 18 to Conrad Lane | Imrpove safety and reduce congestion (Design in RAISE grant) | widening/relocation | Non-exempt | 2030 | CO | 10 | State | $4,608,000.00 | $36,640,000.00 |
| 6-80352 | 42.934 | Kentucky | Boone | Individual | KYTC | I-75 @ KY 14/16 | I-75 (MP 171) South ramp to KY 14/16 Mary Grubbs Highway | Add additional exit lane and align lights to provide 2 left turn lanes and 1 right turn lane. Ramp only work. | traffic operations/safety | Exempt | 2025 | CO | 1 | SAF | $1,350,000.00 | $1,500,000.00 |
| 6-80352 | 42.935 | Kentucky | Boone | Individual | KYTC | I-75 @ KY 14/16 | I-75 (MP 171) South ramp to KY 14/16 Mary Grubbs Highway | Add additional exit lane and align lights to provide 2 left turn lanes and 1 right turn lane. Ramp only work. | traffic operations/safety | Exempt | 2025 | CO | 2 | State | $150,000.00 | $1,500,000.00 |
| 6-8105.06 | 42.936 | Kentucky | Campbell | Individual | KYTC | I-275/AA Connector | Johns Hill Road to AA Highway (KY 9) | New road connecting the AA highway to end of new construction just south of John's Hill Rd | widening/relocation | Non-exempt | 2023 | D | 3 | STBG | $800,000.00 | $1,000,000.00 |
| 6-8105.06 | 42.937 | Kentucky | Campbell | Individual | KYTC | I-275/AA Connector | Johns Hill Road to AA Highway (KY 9) | New road connecting the AA highway to end of new construction just south of John's Hill Rd | widening/relocation | Non-exempt | 2023 | D | 4 | State | $200,000.00 | $1,000,000.00 |
| 6-8105.07 | 42.938 | Kentucky | Campbell | Individual | KYTC | I-275/AA Connector | Johns Hill Road to AA Highway (KY 9) | New road connecting the AA highway to end of new construction just south of John's Hill Rd (D under 6-8105.06) | widening/relocation | Non-exempt | 2023 | RW | 4 | STBG | $4,971,200.00 | $20,384,000.00 |
| 6-8105.07 | 42.939 | Kentucky | Campbell | Individual | KYTC | I-275/AA Connector | Johns Hill Road to AA Highway (KY 9) | New road connecting the AA highway to end of new construction just south of John's Hill Rd (D under 6-8105.06) | widening/relocation | Non-exempt | 2023 | RW | 5 | State | $1,242,800.00 | $20,384,000.00 |
| 6-8105.07 | 42.940 | Kentucky | Campbell | Individual | KYTC | I-275/AA Connector | Johns Hill Road to AA Highway (KY 9) | New road connecting the AA highway to end of new construction just south of John's Hill Rd (D under 6-8105.06) | widening/relocation | Non-exempt | 2025 | UT | 6 | Uncommitted | $1,760,000.00 | $20,384,000.00 |
| 6-8105.07 | 42.941 | Kentucky | Campbell | Individual | KYTC | I-275/AA Connector | Johns Hill Road to AA Highway (KY 9) | New road connecting the AA highway to end of new construction just south of John's Hill Rd (D under 6-8105.06) | widening/relocation | Non-exempt | 2026 | CO | 7 | Uncommitted | $12,410,000.00 | $20,384,000.00 |
| 6-8815 | 42.942 | Kentucky | Kenton | Individual | KYTC | US 25 | North Arlington to the Covington sidewalk system (toll credits) | Sidewalk and curb construction | bicycle/pedestrian/other | Exempt | 2017 | D | 1 | TAP | $300,000.00 | $2,250,000.00 |
| 6-8815 | 42.943 | Kentucky | Kenton | Individual | KYTC | US 25 | North Arlington to the Covington sidewalk system (toll credits) | Sidewalk and curb construction | bicycle/pedestrian/other | Exempt | 2020 | RW | 2 | TAP | $320,000.00 | $2,250,000.00 |
| 6-8815 | 42.944 | Kentucky | Kenton | Individual | KYTC | US 25 | North Arlington to the Covington sidewalk system (toll credits) | Sidewalk and curb construction | bicycle/pedestrian/other | Exempt | 2020 | RW | 3 | Local | $80,000.00 | $2,250,000.00 |
| 6-8815 | 42.945 | Kentucky | Kenton | Individual | KYTC | US 25 | North Arlington to the Covington sidewalk system (toll credits) | Sidewalk and curb construction | bicycle/pedestrian/other | Exempt | 2020 | UT | 4 | TAP | $120,000.00 | $2,250,000.00 |
| 6-8815 | 42.946 | Kentucky | Kenton | Individual | KYTC | US 25 | North Arlington to the Covington sidewalk system (toll credits) | Sidewalk and curb construction | bicycle/pedestrian/other | Exempt | 2020 | UT | 5 | Local | $30,000.00 | $2,250,000.00 |
| 6-8815 | 42.947 | Kentucky | Kenton | Individual | KYTC | US 25 | North Arlington to the Covington sidewalk system (toll credits) | Sidewalk and curb construction | bicycle/pedestrian/other | Exempt | 2020 | CO | 6 | TAP | $1,120,000.00 | $2,250,000.00 |
| 6-8815 | 42.948 | Kentucky | Kenton | Individual | KYTC | US 25 | North Arlington to the Covington sidewalk system (toll credits) | Sidewalk and curb construction | bicycle/pedestrian/other | Exempt | 2020 | CO | 7 | Local | $280,000.00 | $2,250,000.00 |
| 6-8915 | 42.949 | Kentucky | Kenton | Individual | KYTC | IR 275 | From US 25 (Dixie Hwy) westbound (toll credits) | Construct a sound barrier wall | maintenance/reconstruction | Exempt | 2017 | D | 6 | STP | $100,000.00 | $100,000.00 |
| 6-8951 | 42.950 | Kentucky | Kenton | Individual | KYTC | US 25 | from MP 8.583 to 8.667 | Improve existing alignment with Buttermilk Pike, Orphanage Road and US 25. | traffic operations/safety | Exempt | 2021 | D | 1 | STBG | $456,000.00 | $26,910,000.00 |
| 6-8951 | 42.951 | Kentucky | Kenton | Individual | KYTC | US 25 | from MP 8.583 to 8.667 | Improve existing alignment with Buttermilk Pike, Orphanage Road and US 25. | traffic operations/safety | Exempt | 2021 | D | 2 | State | $114,000.00 | $26,910,000.00 |
| 6-8951 | 42.952 | Kentucky | Kenton | Individual | KYTC | US 25 | from MP 8.583 to 8.667 | Improve existing alignment with Buttermilk Pike, Orphanage Road and US 25. | traffic operations/safety | Exempt | 2026 | RW | 4 | STBG | $6,400,000.00 | $26,910,000.00 |
| 6-8951 | 42.953 | Kentucky | Kenton | Individual | KYTC | US 25 | from MP 8.583 to 8.667 | Improve existing alignment with Buttermilk Pike, Orphanage Road and US 25. | traffic operations/safety | Exempt | 2027 | RW | 4 | STBG | $8,000,000.00 | $26,910,000.00 |
| 6-8951 | 42.954 | Kentucky | Kenton | Individual | KYTC | US 25 | from MP 8.583 to 8.667 | Improve existing alignment with Buttermilk Pike, Orphanage Road and US 25. | traffic operations/safety | Exempt | 2027 | RW | 5 | State | $2,000,000.00 | $26,910,000.00 |
| 6-8951 | 42.955 | Kentucky | Kenton | Individual | KYTC | US 25 | from MP 8.583 to 8.667 | Improve existing alignment with Buttermilk Pike, Orphanage Road and US 25. | traffic operations/safety | Exempt | 2026 | RW | 5 | State | $1,600,000.00 | $26,910,000.00 |
| 6-8951 | 42.956 | Kentucky | Kenton | Individual | KYTC | US 25 | from MP 8.583 to 8.667 | Improve existing alignment with Buttermilk Pike, Orphanage Road and US 25. | traffic operations/safety | Exempt | 2028 | UT | 6 | STBG | $1,872,000.00 | $26,910,000.00 |
| 6-8951 | 42.957 | Kentucky | Kenton | Individual | KYTC | US 25 | from MP 8.583 to 8.667 | Improve existing alignment with Buttermilk Pike, Orphanage Road and US 25. | traffic operations/safety | Exempt | 2028 | UT | 7 | State | $468,000.00 | $26,910,000.00 |
| 6-8951 | 42.958 | Kentucky | Kenton | Individual | KYTC | US 25 | from MP 8.583 to 8.667 | Improve existing alignment with Buttermilk Pike, Orphanage Road and US 25. | traffic operations/safety | Exempt | 2028 | CO | 8 | STBG | $4,800,000.00 | $26,910,000.00 |
| 6-8951 | 42.959 | Kentucky | Kenton | Individual | KYTC | US 25 | from MP 8.583 to 8.667 | Improve existing alignment with Buttermilk Pike, Orphanage Road and US 25. | traffic operations/safety | Exempt | 2028 | CO | 9 | State | $1,200,000.00 | $26,910,000.00 |
| 6-8954 | 42.960 | Kentucky | Kenton | Individual | Kenton County | CR 1021 | Bridge replacement on Ernest Bridge Drive (CR 1021) over the CSX RR (toll credits) | Bridge replacement | bridge/culvert replacement | Exempt | 2021 | D | 1 | BR | $400,000.00 | $3,150,000.00 |
| 6-8954 | 42.961 | Kentucky | Kenton | Individual | Kenton County | CR 1021 | Bridge replacement on Ernest Bridge Drive (CR 1021) over the CSX RR (toll credits) | Bridge replacement | bridge/culvert replacement | Exempt | 2021 | RW | 2 | BR | $750,000.00 | $3,150,000.00 |
| 6-8954 | 42.962 | Kentucky | Kenton | Individual | Kenton County | CR 1021 | Bridge replacement on Ernest Bridge Drive (CR 1021) over the CSX RR (toll credits) | Bridge replacement | bridge/culvert replacement | Exempt | 2021 | UT | 3 | BR | $500,000.00 | $3,150,000.00 |
| 6-8954 | 42.963 | Kentucky | Kenton | Individual | Kenton County | CR 1021 | Bridge replacement on Ernest Bridge Drive (CR 1021) over the CSX RR (toll credits) | Bridge replacement | bridge/culvert replacement | Exempt | 2021 | CO | 6 | BR | $1,500,000.00 | $3,150,000.00 |
| 6-902.00 | 42.964 | Kentucky | Boone | Group | KYTC | Various | Various locations in District 6 | Installation of pavement markers on various routes in District 6 | Highway Safety Improvement Program Projects | Exempt | 2023 | CO | 1 | HSIP | $798,300.00 | |
| 6-902.00 | 42.965 | Kentucky | Boone | Group | KYTC | Various | Various locations in District 6 | Installation of pavement markers on various routes in District 6 | Highway Safety Improvement Program Projects | Exempt | 2023 | CO | 2 | State | $88,700.00 | |
| 6-9022.10 | 42.966 | Kentucky | Boone | Group | KYTC | KY 842 | KY 842 & KY 717 intersection | Upgrade the Traffic Signal to include Reflective Backplates and Update the Signing and Striping | Highway Safety Improvement Program Projects | Exempt | 2022 | CO | 6 | HSIP | $90,000.00 | |
| 6-9022.20 | 42.967 | Kentucky | Campbell | Group | KYTC | KY 1892 | Intersection of KY 1892 & Newport Pavilion | Upgrade the Traffic Signal to Include Reflective Backplates and Convert the Left Turn Signals along KY 1892 to Protected Only | Highway Safety Improvement Program Projects | Exempt | 2022 | CO | 6 | HSIP | $20,000.00 | |
| 6-903.00 | 42.968 | Kentucky | Boone | Group | KYTC | District 6 Safety Program-various | Various Off Ramps in District 6 | Installation of Wrong Way Driving Signs and Pavement Markings | Highway Safety Improvement Program Projects | Exempt | 2024 | CO | 1 | HSIP | $1,515,200.00 | |
| 6-903.00 | 42.969 | Kentucky | Boone | Group | KYTC | District 6 Safety Program-various | Various Off Ramps in District 6 | Installation of Wrong Way Driving Signs and Pavement Markings | Highway Safety Improvement Program Projects | Exempt | 2024 | CO | 2 | State | $378,800.00 | |
| 6-9039 | 42.970 | Kentucky | Kenton | Group | KYTC | KY 2045 | from MP 0.0 to 1.34 | Installation of High Friction Surface Treatment | Highway Safety Improvement Program Projects | Exempt | 2025 | CO | 5 | HSIP | $389,813.00 | |
| 6-9039 | 42.971 | Kentucky | Kenton | Group | KYTC | KY 2045 | from MP 0.0 to 1.34 | Installation of High Friction Surface Treatment | Highway Safety Improvement Program Projects | Exempt | 2025 | CO | 6 | State | $43,312.00 | |
| 6-9044 | 42.972 | Kentucky | Boone | Group | KYTC | KY 338 | from MP 0.00 to 4.90 | Striping Improvements on KY 338 | Highway Safety Improvement Program Projects | Exempt | 2025 | CO | 5 | HSIP | $110,000.00 | |
| 6-9045 | 42.973 | Kentucky | Boone | Group | KYTC | KY 338 | from MP 16.50 to 32.528 | Striping Improvements on KY 338 | Highway Safety Improvement Program Projects | Exempt | 2025 | CO | 5 | HSIP | $380,000.00 | |
| 6-9047 | 42.974 | Kentucky | Campbell | Group | KYTC | KY 8 | from MP 0.683 to 19.630 | Striping Improvements on KY 8 | Highway Safety Improvement Program Projects | Exempt | 2025 | CO | 5 | HSIP | $380,000.00 | |
| 6-9048 | 42.975 | Kentucky | Kenton | Group | KYTC | KY 16 | from MP 0.00 to 13.340 | Striping Improvements on KY 16 | Highway Safety Improvement Program Projects | Exempt | 2025 | CO | 5 | HSIP | $345,000.00 | |
| 6-9050 | 42.976 | Kentucky | Boone | Group | KYTC | KY 20 | from MP 6.606 to 10.876 | Perform low-cost safety improvements on KY 20 | Highway Safety Improvement Program Projects | Exempt | 2025 | CO | 5 | HSIP | $1,350,000.00 | |
| 6-9050 | 42.977 | Kentucky | Boone | Group | KYTC | KY 20 | from MP 6.606 to 10.876 | Perform low-cost safety improvements on KY 20 | Highway Safety Improvement Program Projects | Exempt | 2025 | CO | 6 | State | $150,000.00 | |
| 6-944.00 | 42.978 | Kentucky | Boone | Group | KYTC | US 42 | on US 42 from MP 5.03 to MP 5.24 in Boone County, KY | Installation of High Friction Surface Treatment on US 42 from MP 5.03 to MP 5.24 in Boone County, KY. (2022BOP) | Highway Safety Improvement Program Projects | Exempt | 2024 | CO | 1 | HSIP | $72,000.00 | |
| 6-944.00 | 42.979 | Kentucky | Boone | Group | KYTC | US 42 | on US 42 from MP 5.03 to MP 5.24 in Boone County, KY | Installation of High Friction Surface Treatment on US 42 from MP 5.03 to MP 5.24 in Boone County, KY. (2022BOP) | Highway Safety Improvement Program Projects | Exempt | 2024 | CO | 2 | State | $8,000.00 | |
| 6-946.00 | 42.980 | Kentucky | Kenton | Group | KYTC | KY 371 | on KY 371 from MP 2.5 to MP 2.656 in Kenton County, KY | Installation of High Friction Surface Treatment on KY 371 from MP 2.5 to MP 2.656 in Kenton County, KY. (2022BOP) | Highway Safety Improvement Program Projects | Exempt | 2024 | CO | 1 | HSIP | $103,950.00 | |
| 6-946.00 | 42.981 | Kentucky | Kenton | Group | KYTC | KY 371 | on KY 371 from MP 2.5 to MP 2.656 in Kenton County, KY | Installation of High Friction Surface Treatment on KY 371 from MP 2.5 to MP 2.656 in Kenton County, KY. (2022BOP) | Highway Safety Improvement Program Projects | Exempt | 2024 | CO | 2 | State | $11,550.00 | |
| 6-950.00 | 42.982 | Kentucky | Campbell | Group | KYTC | US 27 | between MP 3.15 to MP 3.6 in Campbell County, KY | Convert intersection to an RCUT on US 27 | Highway Safety Improvement Program Projects | Exempt | 2026 | CO | 5 | HSIP | $765,000.00 | |
| 6-950.00 | 42.983 | Kentucky | Campbell | Group | KYTC | US 27 | between MP 3.15 to MP 3.6 in Campbell County, KY | Convert intersection to an RCUT on US 27 | Highway Safety Improvement Program Projects | Exempt | 2026 | CO | 6 | State | $85,000.00 | |
| 77889 | 39.696 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 7.85 | Work at three NSRR bridges (over Prosser Avenue, over I-75, and over SR-562) including work on the track between the three bridges | Phase 8 of the Mill Creek Expressway Project. Project includes replacement of three railroad bridges (over Prosser Avenue, over I-75, and over SR-562) and reconstruct the RR tracks between bridges. Minor realignment of I-75 lanes to accommodate new railr | Railroad Improvements & Rehabilitation | Non-Exempt (Analyzed) | 2026 | DBT | 10 | Garvee / SIB Repayments | $6,081,974.00 | $93,625,955.31 |
| 77889 | 39.697 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 7.85 | Work at three NSRR bridges (over Prosser Avenue, over I-75, and over SR-562) including work on the track between the three bridges | Phase 8 of the Mill Creek Expressway Project. Project includes replacement of three railroad bridges (over Prosser Avenue, over I-75, and over SR-562) and reconstruct the RR tracks between bridges. Minor realignment of I-75 lanes to accommodate new railr | Railroad Improvements & Rehabilitation | Non-Exempt (Analyzed) | 2027 | DBT | 10 | Garvee / SIB Repayments | $6,081,975.00 | $93,625,955.31 |
| 77889 | 39.698 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 7.85 | Work at three NSRR bridges (over Prosser Avenue, over I-75, and over SR-562) including work on the track between the three bridges | Phase 8 of the Mill Creek Expressway Project. Project includes replacement of three railroad bridges (over Prosser Avenue, over I-75, and over SR-562) and reconstruct the RR tracks between bridges. Minor realignment of I-75 lanes to accommodate new railr | Railroad Improvements & Rehabilitation | Non-Exempt (Analyzed) | 2028 | DBT | 10 | Garvee / SIB Repayments | $6,081,975.00 | $93,625,955.31 |
| 77889 | 39.699 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 7.85 | Work at three NSRR bridges (over Prosser Avenue, over I-75, and over SR-562) including work on the track between the three bridges | Phase 8 of the Mill Creek Expressway Project. Project includes replacement of three railroad bridges (over Prosser Avenue, over I-75, and over SR-562) and reconstruct the RR tracks between bridges. Minor realignment of I-75 lanes to accommodate new railr | Railroad Improvements & Rehabilitation | Non-Exempt (Analyzed) | 2029 | DBT | 10 | Garvee / SIB Repayments | $6,081,975.00 | $93,625,955.31 |
| 77925 | 35.818 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 32 0.14/1.27/5.75 | HAM-32-(0012-0016); HAM-32-(0125-0129); HAM-32-(0142-0146); HAM-125-(0162-0166); HAM-32-(0573-0577) | Project to rehabilitate the following bridges carrying SR 32: HAM-32-0014, SFN 3102068 over Eastern Ave and a Railroad; HAM-32-0127, SFN 3102076 over the Little Miami River and a bikepath; and HAM-32-0575, SFN 3102203 over Dry Run. Work to include paintin | Bridge Preservation | Exempt | 2026 | ENV | 0 | State | $20,000.00 | $9,809,532.00 |
| 77925 | 35.819 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 32 0.14/1.27/5.75 | HAM-32-(0012-0016); HAM-32-(0125-0129); HAM-32-(0142-0146); HAM-125-(0162-0166); HAM-32-(0573-0577) | Project to rehabilitate the following bridges carrying SR 32: HAM-32-0014, SFN 3102068 over Eastern Ave and a Railroad; HAM-32-0127, SFN 3102076 over the Little Miami River and a bikepath; and HAM-32-0575, SFN 3102203 over Dry Run. Work to include paintin | Bridge Preservation | Exempt | ENV | 0 | Labor | $9,809,532.00 | ||
| 77925 | 35.820 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 32 0.14/1.27/5.75 | HAM-32-(0012-0016); HAM-32-(0125-0129); HAM-32-(0142-0146); HAM-125-(0162-0166); HAM-32-(0573-0577) | Project to rehabilitate the following bridges carrying SR 32: HAM-32-0014, SFN 3102068 over Eastern Ave and a Railroad; HAM-32-0127, SFN 3102076 over the Little Miami River and a bikepath; and HAM-32-0575, SFN 3102203 over Dry Run. Work to include paintin | Bridge Preservation | Exempt | 2027 | CO | 0 | Preservation | $7,104,800.00 | $9,809,532.00 |
| 77925 | 35.821 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 32 0.14/1.27/5.75 | HAM-32-(0012-0016); HAM-32-(0125-0129); HAM-32-(0142-0146); HAM-125-(0162-0166); HAM-32-(0573-0577) | Project to rehabilitate the following bridges carrying SR 32: HAM-32-0014, SFN 3102068 over Eastern Ave and a Railroad; HAM-32-0127, SFN 3102076 over the Little Miami River and a bikepath; and HAM-32-0575, SFN 3102203 over Dry Run. Work to include paintin | Bridge Preservation | Exempt | 2027 | CO | 0 | State | $1,776,200.00 | $9,809,532.00 |
