OKI CEO Mark Policinski issued the following statements ahead of Friday’s groundbreaking for the long-awaited Brent Spence Bridge Corridor Project. The invite-only ceremony will take place at 1 p.m. at Duke Energy Lot, 655 W. Mehring Way.
“When ceremonial shovels turn over earth on Friday, this once-in-a-lifetime project will do far more than enhance freight movement and daily commutes. It will expand access to jobs, transit and green spaces. Much more than a bridge, this moment marks a bold step toward a more connected, resilient and prosperous future for our entire region.”
Policinski noted that OKI has championed the project for decades:
“Since the end of the last century, OKI has been the most vocal, most consistent and most successful advocate for a new Brent Spence Bridge. Today, our entire region can celebrate a vibrant new connection, not only across the Ohio River, but to a future defined by greater safety, cleaner air and shared prosperity. This bridge will stand into the next century, and the 2.2 million people who call this region home, along with generations to come, will see their lives made immeasurably better.”
OKI’s long-standing support for the project is grounded in extensive analysis and data. The agency’s traffic modeling shows the new companion bridge will relieve the Brent Spence bottleneck and reduce congestion throughout Greater Cincinnati and Northern Kentucky, including chronic backups on I-71 through Kenwood, I-471 through Fort Thomas, and I-75 stretching far north of the river.
The Brent Spence Bridge Corridor Project is essential for both immediate relief and long-term demand. The bridge was built to carry 80,000 vehicles a day but now handles 170,000, including ten times the truck traffic it was designed for in 1963. OKI’s most recent forecasts show average daily traffic rising to 217,400 by 2040 and 228,300 by 2050, underscoring the urgent need for expanded capacity and modernized infrastructure.
“We’ve been precariously relying on a 1963 bridge to meet 21st-century demands, and the math simply doesn’t work anymore. Traffic has already doubled, freight volumes have exploded and our forecasts show even greater pressure in the years ahead. This project delivers the immediate relief people need now, while building the capacity and resilience our region will rely on well into the future.”
That level of strain has made the Brent Spence Bridge one of the nation’s top five freight bottlenecks for nearly two decades. The corridor includes interstate segments with crash rates up to five times higher than comparable roadways, making it among the most dangerous highway stretches in Ohio and Kentucky.
Policinski, who has been a tenacious advocate for a new bridge since joining OKI in 2003, also emphasized the project’s engineering vision, noting the design represents far more than an infrastructure upgrade.
“These plans are both a marvel of engineering and a clear declaration of where we’re headed as a region. This technologically advanced structure won’t just ease congestion and improve safety; it will redefine how infrastructure connects people, economies and communities on both sides of the river. And it will set a new national standard for what modern infrastructure can and should be.”

