2018

Home/2018

Conner Road Multi-Use Path

2019-05-16T17:07:16-04:00

Construct a 10’ wide multi-use path from KY237 (North Bend Road) to KY 20 (Petersburg Road), a distance of 1.35 miles. Includes a sidewalk connection on KY 20 from Merrie Drive to Conner Road, a distance of 730 feet. This path section is a segment of the overall regional CVG Trail Loop.

Amount Funded: $1,012,500

West Covington Riverfront Commons – Shared Use Path

2019-05-16T17:07:16-04:00

Construct an 8’ wide concrete multi-use path along the Ohio River using existing public right of way/city-owned property between River Road (city street) and the existing shared use path located on the north side of the floodwall, just west of the Brent Spence Bridge.

Amount Funded: $714,530

Improved Access to NKU Mixed-Use Development

2019-05-16T17:07:16-04:00

The project is located near NKU's campus on KY SR 2238 (Louie B. Nunn Drive) and on US-27. Includes transit super stop, turn lanes on Nunn, upgrade and reconstruction of old sidewalks and new pedestrian/bicycle path linking the NKU campus to the new development.

Amount Funded: $861,704

SR 129/Liberty Way Modification Phase 2

2019-05-16T17:07:17-04:00

Construction of new ramps from the eastern terminus of SR 129 to local road network at Cox Road. New roundabout at Cox Road. Removal of nearby SR 129 connections to Liberty Way, eliminating weaving issues.

Amount Funded: $5,961,500

Go to Top