| 77925 | 35.822 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM SR 32 0.14/1.27/5.75 | HAM-32-(0012-0016); HAM-32-(0125-0129); HAM-32-(0142-0146); HAM-125-(0162-0166); HAM-32-(0573-0577) | Project to rehabilitate the following bridges carrying SR 32: HAM-32-0014, SFN 3102068 over Eastern Ave and a Railroad; HAM-32-0127, SFN 3102076 over the Little Miami River and a bikepath; and HAM-32-0575, SFN 3102203 over Dry Run. Work to include paintin | Bridge Preservation | Exempt | 2027 | CO | 0 | Labor | $621,670.00 | $9,809,532.00 |
| 77930 | 35.823 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 42 9.73/12.29 | HAM US 42 from SLM 9.731-10.01 & 12.29-13.05 | Resurfacing a portion of US 42 in Hamilton County | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | Preservation | $320,000.00 | $550,000.00 |
| 77930 | 35.824 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 42 9.73/12.29 | HAM US 42 from SLM 9.731-10.01 & 12.29-13.05 | Resurfacing a portion of US 42 in Hamilton County | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | State | $80,000.00 | $550,000.00 |
| 77930 | 35.825 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 42 9.73/12.29 | HAM US 42 from SLM 9.731-10.01 & 12.29-13.05 | Resurfacing a portion of US 42 in Hamilton County | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | Labor | $50,000.00 | $550,000.00 |
| 77930 | 35.826 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 42 9.73/12.29 | HAM US 42 from SLM 9.731-10.01 & 12.29-13.05 | Resurfacing a portion of US 42 in Hamilton County | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | Local | $100,000.00 | $550,000.00 |
| 81468 | 35.827 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 756 0.10 | Begin 0.10 miles S of SR 232 to 0.20 miles S. of SR 232. | Rehabilitate Bridge CLE-756-0013. Replace concrete deck and provide pier protection. | Bridge Preservation | Exempt | 2027 | ENV | 0 | State | $85,000.00 | $1,479,710.00 |
| 81468 | 35.828 | Ohio | CLE | Group | ODOT Sponsoring Agency | CLE SR 756 0.10 | Begin 0.10 miles S of SR 232 to 0.20 miles S. of SR 232. | Rehabilitate Bridge CLE-756-0013. Replace concrete deck and provide pier protection. | Bridge Preservation | Exempt | ENV | 0 | Labor | $1,479,710.00 | ||
| 82288 | 39.700 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 12.60 | From 0.3 miles south of Shepherd Lane to 0.2 miles north of Glendale-Milford Rd.(phase 1) | Phase 1&2 of the HAM-75 Corridor Projects. Phase 1: Reconstruct the interstate between Shepherd Lane and Glendale-Milford Rd. Work includes the redesign of the Shepherd Ln. interchange, removal of the collector distributor system, and improvements to th | Roadway Major Rehab | Non-Exempt (Analyzed) | 2026 | DBT | 10 | Garvee / SIB Repayments | $2,097,390.00 | $125,671,578.36 |
| 82288 | 39.701 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 12.60 | From 0.3 miles south of Shepherd Lane to 0.2 miles north of Glendale-Milford Rd.(phase 1) | Phase 1&2 of the HAM-75 Corridor Projects. Phase 1: Reconstruct the interstate between Shepherd Lane and Glendale-Milford Rd. Work includes the redesign of the Shepherd Ln. interchange, removal of the collector distributor system, and improvements to th | Roadway Major Rehab | Non-Exempt (Analyzed) | 2027 | DBT | 10 | Garvee / SIB Repayments | $2,072,830.00 | $125,671,578.36 |
| 82288 | 39.702 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 12.60 | From 0.3 miles south of Shepherd Lane to 0.2 miles north of Glendale-Milford Rd.(phase 1) | Phase 1&2 of the HAM-75 Corridor Projects. Phase 1: Reconstruct the interstate between Shepherd Lane and Glendale-Milford Rd. Work includes the redesign of the Shepherd Ln. interchange, removal of the collector distributor system, and improvements to th | Roadway Major Rehab | Non-Exempt (Analyzed) | 2028 | DBT | 10 | Garvee / SIB Repayments | $2,048,270.00 | $125,671,578.36 |
| 82288 | 39.703 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 12.60 | From 0.3 miles south of Shepherd Lane to 0.2 miles north of Glendale-Milford Rd.(phase 1) | Phase 1&2 of the HAM-75 Corridor Projects. Phase 1: Reconstruct the interstate between Shepherd Lane and Glendale-Milford Rd. Work includes the redesign of the Shepherd Ln. interchange, removal of the collector distributor system, and improvements to th | Roadway Major Rehab | Non-Exempt (Analyzed) | 2029 | DBT | 10 | Garvee / SIB Repayments | $2,023,711.00 | $125,671,578.36 |
| 84492 | 39.704 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 275 39.81 | HAM IR 275: SLM 39.81 to 41.36 | Resurface and perform pavement repair on I-275 from just before Four Mile Road to the Ohio River in Hamilton County. Project includes minor rehabilitation to a bridge size culvert and 5 mainline twin bridges including the Combs Hehl Bridge over the OhioR | Roadway Minor Rehab | Exempt | 2026 | DBT | 10 | Garvee / SIB Repayments | $1,627,819.00 | $35,459,396.98 |
| 84492 | 39.705 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 275 39.81 | HAM IR 275: SLM 39.81 to 41.36 | Resurface and perform pavement repair on I-275 from just before Four Mile Road to the Ohio River in Hamilton County. Project includes minor rehabilitation to a bridge size culvert and 5 mainline twin bridges including the Combs Hehl Bridge over the OhioR | Roadway Minor Rehab | Exempt | 2027 | DBT | 10 | Garvee / SIB Repayments | $1,624,364.00 | $35,459,396.98 |
| 84492 | 39.706 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 275 39.81 | HAM IR 275: SLM 39.81 to 41.36 | Resurface and perform pavement repair on I-275 from just before Four Mile Road to the Ohio River in Hamilton County. Project includes minor rehabilitation to a bridge size culvert and 5 mainline twin bridges including the Combs Hehl Bridge over the OhioR | Roadway Minor Rehab | Exempt | 2028 | DBT | 10 | Garvee / SIB Repayments | $1,620,908.00 | $35,459,396.98 |
| 84492 | 39.707 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 275 39.81 | HAM IR 275: SLM 39.81 to 41.36 | Resurface and perform pavement repair on I-275 from just before Four Mile Road to the Ohio River in Hamilton County. Project includes minor rehabilitation to a bridge size culvert and 5 mainline twin bridges including the Combs Hehl Bridge over the OhioR | Roadway Minor Rehab | Exempt | 2029 | DBT | 10 | Garvee / SIB Repayments | $1,617,454.00 | $35,459,396.98 |
| 86461 | 35.829 | Ohio | HAM | Group | Cincinnati, City of | HAM Red Bank Shared Use Path | From US 50 to existing IR 71 / Red Bank Road Interchange | Construct a shared use path along Red Bank Road from Hetzel St to the intersection of Old Red Bank and Duck Creek Rd | Shared Use Path | Exempt | 2026 | RW | 0 | Discretionary / Earmark | $12,000.00 | $4,082,740.03 |
| 86461 | 35.830 | Ohio | HAM | Group | Cincinnati, City of | HAM Red Bank Shared Use Path | From US 50 to existing IR 71 / Red Bank Road Interchange | Construct a shared use path along Red Bank Road from Hetzel St to the intersection of Old Red Bank and Duck Creek Rd | Shared Use Path | Exempt | 2026 | RW | 0 | Local | $3,000.00 | $4,082,740.03 |
| 86461 | 35.831 | Ohio | HAM | Group | Cincinnati, City of | HAM Red Bank Shared Use Path | From US 50 to existing IR 71 / Red Bank Road Interchange | Construct a shared use path along Red Bank Road from Hetzel St to the intersection of Old Red Bank and Duck Creek Rd | Shared Use Path | Exempt | 2028 | CO | 0 | Discretionary / Earmark | $1,133,406.38 | $4,082,740.03 |
| 86461 | 35.832 | Ohio | HAM | Group | Cincinnati, City of | HAM Red Bank Shared Use Path | From US 50 to existing IR 71 / Red Bank Road Interchange | Construct a shared use path along Red Bank Road from Hetzel St to the intersection of Old Red Bank and Duck Creek Rd | Shared Use Path | Exempt | 2027 | CO | 0 | Local | $99,173.06 | $4,082,740.03 |
| 86461 | 35.833 | Ohio | HAM | Group | Cincinnati, City of | HAM Red Bank Shared Use Path | From US 50 to existing IR 71 / Red Bank Road Interchange | Construct a shared use path along Red Bank Road from Hetzel St to the intersection of Old Red Bank and Duck Creek Rd | Shared Use Path | Exempt | 2028 | CO | 0 | Local | $283,351.59 | $4,082,740.03 |
| 88129 | 39.708 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 11.09 Part 1 | Railroad bridge 11.09 on southbound IR75 in the split (phase 4) | Part 1 project of TTV Phase 4: Replace railroad bridge prior to widening IR75. Includes construction of substructure for future 3rd rail line. Part 2 project of TTV Phase 4 (PID 122358). Construction of a portion of the ramp and CD system to and from G | Bridge Expansion | Exempt | 2026 | RW | 3 | Major Programs | $1,680,000.00 | $89,825,586.51 |
| 88129 | 39.709 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 11.09 Part 1 | Railroad bridge 11.09 on southbound IR75 in the split (phase 4) | Part 1 project of TTV Phase 4: Replace railroad bridge prior to widening IR75. Includes construction of substructure for future 3rd rail line. Part 2 project of TTV Phase 4 (PID 122358). Construction of a portion of the ramp and CD system to and from G | Bridge Expansion | Exempt | 2027 | RW | 3 | Major Programs | $1,600,000.00 | $89,825,586.51 |
| 88129 | 39.710 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 11.09 Part 1 | Railroad bridge 11.09 on southbound IR75 in the split (phase 4) | Part 1 project of TTV Phase 4: Replace railroad bridge prior to widening IR75. Includes construction of substructure for future 3rd rail line. Part 2 project of TTV Phase 4 (PID 122358). Construction of a portion of the ramp and CD system to and from G | Bridge Expansion | Exempt | RW | 4 | Preservation | $89,825,586.51 | ||
| 88129 | 39.711 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 11.09 Part 1 | Railroad bridge 11.09 on southbound IR75 in the split (phase 4) | Part 1 project of TTV Phase 4: Replace railroad bridge prior to widening IR75. Includes construction of substructure for future 3rd rail line. Part 2 project of TTV Phase 4 (PID 122358). Construction of a portion of the ramp and CD system to and from G | Bridge Expansion | Exempt | 2026 | RW | 5 | State | $420,000.00 | $89,825,586.51 |
| 88129 | 39.712 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 11.09 Part 1 | Railroad bridge 11.09 on southbound IR75 in the split (phase 4) | Part 1 project of TTV Phase 4: Replace railroad bridge prior to widening IR75. Includes construction of substructure for future 3rd rail line. Part 2 project of TTV Phase 4 (PID 122358). Construction of a portion of the ramp and CD system to and from G | Bridge Expansion | Exempt | 2027 | RW | 5 | State | $400,000.00 | $89,825,586.51 |
| 88129 | 39.713 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 11.09 Part 1 | Railroad bridge 11.09 on southbound IR75 in the split (phase 4) | Part 1 project of TTV Phase 4: Replace railroad bridge prior to widening IR75. Includes construction of substructure for future 3rd rail line. Part 2 project of TTV Phase 4 (PID 122358). Construction of a portion of the ramp and CD system to and from G | Bridge Expansion | Exempt | RW | 6 | Labor | $89,825,586.51 | ||
| 88129 | 39.714 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 11.09 Part 1 | Railroad bridge 11.09 on southbound IR75 in the split (phase 4) | Part 1 project of TTV Phase 4: Replace railroad bridge prior to widening IR75. Includes construction of substructure for future 3rd rail line. Part 2 project of TTV Phase 4 (PID 122358). Construction of a portion of the ramp and CD system to and from G | Bridge Expansion | Exempt | 2028 | CO | 7 | Major Programs | $3,200,000.00 | $89,825,586.51 |
| 88129 | 39.715 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 11.09 Part 1 | Railroad bridge 11.09 on southbound IR75 in the split (phase 4) | Part 1 project of TTV Phase 4: Replace railroad bridge prior to widening IR75. Includes construction of substructure for future 3rd rail line. Part 2 project of TTV Phase 4 (PID 122358). Construction of a portion of the ramp and CD system to and from G | Bridge Expansion | Exempt | 2029 | CO | 7 | Major Programs | $52,640,000.00 | $89,825,586.51 |
| 88129 | 39.716 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 11.09 Part 1 | Railroad bridge 11.09 on southbound IR75 in the split (phase 4) | Part 1 project of TTV Phase 4: Replace railroad bridge prior to widening IR75. Includes construction of substructure for future 3rd rail line. Part 2 project of TTV Phase 4 (PID 122358). Construction of a portion of the ramp and CD system to and from G | Bridge Expansion | Exempt | 2028 | CO | 8 | State | $800,000.00 | $89,825,586.51 |
| 88129 | 39.717 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 11.09 Part 1 | Railroad bridge 11.09 on southbound IR75 in the split (phase 4) | Part 1 project of TTV Phase 4: Replace railroad bridge prior to widening IR75. Includes construction of substructure for future 3rd rail line. Part 2 project of TTV Phase 4 (PID 122358). Construction of a portion of the ramp and CD system to and from G | Bridge Expansion | Exempt | 2029 | CO | 8 | State | $13,160,000.00 | $89,825,586.51 |
| 88129 | 39.718 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 75 11.09 Part 1 | Railroad bridge 11.09 on southbound IR75 in the split (phase 4) | Part 1 project of TTV Phase 4: Replace railroad bridge prior to widening IR75. Includes construction of substructure for future 3rd rail line. Part 2 project of TTV Phase 4 (PID 122358). Construction of a portion of the ramp and CD system to and from G | Bridge Expansion | Exempt | 2029 | CO | 9 | Labor | $4,725,000.00 | $89,825,586.51 |
| 88672 | 35.834 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 27 10.20 | HAM-27: SLM 10.20 -18.59 | Resurfacing on a portion of US 27 in Hamilton County. Project includes replacing the asphalt wearing surface on the HAM-27-1849L/R bridges that carry US 27 over Great Miami River. | Roadway Minor Rehab | Exempt | 2026 | RW | 0 | State | $10,000.00 | $7,966,551.00 |
| 88672 | 35.835 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 27 10.20 | HAM-27: SLM 10.20 -18.59 | Resurfacing on a portion of US 27 in Hamilton County. Project includes replacing the asphalt wearing surface on the HAM-27-1849L/R bridges that carry US 27 over Great Miami River. | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | Preservation | $6,120,424.00 | $7,966,551.00 |
| 88672 | 35.836 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 27 10.20 | HAM-27: SLM 10.20 -18.59 | Resurfacing on a portion of US 27 in Hamilton County. Project includes replacing the asphalt wearing surface on the HAM-27-1849L/R bridges that carry US 27 over Great Miami River. | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | State | $1,530,106.00 | $7,966,551.00 |
| 88672 | 35.837 | Ohio | HAM | Group | ODOT Sponsoring Agency | HAM US 27 10.20 | HAM-27: SLM 10.20 -18.59 | Resurfacing on a portion of US 27 in Hamilton County. Project includes replacing the asphalt wearing surface on the HAM-27-1849L/R bridges that carry US 27 over Great Miami River. | Roadway Minor Rehab | Exempt | 2027 | CO | 0 | Labor | $306,021.00 | $7,966,551.00 |
| 91826 | 39.719 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 71 8.42 | HAM IR 71: from north of SR 562 to SR 126 | Plane and Pave a portion of IR 71 in Hamilton County from the RR bridge north of SR 562 to SR 126. Includes deck replacement of bridges HAM-71-1068 L/R over Stewart Rd. and minor rehabiltiations of several other bridges within project limits. Highway sign | Roadway Minor Rehab | Exempt | 2026 | DBT | 10 | Garvee / SIB Repayments | $2,688,907.00 | $39,116,673.16 |
| 91826 | 39.720 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 71 8.42 | HAM IR 71: from north of SR 562 to SR 126 | Plane and Pave a portion of IR 71 in Hamilton County from the RR bridge north of SR 562 to SR 126. Includes deck replacement of bridges HAM-71-1068 L/R over Stewart Rd. and minor rehabiltiations of several other bridges within project limits. Highway sign | Roadway Minor Rehab | Exempt | 2027 | DBT | 10 | Garvee / SIB Repayments | $2,688,907.00 | $39,116,673.16 |
| 91826 | 39.721 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 71 8.42 | HAM IR 71: from north of SR 562 to SR 126 | Plane and Pave a portion of IR 71 in Hamilton County from the RR bridge north of SR 562 to SR 126. Includes deck replacement of bridges HAM-71-1068 L/R over Stewart Rd. and minor rehabiltiations of several other bridges within project limits. Highway sign | Roadway Minor Rehab | Exempt | 2028 | DBT | 10 | Garvee / SIB Repayments | $2,688,907.00 | $39,116,673.16 |
| 91826 | 39.722 | Ohio | Hamilton | Individual | ODOT Sponsoring Agency | HAM IR 71 8.42 | HAM IR 71: from north of SR 562 to SR 126 | Plane and Pave a portion of IR 71 in Hamilton County from the RR bridge north of SR 562 to SR 126. Includes deck replacement of bridges HAM-71-1068 L/R over Stewart Rd. and minor rehabiltiations of several other bridges within project limits. Highway sign | Roadway Minor Rehab | Exempt | 2029 | DBT | 10 | Garvee / SIB Repayments | $2,688,907.00 | $39,116,673.16 |
| 93964 | 39.723 | Ohio | Warren | Individual | Warren County TID | WAR IR 71 3.62 Western Row Rd | IR-71 and Western Row Road interchange | Conversion of the IR-71 and Western Row Road interchange to a full interchange including construction of new ramps and auxiliary lanes. | Roadway Major Rehab | Non-Exempt (Analyzed) | 2026 | DBT | 10 | Garvee / SIB Repayments | $1,570,921.00 | $24,958,046.93 |
| 93964 | 39.724 | Ohio | Warren | Individual | Warren County TID | WAR IR 71 3.62 Western Row Rd | IR-71 and Western Row Road interchange | Conversion of the IR-71 and Western Row Road interchange to a full interchange including construction of new ramps and auxiliary lanes. | Roadway Major Rehab | Non-Exempt (Analyzed) | 2027 | DBT | 10 | Garvee / SIB Repayments | $1,552,682.00 | $24,958,046.93 |
| 93964 | 39.725 | Ohio | Warren | Individual | Warren County TID | WAR IR 71 3.62 Western Row Rd | IR-71 and Western Row Road interchange | Conversion of the IR-71 and Western Row Road interchange to a full interchange including construction of new ramps and auxiliary lanes. | Roadway Major Rehab | Non-Exempt (Analyzed) | 2028 | DBT | 10 | Garvee / SIB Repayments | $1,534,443.00 | $24,958,046.93 |
| 93964 | 39.726 | Ohio | Warren | Individual | Warren County TID | WAR IR 71 3.62 Western Row Rd | IR-71 and Western Row Road interchange | Conversion of the IR-71 and Western Row Road interchange to a full interchange including construction of new ramps and auxiliary lanes. | Roadway Major Rehab | Non-Exempt (Analyzed) | 2029 | DBT | 10 | Garvee / SIB Repayments | $1,516,204.00 | $24,958,046.93 |
