Overview
Completed December 2025
In 2025, OKI Regional Council of Governments partnered with six of the region’s publicly owned general aviation (GA) airports to create an Advanced Air Mobility (AAM) Electrical Infrastructure Plan for each facility. These strategic implementation roadmaps offer a phased plan to electrify each of them by 2050.
Each roadmap analyzes existing conditions and anticipated energy demand across specific airport assets, such as landside vehicle electrification and anticipated airside AAM operations. Considerations include providing resilience through renewable energy and on-site storage, conducting detailed environmental assessments, and developing preliminary cost estimates and funding strategies.
The roadmaps convert technical designs into actionable guidance for securing funding, getting regulatory approvals, and sequencing AAM infrastructure to prepare the following airports for the future.