Other 536 Segments

/Other 536 Segments
Other 536 Segments 2016-12-08T15:02:23+00:00

PREVIOUS, RELATED STUDY: “The 2000 Study”

In December 2000, GRW Consultants prepared a report for the Kentucky Transportation Cabinet entitled KY 237-Camp Ernst Road-KY 536 Corridor Improvements: Boone, Kenton, and Campbell Counties (Document 1 of 2 and Document 2 of 2). This document contains the culmination of all roadway improvement and environmental studies for this KY 237-Camp Ernst Road-KY 536 series of east-west roadways through Northern Kentucky.  “The primary objective of the project was to study and evaluate details of alternate roadway alignments such that a right-of-way corridor may be reserved for the appropriate roadway sections that will improve safety and provide adequate capacity for the year 2025 traveling public.”  As a result of this 2000 Study, preferred alternatives or improvement recommendations were developed for EVERY section of the corridor EXCEPT the section of KY 536 between KY 17 and the Kenton/Campbell County Line.  It is for this reason, to identify a preferred alternative for this final, missing piece of the puzzle (KY 536 between KY 17 and the Kenton/Campbell County Line) that the KY 536 Scoping Study is currently being performed. Please scroll down for information on segments of the KY 536 corridor which are outside of the current KY 536 Scoping Study area.

Click here for: Cost Estimates for Other KY 536 Segment Phases

KY 536 from Hathaway Rd (west of Old Union Rd) to I-71/75

KYTC Project Number 6-158.00 Boone County

STATUS:  This project is in right-of-way planning and acquisition phase.  For further information, please contact the Kentucky Transportation Cabinet District 6 Project Manager at Carol.Callan-Ramler@ky.gov or 859-341-2700. The following files are quite large and require extra time to open.

KY 536 from Tiburon (west of I-71/75) to US 25 (Dixie Hwy)

KYTC Project Number 6-14.00 Boone County / KY 536 Mt. Zion Road Interchange Project

STATUS:  This project is in the preliminary design phase.  Follow its progress through this website http://75crossings.com/ky-536/.

KY 536  from the Norfolk Southern RR  Bridge to KY 17

KYTC Project Number 6-162.00 Boone and Kenton counties

STATUS:  This project is in the preliminary design phase and has not yet reached the right-of-way phase, so properties are not currently being acquired. For further information, please contact the Kentucky Transportation Cabinet District 6 Project Manager atNichole.Boden@ky.gov or 859-341-2700.

KY 536 from KY 17 to the Kenton/Campbell County Line

STATUS:  OKI completed the KY 536 Scoping Study and determined a preferred alternative.

KY  536 from Kenton/Campbell County Line to US 27

STATUS:  COMPLETED

KY 536  from US 27 to KY 9 (AA Highway)

KYTC Project Number 6-352.00 Campbell County

STATUS:  This project is in the preliminary design phase.  For further information, please contact the Kentucky Transportation Cabinet District 6 Project Manager at Mike.Bezold@ky.gov or 859-341-2700.

Translate »
X