| 96425 | 35.838 | Ohio | HAM | Group | Ohio Rail Development Commission | HAM Vine St. NS | HAM Vine Street, City of St. Bernard, at the NS Grade Crossing DOT # 524743Y. | Upgrade modernization of warning devices at the NS grade crossing DOT # 524743Y. Installation will include any ancillary work to make warning devices function as designed, MUTCD compliant, and visible to roadway user. Includes cants and traffic signal pr | Railroad Crossing Protection | Exempt | 2027 | CO | 0 | Rail | $420,180.00 | $1,126,203.00 |
| 96425 | 35.839 | Ohio | HAM | Group | Ohio Rail Development Commission | HAM Vine St. NS | HAM Vine Street, City of St. Bernard, at the NS Grade Crossing DOT # 524743Y. | Upgrade modernization of warning devices at the NS grade crossing DOT # 524743Y. Installation will include any ancillary work to make warning devices function as designed, MUTCD compliant, and visible to roadway user. Includes cants and traffic signal pr | Railroad Crossing Protection | Exempt | CO | 0 | Labor | $1,126,203.00 | ||
| 96425 | 35.840 | Ohio | HAM | Group | Ohio Rail Development Commission | HAM Vine St. NS | HAM Vine Street, City of St. Bernard, at the NS Grade Crossing DOT # 524743Y. | Upgrade modernization of warning devices at the NS grade crossing DOT # 524743Y. Installation will include any ancillary work to make warning devices function as designed, MUTCD compliant, and visible to roadway user. Includes cants and traffic signal pr | Railroad Crossing Protection | Exempt | CO | 0 | Local | $1,126,203.00 | ||
| 96656 | 35.841 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR IR 71 7.05 | WAR IR 71: SLM 7.049-16.069 | Resurfacing a portion of IR 71 in Warren County. | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Preservation | $5,483,610.00 | $6,336,616.00 |
| 96656 | 35.842 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR IR 71 7.05 | WAR IR 71: SLM 7.049-16.069 | Resurfacing a portion of IR 71 in Warren County. | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | State | $609,290.00 | $6,336,616.00 |
| 96656 | 35.843 | Ohio | WAR | Group | ODOT Sponsoring Agency | WAR IR 71 7.05 | WAR IR 71: SLM 7.049-16.069 | Resurfacing a portion of IR 71 in Warren County. | Roadway Minor Rehab | Exempt | 2029 | CO | 0 | Labor | $243,716.00 | $6,336,616.00 |
| 98569 | 35.844 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 503 0.00 | BUT SR 503: SLM 0- 6.05 | Resurfacing a portion of SR 503 in Butler County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Preservation | $2,113,773.89 | $2,816,937.00 |
| 98569 | 35.845 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 503 0.00 | BUT SR 503: SLM 0- 6.05 | Resurfacing a portion of SR 503 in Butler County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | State | $528,443.46 | $2,816,937.00 |
| 98569 | 35.846 | Ohio | BUT | Group | ODOT Sponsoring Agency | BUT SR 503 0.00 | BUT SR 503: SLM 0- 6.05 | Resurfacing a portion of SR 503 in Butler County | Roadway Minor Rehab | Exempt | 2026 | CO | 0 | Labor | $105,692.65 | $2,816,937.00 |
| NEVI_1 | 42.984 | Kentucky | Boone | Individual | KYTC | Install EV Charging Station | 1 location in Valet Parking Lot on Petersburg Rd.-EVGateway | Install EV charging stations at 1 location in Boone County (developer match) | other | Exempt | 2026 | D | 1 | Federal (NEVI) | $34,500.00 | $685,400.00 |
| NEVI_1 | 42.985 | Kentucky | Boone | Individual | KYTC | Install EV Charging Station | 1 location in Valet Parking Lot on Petersburg Rd.-EVGateway | Install EV charging stations at 1 location in Boone County (developer match) | other | Exempt | 2026 | D | 2 | Other | $11,500.00 | $685,400.00 |
| NEVI_1 | 42.986 | Kentucky | Boone | Individual | KYTC | Install EV Charging Station | 1 location in Valet Parking Lot on Petersburg Rd.-EVGateway | Install EV charging stations at 1 location in Boone County (developer match) | other | Exempt | 2026 | CO | 5 | Federal (NEVI) | $479,550.00 | $685,400.00 |
| NEVI_1 | 42.987 | Kentucky | Boone | Individual | KYTC | Install EV Charging Station | 1 location in Valet Parking Lot on Petersburg Rd.-EVGateway | Install EV charging stations at 1 location in Boone County (developer match) | other | Exempt | 2026 | CO | 6 | Other | $159,850.00 | $685,400.00 |
| NKY-RAISE1 | 42.988 | Kentucky | Campbell | Individual | City of Bellevue | Northern Kentucky Riverfront Commons | along the Ohio River between Ludlow and Melbourne | Planning and design of the approximately 20-mile multimodal transportation corridor | bicycle/pedestrian/other | Exempt | 2024 | D | 1 | Federal Discretionary | $3,774,940.00 | |
| NKY-RAISE1 | 42.989 | Kentucky | Campbell | Individual | City of Bellevue | Northern Kentucky Riverfront Commons | along the Ohio River between Ludlow and Melbourne | Planning and design of the approximately 20-mile multimodal transportation corridor | bicycle/pedestrian/other | Exempt | 2024 | D | 2 | Local | $943,735.00 | |
| NKY-RAISE2 | 42.990 | Kentucky | Boone | Individual | Boone County | Limaburg Road Complete Streets Project | KY 18 to Youell Road | Reconstruct Limaburg Road to be a Complete Street, including curb & gutter, center turn lane, sidewalks and multi-use paths. Includes the Hangar Row access road from Limaburg to CVG. | widening/relocation | Non-exempt | 2025 | D | 1 | Federal Discretionary | $2,941,250.00 | $44,275,000.00 |
| NKY-RAISE2 | 42.991 | Kentucky | Boone | Individual | Boone County | Limaburg Road Complete Streets Project | KY 18 to Youell Road | Reconstruct Limaburg Road to be a Complete Street, including curb & gutter, center turn lane, sidewalks and multi-use paths. Includes the Hangar Row access road from Limaburg to CVG. | widening/relocation | Non-exempt | 2025 | D | 2 | Local | $1,333,750.00 | $44,275,000.00 |
| NKY-RAISE2 | 42.992 | Kentucky | Boone | Individual | Boone County | Limaburg Road Complete Streets Project | KY 18 to Youell Road | Reconstruct Limaburg Road to be a Complete Street, including curb & gutter, center turn lane, sidewalks and multi-use paths. Includes the Hangar Row access road from Limaburg to CVG. | widening/relocation | Non-exempt | 2030 | CO | 5 | Uncommitted | $40,000,000.00 | $44,275,000.00 |
| NKY-RAISE3 | 42.993 | Kentucky | Kenton | Individual | City of Covington | Covington Central Riverfront Ph2 | Public infrastructure at the Covington Central Riverfront Site | Includes wide sidewalks, land bridge to top of levee, public parking garage and podium structure | other | Exempt | 2026 | CO | 1 | Federal Discretionary | $16,300,000.00 | $16,300,000.00 |
| RTP21R-029 | 42.994 | Kentucky | Campbell | Individual | City of Newport | Purple Bridge Maintenance and Upgrades | Purple People Bridge over the Ohio River in Newport | Address maintenance needs, especially the joint between the bridge stations. Project also includes repainting and improving the electrical and plumbing services to the bridge | bridge/culvert replacement | Exempt | 2022 | CO | 1 | Recreational Trails Funds | $175,000.00 | $218,750.00 |
| RTP21R-029 | 42.995 | Kentucky | Campbell | Individual | City of Newport | Purple Bridge Maintenance and Upgrades | Purple People Bridge over the Ohio River in Newport | Address maintenance needs, especially the joint between the bridge stations. Project also includes repainting and improving the electrical and plumbing services to the bridge | bridge/culvert replacement | Exempt | 2022 | CO | 2 | Local | $43,750.00 | $218,750.00 |
| SS4A-1 | 42.996 | Kentucky | Boone | Individual | Boone County | Boone County SS4A | Camp Ernst Rd, Hicks Pike, Longbranch Rd, Rogers Ln, and Litton Ln. | Safety improvements including new signs, guardrails, high friction surface treatments, and ditching and shouldering | traffic operations/safety | Exempt | 2025 | D | 1 | Federal Discretionary | $10,000.00 | |
| SS4A-1 | 42.997 | Kentucky | Boone | Individual | Boone County | Boone County SS4A | Camp Ernst Rd, Hicks Pike, Longbranch Rd, Rogers Ln, and Litton Ln. | Safety improvements including new signs, guardrails, high friction surface treatments, and ditching and shouldering | traffic operations/safety | Exempt | 2025 | D | 2 | Local | $2,500.00 | |
| SS4A-1 | 42.998 | Kentucky | Boone | Individual | Boone County | Boone County SS4A | Camp Ernst Rd, Hicks Pike, Longbranch Rd, Rogers Ln, and Litton Ln. | Safety improvements including new signs, guardrails, high friction surface treatments, and ditching and shouldering | traffic operations/safety | Exempt | 2025 | CO | 5 | Federal Discretionary | $699,064.00 | |
| SS4A-1 | 42.999 | Kentucky | Boone | Individual | Boone County | Boone County SS4A | Camp Ernst Rd, Hicks Pike, Longbranch Rd, Rogers Ln, and Litton Ln. | Safety improvements including new signs, guardrails, high friction surface treatments, and ditching and shouldering | traffic operations/safety | Exempt | 2025 | CO | 6 | Local | $174,766.00 | |
| SS4A-4 | 43.000 | Kentucky | Campbell | Individual | Northern Kentucky Area Development District | NKADD SS4A Planning Grant | NKY Area Development District counties of Campbell, Carroll, Gallatin, Grant, Kenton, Owen&Pendleton | Development of a Regional Safety Action Plan (Safe Streets for All - SS4A) | studies | Exempt | 2024 | OTH | 1 | Federal Discretionary | $183,238.00 | |
| SS4A-4 | 43.001 | Kentucky | Campbell | Individual | Northern Kentucky Area Development District | NKADD SS4A Planning Grant | NKY Area Development District counties of Campbell, Carroll, Gallatin, Grant, Kenton, Owen&Pendleton | Development of a Regional Safety Action Plan (Safe Streets for All - SS4A) | studies | Exempt | 2024 | OTH | 2 | Local | $45,810.00 |
TIP Transit Projects
| PID | Grantee Agency | Grantee County | Project Name | Project Description | Air Quality Status | List Type | Quantity | Scope Description | ALI | STIP Fund Type | S/TIP Year (SFY) | Line Item Estimate | Total Project TIP Period Estimate |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 112095 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 BRT Routes | Bus Rapid Transit Routes. Planned funding for discretionary and local funding. | Exempt | Individual | Bus Rolling Stock | 11.12.01 | Local | 2026 | $50,000,000.00 | $300,000,000.00 | |
| 112095 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 BRT Routes | Bus Rapid Transit Routes. Planned funding for discretionary and local funding. | Exempt | Individual | New Start Transitways / Lines | 13.21.01 | Local | 2026 | $40,000,000.00 | $300,000,000.00 | |
| 112095 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 BRT Routes | Bus Rapid Transit Routes. Planned funding for discretionary and local funding. | Exempt | Individual | New Start Transitways / Lines | 13.23.01 | Local | 2026 | $210,000,000.00 | $300,000,000.00 | |
| 112518 | Oxford Senior Citizens, Inc. | BUT | 5310 - 2021-018 Rural/Small Urb | Federal Award Identification Number (FAIN): ----OH-2019-038-00 | Exempt | Group | 5310 Projects | 11.12.15 | 5310 Small Urban / Rural (ODOT) | 2026 | $42,330.00 | $68,660.00 | |
| 112518 | Oxford Senior Citizens, Inc. | BUT | 5310 - 2021-018 Rural/Small Urb | Federal Award Identification Number (FAIN): ----OH-2019-038-00 | Exempt | Group | 5310 Projects | 11.12.15 | Local | 2026 | $26,330.00 | $68,660.00 | |
| 115942 | Southwest Ohio Regional Transit Authority | HAM | SORTA N College Hill Transit Cen | SORTA North College Hill Transit Center construction project through OKI's CMAQ program for SFY 2025 | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.33.03 | Local | 2026 | $1,513,336.00 | $5,044,454.00 | |
| 115942 | Southwest Ohio Regional Transit Authority | HAM | SORTA N College Hill Transit Cen | SORTA North College Hill Transit Center construction project through OKI's CMAQ program for SFY 2025 | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.33.03 | MPO CMAQ | 2026 | $3,531,118.00 | $5,044,454.00 | |
| 115997 | Butler County Regional Transit Authority | BUT | BCRTA EPIC Bus Replacement SFY25 | Bus Replacements using OKI CMAQ funds as a flex fund transfer for Environmentally Preventing Increasing Carbons (EPIC) vehicles | Exempt | Individual | 6 | Bus Rolling Stock | 11.12.02 | Local | 2026 | $1,250,000.00 | $6,250,000.00 |
| 115997 | Butler County Regional Transit Authority | BUT | BCRTA EPIC Bus Replacement SFY25 | Bus Replacements using OKI CMAQ funds as a flex fund transfer for Environmentally Preventing Increasing Carbons (EPIC) vehicles | Exempt | Individual | 6 | Bus Rolling Stock | 11.12.02 | MPO CMAQ | 2026 | $5,000,000.00 | $6,250,000.00 |
| 117304 | Southwest Ohio Regional Transit Authority | HAM | SORTA Bus Stop Enhancements | Senate Earmark for Bus Stop Enhancements, FTA Bus and Bus facility funding, and ODOT-Flex funding | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.33.10 | 5339 (Non-ODOT) | 2026 | $150,000.00 | $5,230,000.00 | |
| 117304 | Southwest Ohio Regional Transit Authority | HAM | SORTA Bus Stop Enhancements | Senate Earmark for Bus Stop Enhancements, FTA Bus and Bus facility funding, and ODOT-Flex funding | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.33.10 | Discretionary - CPF | 2026 | $4,300,000.00 | $5,230,000.00 | |
| 117304 | Southwest Ohio Regional Transit Authority | HAM | SORTA Bus Stop Enhancements | Senate Earmark for Bus Stop Enhancements, FTA Bus and Bus facility funding, and ODOT-Flex funding | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.33.10 | Local | 2026 | $30,000.00 | $5,230,000.00 | |
| 117304 | Southwest Ohio Regional Transit Authority | HAM | SORTA Bus Stop Enhancements | Senate Earmark for Bus Stop Enhancements, FTA Bus and Bus facility funding, and ODOT-Flex funding | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.33.10 | Local | 2026 | $750,000.00 | $5,230,000.00 | |
| 117998 | Butler County Regional Transit Authority | BUT | BCRTA Operating Assistance | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.03 | 5307 | 2026 | $1,200,000.00 | $19,717,392.00 | |
| 117998 | Butler County Regional Transit Authority | BUT | BCRTA Operating Assistance | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.03 | 5307 | 2027 | $700,000.00 | $19,717,392.00 | |
| 117998 | Butler County Regional Transit Authority | BUT | BCRTA Operating Assistance | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.03 | 5307 | 2027 | $1,579,096.00 | $19,717,392.00 | |
| 117998 | Butler County Regional Transit Authority | BUT | BCRTA Operating Assistance | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.03 | 5307 | 2028 | $1,500,000.00 | $19,717,392.00 | |
| 117998 | Butler County Regional Transit Authority | BUT | BCRTA Operating Assistance | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.03 | 5307 | 2029 | $1,500,000.00 | $19,717,392.00 | |
| 117998 | Butler County Regional Transit Authority | BUT | BCRTA Operating Assistance | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.03 | Local | 2026 | $1,200,000.00 | $19,717,392.00 | |
| 117998 | Butler County Regional Transit Authority | BUT | BCRTA Operating Assistance | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.03 | Local | 2027 | $1,579,096.00 | $19,717,392.00 | |
| 117998 | Butler County Regional Transit Authority | BUT | BCRTA Operating Assistance | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.03 | Local | 2028 | $1,500,000.00 | $19,717,392.00 | |
| 117998 | Butler County Regional Transit Authority | BUT | BCRTA Operating Assistance | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.03 | Local | 2029 | $1,500,000.00 | $19,717,392.00 | |
| 117998 | Butler County Regional Transit Authority | BUT | BCRTA Operating Assistance | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.03 | State | 2027 | $700,000.00 | $19,717,392.00 | |
| 117998 | Butler County Regional Transit Authority | HAM | BCRTA Operating Assistance | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.03 | 5307 | 2026 | $1,262,293.00 | $19,717,392.00 | |
| 117998 | Butler County Regional Transit Authority | HAM | BCRTA Operating Assistance | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.03 | Local | 2026 | $4,904,532.00 | $19,717,392.00 | |
| 117998 | Butler County Regional Transit Authority | HAM | BCRTA Operating Assistance | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.03 | State | 2026 | $592,375.00 | $19,717,392.00 | |
| 117999 | Butler County Regional Transit Authority | BUT | BCRTA Prev Maintenance | Preventive Maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5307 | 2026 | $100,000.00 | $3,065,000.00 | |
| 117999 | Butler County Regional Transit Authority | BUT | BCRTA Prev Maintenance | Preventive Maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5307 | 2027 | $1,200,000.00 | $3,065,000.00 | |
| 117999 | Butler County Regional Transit Authority | BUT | BCRTA Prev Maintenance | Preventive Maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5307 | 2028 | $600,000.00 | $3,065,000.00 | |
| 117999 | Butler County Regional Transit Authority | BUT | BCRTA Prev Maintenance | Preventive Maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5307 | 2029 | $600,000.00 | $3,065,000.00 | |
| 117999 | Butler County Regional Transit Authority | BUT | BCRTA Prev Maintenance | Preventive Maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2026 | $25,000.00 | $3,065,000.00 | |
| 117999 | Butler County Regional Transit Authority | BUT | BCRTA Prev Maintenance | Preventive Maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2027 | $240,000.00 | $3,065,000.00 | |
| 117999 | Butler County Regional Transit Authority | BUT | BCRTA Prev Maintenance | Preventive Maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2028 | $150,000.00 | $3,065,000.00 | |
| 117999 | Butler County Regional Transit Authority | BUT | BCRTA Prev Maintenance | Preventive Maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2029 | $150,000.00 | $3,065,000.00 | |
| 118001 | Butler County Regional Transit Authority | BUT | BCRTA ADA Operating | ADA Operating Assistance | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | 5307 | 2026 | $250,000.00 | $1,446,500.00 | |
| 118001 | Butler County Regional Transit Authority | BUT | BCRTA ADA Operating | ADA Operating Assistance | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | 5307 | 2027 | $320,000.00 | $1,446,500.00 | |
| 118001 | Butler County Regional Transit Authority | BUT | BCRTA ADA Operating | ADA Operating Assistance | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | 5307 | 2028 | $300,000.00 | $1,446,500.00 | |
| 118001 | Butler County Regional Transit Authority | BUT | BCRTA ADA Operating | ADA Operating Assistance | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | 5307 | 2029 | $300,000.00 | $1,446,500.00 | |
| 118001 | Butler County Regional Transit Authority | BUT | BCRTA ADA Operating | ADA Operating Assistance | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | Local | 2026 | $62,500.00 | $1,446,500.00 | |
| 118001 | Butler County Regional Transit Authority | BUT | BCRTA ADA Operating | ADA Operating Assistance | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | Local | 2027 | $64,000.00 | $1,446,500.00 | |
| 118001 | Butler County Regional Transit Authority | BUT | BCRTA ADA Operating | ADA Operating Assistance | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | Local | 2028 | $75,000.00 | $1,446,500.00 | |
| 118001 | Butler County Regional Transit Authority | BUT | BCRTA ADA Operating | ADA Operating Assistance | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | Local | 2029 | $75,000.00 | $1,446,500.00 | |
| 118004 | Butler County Regional Transit Authority | BUT | BCRTA Security Equipment | Security Equipment | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.32.07 | 5307 | 2028 | $30,000.00 | $618,750.00 | |
| 118004 | Butler County Regional Transit Authority | BUT | BCRTA Security Equipment | Security Equipment | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.32.07 | 5307 | 2029 | $30,000.00 | $618,750.00 | |
| 118004 | Butler County Regional Transit Authority | BUT | BCRTA Security Equipment | Security Equipment | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.32.07 | Local | 2028 | $7,500.00 | $618,750.00 | |
| 118004 | Butler County Regional Transit Authority | BUT | BCRTA Security Equipment | Security Equipment | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.32.07 | Local | 2029 | $7,500.00 | $618,750.00 | |
| 118004 | Butler County Regional Transit Authority | BUT | BCRTA Security Equipment | Security Equipment | Exempt | Individual | Bus Support Equip / Facilities | 11.42.09 | 5307 | 2026 | $420,000.00 | $618,750.00 | |
| 118004 | Butler County Regional Transit Authority | BUT | BCRTA Security Equipment | Security Equipment | Exempt | Individual | Bus Support Equip / Facilities | 11.42.09 | 5307 | 2027 | $15,000.00 | $618,750.00 | |
| 118004 | Butler County Regional Transit Authority | BUT | BCRTA Security Equipment | Security Equipment | Exempt | Individual | Bus Support Equip / Facilities | 11.42.09 | Local | 2026 | $105,000.00 | $618,750.00 | |
| 118004 | Butler County Regional Transit Authority | BUT | BCRTA Security Equipment | Security Equipment | Exempt | Individual | Bus Support Equip / Facilities | 11.42.09 | Local | 2027 | $3,750.00 | $618,750.00 | |
| 118006 | Butler County Regional Transit Authority | BUT | BCRTA Shop/Office Equipment | Shop/Office Equipment | Exempt | Individual | Bus Support Equip / Facilities | 11.42.20 | 5307 | 2026 | $35,000.00 | $506,250.00 | |
| 118006 | Butler County Regional Transit Authority | BUT | BCRTA Shop/Office Equipment | Shop/Office Equipment | Exempt | Individual | Bus Support Equip / Facilities | 11.42.20 | 5307 | 2027 | $300,000.00 | $506,250.00 | |
| 118006 | Butler County Regional Transit Authority | BUT | BCRTA Shop/Office Equipment | Shop/Office Equipment | Exempt | Individual | Bus Support Equip / Facilities | 11.42.20 | 5307 | 2028 | $35,000.00 | $506,250.00 | |
| 118006 | Butler County Regional Transit Authority | BUT | BCRTA Shop/Office Equipment | Shop/Office Equipment | Exempt | Individual | Bus Support Equip / Facilities | 11.42.20 | 5307 | 2029 | $35,000.00 | $506,250.00 | |
| 118006 | Butler County Regional Transit Authority | BUT | BCRTA Shop/Office Equipment | Shop/Office Equipment | Exempt | Individual | Bus Support Equip / Facilities | 11.42.20 | Local | 2026 | $8,750.00 | $506,250.00 | |
| 118006 | Butler County Regional Transit Authority | BUT | BCRTA Shop/Office Equipment | Shop/Office Equipment | Exempt | Individual | Bus Support Equip / Facilities | 11.42.20 | Local | 2027 | $75,000.00 | $506,250.00 | |
| 118006 | Butler County Regional Transit Authority | BUT | BCRTA Shop/Office Equipment | Shop/Office Equipment | Exempt | Individual | Bus Support Equip / Facilities | 11.42.20 | Local | 2028 | $8,750.00 | $506,250.00 | |
| 118006 | Butler County Regional Transit Authority | BUT | BCRTA Shop/Office Equipment | Shop/Office Equipment | Exempt | Individual | Bus Support Equip / Facilities | 11.42.20 | Local | 2029 | $8,750.00 | $506,250.00 | |
| 118007 | Butler County Regional Transit Authority | BUT | BCRTA Software/Hardware | Technology updates: ADP hardware, software, and communications equipment acquisition | Exempt | Individual | Bus Support Equip / Facilities | 11.42.07 | Local | 2027 | $36,500.00 | $613,750.00 | |
| 118007 | Butler County Regional Transit Authority | BUT | BCRTA Software/Hardware | Technology updates: ADP hardware, software, and communications equipment acquisition | Exempt | Individual | Bus Support Equip / Facilities | 11.42.07 | ODOT Flex | 2027 | $146,000.00 | $613,750.00 | |
| 118007 | Butler County Regional Transit Authority | BUT | BCRTA Software/Hardware | Technology updates: ADP hardware, software, and communications equipment acquisition | Exempt | Individual | Bus Support Equip / Facilities | 11.42.08 | 5307 | 2028 | $120,000.00 | $613,750.00 | |
| 118007 | Butler County Regional Transit Authority | BUT | BCRTA Software/Hardware | Technology updates: ADP hardware, software, and communications equipment acquisition | Exempt | Individual | Bus Support Equip / Facilities | 11.42.08 | 5307 | 2029 | $120,000.00 | $613,750.00 | |
| 118007 | Butler County Regional Transit Authority | BUT | BCRTA Software/Hardware | Technology updates: ADP hardware, software, and communications equipment acquisition | Exempt | Individual | Bus Support Equip / Facilities | 11.42.08 | Local | 2028 | $30,000.00 | $613,750.00 | |
| 118007 | Butler County Regional Transit Authority | BUT | BCRTA Software/Hardware | Technology updates: ADP hardware, software, and communications equipment acquisition | Exempt | Individual | Bus Support Equip / Facilities | 11.42.08 | Local | 2029 | $30,000.00 | $613,750.00 | |
| 118007 | Butler County Regional Transit Authority | HAM | BCRTA Software/Hardware | Technology updates: ADP hardware, software, and communications equipment acquisition | Exempt | Individual | Bus Support Equip / Facilities | 11.42.07 | Local | 2026 | $6,250.00 | $613,750.00 | |
| 118007 | Butler County Regional Transit Authority | HAM | BCRTA Software/Hardware | Technology updates: ADP hardware, software, and communications equipment acquisition | Exempt | Individual | Bus Support Equip / Facilities | 11.42.07 | Local | 2026 | $20,000.00 | $613,750.00 | |
| 118007 | Butler County Regional Transit Authority | HAM | BCRTA Software/Hardware | Technology updates: ADP hardware, software, and communications equipment acquisition | Exempt | Individual | Bus Support Equip / Facilities | 11.42.07 | ODOT Flex | 2026 | $25,000.00 | $613,750.00 | |
| 118007 | Butler County Regional Transit Authority | HAM | BCRTA Software/Hardware | Technology updates: ADP hardware, software, and communications equipment acquisition | Exempt | Individual | Bus Support Equip / Facilities | 11.42.07 | ODOT Flex | 2026 | $80,000.00 | $613,750.00 | |
| 118013 | Butler County Regional Transit Authority | BUT | BCRTA Bus Stat/Stops/Terminals | Transit Enhancements | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.32.20 | 5307 | 2027 | $15,000.00 | $87,500.00 | |
| 118013 | Butler County Regional Transit Authority | BUT | BCRTA Bus Stat/Stops/Terminals | Transit Enhancements | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.32.20 | 5307 | 2028 | $15,000.00 | $87,500.00 | |
| 118013 | Butler County Regional Transit Authority | BUT | BCRTA Bus Stat/Stops/Terminals | Transit Enhancements | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.32.20 | 5307 | 2029 | $15,000.00 | $87,500.00 | |
| 118013 | Butler County Regional Transit Authority | BUT | BCRTA Bus Stat/Stops/Terminals | Transit Enhancements | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.32.20 | Local | 2026 | $6,250.00 | $87,500.00 | |
| 118013 | Butler County Regional Transit Authority | BUT | BCRTA Bus Stat/Stops/Terminals | Transit Enhancements | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.32.20 | Local | 2027 | $3,750.00 | $87,500.00 | |
| 118013 | Butler County Regional Transit Authority | BUT | BCRTA Bus Stat/Stops/Terminals | Transit Enhancements | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.32.20 | Local | 2028 | $3,750.00 | $87,500.00 | |
| 118013 | Butler County Regional Transit Authority | BUT | BCRTA Bus Stat/Stops/Terminals | Transit Enhancements | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.32.20 | Local | 2029 | $3,750.00 | $87,500.00 | |
| 118013 | Butler County Regional Transit Authority | BUT | BCRTA Bus Stat/Stops/Terminals | Transit Enhancements | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.32.20 | Other | 2026 | $25,000.00 | $87,500.00 | |
| 118014 | Butler County Regional Transit Authority | BUT | BCRTA Facility Improvements | Facility Improvements | Exempt | Individual | Bus Support Equip / Facilities | 11.43.05 | 5307 | 2026 | $570,048.00 | $2,209,310.00 | |
| 118014 | Butler County Regional Transit Authority | BUT | BCRTA Facility Improvements | Facility Improvements | Exempt | Individual | Bus Support Equip / Facilities | 11.43.05 | Local | 2026 | $142,512.00 | $2,209,310.00 | |
| 118014 | Butler County Regional Transit Authority | BUT | BCRTA Facility Improvements | Facility Improvements | Exempt | Individual | Bus Support Equip / Facilities | 11.44.03 | 5339 (Non-ODOT) | 2026 | $250,000.00 | $2,209,310.00 | |
| 118014 | Butler County Regional Transit Authority | BUT | BCRTA Facility Improvements | Facility Improvements | Exempt | Individual | Bus Support Equip / Facilities | 11.44.03 | 5339 (Non-ODOT) | 2028 | $250,000.00 | $2,209,310.00 | |
| 118014 | Butler County Regional Transit Authority | BUT | BCRTA Facility Improvements | Facility Improvements | Exempt | Individual | Bus Support Equip / Facilities | 11.44.03 | 5339 (Non-ODOT) | 2029 | $250,000.00 | $2,209,310.00 | |
| 118014 | Butler County Regional Transit Authority | BUT | BCRTA Facility Improvements | Facility Improvements | Exempt | Individual | Bus Support Equip / Facilities | 11.44.03 | Local | 2026 | $118,750.00 | $2,209,310.00 | |
| 118014 | Butler County Regional Transit Authority | BUT | BCRTA Facility Improvements | Facility Improvements | Exempt | Individual | Bus Support Equip / Facilities | 11.44.03 | Local | 2028 | $62,500.00 | $2,209,310.00 | |
| 118014 | Butler County Regional Transit Authority | BUT | BCRTA Facility Improvements | Facility Improvements | Exempt | Individual | Bus Support Equip / Facilities | 11.44.03 | Local | 2029 | $62,500.00 | $2,209,310.00 | |
| 118014 | Butler County Regional Transit Authority | HAM | BCRTA Facility Improvements | Facility Improvements | Exempt | Individual | Bus Support Equip / Facilities | 11.41.05 | 5307 | 2026 | $102,400.00 | $2,209,310.00 | |
| 118014 | Butler County Regional Transit Authority | HAM | BCRTA Facility Improvements | Facility Improvements | Exempt | Individual | Bus Support Equip / Facilities | 11.41.05 | Local | 2026 | $25,600.00 | $2,209,310.00 | |
| 118014 | Butler County Regional Transit Authority | HAM | BCRTA Facility Improvements | Facility Improvements | Exempt | Individual | Bus Support Equip / Facilities | 11.42.20 | Local | 2026 | $75,000.00 | $2,209,310.00 | |
| 118014 | Butler County Regional Transit Authority | HAM | BCRTA Facility Improvements | Facility Improvements | Exempt | Individual | Bus Support Equip / Facilities | 11.42.20 | ODOT Flex | 2026 | $300,000.00 | $2,209,310.00 | |
| 118231 | Cincinnati, City of | HAM | S2024-2027 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 and SFY2022 OTP2 projects - Facility rehab/renovation, transit asset and inventory management software, and rail preventive maintenance; STBG funds are flexible fund transfers with facility rehab and software using Transp | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | 5307 | 2026 | $309,630.20 | $2,753,340.25 | |
| 118231 | Cincinnati, City of | HAM | S2024-2027 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 and SFY2022 OTP2 projects - Facility rehab/renovation, transit asset and inventory management software, and rail preventive maintenance; STBG funds are flexible fund transfers with facility rehab and software using Transp | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | 5307 | 2027 | $273,657.00 | $2,753,340.25 | |
| 118231 | Cincinnati, City of | HAM | S2024-2027 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 and SFY2022 OTP2 projects - Facility rehab/renovation, transit asset and inventory management software, and rail preventive maintenance; STBG funds are flexible fund transfers with facility rehab and software using Transp | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | 5337 | 2026 | $329,747.00 | $2,753,340.25 | |
| 118231 | Cincinnati, City of | HAM | S2024-2027 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 and SFY2022 OTP2 projects - Facility rehab/renovation, transit asset and inventory management software, and rail preventive maintenance; STBG funds are flexible fund transfers with facility rehab and software using Transp | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | 5337 | 2027 | $329,638.00 | $2,753,340.25 | |
| 118231 | Cincinnati, City of | HAM | S2024-2027 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 and SFY2022 OTP2 projects - Facility rehab/renovation, transit asset and inventory management software, and rail preventive maintenance; STBG funds are flexible fund transfers with facility rehab and software using Transp | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | Local | 2026 | $44,588.55 | $2,753,340.25 | |
| 118231 | Cincinnati, City of | HAM | S2024-2027 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 and SFY2022 OTP2 projects - Facility rehab/renovation, transit asset and inventory management software, and rail preventive maintenance; STBG funds are flexible fund transfers with facility rehab and software using Transp | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | Local | 2026 | $82,436.75 | $2,753,340.25 | |
| 118231 | Cincinnati, City of | HAM | S2024-2027 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 and SFY2022 OTP2 projects - Facility rehab/renovation, transit asset and inventory management software, and rail preventive maintenance; STBG funds are flexible fund transfers with facility rehab and software using Transp | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | Local | 2027 | $68,414.25 | $2,753,340.25 | |
| 118231 | Cincinnati, City of | HAM | S2024-2027 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 and SFY2022 OTP2 projects - Facility rehab/renovation, transit asset and inventory management software, and rail preventive maintenance; STBG funds are flexible fund transfers with facility rehab and software using Transp | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | Local | 2027 | $82,409.50 | $2,753,340.25 | |
| 118231 | Cincinnati, City of | HAM | S2024-2027 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 and SFY2022 OTP2 projects - Facility rehab/renovation, transit asset and inventory management software, and rail preventive maintenance; STBG funds are flexible fund transfers with facility rehab and software using Transp | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | Local | 2027 | $1,200,000.00 | $2,753,340.25 | |
| 118231 | Cincinnati, City of | HAM | S2024-2027 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 and SFY2022 OTP2 projects - Facility rehab/renovation, transit asset and inventory management software, and rail preventive maintenance; STBG funds are flexible fund transfers with facility rehab and software using Transp | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | State | 2026 | $32,819.00 | $2,753,340.25 | |
| 118298 | Butler County Regional Transit Authority | BUT, HAM | Middletown Transit Oper Assist | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.01 | State | 2026 | $600,000.00 | $11,519,998.00 | |
| 118298 | Butler County Regional Transit Authority | HAM | Middletown Transit Oper Assist | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.01 | 5307 | 2026 | $359,999.00 | $11,519,998.00 | |
| 118298 | Butler County Regional Transit Authority | HAM | Middletown Transit Oper Assist | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.01 | 5307 | 2026 | $1,500,000.00 | $11,519,998.00 | |
| 118298 | Butler County Regional Transit Authority | HAM | Middletown Transit Oper Assist | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.01 | Local | 2026 | $359,999.00 | $11,519,998.00 | |
| 118298 | Butler County Regional Transit Authority | HAM | Middletown Transit Oper Assist | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.01 | Local | 2026 | $1,103,820.00 | $11,519,998.00 | |
| 118298 | Butler County Regional Transit Authority | HAM | Middletown Transit Oper Assist | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.01 | State | 2026 | $396,180.00 | $11,519,998.00 | |
| 118298 | City of Middletown | BUT | Middletown Transit Oper Assist | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.01 | 5307 | 2027 | $1,200,000.00 | $11,519,998.00 | |
| 118298 | City of Middletown | BUT | Middletown Transit Oper Assist | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.01 | 5307 | 2028 | $1,200,000.00 | $11,519,998.00 | |
| 118298 | City of Middletown | BUT | Middletown Transit Oper Assist | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.01 | 5307 | 2029 | $1,200,000.00 | $11,519,998.00 | |
| 118298 | City of Middletown | BUT | Middletown Transit Oper Assist | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.01 | Local | 2027 | $900,000.00 | $11,519,998.00 | |
| 118298 | City of Middletown | BUT | Middletown Transit Oper Assist | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.01 | Local | 2028 | $900,000.00 | $11,519,998.00 | |
| 118298 | City of Middletown | BUT | Middletown Transit Oper Assist | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.01 | Local | 2029 | $900,000.00 | $11,519,998.00 | |
| 118298 | City of Middletown | BUT | Middletown Transit Oper Assist | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.01 | State | 2027 | $300,000.00 | $11,519,998.00 | |
| 118298 | City of Middletown | BUT | Middletown Transit Oper Assist | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.01 | State | 2028 | $300,000.00 | $11,519,998.00 | |
| 118298 | City of Middletown | BUT | Middletown Transit Oper Assist | Operating Assistance | Exempt | Individual | Operating Assistance | 30.09.01 | State | 2029 | $300,000.00 | $11,519,998.00 | |
| 118299 | City of Middletown | BUT | Middletown Transit ADA Assistanc | ADA Operating Assistance | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | 5307 | 2026 | $120,000.00 | $750,000.00 | |
| 118299 | City of Middletown | BUT | Middletown Transit ADA Assistanc | ADA Operating Assistance | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | 5307 | 2027 | $120,000.00 | $750,000.00 | |
| 118299 | City of Middletown | BUT | Middletown Transit ADA Assistanc | ADA Operating Assistance | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | 5307 | 2028 | $180,000.00 | $750,000.00 | |
| 118299 | City of Middletown | BUT | Middletown Transit ADA Assistanc | ADA Operating Assistance | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | 5307 | 2029 | $180,000.00 | $750,000.00 | |
| 118299 | City of Middletown | BUT | Middletown Transit ADA Assistanc | ADA Operating Assistance | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | Local | 2026 | $30,000.00 | $750,000.00 | |
| 118299 | City of Middletown | BUT | Middletown Transit ADA Assistanc | ADA Operating Assistance | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | Local | 2027 | $30,000.00 | $750,000.00 | |
| 118299 | City of Middletown | BUT | Middletown Transit ADA Assistanc | ADA Operating Assistance | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | Local | 2028 | $45,000.00 | $750,000.00 | |
| 118299 | City of Middletown | BUT | Middletown Transit ADA Assistanc | ADA Operating Assistance | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | Local | 2029 | $45,000.00 | $750,000.00 | |
| 118300 | City of Middletown | BUT | Middletown Transit Prevent Maint | Preventive Maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5307 | 2026 | $200,000.00 | $1,000,000.00 | |
| 118300 | City of Middletown | BUT | Middletown Transit Prevent Maint | Preventive Maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5307 | 2027 | $200,000.00 | $1,000,000.00 | |
| 118300 | City of Middletown | BUT | Middletown Transit Prevent Maint | Preventive Maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5307 | 2028 | $200,000.00 | $1,000,000.00 | |
| 118300 | City of Middletown | BUT | Middletown Transit Prevent Maint | Preventive Maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5307 | 2029 | $200,000.00 | $1,000,000.00 | |
| 118300 | City of Middletown | BUT | Middletown Transit Prevent Maint | Preventive Maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2026 | $50,000.00 | $1,000,000.00 | |
| 118300 | City of Middletown | BUT | Middletown Transit Prevent Maint | Preventive Maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2027 | $50,000.00 | $1,000,000.00 | |
| 118300 | City of Middletown | BUT | Middletown Transit Prevent Maint | Preventive Maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2028 | $50,000.00 | $1,000,000.00 | |
| 118300 | City of Middletown | BUT | Middletown Transit Prevent Maint | Preventive Maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2029 | $50,000.00 | $1,000,000.00 | |
| 118346 | Warren County | WAR | WCTS 2025 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Operating Assistance | 30.09.01 | 5307 | 2026 | $275,647.00 | $1,838,278.00 | |
| 118346 | Warren County | WAR | WCTS 2025 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Operating Assistance | 30.09.01 | 5307 | 2026 | $643,492.00 | $1,838,278.00 | |
| 118346 | Warren County | WAR | WCTS 2025 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Operating Assistance | 30.09.01 | Local | 2026 | $268,492.00 | $1,838,278.00 | |
| 118346 | Warren County | WAR | WCTS 2025 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Operating Assistance | 30.09.01 | State | 2026 | $275,647.00 | $1,838,278.00 | |
| 118346 | Warren County | WAR | WCTS 2025 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Operating Assistance | 30.09.01 | State | 2026 | $375,000.00 | $1,838,278.00 | |
| 118348 | Warren County | WAR | S2026 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5307 | 2026 | $109,654.65 | $466,768.31 | |
| 118348 | Warren County | WAR | S2026 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2026 | $27,413.66 | $466,768.31 | |
| 118348 | Warren County | WAR | S2026 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | 4 | Bus Rolling Stock | 11.12.15 | 5307 | 2026 | $263,760.00 | $466,768.31 |
| 118348 | Warren County | WAR | S2026 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | 4 | Bus Rolling Stock | 11.12.15 | Local | 2026 | $65,940.00 | $466,768.31 |
| 118349 | Warren County | WAR | S2027 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Bus Rolling Stock | 11.12.15 | 5307 | 2027 | $136,984.08 | $1,637,409.83 | |
| 118349 | Warren County | WAR | S2027 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Bus Rolling Stock | 11.12.15 | Local | 2027 | $34,246.02 | $1,637,409.83 | |
| 118349 | Warren County | WAR | S2027 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Operating Assistance | 30.09.03 | 5307 | 2027 | $661,129.00 | $1,637,409.83 | |
| 118349 | Warren County | WAR | S2027 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Operating Assistance | 30.09.03 | Local | 2027 | $527,771.00 | $1,637,409.83 | |
| 118349 | Warren County | WAR | S2027 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Operating Assistance | 30.09.03 | State | 2027 | $133,358.00 | $1,637,409.83 | |
| 118349 | Warren County | WAR | S2027 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5307 | 2027 | $115,137.38 | $1,637,409.83 | |
| 118349 | Warren County | WAR | S2027 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2027 | $28,784.35 | $1,637,409.83 | |
| 118376 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 Operating | SORTA 2026 Operating | Exempt | Group | Operating Assistance | 30.09.01 | Local | 2026 | $77,704,288.00 | $77,704,288.00 | |
| 118378 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 ADA Paratransit | SORTA 2026 ADA Paratransit | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | 5307 | 2026 | $1,881,753.00 | $2,352,191.00 | |
| 118378 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 ADA Paratransit | SORTA 2026 ADA Paratransit | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | Local | 2026 | $470,438.00 | $2,352,191.00 | |
| 118379 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 Security Equipment | SORTA 2026 Security Equipment | Exempt | Individual | Bus Support Equip / Facilities | 11.42.09 | 5307 | 2026 | $188,175.00 | $235,218.00 | |
| 118379 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 Security Equipment | SORTA 2026 Security Equipment | Exempt | Individual | Bus Support Equip / Facilities | 11.42.09 | Local | 2026 | $47,043.00 | $235,218.00 | |
| 118380 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 Prev Maint 5307 | SORTA 2026 Prev Maintenance 5307 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5307 | 2026 | $16,747,607.00 | $20,934,508.00 | |
| 118380 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 Prev Maint 5307 | SORTA 2026 Prev Maintenance 5307 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2026 | $4,186,901.00 | $20,934,508.00 | |
| 118381 | Southwest Ohio Regional Transit Authority | HAM | S2026 SORTA Bus Repl DERG | SORTA 2026 40' Bus Replacements DERG | Exempt | Individual | 2 | Bus Rolling Stock | 11.12.01 | Local | 2026 | $961,000.00 | $961,000.00 |
| 118382 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 Bus Replace 5339 | SORTA 2026 40' Bus Replace 5339 | Exempt | Individual | 2 | Bus Rolling Stock | 11.12.01 | 5339 (Non-ODOT) | 2026 | $666,852.00 | $833,565.00 |
| 118382 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 Bus Replace 5339 | SORTA 2026 40' Bus Replace 5339 | Exempt | Individual | 2 | Bus Rolling Stock | 11.12.01 | Local | 2026 | $166,713.00 | $833,565.00 |
| 118383 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 Para Bus Repl 5339 | SORTA 2026 Para Bus Replace 5339 | Exempt | Individual | 14 | Bus Rolling Stock | 11.12.04 | 5339 (Non-ODOT) | 2026 | $1,000,280.00 | $1,250,350.00 |
| 118383 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 Para Bus Repl 5339 | SORTA 2026 Para Bus Replace 5339 | Exempt | Individual | 14 | Bus Rolling Stock | 11.12.04 | Local | 2026 | $250,070.00 | $1,250,350.00 |
| 118384 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 40' Bus Repl 5339b | SORTA 2026 40' Bus Repl 5339b | Exempt | Individual | 10 | Bus Rolling Stock | 11.12.01 | 5339 (Non-ODOT) | 2026 | $11,498,030.00 | $13,527,090.00 |
| 118384 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 40' Bus Repl 5339b | SORTA 2026 40' Bus Repl 5339b | Exempt | Individual | 10 | Bus Rolling Stock | 11.12.01 | Local | 2026 | $2,029,060.00 | $13,527,090.00 |
| 118385 | Southwest Ohio Regional Transit Authority | HAM | S2026 SORTA Fac Prev Maint 5337 | SORTA 2026 Facility Prev Maint 5337 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5337 | 2026 | $32,946.00 | $41,182.00 | |
| 118385 | Southwest Ohio Regional Transit Authority | HAM | S2026 SORTA Fac Prev Maint 5337 | SORTA 2026 Facility Prev Maint 5337 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2026 | $8,236.00 | $41,182.00 | |
| 118386 | Southwest Ohio Regional Transit Authority | HAM | SORTA Bond Hill Garage Const/Ren | SORTA 2078 Bond Hill Garage OKI STBG | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.33.03 | Local | 2027 | $3,428,571.00 | $11,428,571.00 | |
| 118386 | Southwest Ohio Regional Transit Authority | HAM | SORTA Bond Hill Garage Const/Ren | SORTA 2078 Bond Hill Garage OKI STBG | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.33.03 | MPO STBG | 2027 | $8,000,000.00 | $11,428,571.00 | |
| 118387 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 OKI Bus Replacements | SORTA 2026 OKI Bus Replacements | Exempt | Individual | 1 | Bus Rolling Stock | 11.12.01 | Local | 2026 | $217,269.00 | $11,855,872.00 |
| 118387 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 OKI Bus Replacements | SORTA 2026 OKI Bus Replacements | Exempt | Individual | 1 | Bus Rolling Stock | 11.12.01 | Other | 2026 | $869,081.00 | $11,855,872.00 |
| 118387 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 OKI Bus Replacements | SORTA 2026 OKI Bus Replacements | Exempt | Individual | 2 | Bus Rolling Stock | 11.12.01 | Local | 2026 | $343,529.00 | $11,855,872.00 |
| 118387 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 OKI Bus Replacements | SORTA 2026 OKI Bus Replacements | Exempt | Individual | 2 | Bus Rolling Stock | 11.12.01 | Other | 2026 | $1,374,121.00 | $11,855,872.00 |
| 118387 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 OKI Bus Replacements | SORTA 2026 OKI Bus Replacements | Exempt | Individual | 6 | Bus Rolling Stock | 11.12.01 | Local | 2026 | $2,715,561.00 | $11,855,872.00 |
| 118387 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026 OKI Bus Replacements | SORTA 2026 OKI Bus Replacements | Exempt | Individual | 6 | Bus Rolling Stock | 11.12.01 | MPO CMAQ | 2026 | $6,336,311.00 | $11,855,872.00 |
| 118389 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2027 Operating | SORTA 2027 Operating | Exempt | Group | Operating Assistance | 30.09.01 | Local | 2027 | $77,704,288.00 | $77,704,288.00 | |
| 118391 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2027 ADA Paratransit | SORTA 2027 ADA Paratransit 5307 Project | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | 5307 | 2027 | $1,914,981.00 | $2,393,727.00 | |
| 118391 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2027 ADA Paratransit | SORTA 2027 ADA Paratransit 5307 Project | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | Local | 2027 | $478,746.00 | $2,393,727.00 | |
| 118392 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2027 Security Equipment | SORTA 2027 Security Equipment 5307 Projects | Exempt | Individual | Bus Support Equip / Facilities | 11.42.09 | 5307 | 2027 | $191,498.00 | $239,373.00 | |
| 118392 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2027 Security Equipment | SORTA 2027 Security Equipment 5307 Projects | Exempt | Individual | Bus Support Equip / Facilities | 11.42.09 | Local | 2027 | $47,875.00 | $239,373.00 | |
| 118393 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2027 Prev Maint 5307 | SORTA 2027 Prev Maintenance 5307 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5307 | 2027 | $17,043,325.00 | $21,304,157.00 | |
| 118393 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2027 Prev Maint 5307 | SORTA 2027 Prev Maintenance 5307 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2027 | $4,260,832.00 | $21,304,157.00 | |
| 118394 | Southwest Ohio Regional Transit Authority | HAM | S2027 SORTA Bus Repl DERG | SORTA 2027 40' Bus Replacements DERG | Exempt | Individual | 2 | Bus Rolling Stock | 11.12.01 | Local | 2027 | $961,000.00 | $961,000.00 |
| 118395 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2027 Bus Replace 5339 | SORTA 2027 40' Bus Replace 5339 | Exempt | Individual | 2 | Bus Rolling Stock | 11.12.01 | 5339 (Non-ODOT) | 2027 | $403,939.00 | $504,924.00 |
| 118395 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2027 Bus Replace 5339 | SORTA 2027 40' Bus Replace 5339 | Exempt | Individual | 2 | Bus Rolling Stock | 11.12.01 | Local | 2027 | $100,985.00 | $504,924.00 |
| 118396 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2027 Para Bus Repl 5339 | SORTA 2027 Para Bus Replace 5339 | Exempt | Individual | 14 | Bus Rolling Stock | 11.12.04 | 5339 (Non-ODOT) | 2027 | $605,934.00 | $757,418.00 |
| 118396 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2027 Para Bus Repl 5339 | SORTA 2027 Para Bus Replace 5339 | Exempt | Individual | 14 | Bus Rolling Stock | 11.12.04 | Local | 2027 | $151,484.00 | $757,418.00 |
| 118397 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2027 40' Bus Repl 5339b | SORTA 2027 40' Bus Repl 5339b | Exempt | Individual | 10 | Bus Rolling Stock | 11.12.01 | 5339 (Non-ODOT) | 2027 | $10,000,000.00 | $12,500,000.00 |
| 118397 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2027 40' Bus Repl 5339b | SORTA 2027 40' Bus Repl 5339b | Exempt | Individual | 10 | Bus Rolling Stock | 11.12.01 | Local | 2027 | $2,500,000.00 | $12,500,000.00 |
| 118398 | Southwest Ohio Regional Transit Authority | HAM | S2027 SORTA Fac Prev Maint 5337 | SORTA 2027 Facility Prev Maint 5337 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5337 | 2027 | $32,994.00 | $41,243.00 | |
| 118398 | Southwest Ohio Regional Transit Authority | HAM | S2027 SORTA Fac Prev Maint 5337 | SORTA 2027 Facility Prev Maint 5337 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2027 | $8,249.00 | $41,243.00 | |
| 118745 | Clermont County | CLE | Clermont Facility Planning & Des | Transit facility planning & design using CRRSAA funds | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.32.10 | 5307 | 2026 | $50,000.00 | $3,571,961.00 | |
| 118745 | Clermont County | CLE | Clermont Facility Planning & Des | Transit facility planning & design using CRRSAA funds | Exempt | Individual | Bus Stations/ Stops / Terminals | 11.34.04 | 5307 | 2026 | $12,000.00 | $3,571,961.00 | |
| 118745 | Clermont County | CLE | Clermont Facility Planning & Des | Transit facility planning & design using CRRSAA funds | Exempt | Individual | Bus Support Equip / Facilities | 11.43.01 | 5307 | 2026 | $2,747,424.00 | $3,571,961.00 | |
| 118745 | Clermont County | CLE | Clermont Facility Planning & Des | Transit facility planning & design using CRRSAA funds | Exempt | Individual | Bus Support Equip / Facilities | 11.43.05 | 5307 | 2026 | $618,200.00 | $3,571,961.00 | |
| 118745 | Clermont County | CLE | Clermont Facility Planning & Des | Transit facility planning & design using CRRSAA funds | Exempt | Individual | Bus Support Equip / Facilities | 11.44.01 | 5307 | 2026 | $44,337.00 | $3,571,961.00 | |
| 118745 | Clermont County | CLE | Clermont Facility Planning & Des | Transit facility planning & design using CRRSAA funds | Exempt | Individual | Bus Support Equip / Facilities | 11.44.05 | 5307 | 2026 | $100,000.00 | $3,571,961.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | 5310 Projects | 11.73.00 | 5310 (Non-ODOT) | 2026 | $44,069.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | 5310 Projects | 11.73.00 | Local | 2026 | $17,548.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Bus Rolling Stock | 11.12.04 | 5310 (Non-ODOT) | 2026 | $462,083.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Bus Rolling Stock | 11.12.04 | Local | 2026 | $160,079.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Bus Rolling Stock | 11.12.15 | 5310 (Non-ODOT) | 2026 | $217,360.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Bus Rolling Stock | 11.12.15 | 5310 (Non-ODOT) | 2027 | $216,144.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Bus Rolling Stock | 11.12.15 | Local | 2026 | $101,353.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Bus Rolling Stock | 11.12.15 | Local | 2027 | $54,037.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Bus Rolling Stock | 11.13.04 | 5310 (Non-ODOT) | 2026 | $157,524.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Bus Rolling Stock | 11.13.04 | Local | 2026 | $74,130.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Bus Rolling Stock | 11.13.15 | 5310 (Non-ODOT) | 2026 | $264,784.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Bus Rolling Stock | 11.13.15 | 5310 (Non-ODOT) | 2027 | $364,777.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Bus Rolling Stock | 11.13.15 | Local | 2026 | $104,319.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Bus Rolling Stock | 11.13.15 | Local | 2027 | $91,196.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Bus Support Equip / Facilities | 11.42.09 | 5310 (Non-ODOT) | 2027 | $28,795.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Bus Support Equip / Facilities | 11.42.09 | Local | 2027 | $7,199.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Bus Support Equip / Facilities | 11.46.08 | 5310 (Non-ODOT) | 2026 | $57,500.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Bus Support Equip / Facilities | 11.46.08 | 5310 (Non-ODOT) | 2027 | $39,622.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Bus Support Equip / Facilities | 11.46.08 | Local | 2026 | $27,060.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Bus Support Equip / Facilities | 11.46.08 | Local | 2027 | $9,907.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Operating Assistance | 30.09.01 | 5310 (Non-ODOT) | 2027 | $101,318.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Operating Assistance | 30.09.01 | Local | 2027 | $101,318.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Other Capital Items (Bus) | 11.71.13 | 5310 (Non-ODOT) | 2026 | $463,235.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Other Capital Items (Bus) | 11.71.13 | 5310 (Non-ODOT) | 2027 | $603,132.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Other Capital Items (Bus) | 11.71.13 | Local | 2026 | $217,993.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Other Capital Items (Bus) | 11.71.13 | Local | 2027 | $150,784.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5310 (Non-ODOT) | 2027 | $14,739.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2027 | $3,685.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Other Capital Items (Bus) | 11.7L.00 | 5310 (Non-ODOT) | 2026 | $340,777.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Other Capital Items (Bus) | 11.7L.00 | 5310 (Non-ODOT) | 2027 | $740,648.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Other Capital Items (Bus) | 11.7L.00 | Local | 2026 | $160,367.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Other Capital Items (Bus) | 11.7L.00 | Local | 2027 | $185,388.00 | $5,803,226.00 | |
| 119540 | OKI Subrecipients | HAM | OKI 5310 STIP 2024-27 | OKI 5310 STIP 2024-27 | Exempt | Individual | Other Program Costs | 11.80.00 | 5310 (Non-ODOT) | 2026 | $220,356.00 | $5,803,226.00 | |
| 120725 | Southwest Ohio Regional Transit Authority | HAM | HAM SORTA BEB for BRT | Purchase of battery electric buses to replace diesel buses in SORTA's existing fleet. | Exempt | Individual | 9 | Bus Rolling Stock | 11.12.01 | Local | 2027 | $3,428,571.00 | $11,428,571.00 |
| 120725 | Southwest Ohio Regional Transit Authority | HAM | HAM SORTA BEB for BRT | Purchase of battery electric buses to replace diesel buses in SORTA's existing fleet. | Exempt | Individual | 9 | Bus Rolling Stock | 11.12.01 | MPO STBG | 2027 | $8,000,000.00 | $11,428,571.00 |
| 121315 | Clermont County | CLE | S2024-27 CTC Vehicles | Vehicle Capital for CTC | Exempt | Individual | 2 | Bus Rolling Stock | 11.12.04 | 5307 | 2027 | $545,092.00 | $721,365.00 |
| 121315 | Clermont County | CLE | S2024-27 CTC Vehicles | Vehicle Capital for CTC | Exempt | Individual | 2 | Bus Rolling Stock | 11.12.04 | State | 2027 | $136,273.00 | $721,365.00 |
| 121315 | Clermont County | CLE | S2024-27 CTC Vehicles | Vehicle Capital for CTC | Exempt | Individual | 2 | Bus Rolling Stock | 11.12.15 | State | 2026 | $40,000.00 | $721,365.00 |
| 122571 | Butler County Regional Transit Authority | BUT | S2028-9 BCRTA Vehicle Replace | Vehicle replacement projects for BCRTA funded with 5307 | Exempt | Individual | 1 | Bus Rolling Stock | 11.12.02 | 5307 | 2028 | $300,000.00 | $1,312,500.00 |
| 122571 | Butler County Regional Transit Authority | BUT | S2028-9 BCRTA Vehicle Replace | Vehicle replacement projects for BCRTA funded with 5307 | Exempt | Individual | 1 | Bus Rolling Stock | 11.12.02 | 5307 | 2029 | $300,000.00 | $1,312,500.00 |
| 122571 | Butler County Regional Transit Authority | BUT | S2028-9 BCRTA Vehicle Replace | Vehicle replacement projects for BCRTA funded with 5307 | Exempt | Individual | 1 | Bus Rolling Stock | 11.12.02 | Local | 2028 | $75,000.00 | $1,312,500.00 |
| 122571 | Butler County Regional Transit Authority | BUT | S2028-9 BCRTA Vehicle Replace | Vehicle replacement projects for BCRTA funded with 5307 | Exempt | Individual | 1 | Bus Rolling Stock | 11.12.02 | Local | 2029 | $75,000.00 | $1,312,500.00 |
| 122571 | Butler County Regional Transit Authority | BUT | S2028-9 BCRTA Vehicle Replace | Vehicle replacement projects for BCRTA funded with 5307 | Exempt | Individual | 1 | Bus Rolling Stock | 11.12.04 | 5307 | 2028 | $225,000.00 | $1,312,500.00 |
| 122571 | Butler County Regional Transit Authority | BUT | S2028-9 BCRTA Vehicle Replace | Vehicle replacement projects for BCRTA funded with 5307 | Exempt | Individual | 1 | Bus Rolling Stock | 11.12.04 | 5307 | 2029 | $225,000.00 | $1,312,500.00 |
| 122571 | Butler County Regional Transit Authority | BUT | S2028-9 BCRTA Vehicle Replace | Vehicle replacement projects for BCRTA funded with 5307 | Exempt | Individual | 1 | Bus Rolling Stock | 11.12.04 | Local | 2028 | $56,250.00 | $1,312,500.00 |
| 122571 | Butler County Regional Transit Authority | BUT | S2028-9 BCRTA Vehicle Replace | Vehicle replacement projects for BCRTA funded with 5307 | Exempt | Individual | 1 | Bus Rolling Stock | 11.12.04 | Local | 2029 | $56,250.00 | $1,312,500.00 |
| 122572 | City of Middletown | BUT, WAR | S2026-9 MTS Vehicle Replacements | Vehicle replacement projects | Exempt | Individual | 1 | Bus Rolling Stock | 11.12.02 | 5307 | 2027 | $300,000.00 | $750,000.00 |
| 122572 | City of Middletown | BUT, WAR | S2026-9 MTS Vehicle Replacements | Vehicle replacement projects | Exempt | Individual | 1 | Bus Rolling Stock | 11.12.02 | 5307 | 2028 | $300,000.00 | $750,000.00 |
| 122572 | City of Middletown | BUT, WAR | S2026-9 MTS Vehicle Replacements | Vehicle replacement projects | Exempt | Individual | 1 | Bus Rolling Stock | 11.12.02 | Local | 2027 | $75,000.00 | $750,000.00 |
| 122572 | City of Middletown | BUT, WAR | S2026-9 MTS Vehicle Replacements | Vehicle replacement projects | Exempt | Individual | 1 | Bus Rolling Stock | 11.12.02 | Local | 2028 | $75,000.00 | $750,000.00 |
| 122686 | Warren County | WAR | S2028 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Operating Assistance | 30.09.03 | 5307 | 2028 | $700,000.00 | $1,700,000.00 | |
| 122686 | Warren County | WAR | S2028 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Operating Assistance | 30.09.03 | Local | 2028 | $700,000.00 | $1,700,000.00 | |
| 122686 | Warren County | WAR | S2028 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5307 | 2028 | $80,000.00 | $1,700,000.00 | |
| 122686 | Warren County | WAR | S2028 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2028 | $20,000.00 | $1,700,000.00 | |
| 122686 | Warren County | WAR | S2028 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | 4 | Bus Rolling Stock | 11.12.15 | 5307 | 2028 | $160,000.00 | $1,700,000.00 |
| 122686 | Warren County | WAR | S2028 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | 4 | Bus Rolling Stock | 11.12.15 | Local | 2028 | $40,000.00 | $1,700,000.00 |
| 122687 | Warren County | WAR | S2029 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Operating Assistance | 30.09.03 | 5307 | 2029 | $700,000.00 | $1,662,500.00 | |
| 122687 | Warren County | WAR | S2029 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Operating Assistance | 30.09.03 | Local | 2029 | $700,000.00 | $1,662,500.00 | |
| 122687 | Warren County | WAR | S2029 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5307 | 2029 | $80,000.00 | $1,662,500.00 | |
| 122687 | Warren County | WAR | S2029 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2029 | $20,000.00 | $1,662,500.00 | |
| 122687 | Warren County | WAR | S2029 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | 2 | Bus Rolling Stock | 11.12.15 | 5307 | 2029 | $130,000.00 | $1,662,500.00 |
| 122687 | Warren County | WAR | S2029 WCTS 5307 Program | Operating assistance, vehicle replacement, and preventive maintenance | Exempt | Individual | 2 | Bus Rolling Stock | 11.12.15 | Local | 2029 | $32,500.00 | $1,662,500.00 |
| 122698 | Southwest Ohio Regional Transit Authority | HAM, BUT, CLE, WAR | S2028 SORTA Operating | SORTA 2028 Operating | Exempt | Individual | Operating Assistance | 30.09.01 | Local | 2028 | $80,000,000.00 | $80,000,000.00 | |
| 122699 | Southwest Ohio Regional Transit Authority | HAM, BUT, CLE, WAR | S2029 SORTA Operating | SORTA 2029 Operating | Exempt | Individual | Operating Assistance | 30.09.01 | Local | 2029 | $80,000,000.00 | $80,000,000.00 | |
| 122700 | Southwest Ohio Regional Transit Authority | HAM, BUT, CLE, WAR | S2028 SORTA ADA Paratransit | SORTA 2028 ADA Paratransit 5307 Project | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | 5307 | 2028 | $1,600,000.00 | $2,000,000.00 | |
| 122700 | Southwest Ohio Regional Transit Authority | HAM, BUT, CLE, WAR | S2028 SORTA ADA Paratransit | SORTA 2028 ADA Paratransit 5307 Project | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | Local | 2028 | $400,000.00 | $2,000,000.00 | |
| 122701 | Southwest Ohio Regional Transit Authority | HAM, BUT, CLE, WAR | S2029 SORTA ADA Paratransit | SORTA 2029 ADA Paratransit 5307 Project | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | 5307 | 2029 | $1,600,000.00 | $2,000,000.00 | |
| 122701 | Southwest Ohio Regional Transit Authority | HAM, BUT, CLE, WAR | S2029 SORTA ADA Paratransit | SORTA 2029 ADA Paratransit 5307 Project | Exempt | Individual | Other Capital Items (Bus) | 11.7C.00 | Local | 2029 | $400,000.00 | $2,000,000.00 | |
| 122702 | Southwest Ohio Regional Transit Authority | HAM | S2028 SORTA Security Equipment | SORTA 2028 Security Equipment 5307 Projects | Exempt | Individual | Bus Support Equip / Facilities | 11.42.09 | 5307 | 2028 | $300,000.00 | $370,000.00 | |
| 122702 | Southwest Ohio Regional Transit Authority | HAM | S2028 SORTA Security Equipment | SORTA 2028 Security Equipment 5307 Projects | Exempt | Individual | Bus Support Equip / Facilities | 11.42.09 | Local | 2028 | $70,000.00 | $370,000.00 | |
| 122703 | Southwest Ohio Regional Transit Authority | HAM | S2029 SORTA Security Equipment | SORTA 2029 Security Equipment 5307 Projects | Exempt | Individual | Bus Support Equip / Facilities | 11.42.09 | 5307 | 2029 | $300,000.00 | $370,000.00 | |
| 122703 | Southwest Ohio Regional Transit Authority | HAM | S2029 SORTA Security Equipment | SORTA 2029 Security Equipment 5307 Projects | Exempt | Individual | Bus Support Equip / Facilities | 11.42.09 | Local | 2029 | $70,000.00 | $370,000.00 | |
| 122704 | Southwest Ohio Regional Transit Authority | HAM | S2028 SORTA Preventive Maint | SORTA 2028 Prev Maintenance 5307 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5307 | 2028 | $14,000,000.00 | $17,500,000.00 | |
| 122704 | Southwest Ohio Regional Transit Authority | HAM | S2028 SORTA Preventive Maint | SORTA 2028 Prev Maintenance 5307 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2028 | $1,000,000.00 | $17,500,000.00 | |
| 122704 | Southwest Ohio Regional Transit Authority | HAM | S2028 SORTA Preventive Maint | SORTA 2028 Prev Maintenance 5307 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | State | 2028 | $2,500,000.00 | $17,500,000.00 | |
| 122705 | Southwest Ohio Regional Transit Authority | HAM | S2029 SORTA Preventive Maint | SORTA 2029 Prev Maintenance 5307 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5307 | 2029 | $14,000,000.00 | $17,500,000.00 | |
| 122705 | Southwest Ohio Regional Transit Authority | HAM | S2029 SORTA Preventive Maint | SORTA 2029 Prev Maintenance 5307 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2029 | $1,000,000.00 | $17,500,000.00 | |
| 122705 | Southwest Ohio Regional Transit Authority | HAM | S2029 SORTA Preventive Maint | SORTA 2029 Prev Maintenance 5307 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | State | 2029 | $2,500,000.00 | $17,500,000.00 | |
| 122706 | Southwest Ohio Regional Transit Authority | HAM | S2028 SORTA Bus Replc DERG | SORTA 2028 40' Bus Replacements DERG | Exempt | Individual | 4 | Bus Rolling Stock | 11.12.01 | Local | 2028 | $2,750,000.00 | $2,750,000.00 |
| 122707 | Southwest Ohio Regional Transit Authority | HAM | S2029 SORT Bus Replc DERG | SORTA 2029 40' Bus Replacements DERG | Exempt | Individual | 4 | Bus Rolling Stock | 11.12.01 | Local | 2029 | $2,750,000.00 | $2,750,000.00 |
| 122708 | Southwest Ohio Regional Transit Authority | HAM | S2028 SORTA Bus Replc 5339a | SORTA 2028 40' Bus Replacements 5339a | Exempt | Individual | 10 | Bus Rolling Stock | 11.12.01 | 5339 (Non-ODOT) | 2028 | $1,000,000.00 | $1,300,000.00 |
| 122708 | Southwest Ohio Regional Transit Authority | HAM | S2028 SORTA Bus Replc 5339a | SORTA 2028 40' Bus Replacements 5339a | Exempt | Individual | 10 | Bus Rolling Stock | 11.12.01 | Local | 2028 | $300,000.00 | $1,300,000.00 |
| 122709 | Southwest Ohio Regional Transit Authority | HAM | S2029 SORTA Bus Replc 5339a | SORTA 2029 40' Bus Replacements 5339a | Exempt | Individual | 10 | Bus Rolling Stock | 11.12.01 | 5339 (Non-ODOT) | 2029 | $1,000,000.00 | $1,300,000.00 |
| 122709 | Southwest Ohio Regional Transit Authority | HAM | S2029 SORTA Bus Replc 5339a | SORTA 2029 40' Bus Replacements 5339a | Exempt | Individual | 10 | Bus Rolling Stock | 11.12.01 | Local | 2029 | $300,000.00 | $1,300,000.00 |
| 122710 | Southwest Ohio Regional Transit Authority | HAM | S2028 SORTA ADA Bus Replc 5339a | SORTA 2028 Para Bus Replace 5339a | Exempt | Individual | 10 | Bus Rolling Stock | 11.12.04 | 5339 (Non-ODOT) | 2028 | $1,000,000.00 | $1,300,000.00 |
| 122710 | Southwest Ohio Regional Transit Authority | HAM | S2028 SORTA ADA Bus Replc 5339a | SORTA 2028 Para Bus Replace 5339a | Exempt | Individual | 10 | Bus Rolling Stock | 11.12.04 | Local | 2028 | $300,000.00 | $1,300,000.00 |
| 122711 | Southwest Ohio Regional Transit Authority | HAM | S2029 SORTA ADA Bus Replc 5339a | SORTA 2029 Para Bus Replace 5339a | Exempt | Individual | 10 | Bus Rolling Stock | 11.12.04 | 5339 (Non-ODOT) | 2029 | $1,000,000.00 | $1,300,000.00 |
| 122711 | Southwest Ohio Regional Transit Authority | HAM | S2029 SORTA ADA Bus Replc 5339a | SORTA 2029 Para Bus Replace 5339a | Exempt | Individual | 10 | Bus Rolling Stock | 11.12.04 | Local | 2029 | $300,000.00 | $1,300,000.00 |
| 122720 | Southwest Ohio Regional Transit Authority | HAM | S2028 SORTA Bus Replc 5339c | SORTA 2028 40' Bus Replacements 5339c, contains FTA Low-No discretionary funding | Exempt | Individual | 9 | Bus Rolling Stock | 11.12.01 | Discretionary - 5339(c) | 2028 | $10,000,000.00 | $14,000,000.00 |
| 122720 | Southwest Ohio Regional Transit Authority | HAM | S2028 SORTA Bus Replc 5339c | SORTA 2028 40' Bus Replacements 5339c, contains FTA Low-No discretionary funding | Exempt | Individual | 9 | Bus Rolling Stock | 11.12.01 | Local | 2028 | $4,000,000.00 | $14,000,000.00 |
| 122721 | Southwest Ohio Regional Transit Authority | HAM | S2029 SORTA Bus Replac 5339c | SORTA 2029 40' Bus Replacements 5339c, contains FTA Low-No discretionary funding | Exempt | Individual | 9 | Bus Rolling Stock | 11.12.01 | Discretionary - 5339(c) | 2029 | $10,000,000.00 | $14,000,000.00 |
| 122721 | Southwest Ohio Regional Transit Authority | HAM | S2029 SORTA Bus Replac 5339c | SORTA 2029 40' Bus Replacements 5339c, contains FTA Low-No discretionary funding | Exempt | Individual | 9 | Bus Rolling Stock | 11.12.01 | Local | 2029 | $4,000,000.00 | $14,000,000.00 |
| 122722 | Southwest Ohio Regional Transit Authority | HAM | S2028 SORTA Fac Prev Maint 5337 | SORTA 2028 Facility Prev Maint 5337 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5337 | 2028 | $25,000.00 | $30,000.00 | |
| 122722 | Southwest Ohio Regional Transit Authority | HAM | S2028 SORTA Fac Prev Maint 5337 | SORTA 2028 Facility Prev Maint 5337 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2028 | $5,000.00 | $30,000.00 | |
| 122723 | Southwest Ohio Regional Transit Authority | HAM | S2029 SORTA Fac Prev Maint 5337 | SORTA 2029 Facility Prev Maint 5337 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5337 | 2029 | $25,000.00 | $30,000.00 | |
| 122723 | Southwest Ohio Regional Transit Authority | HAM | S2029 SORTA Fac Prev Maint 5337 | SORTA 2029 Facility Prev Maint 5337 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2029 | $5,000.00 | $30,000.00 | |
| 122908 | Southwest Ohio Regional Transit Authority | HAM | S2028 SORTA OKI Bus Replacement | SORTA 2028 OKI Bus Replacements | Exempt | Individual | 10 | Bus Rolling Stock | 11.12.01 | Local | 2028 | $3,428,571.00 | $11,428,571.00 |
| 122908 | Southwest Ohio Regional Transit Authority | HAM | S2028 SORTA OKI Bus Replacement | SORTA 2028 OKI Bus Replacements | Exempt | Individual | 10 | Bus Rolling Stock | 11.12.01 | MPO STBG | 2028 | $8,000,000.00 | $11,428,571.00 |
| 123010 | Cincinnati, City of | HAM | Cinci StreetCar RT Mang & Interg | Headway Management and realtime arrival integration for the Connector, includes AoPP funding and SFY2025 OWMP STBG funding | Exempt | Individual | Signal & Communication Equip (Rail) | 12.64.02 | Local | 2027 | $303,300.00 | $1,516,500.00 | |
| 123010 | Cincinnati, City of | HAM | Cinci StreetCar RT Mang & Interg | Headway Management and realtime arrival integration for the Connector, includes AoPP funding and SFY2025 OWMP STBG funding | Exempt | Individual | Signal & Communication Equip (Rail) | 12.64.02 | ODOT Flex | 2027 | $1,213,200.00 | $1,516,500.00 | |
| 123013 | Cincinnati, City of | HAM | S2028-2029 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 & 5337 Rail PM with local funding as placeholder for future flex funding | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | 5307 | 2028 | $320,000.00 | $4,330,950.00 | |
| 123013 | Cincinnati, City of | HAM | S2028-2029 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 & 5337 Rail PM with local funding as placeholder for future flex funding | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | 5307 | 2029 | $340,000.00 | $4,330,950.00 | |
| 123013 | Cincinnati, City of | HAM | S2028-2029 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 & 5337 Rail PM with local funding as placeholder for future flex funding | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | 5337 | 2028 | $370,000.00 | $4,330,950.00 | |
| 123013 | Cincinnati, City of | HAM | S2028-2029 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 & 5337 Rail PM with local funding as placeholder for future flex funding | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | 5337 | 2029 | $390,000.00 | $4,330,950.00 | |
| 123013 | Cincinnati, City of | HAM | S2028-2029 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 & 5337 Rail PM with local funding as placeholder for future flex funding | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | Local | 2028 | $80,000.00 | $4,330,950.00 | |
| 123013 | Cincinnati, City of | HAM | S2028-2029 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 & 5337 Rail PM with local funding as placeholder for future flex funding | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | Local | 2028 | $92,500.00 | $4,330,950.00 | |
| 123013 | Cincinnati, City of | HAM | S2028-2029 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 & 5337 Rail PM with local funding as placeholder for future flex funding | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | Local | 2028 | $1,225,000.00 | $4,330,950.00 | |
| 123013 | Cincinnati, City of | HAM | S2028-2029 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 & 5337 Rail PM with local funding as placeholder for future flex funding | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | Local | 2029 | $84,950.00 | $4,330,950.00 | |
| 123013 | Cincinnati, City of | HAM | S2028-2029 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 & 5337 Rail PM with local funding as placeholder for future flex funding | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | Local | 2029 | $97,500.00 | $4,330,950.00 | |
| 123013 | Cincinnati, City of | HAM | S2028-2029 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 & 5337 Rail PM with local funding as placeholder for future flex funding | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | Local | 2029 | $1,250,000.00 | $4,330,950.00 | |
| 123013 | Cincinnati, City of | HAM | S2028-2029 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 & 5337 Rail PM with local funding as placeholder for future flex funding | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | State | 2028 | $40,000.00 | $4,330,950.00 | |
| 123013 | Cincinnati, City of | HAM | S2028-2029 Cinci SC Rail PM | City of Cincinnati Streetcar 5307 & 5337 Rail PM with local funding as placeholder for future flex funding | Exempt | Individual | Other Capital Items (Rail) | 12.7A.00 | State | 2029 | $41,000.00 | $4,330,950.00 | |
| 123184 | Clermont County | CLE | S2028-2029 CTC Vehicles | Vehicle Capital for CTC | Exempt | Individual | Bus Rolling Stock | 11.12.04 | 5307 | 2028 | $400,000.00 | $1,050,000.00 | |
| 123184 | Clermont County | CLE | S2028-2029 CTC Vehicles | Vehicle Capital for CTC | Exempt | Individual | Bus Rolling Stock | 11.12.04 | 5307 | 2029 | $440,000.00 | $1,050,000.00 | |
| 123184 | Clermont County | CLE | S2028-2029 CTC Vehicles | Vehicle Capital for CTC | Exempt | Individual | Bus Rolling Stock | 11.12.04 | State | 2028 | $100,000.00 | $1,050,000.00 | |
| 123184 | Clermont County | CLE | S2028-2029 CTC Vehicles | Vehicle Capital for CTC | Exempt | Individual | Bus Rolling Stock | 11.12.04 | State | 2029 | $110,000.00 | $1,050,000.00 | |
| 123186 | Clermont County | CLE | SFY2026 CTC Operating | SFY2026 CTC Operating | Exempt | Individual | Operating Assistance | 30.09.03 | 5307 | 2026 | $356,063.00 | $4,577,552.00 | |
| 123186 | Clermont County | CLE | SFY2026 CTC Operating | SFY2026 CTC Operating | Exempt | Individual | Operating Assistance | 30.09.03 | 5307 | 2027 | $356,063.00 | $4,577,552.00 | |
| 123186 | Clermont County | CLE | SFY2026 CTC Operating | SFY2026 CTC Operating | Exempt | Individual | Operating Assistance | 30.09.03 | Local | 2026 | $356,064.00 | $4,577,552.00 | |
| 123186 | Clermont County | CLE | SFY2026 CTC Operating | SFY2026 CTC Operating | Exempt | Individual | Operating Assistance | 30.09.03 | Local | 2027 | $356,064.00 | $4,577,552.00 | |
| 123186 | Clermont County | CLE | SFY2026 CTC Operating | SFY2026 CTC Operating | Exempt | Individual | Operating Assistance | 30.09.03 | State | 2026 | $575,000.00 | $4,577,552.00 | |
| 123186 | Clermont County | CLE, HAM | SFY2026 CTC Operating | SFY2026 CTC Operating | Exempt | Individual | Operating Assistance | 30.09.03 | 5307 | 2026 | $302,022.00 | $4,577,552.00 | |
| 123186 | Clermont County | CLE, HAM | SFY2026 CTC Operating | SFY2026 CTC Operating | Exempt | Individual | Operating Assistance | 30.09.03 | 5307 | 2027 | $987,127.00 | $4,577,552.00 | |
| 123186 | Clermont County | CLE, HAM | SFY2026 CTC Operating | SFY2026 CTC Operating | Exempt | Individual | Operating Assistance | 30.09.03 | Local | 2027 | $727,127.00 | $4,577,552.00 | |
| 123186 | Clermont County | CLE, HAM | SFY2026 CTC Operating | SFY2026 CTC Operating | Exempt | Individual | Operating Assistance | 30.09.03 | State | 2026 | $302,022.00 | $4,577,552.00 | |
| 123186 | Clermont County | CLE, HAM | SFY2026 CTC Operating | SFY2026 CTC Operating | Exempt | Individual | Operating Assistance | 30.09.03 | State | 2027 | $260,000.00 | $4,577,552.00 | |
| 123187 | Clermont County | CLE, HAM | S2028-2029 CTC Operating | Clermont Transportation Connection Operating | Exempt | Individual | Operating Assistance | 30.09.03 | 5307 | 2028 | $675,000.00 | $2,750,000.00 | |
| 123187 | Clermont County | CLE, HAM | S2028-2029 CTC Operating | Clermont Transportation Connection Operating | Exempt | Individual | Operating Assistance | 30.09.03 | 5307 | 2029 | $700,000.00 | $2,750,000.00 | |
| 123187 | Clermont County | CLE, HAM | S2028-2029 CTC Operating | Clermont Transportation Connection Operating | Exempt | Individual | Operating Assistance | 30.09.03 | Local | 2028 | $405,000.00 | $2,750,000.00 | |
| 123187 | Clermont County | CLE, HAM | S2028-2029 CTC Operating | Clermont Transportation Connection Operating | Exempt | Individual | Operating Assistance | 30.09.03 | Local | 2029 | $420,000.00 | $2,750,000.00 | |
| 123187 | Clermont County | CLE, HAM | S2028-2029 CTC Operating | Clermont Transportation Connection Operating | Exempt | Individual | Operating Assistance | 30.09.03 | State | 2028 | $270,000.00 | $2,750,000.00 | |
| 123187 | Clermont County | CLE, HAM | S2028-2029 CTC Operating | Clermont Transportation Connection Operating | Exempt | Individual | Operating Assistance | 30.09.03 | State | 2029 | $280,000.00 | $2,750,000.00 | |
| 123188 | Clermont County | CLE | S2027-2029 CTC Misc. Capital | Clermont Transportation Connection Misc. Capital Projects | Exempt | Individual | Signal & Communication Equip - Bus | 11.62.03 | 5307 | 2027 | $80,000.00 | $100,000.00 | |
| 123188 | Clermont County | CLE | S2027-2029 CTC Misc. Capital | Clermont Transportation Connection Misc. Capital Projects | Exempt | Individual | Signal & Communication Equip - Bus | 11.62.03 | State | 2027 | $20,000.00 | $100,000.00 | |
| 123899 | HDR Engineering Inc. (001) | HAM | Super Gr 5311 Admn SFY 2026 | Section 5311 Administration | Exempt | Group | State / Programs Administration | 11.80.00 | 5311 | 2026 | $136,838.86 | $136,838.86 | |
| 124188 | Clermont County | CLE | SFY26 Clermont County Connection | Clermont County Connection - SFY2026 Projects | Exempt | Individual | Other Program Costs | 11.7A.00 | 5307 | 2026 | $104,000.00 | $130,000.00 | |
| 124188 | Clermont County | CLE | SFY26 Clermont County Connection | Clermont County Connection - SFY2026 Projects | Exempt | Individual | Other Program Costs | 11.7A.00 | Local | 2026 | $26,000.00 | $130,000.00 | |
| 124406 | Southwest Ohio Regional Transit Authority | HAM | SFY26-29 Vehicles | SFY2026-2029 Vehicles | Exempt | Group | Bus Rolling Stock | 11.12.04 | Local | 2026 | $319,473.00 | $2,738,352.00 | |
| 124406 | Southwest Ohio Regional Transit Authority | HAM | SFY26-29 Vehicles | SFY2026-2029 Vehicles | Exempt | Group | Bus Rolling Stock | 11.12.04 | ODOT Flex | 2026 | $1,277,899.00 | $2,738,352.00 | |
| 124406 | Southwest Ohio Regional Transit Authority | HAM | SFY26-29 Vehicles | SFY2026-2029 Vehicles | Exempt | Group | 4 | Bus Rolling Stock | 11.13.04 | Local | 2027 | $228,196.00 | $2,738,352.00 |
| 124406 | Southwest Ohio Regional Transit Authority | HAM | SFY26-29 Vehicles | SFY2026-2029 Vehicles | Exempt | Group | 4 | Bus Rolling Stock | 11.13.04 | ODOT Flex | 2027 | $912,784.00 | $2,738,352.00 |
| 124530 | Butler County Regional Transit Authority | HAM | SFY2026-2029 BCRTA OTP2 OP | BCRTA OTP2 SFY26-29 | Exempt | Group | Other Capital Items (Bus) | 11.71.11 | State | 2026 | $18,120.00 | $18,120.00 | |
| 124531 | Butler County Regional Transit Authority | BUT | SFY26 BCRTA Capital | BCRTA Capital SFY2026 | Exempt | Individual | Bus Support Equip / Facilities | 11.42.11 | 5307 | 2026 | $284,000.00 | $2,789,440.00 | |
| 124531 | Butler County Regional Transit Authority | BUT | SFY26 BCRTA Capital | BCRTA Capital SFY2026 | Exempt | Individual | Bus Support Equip / Facilities | 11.42.11 | Local | 2026 | $71,000.00 | $2,789,440.00 | |
| 124531 | Butler County Regional Transit Authority | BUT | SFY26 BCRTA Capital | BCRTA Capital SFY2026 | Exempt | Individual | Signal & Communication Equip - Bus | 11.62.20 | 5307 | 2026 | $146,000.00 | $2,789,440.00 | |
| 124531 | Butler County Regional Transit Authority | BUT | SFY26 BCRTA Capital | BCRTA Capital SFY2026 | Exempt | Individual | Signal & Communication Equip - Bus | 11.62.20 | Local | 2026 | $36,500.00 | $2,789,440.00 | |
| 124531 | Butler County Regional Transit Authority | HAM | SFY26 BCRTA Capital | BCRTA Capital SFY2026 | Exempt | Individual | Bus Support Equip / Facilities | 11.42.10 | 5307 | 2026 | $85,000.00 | $2,789,440.00 | |
| 124531 | Butler County Regional Transit Authority | HAM | SFY26 BCRTA Capital | BCRTA Capital SFY2026 | Exempt | Individual | Bus Support Equip / Facilities | 11.42.10 | Local | 2026 | $21,250.00 | $2,789,440.00 | |
| 124531 | Butler County Regional Transit Authority | HAM | SFY26 BCRTA Capital | BCRTA Capital SFY2026 | Exempt | Individual | Bus Support Equip / Facilities | 11.43.02 | 5307 | 2026 | $500,000.00 | $2,789,440.00 | |
| 124531 | Butler County Regional Transit Authority | HAM | SFY26 BCRTA Capital | BCRTA Capital SFY2026 | Exempt | Individual | Bus Support Equip / Facilities | 11.43.02 | 5339 (Non-ODOT) | 2026 | $216,552.00 | $2,789,440.00 | |
| 124531 | Butler County Regional Transit Authority | HAM | SFY26 BCRTA Capital | BCRTA Capital SFY2026 | Exempt | Individual | Bus Support Equip / Facilities | 11.43.02 | Local | 2026 | $54,138.00 | $2,789,440.00 | |
| 124531 | Butler County Regional Transit Authority | HAM | SFY26 BCRTA Capital | BCRTA Capital SFY2026 | Exempt | Individual | Bus Support Equip / Facilities | 11.43.02 | Local | 2026 | $125,000.00 | $2,789,440.00 | |
| 124531 | Butler County Regional Transit Authority | HAM | SFY26 BCRTA Capital | BCRTA Capital SFY2026 | Exempt | Individual | Bus Support Equip / Facilities | 11.43.02 | Local | 2026 | $250,000.00 | $2,789,440.00 | |
| 124531 | Butler County Regional Transit Authority | HAM | SFY26 BCRTA Capital | BCRTA Capital SFY2026 | Exempt | Individual | Bus Support Equip / Facilities | 11.43.02 | ODOT Flex | 2026 | $1,000,000.00 | $2,789,440.00 | |
| 124533 | Butler County Regional Transit Authority | BUT | Middletown Capital OTP2 | Middletown Marketing OTP2 SFY26-29 | Exempt | Group | Other Capital Items (Bus) | 11.71.11 | State | 2026 | $125,000.00 | $125,000.00 | |
| 124536 | Butler County Regional Transit Authority | BUT | Middletown Gov Apportionment | Governor's Apportionment | Exempt | Individual | Bus Support Equip / Facilities | 11.42.11 | 5307 | 2026 | $40,320.00 | $50,400.00 | |
| 124536 | Butler County Regional Transit Authority | BUT | Middletown Gov Apportionment | Governor's Apportionment | Exempt | Individual | Bus Support Equip / Facilities | 11.42.11 | Local | 2026 | $1,680.00 | $50,400.00 | |
| 124536 | Butler County Regional Transit Authority | BUT | Middletown Gov Apportionment | Governor's Apportionment | Exempt | Individual | Bus Support Equip / Facilities | 11.42.11 | State | 2026 | $8,400.00 | $50,400.00 | |
| 124673 | Clermont County | CLE | CTC Preventative Maintenance | CTC Preventative Maintenance 26-29 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5307 | 2026 | $260,000.00 | $575,000.00 | |
| 124673 | Clermont County | CLE | CTC Preventative Maintenance | CTC Preventative Maintenance 26-29 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5307 | 2028 | $180,000.00 | $575,000.00 | |
| 124673 | Clermont County | CLE | CTC Preventative Maintenance | CTC Preventative Maintenance 26-29 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2026 | $65,000.00 | $575,000.00 | |
| 124673 | Clermont County | CLE | CTC Preventative Maintenance | CTC Preventative Maintenance 26-29 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2028 | $45,000.00 | $575,000.00 | |
| 124673 | Clermont County | CLE | CTC Preventative Maintenance | CTC Preventative Maintenance 26-29 | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | State | 2026 | $25,000.00 | $575,000.00 | |
| 125092 | Southwest Ohio Regional Transit Authority | HAM | SORTA SFY26-28 PM 5307 UTP | SORTA SFY2026-2028 Preventative Maintenance 5307 UTP | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5307 | 2026 | $9,027,072.00 | $37,350,740.00 | |
| 125092 | Southwest Ohio Regional Transit Authority | HAM | SORTA SFY26-28 PM 5307 UTP | SORTA SFY2026-2028 Preventative Maintenance 5307 UTP | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5307 | 2027 | $9,929,776.00 | $37,350,740.00 | |
| 125092 | Southwest Ohio Regional Transit Authority | HAM | SORTA SFY26-28 PM 5307 UTP | SORTA SFY2026-2028 Preventative Maintenance 5307 UTP | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | 5307 | 2028 | $10,923,744.00 | $37,350,740.00 | |
| 125092 | Southwest Ohio Regional Transit Authority | HAM | SORTA SFY26-28 PM 5307 UTP | SORTA SFY2026-2028 Preventative Maintenance 5307 UTP | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | State | 2026 | $2,256,768.00 | $37,350,740.00 | |
| 125092 | Southwest Ohio Regional Transit Authority | HAM | SORTA SFY26-28 PM 5307 UTP | SORTA SFY2026-2028 Preventative Maintenance 5307 UTP | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | State | 2027 | $2,482,444.00 | $37,350,740.00 | |
| 125092 | Southwest Ohio Regional Transit Authority | HAM | SORTA SFY26-28 PM 5307 UTP | SORTA SFY2026-2028 Preventative Maintenance 5307 UTP | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | State | 2028 | $2,730,936.00 | $37,350,740.00 | |
| 125144 | Southwest Ohio Regional Transit Authority | HAM | SORTA Paratransit Operating | One Seat Paratransit Operating | Exempt | Individual | Operating Assistance | 30.80.01 | Local | 2026 | $108,684.00 | $217,368.00 | |
| 125144 | Southwest Ohio Regional Transit Authority | HAM | SORTA Paratransit Operating | One Seat Paratransit Operating | Exempt | Individual | Operating Assistance | 30.80.01 | ODOT Flex | 2026 | $108,684.00 | $217,368.00 | |
| 125289 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026-2029 OWMP Capital | OWMP 2026-2029 Capital Projects | Exempt | Individual | Bus Rolling Stock | 11.13.04 | Local | 2026 | $573,057.00 | $17,366,895.00 | |
| 125289 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026-2029 OWMP Capital | OWMP 2026-2029 Capital Projects | Exempt | Individual | Bus Rolling Stock | 11.13.04 | ODOT Flex | 2026 | $2,291,993.00 | $17,366,895.00 | |
| 125289 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026-2029 OWMP Capital | OWMP 2026-2029 Capital Projects | Exempt | Individual | 7 | Bus Rolling Stock | 11.12.04 | 5307 | 2026 | $1,277,899.00 | $17,366,895.00 |
| 125289 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026-2029 OWMP Capital | OWMP 2026-2029 Capital Projects | Exempt | Individual | 7 | Bus Rolling Stock | 11.12.04 | Local | 2026 | $319,473.00 | $17,366,895.00 |
| 125289 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026-2029 OWMP Capital | OWMP 2026-2029 Capital Projects | Exempt | Individual | 8 | Bus Rolling Stock | 11.12.01 | Local | 2029 | $3,847,380.00 | $17,366,895.00 |
| 125289 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026-2029 OWMP Capital | OWMP 2026-2029 Capital Projects | Exempt | Individual | 8 | Bus Rolling Stock | 11.12.01 | ODOT Flex | 2029 | $5,771,071.00 | $17,366,895.00 |
| 125289 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026-2029 OWMP Capital | OWMP 2026-2029 Capital Projects | Exempt | Individual | 12 | Bus Rolling Stock | 11.12.04 | Local | 2029 | $1,314,409.00 | $17,366,895.00 |
| 125289 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026-2029 OWMP Capital | OWMP 2026-2029 Capital Projects | Exempt | Individual | 12 | Bus Rolling Stock | 11.12.04 | ODOT Flex | 2029 | $1,971,613.00 | $17,366,895.00 |
| 125608 | Southwest Ohio Regional Transit Authority | HAM | SORTA FY29 Capital | SORTA OKI-attributable capital funding FY2029 | Exempt | Individual | Bus Rolling Stock | 11.12.01 | Local | 2029 | $3,847,381.00 | $12,904,474.00 | |
| 125608 | Southwest Ohio Regional Transit Authority | HAM | SORTA FY29 Capital | SORTA OKI-attributable capital funding FY2029 | Exempt | Individual | Bus Rolling Stock | 11.12.01 | MPO CMAQ | 2029 | $5,771,071.00 | $12,904,474.00 | |
| 125608 | Southwest Ohio Regional Transit Authority | HAM | SORTA FY29 Capital | SORTA OKI-attributable capital funding FY2029 | Exempt | Individual | Bus Rolling Stock | 11.12.04 | Local | 2029 | $1,314,409.00 | $12,904,474.00 | |
| 125608 | Southwest Ohio Regional Transit Authority | HAM | SORTA FY29 Capital | SORTA OKI-attributable capital funding FY2029 | Exempt | Individual | Bus Rolling Stock | 11.12.04 | MPO STBG | 2029 | $1,971,613.00 | $12,904,474.00 | |
| 125609 | Butler County Regional Transit Authority | HAM | BCRTA FY29 Capital | BCRTA OKI Attributable Capital Projects (CMAQ) FY2029 | Exempt | Individual | Bus Rolling Stock | 11.12.02 | Local | 2029 | $1,500,000.00 | $7,500,000.00 | |
| 125609 | Butler County Regional Transit Authority | HAM | BCRTA FY29 Capital | BCRTA OKI Attributable Capital Projects (CMAQ) FY2029 | Exempt | Individual | Bus Rolling Stock | 11.12.02 | MPO CMAQ | 2029 | $6,000,000.00 | $7,500,000.00 | |
| 125978 | Butler County Regional Transit Authority | BUT | BCRTA 2027 Capital | BCRTA 2027 Capital Projects ODOT Administered OTP2 Flex & GRF (STBG, CRP) | Exempt | Individual | Bus Rolling Stock | 11.12.04 | 5307 | 2027 | $3,183,536.00 | $6,402,835.00 | |
| 125978 | Butler County Regional Transit Authority | BUT | BCRTA 2027 Capital | BCRTA 2027 Capital Projects ODOT Administered OTP2 Flex & GRF (STBG, CRP) | Exempt | Individual | Bus Rolling Stock | 11.12.04 | Local | 2027 | $636,707.00 | $6,402,835.00 | |
| 125978 | Butler County Regional Transit Authority | BUT | BCRTA 2027 Capital | BCRTA 2027 Capital Projects ODOT Administered OTP2 Flex & GRF (STBG, CRP) | Exempt | Individual | 2 | Bus Rolling Stock | 11.12.04 | 5339 (Non-ODOT) | 2027 | $354,552.00 | $6,402,835.00 |
| 125978 | Butler County Regional Transit Authority | BUT | BCRTA 2027 Capital | BCRTA 2027 Capital Projects ODOT Administered OTP2 Flex & GRF (STBG, CRP) | Exempt | Individual | 2 | Bus Rolling Stock | 11.12.04 | Local | 2027 | $70,910.00 | $6,402,835.00 |
| 125978 | Butler County Regional Transit Authority | HAM | BCRTA 2027 Capital | BCRTA 2027 Capital Projects ODOT Administered OTP2 Flex & GRF (STBG, CRP) | Exempt | Individual | Bus Support Equip / Facilities | 11.42.07 | ODOT Flex | 2027 | $656,000.00 | $6,402,835.00 | |
| 125978 | Butler County Regional Transit Authority | HAM | BCRTA 2027 Capital | BCRTA 2027 Capital Projects ODOT Administered OTP2 Flex & GRF (STBG, CRP) | Exempt | Individual | Bus Support Equip / Facilities | 11.42.07 | State | 2027 | $164,000.00 | $6,402,835.00 | |
| 125978 | Butler County Regional Transit Authority | HAM | BCRTA 2027 Capital | BCRTA 2027 Capital Projects ODOT Administered OTP2 Flex & GRF (STBG, CRP) | Exempt | Individual | Bus Support Equip / Facilities | 11.42.20 | ODOT Flex | 2027 | $192,000.00 | $6,402,835.00 | |
| 125978 | Butler County Regional Transit Authority | HAM | BCRTA 2027 Capital | BCRTA 2027 Capital Projects ODOT Administered OTP2 Flex & GRF (STBG, CRP) | Exempt | Individual | Bus Support Equip / Facilities | 11.42.20 | State | 2027 | $48,000.00 | $6,402,835.00 | |
| 125978 | Butler County Regional Transit Authority | HAM | BCRTA 2027 Capital | BCRTA 2027 Capital Projects ODOT Administered OTP2 Flex & GRF (STBG, CRP) | Exempt | Individual | 1 | Bus Rolling Stock | 11.12.04 | 5307 | 2027 | $292,750.00 | $6,402,835.00 |
| 125978 | Butler County Regional Transit Authority | HAM | BCRTA 2027 Capital | BCRTA 2027 Capital Projects ODOT Administered OTP2 Flex & GRF (STBG, CRP) | Exempt | Individual | 1 | Bus Rolling Stock | 11.12.04 | Local | 2027 | $48,188.00 | $6,402,835.00 |
| 125978 | Butler County Regional Transit Authority | HAM | BCRTA 2027 Capital | BCRTA 2027 Capital Projects ODOT Administered OTP2 Flex & GRF (STBG, CRP) | Exempt | Individual | 1 | Bus Rolling Stock | 11.12.04 | State | 2027 | $25,000.00 | $6,402,835.00 |
| 125978 | Butler County Regional Transit Authority | HAM | BCRTA 2027 Capital | BCRTA 2027 Capital Projects ODOT Administered OTP2 Flex & GRF (STBG, CRP) | Exempt | Individual | 4 | Bus Rolling Stock | 11.12.04 | ODOT Flex | 2027 | $584,952.00 | $6,402,835.00 |
| 125978 | Butler County Regional Transit Authority | HAM | BCRTA 2027 Capital | BCRTA 2027 Capital Projects ODOT Administered OTP2 Flex & GRF (STBG, CRP) | Exempt | Individual | 4 | Bus Rolling Stock | 11.12.04 | State | 2027 | $146,240.00 | $6,402,835.00 |
| 126134 | Southwest Ohio Regional Transit Authority | HAM | 26-29 SORTA Capital | 2027-2029 Capital | Exempt | Individual | Bus Support Equip / Facilities | 11.42.09 | Local | 2027 | $3,500,000.00 | $3,500,000.00 | |
| 126429 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026-2029 CDS Projects | 2026-2029 Congressionally Directed Spending Projects | Exempt | Individual | Bus Support Equip / Facilities | 11.42.09 | Discretionary - CPF | 2028 | $2,800,000.00 | $3,500,000.00 | |
| 126429 | Southwest Ohio Regional Transit Authority | HAM | SORTA 2026-2029 CDS Projects | 2026-2029 Congressionally Directed Spending Projects | Exempt | Individual | Bus Support Equip / Facilities | 11.42.09 | Local | 2028 | $700,000.00 | $3,500,000.00 | |
| 126680 | Butler County Regional Transit Authority | BUT | BCRTA 2027 5307 Capital Projects | BCRTA 2027 Capital Projects 5307 Federal Flex | Exempt | Individual | Bus Rolling Stock | 11.18.15 | Local | 2027 | $445,000.00 | $2,225,000.00 | |
| 126680 | Butler County Regional Transit Authority | BUT | BCRTA 2027 5307 Capital Projects | BCRTA 2027 Capital Projects 5307 Federal Flex | Exempt | Individual | Bus Rolling Stock | 11.18.15 | ODOT Flex | 2027 | $1,780,000.00 | $2,225,000.00 | |
| 126730 | Clermont County | CLE, HAM | SFY2027 CTC PM | SFY2027 Clermont PM OTP2 (GRF) | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2027 | $6,250.00 | $31,250.00 | |
| 126730 | Clermont County | CLE, HAM | SFY2027 CTC PM | SFY2027 Clermont PM OTP2 (GRF) | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | ODOT Flex | 2027 | $25,000.00 | $31,250.00 | |
| 126778 | Cincinnati, City of | HAM | SFY2027 ODOT Capital Projects | SFY2027 ODOT Administered Capital projects. Federal only, no state funding | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | Local | 2027 | $159,457.00 | $797,282.00 | |
| 126778 | Cincinnati, City of | HAM | SFY2027 ODOT Capital Projects | SFY2027 ODOT Administered Capital projects. Federal only, no state funding | Exempt | Individual | Other Capital Items (Bus) | 11.7A.00 | ODOT Flex | 2027 | $637,825.00 | $797,282.00 | |
| 126964 | Southwest Ohio Regional Transit Authority | HAM | SORTA BRT READING RD CORRIDOR | Reading Road Corridor BRT Planned funding to include discretionary grants and local funding | Exempt | Individual | Guideway & Track Elements | 14.01.10 | Local | 2027 | $46,294,000.00 | $166,785,000.00 | |
| 126964 | Southwest Ohio Regional Transit Authority | HAM | SORTA BRT READING RD CORRIDOR | Reading Road Corridor BRT Planned funding to include discretionary grants and local funding | Exempt | Individual | New Start Rolling Stock | 13.13.06 | Local | 2027 | $37,186,000.00 | $166,785,000.00 | |
| 126964 | Southwest Ohio Regional Transit Authority | HAM | SORTA BRT READING RD CORRIDOR | Reading Road Corridor BRT Planned funding to include discretionary grants and local funding | Exempt | Individual | Professional Services | 14.08.80 | Local | 2027 | $34,851,000.00 | $166,785,000.00 | |
| 126964 | Southwest Ohio Regional Transit Authority | HAM | SORTA BRT READING RD CORRIDOR | Reading Road Corridor BRT Planned funding to include discretionary grants and local funding | Exempt | Individual | ROW, Land, Existing Improvements | 14.06.60 | Local | 2027 | $2,680,000.00 | $166,785,000.00 | |
| 126964 | Southwest Ohio Regional Transit Authority | HAM | SORTA BRT READING RD CORRIDOR | Reading Road Corridor BRT Planned funding to include discretionary grants and local funding | Exempt | Individual | Sitework & Special Conditions | 14.04.40 | Local | 2027 | $8,237,000.00 | $166,785,000.00 | |
| 126964 | Southwest Ohio Regional Transit Authority | HAM | SORTA BRT READING RD CORRIDOR | Reading Road Corridor BRT Planned funding to include discretionary grants and local funding | Exempt | Individual | Stations, Stops, Term, Intmdl | 14.02.20 | Local | 2027 | $20,333,000.00 | $166,785,000.00 | |
| 126964 | Southwest Ohio Regional Transit Authority | HAM | SORTA BRT READING RD CORRIDOR | Reading Road Corridor BRT Planned funding to include discretionary grants and local funding | Exempt | Individual | Systems | 14.05.50 | Local | 2027 | $5,247,000.00 | $166,785,000.00 | |
| 126964 | Southwest Ohio Regional Transit Authority | HAM | SORTA BRT READING RD CORRIDOR | Reading Road Corridor BRT Planned funding to include discretionary grants and local funding | Exempt | Individual | Unallocated Contingency | 14.09.90 | Local | 2027 | $11,957,000.00 | $166,785,000.00 | |
| 126966 | Southwest Ohio Regional Transit Authority | HAM | SORTA BRT HAMILTON ROAD CORRIDOR | Hamilton Road Corridor BRT Planned funding include discretionary grants and local funding | Exempt | Individual | Guideway & Track Elements | 14.01.10 | Local | 2027 | $45,554,000.00 | $171,583,000.00 | |
| 126966 | Southwest Ohio Regional Transit Authority | HAM | SORTA BRT HAMILTON ROAD CORRIDOR | Hamilton Road Corridor BRT Planned funding include discretionary grants and local funding | Exempt | Individual | New Start Rolling Stock | 13.13.06 | Local | 2027 | $51,317,000.00 | $171,583,000.00 | |
| 126966 | Southwest Ohio Regional Transit Authority | HAM | SORTA BRT HAMILTON ROAD CORRIDOR | Hamilton Road Corridor BRT Planned funding include discretionary grants and local funding | Exempt | Individual | Professional Services | 14.08.80 | Local | 2027 | $31,802,000.00 | $171,583,000.00 | |
| 126966 | Southwest Ohio Regional Transit Authority | HAM | SORTA BRT HAMILTON ROAD CORRIDOR | Hamilton Road Corridor BRT Planned funding include discretionary grants and local funding | Exempt | Individual | ROW, Land, Existing Improvements | 14.06.60 | Local | 2027 | $2,421,000.00 | $171,583,000.00 | |
| 126966 | Southwest Ohio Regional Transit Authority | HAM | SORTA BRT HAMILTON ROAD CORRIDOR | Hamilton Road Corridor BRT Planned funding include discretionary grants and local funding | Exempt | Individual | Sitework & Special Conditions | 14.04.40 | Local | 2027 | $6,812,000.00 | $171,583,000.00 | |
| 126966 | Southwest Ohio Regional Transit Authority | HAM | SORTA BRT HAMILTON ROAD CORRIDOR | Hamilton Road Corridor BRT Planned funding include discretionary grants and local funding | Exempt | Individual | Stations, Stops, Term, Intmdl | 14.02.20 | Local | 2027 | $17,026,000.00 | $171,583,000.00 | |
| 126966 | Southwest Ohio Regional Transit Authority | HAM | SORTA BRT HAMILTON ROAD CORRIDOR | Hamilton Road Corridor BRT Planned funding include discretionary grants and local funding | Exempt | Individual | Systems | 14.05.50 | Local | 2027 | $4,371,000.00 | $171,583,000.00 | |
| 126966 | Southwest Ohio Regional Transit Authority | HAM | SORTA BRT HAMILTON ROAD CORRIDOR | Hamilton Road Corridor BRT Planned funding include discretionary grants and local funding | Exempt | Individual | Unallocated Contingency | 14.09.90 | Local | 2027 | $12,280,000.00 | $171,583,000.00 | |
| 202602 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY26 Bus Replacements | Replacement of ten 40' buses | Exempt | 10 | 11.12.01 | 5307-Urban Formula | 2026 | $4,960,000.00 | |||
| 202602 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY26 Bus Replacements | Replacement of ten 40' buses | Exempt | 10 | 11.12.01 | KYTC Match/TDC | 2026 | $620,000.00 | |||
| 202602 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY26 Bus Replacements | Replacement of ten 40' buses | Exempt | 10 | 11.12.01 | Local | 2026 | $620,000.00 | |||
| 202604 | Transit Authority of Northern Kentucky | Boone, Campbell, and Kenton counties | FY26 ADP Software | ADP Software | Exempt | 11.42.08 | 5307-Urban Formula | 2026 | $136,000.00 | ||||
| 202604 | Transit Authority of Northern Kentucky | Boone, Campbell, and Kenton counties | FY26 ADP Software | ADP Software | Exempt | 11.42.08 | Local | 2026 | $34,000.00 | ||||
| 202605 | Transit Authority of Northern Kentucky | Boone, Campbell, and Kenton counties | FY26 Misc Equipment | Acquisition, Misc Equipment | Exempt | 11.42.20 | 5307-Urban Formula | 2026 | $336,000.00 | ||||
| 202605 | Transit Authority of Northern Kentucky | Boone, Campbell, and Kenton counties | FY26 Misc Equipment | Acquisition, Misc Equipment | Exempt | 11.42.20 | Local | 2026 | $84,000.00 | ||||
| 202606 | Transit Authority of Northern Kentucky | Boone, Campbell, and Kenton counties | FY26 Planning Study | Transportation Improvement Program Planning Study | Exempt | 0 | 44.25.01 | 5307-Urban Formula | 2026 | $260,000.00 | |||
| 202606 | Transit Authority of Northern Kentucky | Boone, Campbell, and Kenton counties | FY26 Planning Study | Transportation Improvement Program Planning Study | Exempt | 0 | 44.25.01 | Local | 2026 | $65,000.00 | |||
| 202614 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY26 ADP Hardware | ADP Hardware | Exempt | 11.42.07 | 5307-Urban Formula | 2026 | $240,000.00 | ||||
| 202614 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY26 ADP Hardware | ADP Hardware | Exempt | 11.42.07 | KYTC Match/TDC | 2026 | $30,000.00 | ||||
| 202614 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY26 ADP Hardware | ADP Hardware | Exempt | 11.42.07 | Local/Other | 2026 | $30,000.00 | ||||
| 202616 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY26 Surveillance/Security Equipment | Surveillance/Security Equipment | Exempt | 11.32.07 | 5307-Urban Formula | 2026 | $60,000.00 | ||||
| 202616 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY26 Surveillance/Security Equipment | Surveillance/Security Equipment | Exempt | 11.32.07 | KYTC Match/TDC | 2026 | $7,500.00 | ||||
| 202616 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY26 Surveillance/Security Equipment | Surveillance/Security Equipment | Exempt | 11.32.07 | Local | 2026 | $7,500.00 | ||||
| 202620 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY26 Operating | Operating | Exempt | 30.09.00 | Local/Other | 2026 | $26,000,000.00 | ||||
| 202702 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY27 Replacement of Demand-Response Buses | Replacement of Six Demand-Response Buses | Exempt | 6 | 11.12.04 | KYTC Match | 2027 | $377,380.00 | |||
| 202702 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY27 Replacement of Demand-Response Buses | Replacement of Six Demand-Response Buses | Exempt | 6 | 11.12.04 | OKI-SNK | 2027 | $1,509,520.00 | |||
| 202711 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY27 Preventive Maintenance | Preventive Maintenance | Exempt | 12 | 11.7A.00 | 5307-Urban Formula | 2027 | $3,200,000.00 | |||
| 202711 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY27 Preventive Maintenance | Preventive Maintenance | Exempt | 12 | 11.7A.00 | KYTC Match | 2027 | $800,000.00 | |||
| 202714 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY28 ADP Hardware | ADP Hardware | Exempt | 11.42.07 | 5307-Urban Formula | 2028 | $240,000.00 | ||||
| 202714 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY28 ADP Hardware | ADP Hardware | Exempt | 11.42.07 | KYTC Match | 2028 | $60,000.00 | ||||
| 202716 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY28 Surveillance/Security Equipment | Surveillance/Security Equipment | Exempt | 11.32.07 | 5307-Urban Formula | 2028 | $60,000.00 | ||||
| 202716 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY28 Surveillance/Security Equipment | Surveillance/Security Equipment | Exempt | 11.32.07 | KYTC Match | 2028 | $15,000.00 | ||||
| 202720 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY27 Operating | Operating | Exempt | 30.09.00 | Local/Other | 2027 | $26,000,000.00 | ||||
| 202721 | Transit Authority of Northern Kentucky | Boone, Campbell, and Kenton counties | TANK Bus Replacements (Hybrid) | Bus Replacement with 4 full-size hybrid electric buses | Exempt | 8 | 11.12.01 | 5307-Urban Formula | 2028 | $3,247,345.00 | |||
| 202721 | Transit Authority of Northern Kentucky | Boone, Campbell, and Kenton counties | TANK Bus Replacements (Hybrid) | Bus Replacement with 4 full-size hybrid electric buses | Exempt | 8 | 11.12.01 | KYTC Match | 2028 | $1,600,000.00 | |||
| 202721 | Transit Authority of Northern Kentucky | Boone, Campbell, and Kenton counties | TANK Bus Replacements (Hybrid) | Bus Replacement with 4 full-size hybrid electric buses | Exempt | 8 | 11.12.01 | OKI-SNK | 2028 | $3,152,655.00 | |||
| 202722 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY27 Software | Software | Exempt | 11.42.08 | 5307-Urban Formula | 2027 | $88,716.00 | ||||
| 202722 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY27 Software | Software | Exempt | 11.42.08 | KYTC Match | 2027 | $22,179.00 | ||||
| 202723 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY27 Misc. Equipment | Acquisition of Miscellaneous Equipment | Exempt | 11.42.20 | 5307-Urban Formula | 2027 | $16,000.00 | ||||
| 202723 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY27 Misc. Equipment | Acquisition of Miscellaneous Equipment | Exempt | 11.42.20 | KYTC Match | 2027 | $4,000.00 | ||||
| 202724 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY27 Rehab/Renovation | Facility Rehab & Renovation | Exempt | 11.44.03 | 5307-Urban Formula | 2027 | $947,660.00 | ||||
| 202724 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY27 Rehab/Renovation | Facility Rehab & Renovation | Exempt | 11.44.03 | KYTC Match | 2027 | $236,915.00 | ||||
| 202801 | Transit Authority of Northern Kentucky | Boone, Campbell, and Kenton counties | TANK Microtransit Vehicle Replacement & Expansion | Purchase of 18 vehicles to support the TANK+ microtransit program | Exempt | 18 | 11.13.04 | Local | 2028 | $864,000.00 | |||
| 202801 | Transit Authority of Northern Kentucky | Boone, Campbell, and Kenton counties | TANK Microtransit Vehicle Replacement & Expansion | Purchase of 18 vehicles to support the TANK+ microtransit program | Exempt | 18 | 11.13.04 | Local | 2029 | $0.00 | |||
| 202801 | Transit Authority of Northern Kentucky | Boone, Campbell, and Kenton counties | TANK Microtransit Vehicle Replacement & Expansion | Purchase of 18 vehicles to support the TANK+ microtransit program | Exempt | 18 | 11.13.04 | OKI-SNK | 2028 | $3,456,000.00 | |||
| 202801 | Transit Authority of Northern Kentucky | Boone, Campbell, and Kenton counties | TANK Microtransit Vehicle Replacement & Expansion | Purchase of 18 vehicles to support the TANK+ microtransit program | Exempt | 18 | 11.13.04 | OKI-SNK | 2029 | $0.00 | |||
| 202802 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY28 Preventive Maintenance | Preventive Maintenance | Exempt | 12 | 11.7A.00 | 5307-Urban Formula | 2028 | $3,040,000.00 | |||
| 202802 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY28 Preventive Maintenance | Preventive Maintenance | Exempt | 12 | 11.7A.00 | Local | 2028 | $760,000.00 | |||
| 202820 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY28 Operating | Operating | Exempt | 30.09.00 | Local/Other | 2028 | $26,000,000.00 | ||||
| 202901 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton counties | FY29 TANK Replacement of Fixed Route Buses | Replacement of Fixed-Route Buses | Exempt | 5 | 11.12.01 | Local Match | 2029 | $787,935.00 | |||
| 202901 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton counties | FY29 TANK Replacement of Fixed Route Buses | Replacement of Fixed-Route Buses | Exempt | 5 | 11.12.01 | OKI-SNK | 2029 | $3,151,738.00 | |||
| 202920 | Transit Authority of Northern Kentucky | Boone, Campbell and Kenton | FY29 Operating | Operating | Exempt | 30.09.00 | Local/Other | 2029 | $26,000,000.00 |